{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,11,21]],"date-time":"2025-11-21T18:01:25Z","timestamp":1763748085558},"reference-count":37,"publisher":"Walter de Gruyter GmbH","issue":"1","license":[{"start":{"date-parts":[[2019,12,21]],"date-time":"2019-12-21T00:00:00Z","timestamp":1576886400000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/creativecommons.org\/licenses\/by\/4.0"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2020,1,28]]},"abstract":"<jats:title>Abstract<\/jats:title>\n               <jats:p>Small-scale manufacturing often relies on flexible production systems that can cope with frequent changes of products and equipment. Transports are a significant part of the production flow, especially in the domain of large and heavy workpieces that requires explicit planning to avoid unnecessary delays. This contribution takes a detailed look at how to create feasible integrated schedules within a decentralised or even heterarchical architecture and which information the agents have to exchange. These schedules incorporate constraints such as the blocking-constraint. They also consider dynamic setup and operation durations while finding a good-enough solution. The proposed agent-based solution applies to a wide variety of scheduling problems and reveals positive properties in terms of scalability and reconfigurability.<\/jats:p>","DOI":"10.1515\/auto-2019-0105","type":"journal-article","created":{"date-parts":[[2019,12,21]],"date-time":"2019-12-21T09:04:45Z","timestamp":1576919085000},"page":"15-31","source":"Crossref","is-referenced-by-count":15,"title":["On agent-based decentralized and integrated scheduling for small-scale manufacturing"],"prefix":"10.1515","volume":"68","author":[{"given":"Felix","family":"Gehlhoff","sequence":"first","affiliation":[{"name":"Helmut Schmidt University , Hamburg , Germany"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Alexander","family":"Fay","sequence":"additional","affiliation":[{"name":"Helmut Schmidt University , Hamburg , Germany"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"374","published-online":{"date-parts":[[2019,12,21]]},"reference":[{"key":"2021062112572141844_j_auto-2019-0105_ref_001_w2aab3b7d694b1b6b1ab2ab1Aa","doi-asserted-by":"crossref","unstructured":"P. Leit\u00e3o: Agent-based distributed manufacturing control: A state-of-the-art survey. Engineering Applications of Artificial Intelligence, Vol.\u200922 (7), 2009, pp.\u2009979\u2013991.","DOI":"10.1016\/j.engappai.2008.09.005"},{"key":"2021062112572141844_j_auto-2019-0105_ref_002_w2aab3b7d694b1b6b1ab2ab2Aa","doi-asserted-by":"crossref","unstructured":"P. Leit\u00e3o, N. Rodrigues, J. Barbosa, C. Turrin, A. Pagani: Intelligent products: The grace experience. Control Engineering Practice, Vol.\u200942, 2015, S.\u200995\u2013105.","DOI":"10.1016\/j.conengprac.2015.05.001"},{"key":"2021062112572141844_j_auto-2019-0105_ref_003_w2aab3b7d694b1b6b1ab2ab3Aa","unstructured":"T. Bauernhansl, M. ten Hompel, B. Vogel-Heuser: Industrie 4.0 in Produktion, Automatisierung und Logistik \u2013 Anwendung, Technologien, Migration. Springer, Wiesbaden, 2017."