{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,2,21]],"date-time":"2025-02-21T11:49:38Z","timestamp":1740138578310,"version":"3.37.3"},"reference-count":53,"publisher":"Walter de Gruyter GmbH","issue":"2-3","funder":[{"DOI":"10.13039\/501100001659","name":"Deutsche Forschungsgemeinschaft","doi-asserted-by":"publisher","award":["2153"],"award-info":[{"award-number":["2153"]}],"id":[{"id":"10.13039\/501100001659","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2019,4,24]]},"abstract":"<jats:title>Abstract<\/jats:title>\n               <jats:p>Transmission grid congestion is one of the consequences of an increasing power generation from intermittent renewable capacities. These are often installed in the periphery and have rare generation peaks. It thus becomes more complicated to ensure a balanced grid operation at all times. It is necessary to develop holistic strategies for the management of congestion that consider short and long operating horizons. This paper introduces several congestion management mechanisms along minimal analytical and numerical models. These solutions are then discussed in regard to the necessary data availability and their contribution to an improved congestion management strategy. The paper therefore contributes to the development of a research agenda at the intercept between economists and computer scientists in the area of energy informatics.<\/jats:p>","DOI":"10.1515\/itit-2019-0020","type":"journal-article","created":{"date-parts":[[2019,10,1]],"date-time":"2019-10-01T17:03:49Z","timestamp":1569949429000},"page":"73-85","source":"Crossref","is-referenced-by-count":1,"title":["Perspectives on data availability and market approaches to congestion management"],"prefix":"10.1515","volume":"61","author":[{"given":"Bent","family":"Richter","sequence":"first","affiliation":[{"name":"Karlsruhe Institute of Technology , Chair for Information and Market Engineering , Karlsruhe , Germany"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-1328-5765","authenticated-orcid":false,"given":"Philipp","family":"Staudt","sequence":"additional","affiliation":[{"name":"Karlsruhe Institute of Technology , Chair for Information and Market Engineering , Karlsruhe , Germany"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"374","published-online":{"date-parts":[[2019,10,1]]},"reference":[{"key":"2023033119205505708_j_itit-2019-0020_ref_001_w2aab3b7d250b1b6b1ab2ab1Aa","unstructured":"Agentur f\u00fcr Erneuerbare Energien e.\u2009V. (2016). Metaanalyse Flexibilitaet durch Sektorenkopplung."},{"key":"2023033119205505708_j_itit-2019-0020_ref_002_w2aab3b7d250b1b6b1ab2ab2Aa","unstructured":"Agora Energiewende (2013). Stromverteilnetze fuer die Energiewende."},{"key":"2023033119205505708_j_itit-2019-0020_ref_003_w2aab3b7d250b1b6b1ab2ab3Aa","doi-asserted-by":"crossref","unstructured":"Barmack, M., Griffes, P., Kahn, E., and Oren, S. (2003). Performance incentives for transmission. The Electricity Journal, 16(3):9\u201322.","DOI":"10.1016\/S1040-6190(03)00027-7"},{"key":"2023033119205505708_j_itit-2019-0020_ref_004_w2aab3b7d250b1b6b1ab2ab4Aa","unstructured":"BDEW (2016). Erneuerbare Energien liefern mehr als ein Viertel des Stroms."