{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,31]],"date-time":"2024-10-31T03:19:14Z","timestamp":1730344754786,"version":"3.28.0"},"reference-count":10,"publisher":"IEEE","license":[{"start":{"date-parts":[[2022,10,11]],"date-time":"2022-10-11T00:00:00Z","timestamp":1665446400000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-029"},{"start":{"date-parts":[[2022,10,11]],"date-time":"2022-10-11T00:00:00Z","timestamp":1665446400000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-037"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2022,10,11]]},"DOI":"10.23919\/wac55640.2022.9934403","type":"proceedings-article","created":{"date-parts":[[2022,11,8]],"date-time":"2022-11-08T20:43:21Z","timestamp":1667940201000},"page":"267-271","source":"Crossref","is-referenced-by-count":0,"title":["Design of Assembled Wall Panels Module with or without Pipelines for Assembly Decoration Based on BIM Technology"],"prefix":"10.23919","author":[{"given":"Juan","family":"Zou","sequence":"first","affiliation":[{"name":"Chongqing College of Architecture and Technology,Chongqing,China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Yongyi","family":"Zhang","sequence":"additional","affiliation":[{"name":"Chongqing College of Architecture and Technology,Chongqing,China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Yu","family":"Lei","sequence":"additional","affiliation":[{"name":"Chongqing College of Architecture and Technology,Chongqing,China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Guangqian","family":"He","sequence":"additional","affiliation":[{"name":"Chongqing College of Architecture and Technology,Chongqing,China"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref4","first-page":"209","article-title":"Shriraam Ravindran: Blockchain technology and BIM process: review and potential applications","volume":"24","author":"nawari","year":"2019","journal-title":"Int J Constr Inf Technol"},{"key":"ref3","first-page":"440","article-title":"Eskicioglu: Integrating Building Information Modeling (BIM) and sensor technology for Facility Management","volume":"24","author":"kazado","year":"2019","journal-title":"Int J Constr Inf Technol"},{"key":"ref10","first-page":"31","article-title":"Study of the inner space allocation for small and medium-sized apartments","volume":"3","author":"zhou","year":"2008","journal-title":"Art & Design"},{"key":"ref6","first-page":"235","article-title":"Grazyna Slusarczyk:Computational Ontology and BIM Technology in Data-Driven Indoor Route Planning","volume":"1","author":"strug","year":"2021","journal-title":"IEA\/AIE"},{"key":"ref5","first-page":"1","article-title":"Mike Kagioglou:BIM Enabled Approach for Performance-Based Design: Process, Renewable Technology, Design Rules and Assessment","volume":"7","author":"sherko","year":"2018","journal-title":"Int J 3-D Inf Model"},{"key":"ref8","first-page":"118","article-title":"The application of BIM technology in the design of prefabricated buildings","volume":"16","author":"wang","year":"2019","journal-title":"Building material and decoration"},{"key":"ref7","first-page":"99","article-title":"Juan-Manuel Vizcarra-Aparicio, Antonio L. Leal-Rodr&#x00ED;guez: BIM: a technology acceptance model in Peru","volume":"25","author":"sanch\u00eds-pedregosa","year":"2020","journal-title":"Int J Constr Inf Technol"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ecoinf.2019.02.012"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1155\/2021\/7230585"},{"key":"ref1","first-page":"97","article-title":"Research on BIM-based prefabricated building system","volume":"34","author":"zhang","year":"2018","journal-title":"Building Science"}],"event":{"name":"2022 World Automation Congress (WAC)","start":{"date-parts":[[2022,10,11]]},"location":"San Antonio, TX, USA","end":{"date-parts":[[2022,10,15]]}},"container-title":["2022 World Automation Congress (WAC)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/9933723\/9934001\/09934403.pdf?arnumber=9934403","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,2,6]],"date-time":"2023-02-06T19:29:17Z","timestamp":1675711757000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/9934403\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2022,10,11]]},"references-count":10,"URL":"https:\/\/doi.org\/10.23919\/wac55640.2022.9934403","relation":{},"subject":[],"published":{"date-parts":[[2022,10,11]]}}}