{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,26]],"date-time":"2026-06-26T22:45:31Z","timestamp":1782513931171,"version":"3.54.5"},"reference-count":24,"publisher":"Walter de Gruyter GmbH","issue":"1","license":[{"start":{"date-parts":[[2025,1,1]],"date-time":"2025-01-01T00:00:00Z","timestamp":1735689600000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/creativecommons.org\/licenses\/by\/4.0"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2025,3,10]]},"abstract":"<jats:title>Abstract<\/jats:title>\n                  <jats:p>To foster the advancement of telecommunications enterprise supply chains and facilitate their transition toward global market competitiveness, the author advocates for a novel performance evaluation framework tailored for the integrated circuit industry supply chain. This framework integrates the fuzzy analytic hierarchy process and fuzzy neural network methodologies to devise a comprehensive supplier performance assessment model. Leveraging extensive historical supplier data, the author employs MATLAB\u2019s neural network toolbox for model training and simulation. The results indicate that the error value output after running the validation sample is relatively small. This indicates that the model can be effectively applied to the performance evaluation of common integrated circuit product suppliers in CM company. According to the performance results of the model application, all participating suppliers have performance scores greater than 0.7, indicating that in the supply and service process of butterfly integrated circuit products, the performance evaluation scores of each supplier meet the requirements of qualified suppliers, among them, suppliers DS1, DS8, and DS9 with a comprehensive performance score greater than 0.8 are relatively excellent suppliers. The model\u2019s effectiveness and accuracy have been confirmed, demonstrating its practical applicability to CM Company. Moreover, its insights provide valuable guidance for establishing supplier performance evaluation systems across various product categories within telecommunications enterprises.<\/jats:p>","DOI":"10.1515\/jisys-2024-0370","type":"journal-article","created":{"date-parts":[[2025,3,10]],"date-time":"2025-03-10T08:10:57Z","timestamp":1741594257000},"source":"Crossref","is-referenced-by-count":1,"title":["Supply chain performance evaluation model for integrated circuit industry based on fuzzy analytic hierarchy process and fuzzy neural network"],"prefix":"10.1515","volume":"34","author":[{"given":"Qian","family":"Chen","sequence":"first","affiliation":[{"name":"School of Logistics Management and Engineering, Zhuhai College of Science and Technology , Zhuhai , 519041, Guangdong , China"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Xiangping","family":"Wang","sequence":"additional","affiliation":[{"name":"School of Logistics Management and Engineering, Zhuhai College of Science and Technology , Zhuhai , 519041, Guangdong , China"}],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"374","published-online":{"date-parts":[[2025,3,10]]},"reference":[{"key":"2025122009032220990_j_jisys-2024-0370_ref_001","doi-asserted-by":"crossref","unstructured":"Chien CF, Wu HJ. Integrated circuit probe card troubleshooting based on rough set theory for advanced quality control and an empirical study. J Intell Manuf. 2022;35(4):1\u201313. 10.1007\/s10845-022-02042-8.","DOI":"10.1007\/s10845-022-02042-8"},{"key":"2025122009032220990_j_jisys-2024-0370_ref_002","doi-asserted-by":"crossref","unstructured":"Santos KVD, Arantes FP, Leite MSA, Bornia AC. Supplier\u2019s performance evaluation in supply chains using item response theory. Int J Serv Oper Manag. 2023;45(4):530\u201351. 10.1504\/ijsom.2023.132858.","DOI":"10.1504\/IJSOM.2023.132858"},{"key":"2025122009032220990_j_jisys-2024-0370_ref_003","doi-asserted-by":"crossref","unstructured":"Min S, Zacharia ZG, Smith CD. Defining supply chain management: In the past, present, and future. J Bus Logist. 2019;40(1):44\u201355. 