},{"key":"2021062112572141844_j_auto-2019-0105_ref_004_w2aab3b7d694b1b6b1ab2ab4Aa","unstructured":"Platform Industrie 4.0: Platform Industrie 4.0 Aspects of the Research Roadmap in Application Scenarios I4.0. Berlin, Germany, 2016."},{"key":"2021062112572141844_j_auto-2019-0105_ref_005_w2aab3b7d694b1b6b1ab2ab5Aa","doi-asserted-by":"crossref","unstructured":"F. Thiesse, E. Fleisch: On the value of location information to lot scheduling in complex manufacturing processes. International Journal of Production Economics, Vol.\u2009112 (2), 2008, pp.\u2009532\u2013547.","DOI":"10.1016\/j.ijpe.2007.05.006"},{"key":"2021062112572141844_j_auto-2019-0105_ref_006_w2aab3b7d694b1b6b1ab2ab6Aa","doi-asserted-by":"crossref","unstructured":"P. Nyhuis, J. Mayer et al. (Hrsg.): Aktuellen Herausforderungen der Produktionsplanung und -steuerung mittels Industrie 4.0 begegnen: Studienergebnisse. Garbsen: PZH Verlag, October 2016.","DOI":"10.3139\/9783446449893.002"},{"key":"2021062112572141844_j_auto-2019-0105_ref_007_w2aab3b7d694b1b6b1ab2ab7Aa","unstructured":"G. Schuh, P. Nyhuis, C. Reuter, A. Hauptvogel, S. Schmitz, J. Nywlt, F. Brambring, F. Schulte, J. Hansen: Produktionsdaten als Enabler f\u00fcr Industrie 4.0: Gemeinsame Studie der produktionstechnischen Institute IFA, IPMT, Fraunhofer IWU und WZL. wt Werkstattstechnik online, Vol.\u2009105 (4), 2015, pp.\u2009200\u2013203."},{"key":"2021062112572141844_j_auto-2019-0105_ref_008_w2aab3b7d694b1b6b1ab2ab8Aa","doi-asserted-by":"crossref","unstructured":"I.N. Pujawan, A.U. Smart: Factors affecting schedule instability in manufacturing companies. International Journal of Production Research, Vol.\u200950 (8), 2012, pp.\u20092252\u20132266.","DOI":"10.1080\/00207543.2011.575095"},{"key":"#cr-split#-2021062112572141844_j_auto-2019-0105_ref_009_w2aab3b7d694b1b6b1ab2ab9Aa.1","doi-asserted-by":"crossref","unstructured":"W. Weng, S. Fujimura: Flexible Flow Shop Scheduling by Intelligent Multi-agents. In: Ormandjieva (Hrsg.): Eighth ACIS International Conference on Software Engineering Research, Management and Applications (SERA), 2010: 24-26 May 2010, Montreal, Canada","DOI":"10.1109\/SERA.2010.24"},{"key":"#cr-split#-2021062112572141844_j_auto-2019-0105_ref_009_w2aab3b7d694b1b6b1ab2ab9Aa.2","unstructured":"proceedings. Piscataway, NJ: IEEE, pp.\u2009113-120, 2010."},{"key":"2021062112572141844_j_auto-2019-0105_ref_010_w2aab3b7d694b1b6b1ab2ac10Aa","unstructured":"J.-S. Liu, K.\u2009P. Sycara: Multiagent Coordination in Tightly Coupled Task Scheduling. In: Tokoro (Hrsg.): Proc. Second International Conference on Multi-Agent Systems, Dec 10\u201313, 1996, Kyoto, Japan. Menlo Park, Calif.: AAAI Press, 1996."},{"key":"2021062112572141844_j_auto-2019-0105_ref_011_w2aab3b7d694b1b6b1ab2ac11Aa","doi-asserted-by":"crossref","unstructured":"A. Mascis, D. Pacciarelli: Job-shop scheduling with blocking and no-wait constraints. European Journal of Operational Research, Vol.\u2009143 (3), 2002, pp.