{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,8,15]],"date-time":"2025-08-15T02:01:41Z","timestamp":1755223301902,"version":"3.43.0"},"reference-count":52,"publisher":"FapUNIFESP (SciELO)","license":[{"start":{"date-parts":[[2025,1,1]],"date-time":"2025-01-01T00:00:00Z","timestamp":1735689600000},"content-version":"vor","delay-in-days":0,"URL":"http:\/\/creativecommons.org\/licenses\/by\/4.0\/"},{"start":{"date-parts":[[2025,1,1]],"date-time":"2025-01-01T00:00:00Z","timestamp":1735689600000},"content-version":"am","delay-in-days":0,"URL":"http:\/\/creativecommons.org\/licenses\/by\/4.0\/"},{"start":{"date-parts":[[2025,1,1]],"date-time":"2025-01-01T00:00:00Z","timestamp":1735689600000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/creativecommons.org\/licenses\/by\/4.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Gest. Prod."],"abstract":"<jats:p> Abstract This study investigates the benefits of using Building Information Modeling (BIM) for Project Management. Individual case studies were found on the subject in the literature, but this study comprehensively analyzes these benefits. The benefits surveyed were categorized according to the Project Management Institute's (PMI) knowledge areas, and how they impact project management was identified. A Systematic Literature Review was conducted on the Scopus and Web of Science databases. Thirty articles were analyzed, and 173 benefits of using BIM for project management were mapped. The article provides a matrix of interaction between the benefits of BIM, the stage of project development and the PMI (2017) knowledge areas. Concerning project development stages, benefits were identified in the design, planning and construction stages. With the PMI (2017) knowledge areas, 42 benefits were mapped in the integration area, 35 benefits were mapped in the improvement in the cost area, and 26 benefits were mapped in the improvement in the elaboration of the schedule.<\/jats:p>","DOI":"10.1590\/1806-9649-2025v32e2125","type":"journal-article","created":{"date-parts":[[2025,8,11]],"date-time":"2025-08-11T14:53:28Z","timestamp":1754924008000},"source":"Crossref","is-referenced-by-count":0,"title":["Benefits of using Building Information Modeling for project management"],"prefix":"10.1590","volume":"32","author":[{"ORCID":"https:\/\/orcid.org\/0000-0003-0815-4250","authenticated-orcid":false,"given":"Tiago Ajami","family":"Contini","sequence":"first","affiliation":[{"name":"Universidade Nove de Julho,  Brasil"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-9920-3830","authenticated-orcid":false,"given":"Cristiane Drebes","family":"Pedron","sequence":"additional","affiliation":[{"name":"Universidade Nove de Julho,  Brasil"}]}],"member":"530","published-online":{"date-parts":[[2025]]},"reference":[{"key":"ref1","doi-asserted-by":"crossref","first-page":"103","DOI":"10.1016\/j.autcon.2018.03.032","article-title":"Building information modeling as a risk transformer: an evolutionary insight into the project uncertainty","volume":"92","author":"Ahmad Z.","year":"2018","journal-title":"Automation in Construction"},{"key":"ref2","first-page":"7","author":"Aish R.","year":"1986"},{"issue":"3","key":"ref3","doi-asserted-by":"crossref","first-page":"608","DOI":"10.1108\/IJMPB-05-2017-0046","article-title":"Adoption and implementation of BIM \u2013 case study of a Saudi Arabian AEC firm","volume":"11","author":"Almuntaser T.","year":"2018","journal-title":"International Journal of Managing Projects in Business"},{"issue":"1","key":"ref4","doi-asserted-by":"crossref","first-page":"63","DOI":"10.28991\/cej-2017-00000073","article-title":"Diagnostic and assessment benefits and barriers of BIM in construction project management","volume":"3","author":"Al-Zwainy F. M.","year":"2017","journal-title":"Civil Engineering Journal"},{"issue":"6","key":"ref5","doi-asserted-by":"crossref","first-page":"1913","DOI":"10.3390\/app10061913","article-title":"BIM-LEAN as a methodology to save execution costs in building construction: an experience under the spanish framework","volume":"10","author":"And\u00fajar-Montoya M. D.","year":"2020","journal-title":"Applied