},{"key":"2023033119205505708_j_itit-2019-0020_ref_005_w2aab3b7d250b1b6b1ab2ab5Aa","unstructured":"bdew (2018). Branchenleitfaden Verg\u00fctung von Redispatch- Ma\u00dfnahmen."},{"key":"2023033119205505708_j_itit-2019-0020_ref_006_w2aab3b7d250b1b6b1ab2ab6Aa","unstructured":"Brunekreeft, G., Goto, M., Meyer, R., Maruyama, M., and Hattori, T. (2014). Unbundling of electricity transmission system operators in Germany: An experience report. Technical report, Bremen Energy Working Papers."},{"key":"2023033119205505708_j_itit-2019-0020_ref_007_w2aab3b7d250b1b6b1ab2ab7Aa","unstructured":"Bundesnetzagentur (2018a). Quartalsbericht zu Netz-und Systemsicherheitsma\u00dfnahmen Gesamtjahr und viertel Quartal 2017. Technical report, Bundesnetzagentur, Bonn."},{"key":"2023033119205505708_j_itit-2019-0020_ref_008_w2aab3b7d250b1b6b1ab2ab8Aa","unstructured":"Bundesnetzagentur (2019). Quartalsbericht zu Netz-und Systemsicherheitsma\u00dfnahmen Viertes Quartal und Gesamtjahr 2018. Technical report, Bundesnetzagentur, Bonn."},{"key":"2023033119205505708_j_itit-2019-0020_ref_009_w2aab3b7d250b1b6b1ab2ab9Aa","unstructured":"Bundesnetzagentur, B. (2018b). Monitoringbericht 2018."},{"key":"2023033119205505708_j_itit-2019-0020_ref_010_w2aab3b7d250b1b6b1ab2ac10Aa","unstructured":"Bundesregierung, D. (2016). Schriftliche Frage an die Bundesregierung durch Oliver Krischer."},{"key":"2023033119205505708_j_itit-2019-0020_ref_011_w2aab3b7d250b1b6b1ab2ac11Aa","unstructured":"Bundesregierung, D. (2018). Kleine Anfrage der Abgeordneten Nestle, Krischer, Verlinden."},{"key":"2023033119205505708_j_itit-2019-0020_ref_012_w2aab3b7d250b1b6b1ab2ac12Aa","unstructured":"Bundesverband der Energie- und Wasserwirtschaft e.\u2009V. (2018). Redispatch als Teil des marktlichen Engpassmanagements."},{"key":"2023033119205505708_j_itit-2019-0020_ref_013_w2aab3b7d250b1b6b1ab2ac13Aa","doi-asserted-by":"crossref","unstructured":"De Vries, L.\u2009J. and Hakvoort, R.\u2009A. (2002). An economic assessment of congestion management methods for electricity transmission networks. Journal of Network Industries, (4):425\u2013466.","DOI":"10.1177\/178359170200300403"},{"key":"2023033119205505708_j_itit-2019-0020_ref_014_w2aab3b7d250b1b6b1ab2ac14Aa","doi-asserted-by":"crossref","unstructured":"Devine-Wright, P. (2013). Explaining \u201cNIMBY\u201d objections to a power line: The role of personal, place attachment and project-related factors. Environment and behavior, 45(6):761\u2013781.","DOI":"10.1177\/0013916512440435"},{"key":"2023033119205505708_j_itit-2019-0020_ref_015_w2aab3b7d250b1b6b1ab2ac15Aa","unstructured":"European Commission (2016). Clean energy for all Europeans. COM (2016), 860."},{"key":"2023033119205505708_j_itit-2019-0020_ref_016_w2aab3b7d250b1b6b1ab2ac16Aa","unstructured":"Federal Ministry for Economic Affairs and Energy (2017). Erneuerbare Energien in Zahlen, nationale und internationale Entwicklung 2017."},{"key":"2023033119205505708_j_itit-2019-0020_ref_017_w2aab3b7d250b1b6b1ab2ac17Aa","doi-asserted-by":"crossref","unstructured":"Gan, D. and Bourcier, D.