{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,8,6]],"date-time":"2024-08-06T21:09:02Z","timestamp":1722978542843},"reference-count":42,"publisher":"International Academy Publishing (IAP)","issue":"8","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["JSW"],"DOI":"10.17706\/jsw.10.8.939-960","type":"journal-article","created":{"date-parts":[[2015,9,25]],"date-time":"2015-09-25T08:20:16Z","timestamp":1443169216000},"page":"939-960","source":"Crossref","is-referenced-by-count":1,"title":["Project Schedule Simulation: Incorporating Human Factors\u2019 Uncertainty and Features\u2019 Priority in Task Modeling"],"prefix":"10.17706","volume":"10","author":[{"name":"Department of Electrical and Computer Engineering, Khalifa University, UAE.","sequence":"first","affiliation":[]},{"given":"Rabeb","family":"Mizouni","sequence":"first","affiliation":[]},{"given":"Sanja","family":"Lazarova-Molnar","sequence":"additional","affiliation":[]}],"member":"7163","published-online":{"date-parts":[[2015]]},"reference":[{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1111\/j.1937-5956.2005.tb00230.x"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1016\/0263-7863(95)00064-X"},{"key":"ref3","first-page":"1","article-title":"Multi-mode double resource-Constrained time\/cost trade-offs project scheduling problems.","volume-title":"Proceedings of the International Conference on Management and Service Science","author":"Wen","year":"2009","unstructured":"[6] Wen, Z. J., & Fang, S. H. (2009). Multi-mode double resource-Constrained time\/cost trade-offs project scheduling problems. Proceedings of the International Conference on Management and Service Science (pp. 1-4)."},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2004.04.002"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.4114\/ia.v13i42.1042"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2008.10.004"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2007.08.005"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1109\/ASE.2008.37"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.4304\/jsw.7.7.1440-1450"},{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.5381\/jot.2004.3.8.c4"},{"key":"ref11","volume-title":"Managing Software Requirements","author":"Leffingwell","year":"2003","unstructured":"[16] Leffingwell, D., & Widrig, D. (2003). Managing Software Requirements: A Use Case Approach. Pearson Education."},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1016\/S0950-5849(00)00152-X"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1007\/s10951-007-0021-0"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1002\/smr.515"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1016\/j.knosys.2010.03.014"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.1016\/j.jss.2009.03.014"},{"key":"ref17","doi-asserted-by":"publisher","DOI":"10.1007\/s10288-003-0031-5"},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.1002\/smr.466"},{"key":"ref19","doi-asserted-by":"publisher","DOI":"10.1007\/978-0-387-33768-5_2"},{"key":"ref20","first-page":"293","article-title":"Predictive and reactive scheduling with the microboss production scheduling and control system.","volume-title":"Proceedings of the IJCAI-93 Workshop on Knowledge-Based Production Planning Scheduling and Control","author":"Sadeh","year":"1993","unstructured":"[25] Sadeh, N., Otsuka, S., & Schelback, R. (1993). Predictive and reactive scheduling with the microboss production scheduling and control system. Proceedings of the IJCAI-93, Workshop on Knowledge-Based Production Planning, Scheduling and Control (pp. 293-306)."},{"key":"ref21","doi-asserted-by":"publisher","DOI":"10.1023\/A:1009856210543"},{"key":"ref22","doi-asserted-by":"publisher","DOI":"10.1016\/S0377-2217(02)00499-X"},{"key":"ref23","volume-title":"Stochastic Resource-Constrained Project Scheduling","author":"Stork","year":"2001","unstructured":"[28] Stork, F. (2001). Stochastic Resource-Constrained Project Scheduling. Technische Universitat Berlin."},{"key":"ref24","doi-asserted-by":"publisher","DOI":"10.1016\/0165-0114(79)90022-8"},{"key":"ref25","first-page":"70","article-title":"A project scheduling method based on fuzzy theory.","volume":"1","author":"Soltani","year":"2007","unstructured":"[30] Soltani, A., & Haji, R. (2007). A project scheduling method based on fuzzy theory. Journal of Industrial and Systems Engineering, 1, 70-80.","journal-title":"Journal of Industrial and Systems Engineering"},{"key":"ref26","doi-asserted-by":"publisher","DOI":"10.1023\/A:1022036931014"},{"key":"ref27","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2005)131:1(42)"},{"key":"ref28","doi-asserted-by":"publisher","DOI":"10.1016\/S0377-2217(03)00130-9"},{"key":"ref29","doi-asserted-by":"publisher","DOI":"10.1016\/S0377-2217(00)00281-2"},{"key":"ref30","doi-asserted-by":"publisher","DOI":"10.1016\/S0164-1212(99)00003-5"},{"key":"ref31","doi-asserted-by":"publisher","DOI":"10.1109\/mnet.2011.5687949"},{"key":"ref32","doi-asserted-by":"publisher","DOI":"10.1016\/j.comcom.2013.07.003"},{"key":"ref33","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2013.6721436"},{"key":"ref34","volume-title":"Modeling human decision behaviors for accurate prediction of project schedule duration","author":"Lazarova","year":"2010","unstructured":"[39] Lazarova, S. M., & Mizouni, R. (2010). Modeling human decision behaviors for accurate prediction of project schedule duration. Hammamet, Tunisia."},{"key":"ref35","article-title":"A new paradigm for the numerical simulation of stochastic Petri nets with general firing times.","volume-title":"Proceedings of the European Simulation Symposium","author":"Horton","year":"2002","unstructured":"[40] Horton, G. (2002). A new paradigm for the numerical simulation of stochastic Petri nets with general firing times. Proceedings of the European Simulation Symposium."},{"key":"ref36","article-title":"Combining proxels and discrete phases.","volume-title":"Proceedings of International Conference on Modeling Simulation and Applied Optimization","author":"Isensee","year":"2005","unstructured":"[41] Isensee, C., Molnar, S. L., & Horton, G. (2005). Combining proxels and discrete phases. Proceedings of International Conference on Modeling, Simulation and Applied Optimization."},{"key":"ref37","volume-title":"Introduction to the Numerical Solution of Markov Chains","author":"Stewart","year":"1994","unstructured":"[42] Stewart, W. J. (1994). Introduction to the Numerical Solution of Markov Chains, Princeton University Press."},{"key":"ref38","doi-asserted-by":"publisher","DOI":"10.1017\/S0305004100030437"},{"key":"ref39","doi-asserted-by":"publisher","DOI":"10.1145\/55483.55496"},{"key":"ref40","doi-asserted-by":"publisher","DOI":"10.1109\/ANSS.2005.12"},{"key":"ref41","doi-asserted-by":"publisher","DOI":"10.1007\/s00766-010-0104-x"},{"key":"ref42","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1997)123:1(11)"}],"container-title":["Journal of Software"],"original-title":[],"link":[{"URL":"http:\/\/www.jsoftware.us\/vol10\/77-jsw140316-1150.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2015,10,21]],"date-time":"2015-10-21T03:18:44Z","timestamp":1445397524000},"score":1,"resource":{"primary":{"URL":"http:\/\/www.jsoftware.us\/index.php?m=content&c=index&a=show&catid=155&id=2362"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015]]},"references-count":42,"journal-issue":{"issue":"8","published-online":{"date-parts":[[2015]]}},"URL":"https:\/\/doi.org\/10.17706\/jsw.10.8.939-960","relation":{},"ISSN":["1796-217X"],"issn-type":[{"type":"electronic","value":"1796-217X"}],"subject":[],"published":{"date-parts":[[2015]]}}}