{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2022,3,31]],"date-time":"2022-03-31T09:43:09Z","timestamp":1648719789550},"reference-count":12,"publisher":"ACTA Press","issue":"2","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[""],"published-print":{"date-parts":[[2007]]},"DOI":"10.2316\/journal.201.2007.2.201-1506","type":"journal-article","created":{"date-parts":[[2007,6,1]],"date-time":"2007-06-01T16:49:41Z","timestamp":1180716581000},"source":"Crossref","is-referenced-by-count":1,"title":["REAL-TIME OPTIMIZATION OF A CASCADED RESERVOIRS HYDROPOWER PLANT BASED ON FUZZY LOGIC"],"prefix":"10.2316","volume":"35","author":[{"given":"M.","family":"Mahmoud","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"K.","family":"Dutton","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"1130","reference":[{"key":"30807-1","author":"Gulliver","year":"1932","journal-title":"ISBN00702551932 (New York: McGraw-Hill"},{"key":"30807-2","doi-asserted-by":"publisher","DOI":"10.1016\/S0377-2217(99)00450-6"},{"key":"30807-3","unstructured":"[3] A. Kj\u00f8lle, A survey on hydropower in Norway\u2014MechanicalEquipments, (Norwegian University of Science and Technology, Trondheim, December 2001). Available at http:\/\/www.tev.ntnu.no\/vk\/publikasjoner\/, accessed May 2003."},{"key":"30807-4","doi-asserted-by":"publisher","DOI":"10.1109\/60.257069"},{"key":"30807-5","doi-asserted-by":"publisher","DOI":"10.1109\/59.801904"},{"key":"30807-6","doi-asserted-by":"crossref","unstructured":"[6] IEEE System Dynamic Performance Subcommittee, Hydraulic turbine and turbine control models for system dynamic studies, IEEE Trans. on Power Systems, 7(1), 1992, 167\u2013179.","DOI":"10.1109\/59.141700"},{"key":"30807-7","unstructured":"[7] G.J. Klir & Bo Yuan, Fuzzy sets, fuzzy logic, and fuzzy systems: Selected papers by Lotfi Zadeh, ISBN9810224214 (New Jersy: World Scientific Publishing Co. Pte. Ltd., 1996)."},{"key":"30807-8","doi-asserted-by":"publisher","DOI":"10.1016\/S0378-7796(96)01128-5"},{"key":"30807-9","doi-asserted-by":"publisher","DOI":"10.1016\/0377-2217(94)00006-X"},{"key":"30807-10","doi-asserted-by":"publisher","DOI":"10.1016\/S0952-1976(00)00009-9"},{"key":"30807-11","author":"Molina","year":"2000","journal-title":"Hydroelectric power plant management relying on neural networks and expert system integration"},{"key":"30807-12","author":"Mantawy","year":"2002","journal-title":"An innovative simulated annealing approach to the long-term hydro scheduling problem"}],"container-title":["Control and Intelligent Systems"],"original-title":[],"language":"en","deposited":{"date-parts":[[2017,6,17]],"date-time":"2017-06-17T14:14:37Z","timestamp":1497708877000},"score":1,"resource":{"primary":{"URL":"http:\/\/www.actapress.com\/PaperInfo.aspx?paperId=30807"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2007]]},"references-count":12,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2007]]}},"alternative-id":["201-1506"],"URL":"https:\/\/doi.org\/10.2316\/journal.201.2007.2.201-1506","relation":{},"ISSN":["1925-5810"],"issn-type":[{"value":"1925-5810","type":"print"}],"subject":[],"published":{"date-parts":[[2007]]}}}