{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,2]],"date-time":"2026-05-02T03:51:38Z","timestamp":1777693898173,"version":"3.51.4"},"reference-count":37,"publisher":"SAGE Publications","issue":"3","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["ICA"],"published-print":{"date-parts":[[2016,6,29]]},"DOI":"10.3233\/ica-160519","type":"journal-article","created":{"date-parts":[[2016,7,1]],"date-time":"2016-07-01T10:51:59Z","timestamp":1467370319000},"page":"269-285","source":"Crossref","is-referenced-by-count":29,"title":["Genetic algorithms for the scheduling problem with arbitrary precedence relations and skilled operators"],"prefix":"10.1177","volume":"23","author":[{"given":"Ra\u00fal","family":"Menc\u00eda","sequence":"first","affiliation":[{"name":"Department of Computer Science, University of Oviedo, Spain"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Mar\u00eda R.","family":"Sierra","sequence":"additional","affiliation":[{"name":"Department of Computer Science, University of Oviedo, Spain"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Carlos","family":"Menc\u00eda","sequence":"additional","affiliation":[{"name":"CASL, University College Dublin, Ireland"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ramiro","family":"Varela","sequence":"additional","affiliation":[{"name":"Department of Computer Science, University of Oviedo, Spain"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"179","reference":[{"issue":"3","key":"10.3233\/ICA-160519_ref1","doi-asserted-by":"crossref","first-page":"225","DOI":"10.1007\/s10951-010-0162-4","article-title":"A job-shop problem with one additional resource type","volume":"14","author":"Agnetis","year":"2011","journal-title":"Journal of Scheduling"},{"issue":"13","key":"10.3233\/ICA-160519_ref2","doi-asserted-by":"crossref","first-page":"3820","DOI":"10.1080\/00207543.2013.831220","article-title":"A job shop scheduling problem with human operators in handicraft production","volume":"52","author":"Agnetis","year":"2014","journal-title":"International Journal of Production Research"},{"issue":"8","key":"10.3233\/ICA-160519_ref3","doi-asserted-by":"crossref","first-page":"2330","DOI":"10.1016\/j.cor.2008.08.013","article-title":"Solving an integrated employee timetabling and job-shop scheduling problem via hybrid branch-and-bound","volume":"36","author":"Artigues","year":"2009","journal-title":"Computers and Operations Research"},{"key":"10.3233\/ICA-160519_ref4","doi-asserted-by":"crossref","first-page":"21","DOI":"10.1007\/s10479-005-2443-4","article-title":"Schedule generation schemes for the job shop problem with sequence-dependent setup times: Dominance properties and computational analysis","volume":"138","author":"Artigues","year":"2005","journal-title":"Annals of Operations Research"},{"issue":"11","key":"10.3233\/ICA-160519_ref5","doi-asserted-by":"crossref","first-page":"1069","DOI":"10.1057\/jors.1990.166","article-title":"Or-library: Distributing test problems by electronic mail","volume":"41","author":"Beasley","year":"1990","journal-title":"Journal of the Operational Research Society"},{"issue":"1","key":"10.3233\/ICA-160519_ref6","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1287\/ijoc.1100.0388","article-title":"Combining constraint programming and local search for job-shop scheduling","volume":"23","author":"Beck","year":"2011","journal-title":"INFORMS Journal on Computing"},{"issue":"2","key":"10.3233\/ICA-160519_ref7","doi-asserted-by":"crossref","first-page":"713","DOI":"10.1016\/j.ejor.2014.02.012","article-title":"Flow shop scheduling with heterogeneous workers","volume":"237","author":"Benavides","year":"2014","journal-title":"European Journal of Operational Research"},{"issue":"1","key":"10.3233\/ICA-160519_ref8","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1162\/evco.1999.7.1.1","article-title":"Production scheduling and rescheduling with genetic algorithms","volume":"7","author":"Bierwirth","year":"1999","journal-title":"Evolutionary Computation"},{"issue":"4","key":"10.3233\/ICA-160519_ref9","doi-asserted-by":"crossref","first-page":"361","DOI":"10.3233\/ICA-150495","article-title":"Finite