{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,5,14]],"date-time":"2025-05-14T05:30:49Z","timestamp":1747200649972,"version":"3.40.5"},"reference-count":28,"publisher":"Universidad de Antioquia","license":[{"start":{"date-parts":[[2021,7,9]],"date-time":"2021-07-09T00:00:00Z","timestamp":1625788800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by-nc-sa\/4.0"}],"content-domain":{"domain":["revistas.udea.edu.co"],"crossmark-restriction":false},"short-container-title":["Rev.Fac.Ing.Univ.Antioquia"],"abstract":"<jats:p>Footwear production is subject to the variability inherent in any process, and producers often need to apply tools that allow them to make the right decisions. This work documents the process to optimize the buffer allocation in a shoe manufacturing line minimizing the cycle time in the system, applying a metamodeling approach. It was found that the Front sewing operation, and the interaction between the Lining sewing operation and the assembly operation have the greatest effect on the flow time of the product within the process; the optimum assignment of spaces follows a non-uniform arrangement on the line saturating the slower stations; the cycle time follows a non-linear behavior vs. the total number of spaces (N) in the line. For a certain value of N, the cycle time reaches a minimum value.<\/jats:p>","DOI":"10.17533\/udea.redin.20210735","type":"journal-article","created":{"date-parts":[[2021,10,7]],"date-time":"2021-10-07T13:39:23Z","timestamp":1633613963000},"update-policy":"https:\/\/doi.org\/10.17533\/udea.crossmark","source":"Crossref","is-referenced-by-count":1,"title":["Buffer allocation problem in a shoe manufacturing line: A metamodeling approach"],"prefix":"10.17533","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-0022-7614","authenticated-orcid":false,"given":"Jos\u00e9 Omar","family":"Hern\u00e1ndez - Va\u00b4zquez","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0001-7237-9521","authenticated-orcid":false,"given":"Salvador","family":"Hern\u00e1ndez-Gonz\u00e1lez","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-1332-8243","authenticated-orcid":false,"given":"Jos\u00e9 Israel","family":"Hern\u00e1ndez - V\u00b4\u00e1zquez","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-2824-9994","authenticated-orcid":false,"given":"Vicente","family":"Figueroa- Fern\u00e1ndez","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-0460-5739","authenticated-orcid":false,"given":"Claudia Iveth","family":"Cancino de la Fuente","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"7132","published-online":{"date-parts":[[2021,7,9]]},"reference":[{"key":"615912","doi-asserted-by":"crossref","unstructured":"S. Hern\u00e1ndez Gonz\u00e1lez, R. Ram\u00edrez Tapia, and J. A. Jim\u00e9nez Garc\u00eda, \u201cAnalysis of the productivity of a shoe production line\u2013application of queueing theory and lean manufacturing,\u201d in Best Practices in Manufacturing Processes. New York: Springer, Cham, 2019, pp. 367\u2013388.","DOI":"10.1007\/978-3-319-99190-0_17"},{"key":"615913","doi-asserted-by":"crossref","unstructured":"V. Cerda-Mej\u00eda and et al., \u201cSimulation strategy to reduce quality uncertainty in the sugar cane honey process design,\u201d Ingenier\u00eda e Investigaci\u00f3n, vol. 41, no. 1, 2021. [Online]. Available: https:\/\/dialnet.unirioja.es\/servlet\/articulo?codigo=7736574","DOI":"10.15446\/ing.investig.v41n1.81484"},{"key":"615914","doi-asserted-by":"crossref","unstructured":"C. Bocanegra-Herrera