{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,11,2]],"date-time":"2026-11-02T09:07:29Z","timestamp":1793610449827,"version":"4.5.0"},"reference-count":51,"publisher":"Society of Petroleum Engineers (SPE)","issue":"07","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2025,7,9]]},"abstract":"<jats:title>Summary<\/jats:title>\n               <jats:p>Installing qualified cross-sectional cement barriers is a difficult task. One needs to ensure that cement is displaced evenly along the required length and fills the annulus completely, which may prove difficult in some scenarios such as unknown annular content and wells with eccentric casings. Traditional methods, such as section milling and cement squeeze, have been ineffective in delivering good results in terms of time, cost, and quality, and as such, new techniques have been developed. In this review article, we discuss perforate, wash, and cement (PWC), a method of installing a cross-sectional cement barrier that is being deployed widely around the world for remediating poor cement and performing plugging and abandonment (P&amp;A) jobs. Abandoning wells will be an enormous undertaking in the short term, thus installing safe and cost-effective barriers is of utmost importance. In this context, we review PWC in terms of reported field deployments, modeling techniques with computational fluid dynamics (CFD), qualification processes according to existing standards, the establishment of track records, and the efforts to go rigless. We conclude that establishing track records through qualification matrices is fundamental for reducing costs without incurring reduced safety as well as that performing rigless P&amp;A through PWC could save significant costs and time in the context of thousands of wells to be plugged in the near future.<\/jats:p>","DOI":"10.2118\/226204-pa","type":"journal-article","created":{"date-parts":[[2025,4,28]],"date-time":"2025-04-28T10:18:35Z","timestamp":1745835515000},"page":"4053-4065","source":"Crossref","is-referenced-by-count":9,"title":["Perforate, Wash, and Cement: A Review of Practices and Where to Go Next"],"prefix":"10.2118","volume":"30","author":[{"ORCID":"https:\/\/orcid.org\/0000-0001-9025-4589","authenticated-orcid":true,"given":"M. A.","family":"Jaculli","sequence":"first","affiliation":[{"name":"HydraWell Intervention (Corresponding author)"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"M.","family":"Iuell","sequence":"additional","affiliation":[{"name":"HydraWell Intervention"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"E.","family":"Engelsgjerd","sequence":"additional","affiliation":[{"name":"HydraWell Intervention"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"E. A.","family":"Knudsen","sequence":"additional","affiliation":[{"name":"HydraWell Intervention"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"S.","family":"Amdal","sequence":"additional","affiliation":[{"name":"HydraWell Intervention"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"P.","family":"Andersen","sequence":"additional","affiliation":[{"name":"HydraWell Intervention"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"S. I.","family":"Haukelid","sequence":"additional","affiliation":[{"name":"HydraWell Intervention"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"S.","family":"Vemmestad","sequence":"additional","affiliation":[{"name":"HydraWell Intervention"}],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"861","published-online":{"date-parts":[[2025,4,28]]},"reference":[{"key":"2025071014221920200_R1","doi-asserted-by":"crossref","DOI":"10.2118\/220593-MS","article-title":"Innovative Techniques for Managing Sustained Annulus Pressure in Highly Fractured Carbonate Field","author":"Adawi","year":"2024"},{"key":"2025071014221920200_R2","doi-asserted-by":"crossref","DOI":"10.2118\/208492-MS","article-title":"Annulus Perforate, Wash and Cement: Establishing Barrier Verification Process for Deepwater Subsea Wells Abandonment and Its Lessons Learnt","author":"Allapitchai","year":"2021"},{"key":"2025071014221920200_R3","doi-asserted-by":"crossref","DOI":"10.2523\/IPTC-22892-MS","article-title":"A