element model updating using fish school search and volitive particle swarm optimization","volume":"22","author":"Boulkaibet","year":"2015","journal-title":"Integrated Computer-Aided Engineering"},{"key":"10.3233\/ICA-160519_ref10","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-540-24804-0","volume-title":"Scheduling algorithms","author":"Brucker","year":"2004"},{"key":"10.3233\/ICA-160519_ref11","volume-title":"Complex Scheduling","author":"Brucker","year":"2006"},{"issue":"4","key":"10.3233\/ICA-160519_ref12","doi-asserted-by":"crossref","first-page":"369","DOI":"10.1007\/BF02238804","article-title":"Job-shop scheduling with multi-purpose machines","volume":"45","author":"Brucker","year":"1990","journal-title":"Computing"},{"issue":"2","key":"10.3233\/ICA-160519_ref13","doi-asserted-by":"crossref","first-page":"177","DOI":"10.3233\/ICA-130459","article-title":"A computational intelligence optimization algorithm: Cloud drops algorithm","volume":"21","author":"Chen","year":"2014","journal-title":"Integrated Computer-Aided Engineering"},{"issue":"3","key":"10.3233\/ICA-160519_ref14","doi-asserted-by":"crossref","first-page":"229","DOI":"10.3233\/ICA-150485","article-title":"Using metaheuristics to optimize the combination of classifier and cluster ensembles","volume":"22","author":"Coletta","year":"2015","journal-title":"Integrated Computer-Aided Engineering"},{"key":"10.3233\/ICA-160519_ref15","doi-asserted-by":"crossref","first-page":"231","DOI":"10.1007\/BF02023076","article-title":"Applying tabu search to the job-shop scheduling problem","volume":"41","author":"Dell' Amico","year":"1993","journal-title":"Annals of Operational Research"},{"issue":"2","key":"10.3233\/ICA-160519_ref16","doi-asserted-by":"crossref","first-page":"461","DOI":"10.1109\/TC.2012.222","article-title":"Resource selection for tasks with time requirements using spectral clustering","volume":"63","author":"Doulamis","year":"2014","journal-title":"Computers, IEEE Transactions on"},{"issue":"4","key":"10.3233\/ICA-160519_ref17","doi-asserted-by":"crossref","first-page":"557","DOI":"10.1109\/91.649907","article-title":"Jobshop scheduling with imprecise durations: a fuzzy approach","volume":"5","author":"Fortemps","year":"1997","journal-title":"Fuzzy Systems, IEEE Transactions on"},{"key":"10.3233\/ICA-160519_ref18","volume-title":"Computers and Intractability; A Guide to the Theory of NP-Completeness","author":"Garey","year":"1979"},{"issue":"1","key":"10.3233\/ICA-160519_ref19","doi-asserted-by":"crossref","first-page":"147","DOI":"10.1007\/s10479-012-1132-3","article-title":"Solving an integrated job-shop problem with human resource constraints","volume":"213","author":"Guyon","year":"2014","journal-title":"Annals of Operations Research"},{"issue":"1","key":"10.3233\/ICA-160519_ref20","doi-asserted-by":"crossref","first-page":"77","DOI":"10.3233\/ICA-130452","article-title":"Multiobjective bilevel optimization for production-distribution planning problems using hybrid genetic algorithm","volume":"21","author":"Jia","year":"2014","journal-title":"Integrated Computer-Aided Engineering"},{"issue":"3","key":"10.3233\/ICA-160519_ref21","doi-asserted-by":"crossref","first-page":"249","DOI":"10.3233\/ICA-140463","article-title":"Integrated multifidelity, multidisciplinary evolutionary design optimization of counterrotating compressors","volume":"21","author":"Joly","year":"2014","journal-title":"Integrated Computer-Aided Engineering"},{"key":"10.3233\/ICA-160519_ref22","doi-asserted-by":"crossref","first-page":"283","DOI":"10.1016\/j.jcsr.2013.07.027","article-title":"Two-phase genetic algorithm for size optimization of free-form steel space-frame roof structures","volume":"90","author":"Kociecki","year":"2013","journal-title":"Journal of Constructional Steel Research"},{"key":"10.3233\/ICA-160519_ref23","doi-asserted-by":"crossref","first-page":"168","DOI":"10.1016\/j.engappai.2014.10.012","article-title":"Shape optimization of free-form steel space-frame roof structures with complex geometries using evolutionary computing","volume":"38","author":"Kociecki","year":"2015","journal-title":"Engineering