and C. J. Vidal, \u201cDevelopment of a simulation model as a decision support system for sugarcane supply,\u201d DYNA revusta facultad nacional de minas, vol. 83, no. 198, 2016. [Online]. Available: https:\/\/doi.org\/10.15446\/dyna.v83n198.52719.","DOI":"10.15446\/dyna.v83n198.52719"},{"key":"615915","doi-asserted-by":"crossref","unstructured":"S. Y. K. . O. Kilincci, \u201cHybrid approach for buffer allocation in open serial production lines,\u201d Computers and Operations Research, vol. 60, Ago. 2015. [Online]. Available: https:\/\/doi.org\/10.1016\/j.cor.2015.01.009","DOI":"10.1016\/j.cor.2015.01.009"},{"key":"615916","doi-asserted-by":"crossref","unstructured":"S. Weiss, J. A. Schwarz, and R. Stolletz, \u201cThe buffer allocation problem in production lines: Formulations, solution methods, and instances,\u201d IISE Transactions, vol. 51, no. 5, May. 30, 2019. [Online]. Available: https:\/\/doi.org\/10.1080\/24725854.2018.1442031","DOI":"10.1080\/24725854.2018.1442031"},{"key":"615917","doi-asserted-by":"crossref","unstructured":"G. A. Vouros and H. T. Papadopoulos, \u201cBuffer allocation in unreliable production lines using a knowledge based system,\u201d Computers & Operations Research, vol. 25, no. 12, Dic. 1998. [Online]. Available: https:\/\/doi.org\/10.1016\/S0305-0548(98)00034-3","DOI":"10.1016\/S0305-0548(98)00034-3"},{"key":"615918","unstructured":"G. A. Vouros, M. I. Vidalis, and H. D. Papadopoulos, \u201cA heuristic algorithm for buffer allocation in unreliable production lines,\u201d International Journal of Operations and Quantitative Management, vol. 6, no. 1, 2000. [Online]. Available: https:\/\/bit.ly\/3d6ZjBT"},{"key":"615919","doi-asserted-by":"crossref","unstructured":"J. M. Smith and F. B. Cruz, \u201cThe buffer allocation problema for general finite buffer queueing networks,\u201d IIE Transactions, vol. 37, no. 4, 2005. [Online]. Available: https:\/\/doi.org\/10.1080\/07408170590916986","DOI":"10.1080\/07408170590916986"},{"key":"615920","doi-asserted-by":"crossref","unstructured":"S. Durieux and H. Pierreval, \u201cRegression metamodeling for the design of automated manufacturing system composed of parallel machines sharing a material handling resource,\u201d International Journal of Production Economics, vol. 89, no. 1, May. 2004. [Online]. Available: https:\/\/doi.org\/10.1016\/S0925-5273(03)00199-3","DOI":"10.1016\/S0925-5273(03)00199-3"},{"key":"615921","unstructured":"R. O. Kuehl, Design of experiments : statistical principles of research design and analysis, 2nd ed. Pacific Grove, CA : Duxbury\/Thomson Learning, 2000."},{"key":"615922","doi-asserted-by":"crossref","unstructured":"G. Wang, S. Song, Shin, Y.W. and D. H. Moon, \u201cA Simulation Based Study on Increasing Production Capacity in a Crankshaft Line Considering Limited Budget and Space\u201d Journal of Korean Institute of Industrial Engineers, vol. 40, no. 5, May. 29, 2014. [Online]. Available: https:\/\/doi.org\/10.7232\/jkiie.2014.40.5.481","DOI":"10.7232\/JKIIE.2014.40.5.481"},{"key":"615923","doi-asserted-by":"crossref","unstructured":"A. Patchong and L. Kerbache, \u201cTransiting toward the factory of the future: Optimal buffer sizes and robot cell design in car body production,\u201d in IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), Singapur, 2017.","DOI":"10.1109\/IEEM.2017.8290162"},{"key":"615924","doi-asserted-by":"crossref","unstructured":"J. T. Lin and C. C. Chiu, \u201cA hybrid particle swarm optimization with