\u2009498\u2013517.","DOI":"10.1016\/S0377-2217(01)00338-1"},{"key":"2021062112572141844_j_auto-2019-0105_ref_012_w2aab3b7d694b1b6b1ab2ac12Aa","doi-asserted-by":"crossref","unstructured":"F. Gehlhoff, H. Nabizada, A. Fay: Optimization of multi-agent auctioning processes in flexible production networks. In: IEEE 17th International Conference of Industrial Informatics INDIN 2019, July 22\u201325, 2019, Helsinki, Finland.","DOI":"10.1109\/INDIN41052.2019.8972115"},{"key":"2021062112572141844_j_auto-2019-0105_ref_013_w2aab3b7d694b1b6b1ab2ac13Aa","unstructured":"G. Bencheikh, A. Letouzey, X. Desforges: Scheduling of production and maintenance activities using multi-agents system. In: 2018 IEEE 23rd International Conference on Emerging Technologies and Factory Automation (ETFA)."},{"key":"2021062112572141844_j_auto-2019-0105_ref_014_w2aab3b7d694b1b6b1ab2ac14Aa","doi-asserted-by":"crossref","unstructured":"A. Fazlirad, R.W. Brennan: Multiagent Manufacturing Scheduling: An Updated State of the Art Review. In: Vogel-Heuser (Hrsg.): 2018 IEEE 14th International Conference on Automation Science and Engineering (CASE): 20\u201324 Aug. 2018. Piscataway, NJ: IEEE, S.\u2009722\u2013729, 2018.","DOI":"10.1109\/COASE.2018.8560576"},{"key":"2021062112572141844_j_auto-2019-0105_ref_015_w2aab3b7d694b1b6b1ab2ac15Aa","unstructured":"M. Paolucci, R. Sacile: Agent-based manufacturing and control systems: New agile manufacturing solutions for achieving peak performance. Boca Raton Fla.: CRC Press, 2005."},{"key":"2021062112572141844_j_auto-2019-0105_ref_016_w2aab3b7d694b1b6b1ab2ac16Aa","unstructured":"M.\u2009l\u2009L. Pinedo: Scheduling. New York, NY: Springer New York, 2008."},{"key":"2021062112572141844_j_auto-2019-0105_ref_017_w2aab3b7d694b1b6b1ab2ac17Aa","doi-asserted-by":"crossref","unstructured":"W. Shen, L. Wang, Q. Hao: Agent-based distributed manufacturing process planning and scheduling: A state-of-the-art survey. IEEE Transactions on Systems, Man and Cybernetics, Part C (Applications and Reviews), Vol.\u200936 (4), 2006, pp.\u2009563\u2013577.","DOI":"10.1109\/TSMCC.2006.874022"},{"key":"2021062112572141844_j_auto-2019-0105_ref_018_w2aab3b7d694b1b6b1ab2ac18Aa","unstructured":"J. Sgall: Woeginger, Fiat (Hrsg.): Online Algorithms: The State of the Art. Vol.\u2009144. Berlin, Heidelberg: Springer Berlin Heidelberg, 1998 (Lecture notes in computer science Online algorithms)."},{"key":"2021062112572141844_j_auto-2019-0105_ref_019_w2aab3b7d694b1b6b1ab2ac19Aa","doi-asserted-by":"crossref","unstructured":"N.R. Jennings, S. Bussmann: Agent-based control systems: Why are they suited to engineering complex systems? IEEE Control Systems, Vol.\u200923 (3), 2003, S.\u200961\u201373.","DOI":"10.1109\/MCS.2003.1200249"},{"key":"2021062112572141844_j_auto-2019-0105_ref_020_w2aab3b7d694b1b6b1ab2ac20Aa","doi-asserted-by":"crossref","unstructured":"M. Caridi, S. Cavalieri: Multi-agent systems in production planning and control: An overview. Production Planning & Control, Vol.\u200915 (2), 2004, pp.\u2009106\u2013118.","DOI":"10.1080\/09537280410001662556"},{"key":"2021062112572141844_j_auto-2019-0105_ref_021_w2aab3b7d694b1b6b1ab2ac21Aa","unstructured":"FIPA \u2013 Foundation for Intelligent Physical Agents, http:\/\/www.fipa.org\/repository\/standardspecs.html."},{"key":"2021062112572141844_j_auto-2019-0105_ref_022_w2aab3b7d694b1b6b1ab2ac22Aa","doi-asserted-by":"crossref","unstructured":"G.Y.-J. Lin, J.J. Solberg: Integrated Shop Floor Control Using Autonomous Agents. IIE Transactions, Vol.