\u2009V. (2002). Locational market power screening and congestion management: experience and suggestions. IEEE Transactions on Power Systems, 17(1):180\u2013185.","DOI":"10.1109\/59.982211"},{"key":"2023033119205505708_j_itit-2019-0020_ref_018_w2aab3b7d250b1b6b1ab2ac18Aa","doi-asserted-by":"crossref","unstructured":"Grimm, V., Martin, A., S\u00f6lch, C., Weibelzahl, M., and Z\u00f6ttl, G. (2018). Market-Based Redispatch May Result in Inefficient Dispatch.","DOI":"10.2139\/ssrn.3120403"},{"key":"2023033119205505708_j_itit-2019-0020_ref_019_w2aab3b7d250b1b6b1ab2ac19Aa","unstructured":"Hirth, L. and Glismann, S. (2018). Congestion Management: From Physics to Regulatory Instruments."},{"key":"2023033119205505708_j_itit-2019-0020_ref_020_w2aab3b7d250b1b6b1ab2ac20Aa","doi-asserted-by":"crossref","unstructured":"Hirth, L. and Schlecht, I. (2018). Market-Based Redispatch in Zonal Electricity Markets.","DOI":"10.2139\/ssrn.3286798"},{"key":"2023033119205505708_j_itit-2019-0020_ref_021_w2aab3b7d250b1b6b1ab2ac21Aa","unstructured":"Hogan, W. (2002). Financial transmission right incentives: Applications beyond hedging. Presentation to HEPG Twenty-Eight Plenary Sessions, May, 31."},{"key":"2023033119205505708_j_itit-2019-0020_ref_022_w2aab3b7d250b1b6b1ab2ac22Aa","doi-asserted-by":"crossref","unstructured":"Holttinen, H., Meibom, P., Orths, A., Lange, B., O\u2019Malley, M., Tande, J.\u2009O., Estanqueiro, A., Gomez, E., S\u00f6der, L., Strbac, G., et al.(2011). Impacts of large amounts of wind power on design and operation of power systems, results of IEA collaboration. Wind Energy, 14(2):179\u2013192.","DOI":"10.1002\/we.410"},{"key":"2023033119205505708_j_itit-2019-0020_ref_023_w2aab3b7d250b1b6b1ab2ac23Aa","doi-asserted-by":"crossref","unstructured":"Joos, M. and Staffell, I. (2018). Short-term integration costs of variable renewable energy: wind curtailment and balancing in Britain and Germany. Renewable and Sustainable Energy Reviews, 86:45\u201365.","DOI":"10.1016\/j.rser.2018.01.009"},{"key":"2023033119205505708_j_itit-2019-0020_ref_024_w2aab3b7d250b1b6b1ab2ac24Aa","doi-asserted-by":"crossref","unstructured":"Kemfert, C., Kunz, F., and Rosell\u00f3n, J. (2016). A welfare analysis of electricity transmission planning in Germany. Energy Policy, 94:446\u2013452.","DOI":"10.1016\/j.enpol.2016.04.011"},{"key":"2023033119205505708_j_itit-2019-0020_ref_025_w2aab3b7d250b1b6b1ab2ac25Aa","doi-asserted-by":"crossref","unstructured":"Komendantova, N. and Battaglini, A. (2016). Beyond Decide-Announce-Defend (DAD) and Not-in-My-Backyard (NIMBY) models? Addressing the social and public acceptance of electric transmission lines in Germany. Energy research & social science, 22:224\u2013231.","DOI":"10.1016\/j.erss.2016.10.001"},{"key":"2023033119205505708_j_itit-2019-0020_ref_026_w2aab3b7d250b1b6b1ab2ac26Aa","doi-asserted-by":"crossref","unstructured":"Korte, K. and Gawel, E. (2018). R\u00e4umliche Koordination im liberalisierten Strommarkt: angemessene Anreize f\u00fcr die Einspeisung. Wirtschaftsdienst, 98(1):60\u201367.","DOI":"10.1007\/s10273-018-2242-6"},{"key":"2023033119205505708_j_itit-2019-0020_ref_027_w2aab3b7d250b1b6b1ab2ac27Aa","doi-asserted-by":"crossref","unstructured":"Leuthold, F., Weigt, H., and Von Hirschhausen, C. (2008). Efficient pricing for European electricity networks\u2013The theory of nodal pricing applied to feeding-in wind in Germany. Utilities Policy, 16(4):284\u2013291.","DOI":"10.1016\/j.jup.2007.12.003"},{"key":"2023033119205505708_j_itit-2019-0020_ref_028_w2aab3b7d250b1b6b1ab2ac28Aa","doi-asserted-by":"crossref","unstructured":"Matschoss, P., Bayer, B., Thomas, H., and Marian, A. (2019). The German incentive regulation and its practical impact on the grid integration of renewable energy systems. Renewable Energy, 134:727\u2013738.","DOI":"10.1016\/j.renene.2018.10.103"},{"key":"2023033119205505708_j_itit-2019-0020_ref_029_w2aab3b7d250b1b6b1ab2ac29Aa","doi-asserted-by":"crossref","unstructured":"Mester, K.