local search for stochastic resource allocation problem,\u201d Journal of Intelligent Manufacturing, vol. 29, Jul. 14, 2015. [Online]. Available: https:\/\/doi.org\/10.1007\/s10845-015-1124-7","DOI":"10.1007\/s10845-015-1124-7"},{"key":"615925","doi-asserted-by":"crossref","unstructured":"J. Li, \u201cContinuous improvement at toyota manufacturing plant: applications of production systems engineering methods,\u201d International Journal of Production Research, vol. 51, no. 23-24, Feb. 6, 2013. [Online]. Available: https:\/\/doi.org\/10.1080\/00207543.2012.753166","DOI":"10.1080\/00207543.2012.753166"},{"key":"615926","doi-asserted-by":"crossref","unstructured":"N. Nahas, \u201cBuffer allocation and preventive maintenance optimization in unreliable production lines,\u201d Journal of Intelligent Manufacturing volume, vol. 28, Ene. 2017. [Online]. Available: https:\/\/doi.org\/10.1007\/s10845-014-0963-y","DOI":"10.1007\/s10845-014-0963-y"},{"key":"615927","doi-asserted-by":"crossref","unstructured":"M. Ouzineb, F. Z. Mhada, R. Pellerin, and I. E. Hallaoui, \u201cOptimal planning of buffer sizes and inspection station positions,\u201d Production & Manufacturing Research, vol. 6, no. 1, Feb. 1, 2018. [Online]. Available: https:\/\/doi.org\/10.1080\/21693277.2017.1422812","DOI":"10.1080\/21693277.2017.1422812"},{"key":"615928","doi-asserted-by":"crossref","unstructured":"S. Shaaban and R. Romero-Silva, \u201cPerformance of merging lines with uneven buffer capacity allocation: the effects of unreliability under different inventory-related costs,\u201d Central European Journal of Operations Research, Ene. 19, 2020. [Online]. Available: https:\/\/doi.org\/10.1007\/s10100-019-00670-9","DOI":"10.1007\/s10100-019-00670-9"},{"key":"615929","doi-asserted-by":"crossref","unstructured":"F. Altiparmak, B. Dengiz, and A. Bulgak, \u201cBuffer allocation and performance modeling in asynchronous assembly system operations: An artificial neural network metamodeling approach,\u201d Applied Soft Computing, vol. 7, no. 3, Jun. 2007. [Online]. Available: https:\/\/doi.org\/10.1016\/j.asoc.2006.06.002","DOI":"10.1016\/j.asoc.2006.06.002"},{"key":"615930","doi-asserted-by":"crossref","unstructured":"M. A. . A. Mohtashami, \u201cBuffer allocation in unreliable production lines based on design of experiments, simulation, and genetic algorithm,\u201d The International Journal of Advanced Manufacturing Technology, vol. 62, Sep. 2012. [Online]. Available: https:\/\/doi.org\/10.1007\/s00170-011-3802-8","DOI":"10.1007\/s00170-011-3802-8"},{"key":"615931","doi-asserted-by":"crossref","unstructured":"W. Ameen, M. AlKahtani, M. K. Mohammed, O. Abdulhameed, and A. M. El-Tamimi, \u201cInvestigation of the effect of buffer storage capacity and repair rate on production line efficiency,\u201d Journal of King Saud University \u2013 Engineering Sciences, vol. 30, no. 3, Jul. 2018. [Online]. Available: https:\/\/doi.org\/10.1016\/j.jksues.2018.03.001","DOI":"10.1016\/j.jksues.2018.03.001"},{"key":"615932","doi-asserted-by":"crossref","unstructured":"M. M. Motlagh, P. Azimi, M. Amiri, and G. Madraki, \u201cAn efficient simulation optimization methodology to solve a multi-objective problem in unreliable unbalanced production lines,\u201d Expert Systems with Applications, vol. 138, Dic. 30, 2019. [Online]. Available: https:\/\/doi.org\/10.1016\/j.eswa.2019.112836","DOI":"10.1016\/j.eswa.2019.112836"},{"key":"615933","doi-asserted-by":"crossref","unstructured":"F. Nu\u00f1ez-Pi\u00f1a, J. Medina-Marin, J. C. Seck-Tuoh-Mora, N. Hernandez-Romero, and