Sciences"},{"issue":"3","key":"ref6","doi-asserted-by":"crossref","first-page":"419","DOI":"10.1108\/17538370910971063","article-title":"Building information modelling demystified: does it make business sense to adopt BIM?","volume":"2","author":"Aranda-Mena G.","year":"2009","journal-title":"International Journal of Managing Projects in Business"},{"key":"ref7","series-title":"Autodesk building industry solutions","year":"2002"},{"issue":"4","key":"ref8","doi-asserted-by":"crossref","first-page":"15","DOI":"10.5130\/AJCEB.v12i4.3032","article-title":"Building information modeling (BIM): now and beyond","volume":"12","author":"Azhar S.","year":"2012","journal-title":"The Australasian Journal of Construction Economics and Building"},{"issue":"2","key":"ref9","doi-asserted-by":"crossref","first-page":"103","DOI":"10.1108\/SASBE-11-2017-0060","article-title":"Overview: the opportunity of BIM in railway","volume":"8","author":"Bensalah M.","year":"2019","journal-title":"Smart and Sustainable Built Environment"},{"issue":"7","key":"ref10","doi-asserted-by":"crossref","first-page":"971","DOI":"10.1016\/j.ijproman.2012.12.001","article-title":"The project benefits of building information modelling (BIM)","volume":"31","author":"Bryde D.","year":"2013","journal-title":"International Journal of Project Management"},{"key":"ref11","series-title":"Singapore BIM guide.","year":"2013"},{"key":"ref12","series-title":"Fundamentos em gest\u00e3o de projetos: construindo compet\u00eancias para gerenciar projetos","author":"Carvalho M. M. D.","year":"2011"},{"key":"ref13","article-title":"Perceived benefits of and barriers to Building Information Modelling (BIM) implementation in construction: the case of Hong Kong","volume":"25","author":"Chan D. W.","year":"2019","journal-title":"Journal of Building Engineering"},{"key":"ref14","doi-asserted-by":"crossref","first-page":"242","DOI":"10.1016\/j.jobe.2018.04.028","article-title":"Beyond the third dimension of BIM: a systematic review of literature and assessment of professional views","volume":"19","author":"Charef R.","year":"2018","journal-title":"Journal of Building Engineering"},{"issue":"6","key":"ref15","doi-asserted-by":"crossref","first-page":"513","DOI":"10.3846\/jcem.2020.12611","article-title":"Use of BIM with photogrammetry support in small construction projects. Case study for commercial franchises","volume":"26","author":"Conde A. J.","year":"2020","journal-title":"Journal of Civil Engineering and Management"},{"issue":"2","key":"ref16","doi-asserted-by":"crossref","first-page":"345","DOI":"10.1016\/j.compind.2013.12.003","article-title":"Supply-chain transparency within industrialized construction projects","volume":"65","author":"\u010cu\u0161-Babi\u010d N.","year":"2014","journal-title":"Computers in Industry"},{"issue":"6","key":"ref17","doi-asserted-by":"crossref","first-page":"80","DOI":"10.3390\/buildings8060080","article-title":"An investigation on virtual information modeling acceptance based on project management knowledge areas","volume":"8","author":"Didehvar N.","year":"2018","journal-title":"Buildings"},{"key":"ref18","doi-asserted-by":"crossref","first-page":"82","DOI":"10.1016\/j.autcon.2014.04.009","article-title":"Building Information Modeling (BIM) application framework: the process of expanding from 3D to computable nD","volume":"46","author":"Ding L.","year":"2014","journal-title":"Automation in Construction"},{"key":"ref19","series-title":"The business value of BIM for construction in major global markets: how contractors around the world are driving innovation with building information modeling.","year":"2017"},{"issue":"5","key":"ref20","article-title":"BIM for improved project communication networks: empirical evidence from email logs","volume":"34","author":"Du J.","year":"2020","journal-title":"Journal of Computing in Civil Engineering"},{"key":"ref21","series-title":"An outline of the building description system","author":"Eastman C.","year":"1974"},{"key":"ref22","first-page":"867","author":"Finnerty I. B.","year":"2017"},{"issue":"3","key":"ref23","doi-asserted-by":"crossref","first-page":"298","DOI":"10.1108\/CI-04-2017-0030","article-title":"An overview of