\u2009A., Christ, M., Degel, M., and Bunke, W.-D. (2017). Integrating social acceptance of electricity grid expansion into energy system modeling: a methodological approach for Germany. In Advances and New Trends in Environmental Informatics, pages 115\u2013129. Springer.","DOI":"10.1007\/978-3-319-44711-7_10"},{"key":"2023033119205505708_j_itit-2019-0020_ref_030_w2aab3b7d250b1b6b1ab2ac30Aa","unstructured":"D\u00f6ring, Michael (2018). Rolle der Verteilnetzbetreiber bei der zuk\u00fcnftigen Netzengpassbehebung."},{"key":"2023033119205505708_j_itit-2019-0020_ref_031_w2aab3b7d250b1b6b1ab2ac31Aa","unstructured":"N\u00fc\u00dfler, A. (2012). Congestion and redispatch in Germany. A model-based analysis of the development of redispatch. PhD thesis, Universit\u00e4t zu K\u00f6ln."},{"key":"2023033119205505708_j_itit-2019-0020_ref_032_w2aab3b7d250b1b6b1ab2ac32Aa","doi-asserted-by":"crossref","unstructured":"Ott, A.\u2009L. (2003). Experience with PJM market operation, system design, and implementation. IEEE Transactions on Power Systems, 18(2):528\u2013534.","DOI":"10.1109\/TPWRS.2003.810698"},{"key":"2023033119205505708_j_itit-2019-0020_ref_033_w2aab3b7d250b1b6b1ab2ac33Aa","doi-asserted-by":"crossref","unstructured":"Pechan, A. (2017). Where do all the windmills go? Influence of the institutional setting on the spatial distribution of renewable energy installation. Energy Economics, 65:75\u201386.","DOI":"10.1016\/j.eneco.2017.04.034"},{"key":"2023033119205505708_j_itit-2019-0020_ref_034_w2aab3b7d250b1b6b1ab2ac34Aa","doi-asserted-by":"crossref","unstructured":"Qin, J., Rajagopal, R., and Varaiya, P.\u2009P. (2017). Flexible Market for Smart Grid: Coordinated Trading of Contingent Contracts. IEEE Transactions on Control of Network Systems, 1.","DOI":"10.1109\/TCNS.2017.2746347"},{"key":"2023033119205505708_j_itit-2019-0020_ref_035_w2aab3b7d250b1b6b1ab2ac35Aa","doi-asserted-by":"crossref","unstructured":"Rausch, B., Staudt, P., and Weinhardt, C. (2019). Transmission grid congestion data and directions for future research. In Proceedings of the Tenth ACM International Conference on Future Energy Systems, pages 443\u2013446. ACM.","DOI":"10.1145\/3307772.3331018"},{"key":"2023033119205505708_j_itit-2019-0020_ref_036_w2aab3b7d250b1b6b1ab2ac36Aa","doi-asserted-by":"crossref","unstructured":"Reusswig, F., Braun, F., Heger, I., Ludewig, T., Eichenauer, E., and Lass, W. (2016). Against the wind: Local opposition to the German Energiewende. Utilities Policy, 41:214\u2013227.","DOI":"10.1016\/j.jup.2016.02.006"},{"key":"2023033119205505708_j_itit-2019-0020_ref_037_w2aab3b7d250b1b6b1ab2ac37Aa","unstructured":"Richstein, J.\u2009C., Neuhoff, K., and May, N. (2018). Europe\u2019s power system in transition: How to couple zonal and locational pricing systems?"