Systematic Approach in Methodology for Permanent Plug Placement in Deepwater Subsea Plug and Abandonment Campaign","author":"Allapitchai","year":"2023"},{"key":"2025071014221920200_R4","doi-asserted-by":"crossref","DOI":"10.2118\/185911-MS","article-title":"Innovative Remediation Techniques for Restoring Well Integrity by Curing High Annulus-B Pressure and Zonal Communication","author":"Ansari","year":"2017"},{"key":"2025071014221920200_R5","doi-asserted-by":"crossref","DOI":"10.2523\/IPTC-18894-MS","article-title":"Innovative Planning and Remediation Techniques for Restoring the Well Integrity by Curing High Annulus-B Pressure and Zonal Communication","author":"Ansari","year":"2016"},{"key":"2025071014221920200_R6","article-title":"A Novel Strategy for Restoring the Well Integrity by Curing High Annulus-B Pressure and Zonal Communication","author":"Ansari","year":"2016"},{"key":"2025071014221920200_R7","article-title":"Wellbore Plugging and Abandonment","author":"API RP 65-3","year":"2021"},{"key":"2025071014221920200_R8","doi-asserted-by":"crossref","DOI":"10.4043\/31403-MS","article-title":"Biggest Wells Plug and Abandonment Campaign \u2013 Effective Management & Best Practices Implementation","author":"Azihar","year":"2022"},{"key":"2025071014221920200_R9","doi-asserted-by":"crossref","DOI":"10.2118\/202430-MS","article-title":"Installation of Annulus Cement Plugs Using Perforation, Wash and Cement Technique, a Lookback from a First for Australia","author":"Bothamley","year":"2020"},{"key":"2025071014221920200_R10","doi-asserted-by":"crossref","first-page":"211718","DOI":"10.1016\/j.geoen.2023.211718","article-title":"Plug and Abandonment of Oil and Gas Wells \u2013 A Comprehensive Review of Regulations, Practices, and Related Impact of Materials Selection","volume":"226","author":"Chukwuemeka","year":"2023","journal-title":"Geoenergy Sci Eng"},{"key":"2025071014221920200_R11","doi-asserted-by":"crossref","DOI":"10.2118\/209047-MS","article-title":"A Low Impact Rigless Well Abandonment Solution for Complex Wells","author":"Dahmani","year":"2022"},{"key":"2025071014221920200_R12","doi-asserted-by":"crossref","DOI":"10.2118\/185938-MS","article-title":"Perforate, Wash and Cement PWC Verification Process and an Industry Standard for Barrier Acceptance Criteria","author":"Delabroy","year":"2017"},{"key":"2025071014221920200_R13","doi-asserted-by":"crossref","DOI":"10.2118\/193945-MS","article-title":"Perforate Wash and Cement for Large Casing Sizes","author":"Delabroy","year":"2018"},{"key":"2025071014221920200_R14","article-title":"Novel Approach to More Effective Plug and Abandonment Cementing Techniques","author":"Ferg","year":"2011"},{"key":"2025071014221920200_R15","doi-asserted-by":"crossref","DOI":"10.2118\/217712-MS","article-title":"Improved Logging Techniques and Interpretation Experiences to Evaluate Perforate-Wash-Cement Intervals","author":"Govil","year":"2024"},{"key":"2025071014221920200_R16","doi-asserted-by":"crossref","DOI":"10.2118\/193959-MS","article-title":"Malaysia\u2019s First Subsea Fields Abandonment","author":"Ho","year":"2018"},{"key":"2025071014221920200_R17","doi-asserted-by":"crossref","DOI":"10.2118\/217690-MS","article-title":"Lessons Learned from 150 Jet-Type Perforate, Wash and Cement Well Abandonment Operations","author":"Hovda","year":"2024"},{"key":"2025071014221920200_R18","doi-asserted-by":"crossref","DOI":"10.2118\/202397-MS","article-title":"Best Practice for Cementing and Zonal Isolation Using the Jet-Type Perforate, Wash and Cement Technique","author":"Hovda","year":"2020"},{"key":"2025071014221920200_R19","doi-asserted-by":"crossref","DOI":"10.2118\/222408-MS","article-title":"Extending Well Life and Securing Well Integrity Efficiently","author":"Hurtado","year":"2024"},{"key":"2025071014221920200_R20","volume-title":"Diretrizes Para Abandono de Po\u00b8cos (Well Abandonment Guidelines)","author":"IBP","year":"2022","edition":"second revision"},{"key":"2025071014221920200_R21","doi-asserted-by":"crossref","DOI":"10.2118\/189580-MS","article-title":"Perf-and-Wash