\u200924 (3), 1992, pp.\u200957\u201371.","DOI":"10.1080\/07408179208964224"},{"key":"2021062112572141844_j_auto-2019-0105_ref_023_w2aab3b7d694b1b6b1ab2ac23Aa","doi-asserted-by":"crossref","unstructured":"K. Kuiss, H. Pierreval, N. Mebarki: Using multi-agent architecture in FMS for dynamic scheduling. Journal of Intelligent Manufacturing, Vol.\u20098, 1997.","DOI":"10.1023\/A:1018540317470"},{"key":"2021062112572141844_j_auto-2019-0105_ref_024_w2aab3b7d694b1b6b1ab2ac24Aa","doi-asserted-by":"crossref","unstructured":"P. Sousa, C. Ramos: A dynamic scheduling holon for manufacturing orders. Journal of Intelligent Manufacturing, Vol.\u20099 (2), 1998, pp.\u2009107\u2013112.","DOI":"10.1023\/A:1008807726981"},{"key":"2021062112572141844_j_auto-2019-0105_ref_025_w2aab3b7d694b1b6b1ab2ac25Aa","doi-asserted-by":"crossref","unstructured":"P. Leit\u00e3o, F. Restivo: A holonic approach to dynamic manufacturing scheduling. Robotics and Computer-Integrated Manufacturing, Vol.\u200924 (5), 2008, pp.\u2009625\u2013634.","DOI":"10.1016\/j.rcim.2007.09.005"},{"key":"2021062112572141844_j_auto-2019-0105_ref_026_w2aab3b7d694b1b6b1ab2ac26Aa","doi-asserted-by":"crossref","unstructured":"P. Leit\u00e3o, F. Casais, F. Restivo: Holonic Manufacturing Control: A Practical Implementation. In: Camarinha-Matos (Hrsg.): Emerging solutions for future manufacturing systems: IFIP TC 5\/WG 5.5 sixth IFIP International Conference on Information Technology for Balanced Automation Systems in Manufacturing and Services, 27\u201329 September 2004, Vienna, Austria. New York: Springer Science & Business Media, Vol.\u2009159, pp.\u200933\u201344, 2005.","DOI":"10.1007\/0-387-22829-2_4"},{"key":"2021062112572141844_j_auto-2019-0105_ref_027_w2aab3b7d694b1b6b1ab2ac27Aa","doi-asserted-by":"crossref","unstructured":"J. Fischer, M. Marcos, B. Vogel-Heuser: Model-based development of a multi-agent system for controlling material flow systems. at \u2013 Automatisierungstechnik, Vol.\u200966 (5), 2018, S.\u2009438\u2013448.","DOI":"10.1515\/auto-2017-0107"},{"key":"2021062112572141844_j_auto-2019-0105_ref_028_w2aab3b7d694b1b6b1ab2ac28Aa","doi-asserted-by":"crossref","unstructured":"L.-C. Wang, S.-K. Lin: A multi-agent based agile manufacturing planning and control system. Computers & Industrial Engineering, Vol.\u200957 (2), 2009, pp.\u2009620\u2013640.","DOI":"10.1016\/j.cie.2009.05.015"},{"key":"2021062112572141844_j_auto-2019-0105_ref_029_w2aab3b7d694b1b6b1ab2ac29Aa","doi-asserted-by":"crossref","unstructured":"I. Badr, F. Schmitt, P. G\u00f6hner: Integrating Transportation Scheduling with Production Scheduling for FMS: An Agent-Based Approach. In: IEEE International Symposium on Industrial Electronics (ISIE), 2010: Bari, Italy, 4\u20137 July 2010. Piscataway, NJ: IEEE, pp.\u20093539\u20133544, 2010.","DOI":"10.1109\/ISIE.2010.5636632"},{"key":"2021062112572141844_j_auto-2019-0105_ref_030_w2aab3b7d694b1b6b1ab2ac30Aa","doi-asserted-by":"crossref","unstructured":"O.J. Shukla, G. Soni, R. Kumar, S. A: An agent-based architecture for production scheduling in dynamic job-shop manufacturing system. at \u2013 Automatisierungstechnik, Vol.\u200966 (6), 2018, S.