},{"key":"2023033119205505708_j_itit-2019-0020_ref_038_w2aab3b7d250b1b6b1ab2ac38Aa","doi-asserted-by":"crossref","unstructured":"Rubio-Od\u00e9riz, F.\u2009J. and Perez-Arriaga, I.\u2009J. (2000). Marginal pricing of transmission services: A comparative analysis of network cost allocation methods. IEEE Transactions on Power systems, 15(1):448\u2013454.","DOI":"10.1109\/59.852158"},{"key":"2023033119205505708_j_itit-2019-0020_ref_039_w2aab3b7d250b1b6b1ab2ac39Aa","doi-asserted-by":"crossref","unstructured":"Sauma, E.\u2009E. and Oren, S.\u2009S. (2009). Do generation firms in restructured electricity markets have incentives to support social-welfare-improving transmission investments? Energy Economics, 31(5):676\u2013689.","DOI":"10.1016\/j.eneco.2009.01.015"},{"key":"2023033119205505708_j_itit-2019-0020_ref_040_w2aab3b7d250b1b6b1ab2ac40Aa","doi-asserted-by":"crossref","unstructured":"Schermeyer, H., Vergara, C., and Fichtner, W. (2018). Renewable energy curtailment: A case study on today\u2019s and tomorrow\u2019s congestion management. Energy Policy, 112:427\u2013436.","DOI":"10.1016\/j.enpol.2017.10.037"},{"key":"2023033119205505708_j_itit-2019-0020_ref_041_w2aab3b7d250b1b6b1ab2ac41Aa","doi-asserted-by":"crossref","unstructured":"Schmitz, K. and Weber, C. (2013). Does one design fit all? On the transferability of the PJM market design to the German electricity market.","DOI":"10.2139\/ssrn.2256864"},{"key":"2023033119205505708_j_itit-2019-0020_ref_042_w2aab3b7d250b1b6b1ab2ac42Aa","doi-asserted-by":"crossref","unstructured":"Sensfu\u00df, F., Ragwitz, M., and Genoese, M. (2008). The merit-order effect: A detailed analysis of the price effect of renewable electricity generation on spot market prices in Germany. Energy policy, 36(8):3086\u20133094.","DOI":"10.1016\/j.enpol.2008.03.035"},{"key":"2023033119205505708_j_itit-2019-0020_ref_043_w2aab3b7d250b1b6b1ab2ac43Aa","doi-asserted-by":"crossref","unstructured":"Staudt, P., Garttner, J., Richter, B., and Weinhardt, C. (2018a). Liberalized markets for power transmission capacity. In 2018 15th International Conference on the European Energy Market (EEM), pages 1\u20135. IEEE.","DOI":"10.1109\/EEM.2018.8469915"},{"key":"2023033119205505708_j_itit-2019-0020_ref_044_w2aab3b7d250b1b6b1ab2ac44Aa","unstructured":"Staudt, P., G\u00e4rttner, J., and Weinhardt, C. (2018b). Assessment of Market Power in Local Electricity Markets with regards to Competition and Tacit Collusion. Tagungsband Multikonferenz Wirtschaftsinformatik 2018, 912\u2013923."},{"key":"2023033119205505708_j_itit-2019-0020_ref_045_w2aab3b7d250b1b6b1ab2ac45Aa","unstructured":"Staudt, P., Golla, A., Richter, B., Schmidt, M., vom Scheidt, F., and Weinhardt, C. (2019a). Behavioral studies in energy economics: A review and research framework. In Local Energy, Global Markets, 42nd IAEE International Conference, May 29\u2013June 1, 2019. International Association for Energy Economics."},{"key":"2023033119205505708_j_itit-2019-0020_ref_046_w2aab3b7d250b1b6b1ab2ac46Aa","unstructured":"Staudt, P., K\u00f6pke, S., and Weinhardt, C. (2019b). Market mechanisms for neighbourhood electricity grids: Design and agent-based evaluation. In Twenty-Seventh European Conference on Information Systems (ECIS2019), Stockholm, Sweden."