Cement Placement Technique as A Cost-Effective Solution for Permanent Abandonment of A Well with Multiple Permeable Zones: A Case Study from North Sea, UK","author":"Joneja","year":"2018"},{"key":"2025071014221920200_R22","doi-asserted-by":"crossref","DOI":"10.2118\/212444-MS","article-title":"Abandonment Barrier Placement with Novel Analysis Spells Success in Deepwater","author":"Kehlenbeck","year":"2023"},{"key":"2025071014221920200_R23","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-030-39970-2","volume-title":"Introduction to Permanent Plug and Abandonment of Wells","author":"Khalifeh","year":"2020"},{"key":"2025071014221920200_R24","doi-asserted-by":"crossref","DOI":"10.2118\/193965-MS","article-title":"Cap Rock Restoration in Well Abandonment: Fit-for-Purpose Well Abandonment Design through Workflow Optimization and Integrated Assessment","author":"Kueh","year":"2018"},{"key":"2025071014221920200_R25","doi-asserted-by":"crossref","DOI":"10.2118\/212548-MS","article-title":"System Integration Test (SIT) of Technology Enabling Through-Tubing Rig-Less Plug and Abandonment","author":"Kverneland","year":"2023"},{"key":"2025071014221920200_R26","doi-asserted-by":"crossref","DOI":"10.2118\/202344-MS","article-title":"When Can Perforating, Wash and Cement PWC Reduce Abandonment Costs?","author":"Leeson","year":"2020"},{"key":"2025071014221920200_R27","doi-asserted-by":"crossref","DOI":"10.2118\/222228-MS","article-title":"Advanced Perforation Technology for Enhanced Remedial and Casing Recovery Applications","author":"Lucas","year":"2024"},{"key":"2025071014221920200_R28","doi-asserted-by":"crossref","DOI":"10.2118\/191528-MS","article-title":"Improving the Understanding, Application and Reliability of the Perforate, Wash and Cement Technique through the Use of Cement Bond Logs, Tool Enhancements and Barrier Verification via Annular Pressure Monitoring","author":"Lucas","year":"2018"},{"key":"2025071014221920200_R29","doi-asserted-by":"crossref","DOI":"10.4043\/31394-MS","article-title":"An Electrifying Integrated Solution Towards a Safe and Environmentally Sound Well Abandonment in Urban Setting","author":"Mohamad","year":"2022"},{"key":"2025071014221920200_R30","doi-asserted-by":"crossref","DOI":"10.2118\/195843-MS","article-title":"How Malaysia Late Life Field Benefited From Well Intervention Efficiency Improvements Through Integrated Operations","author":"Mohd Mokhtar","year":"2019"},{"key":"2025071014221920200_R31","article-title":"Well Integrity in Drilling and Well Operations","author":"NORSOK D-010","year":"2021"},{"key":"2025071014221920200_R32","volume-title":"Use of Barrier Materials in Well Decommissioning Guidelines, Issue 3","author":"OEUK","year":"2022"},{"key":"2025071014221920200_R33","doi-asserted-by":"crossref","DOI":"10.2118\/193980-MS","article-title":"Malaysia\u2019s First Subsea Development Well Plug and Abandonment","author":"Othman","year":"2018"},{"key":"2025071014221920200_R34","doi-asserted-by":"crossref","DOI":"10.2118\/206019-MS","article-title":"A Novel Method to Detect Cement through Direct Measurement \u2013 Case Histories","author":"Palisch","year":"2021"},{"key":"2025071014221920200_R35","doi-asserted-by":"crossref","DOI":"10.2118\/202441-MS","article-title":"Application of Computational Fluid Dynamics for Parametric Optimization of Jet-Type P\/W\/C Technique","author":"Phadke","year":"2020"},{"key":"2025071014221920200_R36","doi-asserted-by":"crossref","DOI":"10.5957\/TOS-2023-014","article-title":"Insight into Parameters Influencing Wash Displacement Efficiency Through CFD Modeling","author":"Phadke","year":"2023"},{"key":"2025071014221920200_R37","unstructured":"Pollard, M\n          . 2021. Qualification Process for P&A Perforate, Wash, Cement (PWC). Technical Report. Reflekt AS, Stavanger, Norway."