10.1111\/jbl.12201.","DOI":"10.1111\/jbl.12201"},{"key":"2025122009032220990_j_jisys-2024-0370_ref_004","doi-asserted-by":"crossref","unstructured":"Wang P. Product modeling design method based on graph neural network and fuzzy inference theory. Alex Eng J. 2023;77:513\u201324. 10.1016\/j.aej.2023.07.005.","DOI":"10.1016\/j.aej.2023.07.005"},{"key":"2025122009032220990_j_jisys-2024-0370_ref_005","doi-asserted-by":"crossref","unstructured":"Lamba D, Yadav DK, Barve A, Panda G. Prioritizing barriers in reverse logistics of E-commerce supply chain using fuzzy-analytic hierarchy process. Electron Commer Res. 2020;20(2):381\u2013403. 10.1007\/s10660-019-09333-y.","DOI":"10.1007\/s10660-019-09333-y"},{"key":"2025122009032220990_j_jisys-2024-0370_ref_006","doi-asserted-by":"crossref","unstructured":"Piprani AZ, Jaafar NI, Mohezar Ali S. Prioritizing resilient capability factors of dealing with supply chain disruptions: an analytical hierarchy process (AHP) application in the textile industry. Benchmarking: An Int J. 2020;27(9):2537\u201363. 10.1108\/bij-03-2019-0111.","DOI":"10.1108\/BIJ-03-2019-0111"},{"key":"2025122009032220990_j_jisys-2024-0370_ref_007","doi-asserted-by":"crossref","unstructured":"He K, Zhu N. Strategic emerging industry layout based on analytic hierarchy process and fuzzy comprehensive evaluation: a case study of Sichuan province. PLoS One. 2022;17(3):e0264578. 10.1371\/journal.pone.0264578.","DOI":"10.1371\/journal.pone.0264578"},{"key":"2025122009032220990_j_jisys-2024-0370_ref_008","doi-asserted-by":"crossref","unstructured":"Vafadarnikjoo A, Badri Ahmadi H, Liou JJ, Botelho T, Chalvatzis K. Analyzing blockchain adoption barriers in manufacturing supply chains by the neutrosophic analytic hierarchy process. Ann Oper Res. 2023;327(1):129\u201356. 10.1007\/s10479-021-04048-6.","DOI":"10.1007\/s10479-021-04048-6"},{"key":"2025122009032220990_j_jisys-2024-0370_ref_009","doi-asserted-by":"crossref","unstructured":"Wang Y, Wai RJ. Adaptive fuzzy-neural-network power decoupling strategy for virtual synchronous generator in micro-grid. IEEE Trans Power Electron. 2022;37(4):3878\u201391. 10.1109\/tpel.2021.3120519.","DOI":"10.1109\/TPEL.2021.3120519"},{"key":"2025122009032220990_j_jisys-2024-0370_ref_010","doi-asserted-by":"crossref","unstructured":"Ben-Daya M, Hassini E, Bahroun Z. Internet of things and supply chain management: a literature review. Int J Prod Res. 2019;57(15-16):4719\u201342. 10.1016\/j.iot.2023.100982.","DOI":"10.1080\/00207543.2017.1402140"},{"key":"2025122009032220990_j_jisys-2024-0370_ref_011","unstructured":"Mathew AO, Yashas KN, Kamath GB. The relationship between the strategies of operations, supply chain, and information system, and its impact on supply chain performance. Int J Product Qual Manag. 2022;36(3):441\u20139. 10.1504\/IJPQM.2022.10049306."},{"key":"2025122009032220990_j_jisys-2024-0370_ref_012","doi-asserted-by":"crossref","unstructured":"Srai JS, Lorentz H. Developing design principles for the digitalisation of purchasing and supply management. J Purch Supply Manag. 2019;25(1):78\u201398. 10.1016\/j.pursup.2018.07.001.","DOI":"10.1016\/j.pursup.2018.07.001"},{"key":"2025122009032220990_j_jisys-2024-0370_ref_013","doi-asserted-by":"crossref","unstructured":"Patrucco A, Frattini F, Di Benedetto A. Characteristics of supplier performance measurement systems in collaborative innovation projects: the role of the purchasing department. Supply Chain Manag: An Int J. 2022;27(2):207\u201331. 10.1108\/scm-11-2020-0551.","DOI":"10.1108\/SCM-11-2020-0551"},{"key":"2025122009032220990_j_jisys-2024-0370_ref_014","doi-asserted-by":"crossref","unstructured":"Sar\u0131\u00e7am C, Yilmaz SM. An integrated framework for supplier selection and performance evaluation for the apparel retail industry. Text Res J. 2022;92(17-18):2947\u201365. 10.1177\/0040517521992353.","DOI":"10.1177\/0040517521992353"},{"key":"2025122009032220990_j_jisys-2024-0370_ref_015","doi-asserted-by":"crossref","unstructured":"Pratap S, Daultani Y, Dwivedi A, Zhou F. Supplier selection and evaluation in e-commerce enterprises: A data envelopment analysis approach. Benchmarking: An Int J. 2022;29(1):325\u201341. 