},{"key":"2023033119205505708_j_itit-2019-0020_ref_047_w2aab3b7d250b1b6b1ab2ac47Aa","doi-asserted-by":"crossref","unstructured":"Staudt, P., Schmidt, M., G\u00e4rttner, J., and Weinhardt, C. (2018c). Using vehicle-to-grid concepts to balance redispatch needs: A case study in germany. In Proceedings of the Ninth International Conference on Future Energy Systems, pages 80\u201384. ACM.","DOI":"10.1145\/3208903.3208926"},{"key":"2023033119205505708_j_itit-2019-0020_ref_048_w2aab3b7d250b1b6b1ab2ac48Aa","unstructured":"Staudt, P., Traeris, Y., Rausch, B., and Weinhardt, C. (2018d). Predicting Redispatch in the German Electricity Market using Information Systems based on Machine Learning."},{"key":"2023033119205505708_j_itit-2019-0020_ref_049_w2aab3b7d250b1b6b1ab2ac49Aa","doi-asserted-by":"crossref","unstructured":"Stoft, S. (2002). Power system economics. Journal of Energy Literature, 8:94\u201399.","DOI":"10.1109\/9780470545584"},{"key":"2023033119205505708_j_itit-2019-0020_ref_050_w2aab3b7d250b1b6b1ab2ac50Aa","doi-asserted-by":"crossref","unstructured":"Trepper, K., Bucksteeg, M., and Weber, C. (2015). Market splitting in Germany\u2013New evidence from a three-stage numerical model of Europe. Energy Policy, 87:199\u2013215.","DOI":"10.1016\/j.enpol.2015.08.016"},{"key":"2023033119205505708_j_itit-2019-0020_ref_051_w2aab3b7d250b1b6b1ab2ac51Aa","unstructured":"Umweltbundesamt (2019). Energiebedingte Emissionen."},{"key":"2023033119205505708_j_itit-2019-0020_ref_052_w2aab3b7d250b1b6b1ab2ac52Aa","doi-asserted-by":"crossref","unstructured":"Weinhardt, C., Holtmann, C., and Neumann, D. (2003). Market-engineering. Wirtschaftsinformatik, 45(6):635\u2013640.","DOI":"10.1007\/BF03250926"},{"key":"2023033119205505708_j_itit-2019-0020_ref_053_w2aab3b7d250b1b6b1ab2ac53Aa","doi-asserted-by":"crossref","unstructured":"Wu, F.\u2009F. and Varaiya, P. (1999). Coordinated multilateral trades for electric power networks: theory and implementation. International Journal of Electrical Power & Energy Systems, 21(2):75\u2013102.","DOI":"10.1016\/S0142-0615(98)00031-3"}],"container-title":["it - Information Technology"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/www.degruyter.com\/view\/j\/itit.2019.61.issue-2-3\/itit-2019-0020\/itit-2019-0020.xml","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/www.degruyter.com\/document\/doi\/10.1515\/itit-2019-0020\/xml","content-type":"application\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/www.degruyter.com\/document\/doi\/10.1515\/itit-2019-0020\/pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,4,1]],"date-time":"2023-04-01T06:27:14Z","timestamp":1680330434000},"score":1,"resource":{"primary":{"URL":"https:\/\/www.degruyter.com\/document\/doi\/10.1515\/itit-2019-0020\/html"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019,4,1]]},"references-count":53,"journal-issue":{"issue":"2-3","published-online":{"date-parts":[[2019,7,3]]},"published-print":{"date-parts":[[2019,4,24]]}},"alternative-id":["10.1515\/itit-2019-0020"],"URL":"https:\/\/doi.org\/10.1515\/itit-2019-0020","relation":{},"ISSN":["2196-7032","1611-2776"],"issn-type":[{"type":"electronic","value":"2196-7032"},{"type":"print","value":"1611-2776"}],"subject":[],"published":{"date-parts":[[2019,4,1]]}}}