E. S. Hernandez-Gress, \u201cModeling of throughput in production lines using response surface methodology and artificial neural networks,\u201d Complexity, vol. 2018, Ene. 31, 2018. [Online]. Available: https:\/\/doi.org\/10.1155\/2018\/1254794","DOI":"10.1155\/2018\/1254794"},{"key":"615934","doi-asserted-by":"crossref","unstructured":"H. T. Papadopoulos and M. I. Vidalis, \u201cMinimizing wip inventory in reliable production lines,\u201d International Journal of Production Economics, vol. 70, no. 2, Mar. 21, 2001. [Online]. Available: https:\/\/doi.org\/10.1016\/S0925-5273(00)00056-6","DOI":"10.1016\/S0925-5273(00)00056-6"},{"key":"615935","doi-asserted-by":"crossref","unstructured":"J. O. Hern\u00e1ndez-V\u00e1zquez, S. Hern\u00e1ndez-Gonz\u00e1lez, J. A. Jim\u00e9nez-Garc\u00eda, M. D. Hern\u00e1ndez-Ripalda, and J. I. Hern\u00e1ndez-V\u00e1quez, \u201cEnfoque h\u00edbrido metaheur\u00edstico AG-RS para el problema de asignaci\u00f3n del buffer que minimiza el inventario en proceso en l\u00edneas de producci\u00f3n abiertas en serie,\u201d Revista iberoamericana de autom\u00e1tica e inform\u00e1tica industrial (RIAI), vol. 16, no. 4, 2019. [Online]. Available: https:\/\/doi.org\/10.4995\/riai.2019.10883","DOI":"10.4995\/riai.2019.10883"},{"key":"615936","doi-asserted-by":"crossref","unstructured":"S. Shaaban, T. McNamara, and V. Dmitriev, \u201cAsymmetrical buffer allocation in unpaced merging assembly lines,\u201d Computers & Industrial Engineering, vol. 109, Jul. 2017. [Online]. Available: https:\/\/doi.org\/10.1016\/j.cie.2017.05.008","DOI":"10.1016\/j.cie.2017.05.008"},{"key":"615937","unstructured":"W. J. Hopp and M. L. Spearman, Factory Physics, 3rd ed. Long Grove: Waveland Pr Inc, 2011."},{"key":"615938","doi-asserted-by":"crossref","unstructured":"S. Balsamo, V. Nitto-Persone, and R. Onvural, Analysis of Queueing Networks with Blocking. New York: Springer Science+Business Media, 2001.","DOI":"10.1007\/978-1-4757-3345-7"},{"key":"615939","doi-asserted-by":"crossref","unstructured":"J. P. Kleijnen and R. G. Sargent, \u201cA methodology for fitting and validating metamodels in simulation,\u201d European Journal of Operational Research, vol. 120, no. 1, Ene. 1, 2000. [Online]. Available: https:\/\/doi.org\/10.1016\/S0377-2217(98)00392-0","DOI":"10.1016\/S0377-2217(98)00392-0"}],"container-title":["Revista Facultad de Ingenier\u00eda Universidad de Antioquia"],"original-title":[],"link":[{"URL":"https:\/\/revistas.udea.edu.co\/index.php\/ingenieria\/article\/download\/343859\/20805690","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/revistas.udea.edu.co\/index.php\/ingenieria\/article\/download\/343859\/20805690","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,10,7]],"date-time":"2021-10-07T13:40:48Z","timestamp":1633614048000},"score":1,"resource":{"primary":{"URL":"https:\/\/revistas.udea.edu.co\/index.php\/ingenieria\/article\/view\/343859"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021,7,9]]},"references-count":28,"URL":"https:\/\/doi.org\/10.17533\/udea.redin.20210735","relation":{},"ISSN":["2422-2844","0120-6230"],"issn-type":[{"type":"electronic","value":"2422-2844"},{"type":"print","value":"0120-6230"}],"subject":[],"published":{"date-parts":[[2021,7,9]]},"assertion":[{"value":"Universidad de Antioquia","name":"publisher","label":"This article is maintained by"},{"value":"\u00a9 Universidad de Antioquia","name":"copyright","label":"Copyright"}]}}