10.1108\/bij-10-2020-0556.","DOI":"10.1108\/BIJ-10-2020-0556"},{"key":"2025122009032220990_j_jisys-2024-0370_ref_016","doi-asserted-by":"crossref","unstructured":"Dutta P, Jaikumar B, Arora MS. Applications of data envelopment analysis in supplier selection between 2000 and 2020: A literature review. Ann Oper Res. 2022;315(2):1399\u2013454. 10.1007\/s10479-021-03931-6.","DOI":"10.1007\/s10479-021-03931-6"},{"key":"2025122009032220990_j_jisys-2024-0370_ref_017","doi-asserted-by":"crossref","unstructured":"Aydas O, Ross A, Parker H, Alavi S. Using efficiency frontiers to visualize suppliers\u2019 performance capabilities: Moving beyond supplier rationalization. J Bus Anal. 2023;6(1):19\u201338. 10.1080\/2573234X.2021.1999179.","DOI":"10.1080\/2573234X.2021.1999179"},{"key":"2025122009032220990_j_jisys-2024-0370_ref_018","doi-asserted-by":"crossref","unstructured":"Mahmoudi A, Abbasi M, Deng X. Evaluating the performance of the suppliers using hybrid DEA-OPA model: A sustainable development perspective. Group Decis Negotiation. 2022;31(2):335\u201362. 10.1007\/s10726-021-09770-x.","DOI":"10.1007\/s10726-021-09770-x"},{"key":"2025122009032220990_j_jisys-2024-0370_ref_019","doi-asserted-by":"crossref","unstructured":"Sabri Y, Micheli GJ, Cagno E. Supplier selection and supply chain configuration in the project environment. Prod Plan Control. 2022;33(12):1155\u201372. 10.1080\/09537287.2020.1853269.","DOI":"10.1080\/09537287.2020.1853269"},{"key":"2025122009032220990_j_jisys-2024-0370_ref_020","doi-asserted-by":"crossref","unstructured":"Wi\u0119ckowski J, Kizielewicz B, Shekhovtsov A, Sa\u0142abun W. How do the criteria affect sustainable supplier evaluation? -A case study using multi-criteria decision analysis methods in a fuzzy environment. J Eng Manag Syst Eng. 2023;2(1):37\u201352. 10.56578\/jemse020102.","DOI":"10.56578\/jemse020102"},{"key":"2025122009032220990_j_jisys-2024-0370_ref_021","doi-asserted-by":"crossref","unstructured":"Helo P, Hao Y. Artificial intelligence in operations management and supply chain management: An exploratory case study. Prod Plan Control. 2022;33(16):1573\u201390. 10.1080\/09537287.2021.1882690.","DOI":"10.1080\/09537287.2021.1882690"},{"key":"2025122009032220990_j_jisys-2024-0370_ref_022","unstructured":"Saragih J, Tarigan A, Silalahi EF, Wardati J, Pratama I. Supply chain operational capability and supply chain operational performance: Does the supply chain management and supply chain integration matters. Int J Sup Chain Mgt. 2020;9(4):1222\u20139. 10.59160\/ijscm.v9i4.5268."},{"key":"2025122009032220990_j_jisys-2024-0370_ref_023","doi-asserted-by":"crossref","unstructured":"Mostaghel R, Oghazi P, Parida V, Sohrabpour V. Digitalization driven retail business model innovation: Evaluation of past and avenues for future research trends. J Bus Res. 2022;146:134\u201345. 10.1016\/j.jbusres.2022.03.072.","DOI":"10.1016\/j.jbusres.2022.03.072"},{"key":"2025122009032220990_j_jisys-2024-0370_ref_024","doi-asserted-by":"crossref","unstructured":"Kuo RJ, Hong SY, Huang Y. Integration of particle swarm optimization-based fuzzy neural network and artificial neural network for supplier selection. Appl Math Model. 2010;34(12):3976\u201390. 10.1016\/j.apm.2010.03.033.","DOI":"10.1016\/j.apm.2010.03.033"}],"container-title":["Journal of Intelligent Systems"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.degruyterbrill.com\/document\/doi\/10.1515\/jisys-2024-0370\/xml","content-type":"application\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/www.degruyterbrill.com\/document\/doi\/10.1515\/jisys-2024-0370\/pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,12,20]],"date-time":"2025-12-20T09:13:34Z","timestamp":1766222014000},"score":1,"resource":{"primary":{"URL":"https:\/\/www.degruyterbrill.com\/document\/doi\/10.1515\/jisys-2024-0370\/html"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2025,1,1]]},"references-count":24,"journal-issue":{"issue":"1","published-online":{"date-parts":[[2025,3,7]]},"published-print":{"date-parts":[[2025,3,7]]}},"alternative-id":["10.1515\/jisys-2024-0370"],"URL":"https:\/\/doi.org\/10.1515\/jisys-2024-0370","relation":{},"ISSN":["2191-026X"],"issn-type":[{"value":"2191-026X","type":"electronic"}],"subject":[],"published":{"date-parts":[[2025,1,1]]},"article-number":"20240370"}}