benefits and challenges of building information modelling (BIM) adoption in UK residential projects","volume":"19","author":"Georgiadou M. C.","year":"2019","journal-title":"Construction Innovation"},{"key":"ref24","series-title":"Advanced project management: a structured approach.","author":"Harrison F.","year":"2017"},{"key":"ref25","series-title":"ISO 19650-1:2018. Organization and digitization of information about buildings and civil engineering works, including building information modelling (BIM) \u2014 Information management using building information modelling \u2014 part 1: concepts and principles","year":"2018"},{"issue":"1","key":"ref26","first-page":"3","article-title":"Building information modeling and building knowledge modeling in project management","volume":"28","author":"Jasim N. A.","year":"2020","journal-title":"Computer Assisted Methods in Engineering and Science"},{"issue":"2","key":"ref27","doi-asserted-by":"crossref","first-page":"189","DOI":"10.1016\/j.autcon.2006.04.001","article-title":"A method for planning of work-flow by combined use of location-based scheduling and 4D CAD","volume":"16","author":"Jongeling R.","year":"2007","journal-title":"Automation in Construction"},{"issue":"10","key":"ref28","doi-asserted-by":"crossref","first-page":"1298","DOI":"10.1108\/ECAM-08-2017-0188","article-title":"Mobile BIM implementation and lean interaction on construction site: a case study of a complex airport project","volume":"25","author":"Koseoglu O.","year":"2018","journal-title":"Engineering, Construction, and Architectural Management"},{"issue":"6","key":"ref29","article-title":"Demystifying construction project time\u2013effort distribution curves: BIM and non-BIM comparison","volume":"31","author":"Lu W.","year":"2015","journal-title":"Journal of Management Engineering"},{"issue":"1","key":"ref30","doi-asserted-by":"crossref","first-page":"103","DOI":"10.1061\/(ASCE)SC.1943-5576.0000200","article-title":"Lessons from using BIM to increase design-construction integration","volume":"19","author":"Luth G. P.","year":"2014","journal-title":"Practice Periodical on Structural Design and Construction"},{"issue":"3","key":"ref31","doi-asserted-by":"crossref","first-page":"537","DOI":"10.1108\/JEDT-05-2018-0080","article-title":"5D BIM: an investigation into the integration of quantity surveyors within the BIM process","volume":"17","author":"Mayouf M.","year":"2019","journal-title":"Journal of Engineering, Design and Technology"},{"key":"ref32","series-title":"BICP global BIM study: lessons for Ireland\u2019s BIM Programme","author":"McAuley B.","year":"2017"},{"issue":"10","key":"ref33","doi-asserted-by":"crossref","first-page":"228","DOI":"10.14569\/IJACSA.2018.091028","article-title":"Construction project quality management using building information modeling 360 field","volume":"9","author":"Nguyen P. T.","year":"2018","journal-title":"International Journal of Advanced Computer Science and Applications"},{"issue":"9","key":"ref34","article-title":"The integration of lessons learned knowledge in Building Information Modelling (BIM). ASCE\u2019s.","volume":"144","author":"Oti A.","year":"2018","journal-title":"Journal of Construction Engineering and Management"},{"issue":"4","key":"ref35","doi-asserted-by":"crossref","first-page":"639","DOI":"10.1007\/s42107-020-00224-4","article-title":"Digital project management in infrastructure project: a case study of Nagpur Metro Rail Project","volume":"21","author":"Pakhale P. D.","year":"2020","journal-title":"Asian Journal of Civil Engineering"},{"key":"ref36","first-page":"49","author":"Peng H.","year":"2018"},{"key":"ref37","series-title":"Um guia do conhecimento em gerenciamento de projetos. Guia PMBOK","year":"2013","edition":"5th"},{"key":"ref38","series-title":"A guide to the project management body of knowledge (PMBOK\u00ae guide)","year":"2017"},{"key":"ref39","series-title":"Guia do conhecimento em gerenciamento de projetos (Guia PMBOK).","year":"2021","edition":"7."