\u2009492\u2013502.","DOI":"10.1515\/auto-2017-0119"},{"key":"2021062112572141844_j_auto-2019-0105_ref_031_w2aab3b7d694b1b6b1ab2ac31Aa","doi-asserted-by":"crossref","unstructured":"M. Klein, A. L\u00f6cklin, N. Jazdi, M. Weyrich: A negotiation based approach for agent based production scheduling. Procedia Manufacturing, Vol.\u200917, 2018, S.\u2009334\u2013341.","DOI":"10.1016\/j.promfg.2018.10.054"},{"key":"2021062112572141844_j_auto-2019-0105_ref_032_w2aab3b7d694b1b6b1ab2ac32Aa","doi-asserted-by":"crossref","unstructured":"R.G. Smith: The Contract Net Protocol: High-Level Communication and Control in a Distributed Problem Solver. IEEE Transactions on Computers, Vol.\u2009C-29, (12), 1980, pp.\u20091104\u20131118.","DOI":"10.1109\/TC.1980.1675516"},{"key":"2021062112572141844_j_auto-2019-0105_ref_033_w2aab3b7d694b1b6b1ab2ac33Aa","unstructured":"P. Leit\u00e3o, An agile and adaptive holonic architecture for manufacturing control, PhD thesis, Univ. of Porto, Portugal, 2004."},{"key":"2021062112572141844_j_auto-2019-0105_ref_034_w2aab3b7d694b1b6b1ab2ac34Aa","doi-asserted-by":"crossref","unstructured":"F. Bellifemine, G. Caire, D. Greenwood: Developing Multi-Agent Systems with JADE, Chichester 2007.","DOI":"10.1002\/9780470058411"},{"key":"2021062112572141844_j_auto-2019-0105_ref_035_w2aab3b7d694b1b6b1ab2ac35Aa","unstructured":"J. Sundermeier, F. Gehlhoff, A. Fay: Development of a simulation model to analyze the performance of decentral rescheduling algorithms in production systems. In: C. Deatcu, T. Schramm, K. Zobel (Hrsg.): Tagungsband ASIM 2018, 24. Symposium Simulationstechnik, ARGESIM Report Nr.\u200956, S.\u2009275\u2013283, 04.\u201305. October 2018, Hamburg."},{"key":"2021062112572141844_j_auto-2019-0105_ref_036_w2aab3b7d694b1b6b1ab2ac36Aa","unstructured":"A. Fay, F. Gehlhoff, M. Seitz, B. Vogel-Heuser, H. Baumg\u00e4rtel, C. Diedrich, A. L\u00fcder, T. Sch\u00f6ler, G. Sutschet, R. Verbeet: VDI-Statu Report Agents for the realisation of Industrie 4.0, Juli 2019.Platform Industrie 4.0."}],"container-title":["at - Automatisierungstechnik"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.degruyter.com\/view\/journals\/auto\/68\/1\/article-p15.xml","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/www.degruyter.com\/document\/doi\/10.1515\/auto-2019-0105\/xml","content-type":"application\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/www.degruyter.com\/document\/doi\/10.1515\/auto-2019-0105\/pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,6,21]],"date-time":"2021-06-21T19:11:16Z","timestamp":1624302676000},"score":1,"resource":{"primary":{"URL":"https:\/\/www.degruyter.com\/document\/doi\/10.1515\/auto-2019-0105\/html"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019,12,21]]},"references-count":37,"journal-issue":{"issue":"1","published-online":{"date-parts":[[2019,12,21]]},"published-print":{"date-parts":[[2020,1,28]]}},"alternative-id":["10.1515\/auto-2019-0105"],"URL":"https:\/\/doi.org\/10.1515\/auto-2019-0105","relation":{},"ISSN":["2196-677X","0178-2312"],"issn-type":[{"value":"2196-677X","type":"electronic"},{"value":"0178-2312","type":"print"}],"subject":[],"published":{"date-parts":[[2019,12,21]]}}}