},{"key":"2025071014221920200_R38","article-title":"Pushing the Operational Envelope of a Cap-Rock Restoration Campaign Utilizing Perforate Wash Cement Technology and a Hydraulic Work Over Unit Offshore Malaysia","author":"Razak","year":"2021"},{"key":"2025071014221920200_R39","doi-asserted-by":"crossref","DOI":"10.2118\/214446-MS","article-title":"Tracer-Based Monitoring of P&A in Offshore Fields","author":"Silva","year":"2023"},{"key":"2025071014221920200_R40","article-title":"Smart Completion Improvement in Horizontal Wells Based on Through-Barrier Diagnostics","author":"Solovyev","year":"2020"},{"key":"2025071014221920200_R41","doi-asserted-by":"crossref","DOI":"10.2118\/220577-MS","article-title":"Maximize Well Integrity During Plug and Abandonment Through Perforate and Wash Operation","author":"Tayar","year":"2024"},{"key":"2025071014221920200_R42","doi-asserted-by":"crossref","DOI":"10.2118\/202292-MS","article-title":"Dual Casing Perforate Wash and Cement for Annular Isolation","author":"Teo","year":"2020"},{"key":"2025071014221920200_R43","doi-asserted-by":"crossref","DOI":"10.2118\/193989-MS","article-title":"Dual Annuli Closed System Perforate, Wash and Cement","author":"Teo","year":"2018"},{"key":"2025071014221920200_R44","doi-asserted-by":"crossref","DOI":"10.2118\/189956-MS","article-title":"Successful Creation of Permanent Reservoir Isolation Barriers Using Coiled Tubing on the Norwegian Continental Shelf NCS","author":"Thomson","year":"2018"},{"key":"2025071014221920200_R45","doi-asserted-by":"crossref","DOI":"10.2118\/210783-MS","article-title":"Perf, Wash and Cementing Technique Remediates Cemented Annulus to Achieve High Quality Bond Across the Entire Interval in Complex Slot Recovery Operation","author":"Torvestad","year":"2022"},{"key":"2025071014221920200_R46","doi-asserted-by":"crossref","DOI":"10.2118\/205938-MS","article-title":"Through Barrier Diagnostics to Locate Multiple Barrier Failures in Complex Well Failure Scenario and to Enable Successful P&A","author":"Volkov","year":"2021"},{"key":"2025071014221920200_R47","doi-asserted-by":"crossref","DOI":"10.2118\/197149-MS","article-title":"Plugging & Abandonment of Multiple Zones in One Run Using Perforate Wash and Cement on Hydraulic Workover Unit","author":"Yang","year":"2019"},{"key":"2025071014221920200_R48","doi-asserted-by":"crossref","DOI":"10.2118\/207067-MS","article-title":"Vertical Fracture Monitoring by Multi-Rate Through-Barrier Diagnostics","author":"Yeleussinov","year":"2021"},{"key":"2025071014221920200_R49","doi-asserted-by":"crossref","DOI":"10.2118\/194054-MS","article-title":"Well Decommissioning Campaign in Block SK305, Sarawak, Malaysia 7 Production Wells and 9 Suspended Subsea Mud Line Suspension Exploration Wells","author":"Yusof","year":"2018"},{"key":"2025071014221920200_R50","doi-asserted-by":"crossref","DOI":"10.2118\/199200-MS","article-title":"Knowledge and Experiences Combined under One Hood: Lessons Learned from Peninsular Malaysia Well Abandonment Campaign","author":"Zulkipli","year":"2019"},{"key":"2025071014221920200_R51","doi-asserted-by":"crossref","DOI":"10.2118\/193974-MS","article-title":"Maximizing Value from Well Abandonment through Shallow Gas Hunting and Integrated Well Surveillance","author":"Zulkipli","year":"2018"}],"container-title":["SPE Journal"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/onepetro.org\/SJ\/article-pdf\/30\/07\/4053\/4791723\/spe-226204-pa.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"syndication"},{"URL":"https:\/\/onepetro.org\/SJ\/article-pdf\/30\/07\/4053\/4791723\/spe-226204-pa.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,7,10]],"date-time":"2025-07-10T18:22:26Z","timestamp":1752171746000},"score":1,"resource":{"primary":{"URL":"https:\/\/onepetro.org\/SJ\/article\/30\/07\/4053\/662737\/Perforate-Wash-and-Cement-A-Review-of-Practices"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2025,4,28]]},"references-count":51,"journal-issue":{"issue":"07","published-online":{"date-parts":[[2025,4,28]]},"published-print":{"date-parts":[[2025,7,9]]}},"URL":"https:\/\/doi.org\/10.2118\/226204-pa","relation":{},"ISSN":["1086-055X","1930-0220"],"issn-type":[{"value":"1086-055X","type":"print"},{"value":"1930-0220","type":"electronic"}],"subject":[],"published":{"date-parts":[[2025,4,28]]}}}