},{"key":"ref40","doi-asserted-by":"crossref","first-page":"607","DOI":"10.1016\/j.proeng.2017.08.048","article-title":"Project management success factors","volume":"196","author":"Radujkovi\u0107 M.","year":"2017","journal-title":"Procedia Engineering"},{"issue":"8","key":"ref41","doi-asserted-by":"crossref","first-page":"1053","DOI":"10.1108\/ECAM-08-2016-0183","article-title":"Strategy management of construction workspaces by conflict resolution algorithm and visualization model","volume":"25","author":"Rohani M.","year":"2018","journal-title":"Engineering, Construction, and Architectural Management"},{"issue":"2","key":"ref42","doi-asserted-by":"crossref","first-page":"122","DOI":"10.1680\/jmuen.16.00045","article-title":"Applications of building information modelling for planning and delivery of rapid transit","volume":"172","author":"Saldanha A. G.","year":"2019","journal-title":"Proceedings of the Institution of Civil Engineers. Municipal Engineer"},{"key":"ref43","first-page":"475","article-title":"BIM & the 5D project cost manager","volume":"119","author":"Smith P.","year":"2014","journal-title":"Procedia: Social and Behavioral Sciences"},{"key":"ref44","first-page":"168","author":"Suzuki R. T.","year":"2015"},{"issue":"3","key":"ref45","doi-asserted-by":"crossref","first-page":"207","DOI":"10.1111\/1467-8551.00375","article-title":"Towards a methodology for developing evidence\u2010informed management knowledge by means of systematic review","volume":"14","author":"Tranfield D.","year":"2003","journal-title":"British Journal of Management"},{"issue":"3","key":"ref46","doi-asserted-by":"crossref","first-page":"215","DOI":"10.1016\/0926-5805(92)90014-B","article-title":"Modelling multiple views on buildings","volume":"1","author":"van Nederveen G. A.","year":"1992","journal-title":"Automation in Construction"},{"key":"ref47","first-page":"123","author":"Ward D.","year":"2014"},{"issue":"12","key":"ref48","first-page":"7749","article-title":"Building Information Modeling (BIM) for project value: quantity take-off of building frame approach","volume":"11","author":"Whang S. W.","year":"2016","journal-title":"International Journal of Applied Engineering Research: IJAER"},{"key":"ref49","doi-asserted-by":"crossref","DOI":"10.1016\/j.autcon.2019.102908","article-title":"Subjective benefit evaluation model for immature BIM-enabled stakeholders","volume":"106","author":"Yang J.","year":"2019","journal-title":"Automation in Construction"},{"issue":"2","key":"ref50","first-page":"77","article-title":"Study on the cost control of construction engineering project based on BIM","volume":"38","author":"Zhao Z. W.","year":"2015","journal-title":"Journal of Mechanical Engineering Research and Developments"},{"issue":"3","key":"ref51","doi-asserted-by":"crossref","first-page":"393","DOI":"10.1016\/j.ijproman.2017.01.006","article-title":"Benefit sharing for BIM implementation: tackling the moral hazard dilemma in inter-firm cooperation","volume":"35","author":"Zheng L.","year":"2017","journal-title":"International Journal of Project Management"},{"issue":"1","key":"ref52","doi-asserted-by":"crossref","first-page":"29","DOI":"10.1680\/jcien.20.00024","article-title":"Rapid construction and advanced technology for a Covid-19 field hospital in Wuhan, China","volume":"174","author":"Zhou M.","year":"2020","journal-title":"Proceedings of the Institution of Civil Engineers. Civil Engineering"}],"container-title":["Gest\u00e3o &amp; Produ\u00e7\u00e3o"],"original-title":["Benef\u00edcios do uso do Building Information Modeling para o gerenciamento de projetos"],"link":[{"URL":"http:\/\/www.scielo.br\/scielo.php?script=sci_pdf&pid=S0104-530X2025000100215&tlng=en","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,8,11]],"date-time":"2025-08-11T14:53:34Z","timestamp":1754924014000},"score":1,"resource":{"primary":{"URL":"http:\/\/www.scielo.br\/scielo.php?script=sci_arttext&pid=S0104-530X2025000100215&tlng=en"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2025]]},"references-count":52,"alternative-id":["S0104-530X2025000100215"],"URL":"https:\/\/doi.org\/10.1590\/1806-9649-2025v32e2125","relation":{},"ISSN":["1806-9649","0104-530X"],"issn-type":[{"value":"1806-9649","type":"electronic"},{"value":"0104-530X","type":"print"}],"subject":[],"published":{"date-parts":[[2025]]},"article-number":"e2125"}}