{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,8,21]],"date-time":"2025-08-21T18:42:55Z","timestamp":1755801775402,"version":"3.44.0"},"reference-count":30,"publisher":"IEEE","license":[{"start":{"date-parts":[[2019,9,1]],"date-time":"2019-09-01T00:00:00Z","timestamp":1567296000000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-029"},{"start":{"date-parts":[[2019,9,1]],"date-time":"2019-09-01T00:00:00Z","timestamp":1567296000000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-037"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2019,9]]},"DOI":"10.23919\/iconac.2019.8895186","type":"proceedings-article","created":{"date-parts":[[2019,11,13]],"date-time":"2019-11-13T04:06:29Z","timestamp":1573617989000},"page":"1-8","source":"Crossref","is-referenced-by-count":0,"title":["An Order Inserting Predictive-reactive Batch-splitting Scheduling Method"],"prefix":"10.23919","author":[{"given":"Jian Lin","family":"Fu","sequence":"first","affiliation":[{"name":"Southwest Jiaotong University,School of Mechanical Engineering,Chengdu,China"}]},{"given":"Jian Jun","family":"Tang","sequence":"additional","affiliation":[{"name":"Southwest Jiaotong University,School of Mechanical Engineering,Chengdu,China"}]},{"given":"Ruo Xin","family":"Wang","sequence":"additional","affiliation":[{"name":"Southwest Jiaotong University,School of Mechanical Engineering,Chengdu,China"}]},{"given":"Hong Qin","family":"Liang","sequence":"additional","affiliation":[{"name":"Southwest Jiaotong University,School of Mechanical Engineering,Chengdu,China"}]},{"given":"Jian","family":"Zhang","sequence":"additional","affiliation":[{"name":"Southwest Jiaotong University,School of Mechanical Engineering,Chengdu,China"}]}],"member":"263","reference":[{"key":"ref30","first-page":"1953","article-title":"Batch division and parallel scheduling optimization of flexible job shop[J]","volume":"22","author":"xu","year":"2016","journal-title":"Computer Integrated Manufacturing Systems"},{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.2507\/IJSIMM17(3)CO13"},{"key":"ref11","first-page":"396","article-title":"Multi-objective flexible Job Shop scheduling with lot-splitting[J]","volume":"16","author":"bai","year":"2010","journal-title":"Computer Integrated Manufacturing Systems"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1016\/j.swevo.2017.06.003"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2018.02.010"},{"key":"ref14","doi-asserted-by":"crossref","first-page":"6391","DOI":"10.1080\/00207543.2017.1346322","article-title":"Flexible job shop scheduling with lot streaming and sublot size optimisation","volume":"56","author":"bo?ek","year":"2018","journal-title":"International Journal of Production Research"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1145\/3205455.3205534"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.1109\/IHMSC.2018.10157"},{"key":"ref17","first-page":"1","article-title":"Review of job shop scheduling research and its new perspectives under Industry 4.0[J]","author":"zhang","year":"2017","journal-title":"Journal of Intelligent Manufacturing"},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.1016\/j.asoc.2007.07.002"},{"key":"ref19","doi-asserted-by":"publisher","DOI":"10.1145\/1068009.1068035"},{"key":"ref28","doi-asserted-by":"publisher","DOI":"10.3901\/JME.2007.04.119"},{"key":"ref4","first-page":"1809","article-title":"Rush order inserting problem based on load-oriented manufacturing control technique[J]","volume":"15","author":"yan","year":"2009","journal-title":"Computer Integrated Manufacturing Systems"},{"key":"ref27","doi-asserted-by":"publisher","DOI":"10.1007\/BF02023073"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2007.06.038"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1016\/j.jmsy.2017.04.018"},{"key":"ref29","doi-asserted-by":"publisher","DOI":"10.1109\/ISIC.2004.1387729"},{"key":"ref5","doi-asserted-by":"crossref","first-page":"1515","DOI":"10.1080\/00207540412331325396","article-title":"A comprehensive review of lot streaming[J]","volume":"43","author":"chiu","year":"2005","journal-title":"International Journal of Production Research"},{"key":"ref8","first-page":"816","article-title":"Multiobjective optimization method for equal lot scheduling problem of Job Shop with parallel machines[J]","volume":"17","author":"zeng","year":"2011","journal-title":"Computer Integrated Manufacturing Systems"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1016\/j.simpat.2008.10.002"},{"key":"ref2","doi-asserted-by":"crossref","first-page":"3308","DOI":"10.1080\/00207543.2017.1306134","article-title":"Solving comprehensive dynamic job shop scheduling problem by using a GRASP-based approach[J]","volume":"55","author":"a","year":"2017","journal-title":"International Journal of Production Research"},{"key":"ref9","doi-asserted-by":"crossref","first-page":"642","DOI":"10.1016\/j.asoc.2017.04.062","article-title":"An effective ant colony optimization algorithm for multi-objective job-shop scheduling with equal-size lot-splitting","volume":"57","author":"huang","year":"2017","journal-title":"Applied Soft Computing"},{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1287\/moor.1.2.117"},{"key":"ref20","doi-asserted-by":"crossref","first-page":"997","DOI":"10.1109\/TSMCB.2003.818557","article-title":"A hybrid of genetic algorithm and particle swarm optimization for recurrent network design[J]","volume":"34","author":"f","year":"2004","journal-title":"IEEE Transactions on Systems Man and Cybernetics Part B (Cybernetics)"},{"key":"ref22","article-title":"Multiobjective differential evolution algorithm for flexible Job-Shop batch scheduling problem[J]","volume":"19","author":"wang","year":"2013","journal-title":"Computer Integrated Manufacturing Systems"},{"key":"ref21","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2009.06.085"},{"key":"ref24","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2007.04.010"},{"key":"ref23","first-page":"183","article-title":"Lot Scheduling with Multiple Process Routes in Job Shop [J]","volume":"19","author":"zhijun","year":"2008","journal-title":"China Mechanical Engineering"},{"key":"ref26","doi-asserted-by":"publisher","DOI":"10.1016\/j.asoc.2016.09.038"},{"key":"ref25","doi-asserted-by":"crossref","first-page":"23","DOI":"10.1007\/s10845-014-0959-7","article-title":"A modified particle swarm optimization algorithm to mixed-model two-sided assembly line balancing[J]","volume":"28","author":"y","year":"2017","journal-title":"Journal of Intelligent Manufacturing"}],"event":{"name":"2019 25th International Conference on Automation and Computing (ICAC)","start":{"date-parts":[[2019,9,5]]},"location":"Lancaster, UK","end":{"date-parts":[[2019,9,7]]}},"container-title":["2019 25th International Conference on Automation and Computing (ICAC)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/8891805\/8894921\/08895186.pdf?arnumber=8895186","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,8,20]],"date-time":"2025-08-20T18:32:11Z","timestamp":1755714731000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/8895186\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019,9]]},"references-count":30,"URL":"https:\/\/doi.org\/10.23919\/iconac.2019.8895186","relation":{},"subject":[],"published":{"date-parts":[[2019,9]]}}}