Applications of Artificial Intelligence"},{"key":"10.3233\/ICA-160519_ref24","doi-asserted-by":"crossref","first-page":"468","DOI":"10.1016\/j.ins.2014.11.035","article-title":"Structural bias in population-based algorithms","volume":"298","author":"Kononova","year":"2015","journal-title":"Information Sciences"},{"issue":"1","key":"10.3233\/ICA-160519_ref25","doi-asserted-by":"crossref","first-page":"113","DOI":"10.1287\/opre.40.1.113","article-title":"Job shop scheduling by simulated annealing","volume":"40","author":"Laarhoven","year":"1992","journal-title":"Operations Research"},{"key":"10.3233\/ICA-160519_ref26","doi-asserted-by":"crossref","first-page":"148","DOI":"10.1007\/978-3-642-01929-6_12","article-title":"IBM CP Optimizer for detailed scheduling illustrated on three problems","author":"Laborie","year":"2009","journal-title":"Integration of AI and OR Techniques in Constraint Programming for Combinatorial Optimization Problems"},{"issue":"4","key":"10.3233\/ICA-160519_ref27","doi-asserted-by":"crossref","first-page":"311","DOI":"10.3233\/ICA-150492","article-title":"A hybrid optimization approach for sustainable process planning and scheduling","volume":"22","author":"Li","year":"2015","journal-title":"Integrated Computer-Aided Engineering"},{"issue":"2","key":"10.3233\/ICA-160519_ref28","doi-asserted-by":"crossref","first-page":"153","DOI":"10.3233\/ICA-150484","article-title":"Combining soft computing techniques and the finite element method to design and optimize complex welded products","volume":"22","author":"Lostado","year":"2015","journal-title":"Integrated Computer-Aided Engineering"},{"issue":"4","key":"10.3233\/ICA-160519_ref29","doi-asserted-by":"crossref","first-page":"321","DOI":"10.3233\/ICA-140467","article-title":"Reducing gaps in quantitative association rules: A genetic programming free-parameter algorithm","volume":"21","author":"Luna","year":"2014","journal-title":"Integrated Computer-Aided Engineering"},{"key":"10.3233\/ICA-160519_ref30","doi-asserted-by":"crossref","first-page":"94","DOI":"10.1016\/j.asoc.2015.05.004","article-title":"Memetic algorithms for the job shop scheduling problem with operators","volume":"34","author":"Menc\u00eda","year":"2015","journal-title":"Applied Soft Computing"},{"key":"10.3233\/ICA-160519_ref31","doi-asserted-by":"crossref","unstructured":"Menc\u00eda R., Sierra M.R., Menc\u00eda C. and Varela R., Schedule generation schemes and genetic algorithm for the scheduling problem with skilled operators and arbitrary precedence relations, In Proceedings of the Twenty-Fifth International Conference on Automated Planning and Scheduling, ICAPS 2015, Jerusalem, Israel, June 7-11, 2015, pages 165-173, 2015.","DOI":"10.1609\/icaps.v25i1.13707"},{"key":"10.3233\/ICA-160519_ref32","doi-asserted-by":"crossref","unstructured":"Menc\u00eda R., Sierra M.R. and Varela R., Genetic algorithm for the job-shop scheduling with skilled operators, In Bioinspired Computation in Artificial Systems - International Work-Conference on the Interplay Between Natural and Artificial Computation, IWINAC 2015, Elche, Spain, June 1-5, 2015, Proceedings, Part II, pages 41-50, 2015.","DOI":"10.1007\/978-3-319-18833-1_5"},{"key":"10.3233\/ICA-160519_ref33","volume-title":"Scheduling: Theory, Algorithms, and Systems","author":"Pinedo","year":"2008"},{"key":"10.3233\/ICA-160519_ref35","doi-asserted-by":"crossref","DOI":"10.1002\/9781118534823","volume-title":"Computational intelligence: synergies of fuzzy logic, neural networks and evolutionary computing","author":"Siddique","year":"2013"},{"issue":"2","key":"10.3233\/ICA-160519_ref36","first-page":"120","article-title":"A particle swarm optimization and differential evolution algorithms for job shop scheduling problem","volume":"3","author":"Tasgetiren","year":"2006","journal-title":"International Journal of Operations Research"},{"issue":"3","key":"10.3233\/ICA-160519_ref37","doi-asserted-by":"crossref","first-page":"791","DOI":"10.1016\/j.ejor.2007.11.008","article-title":"Skilled workforce scheduling in service centres","volume":"193","author":"Valls","year":"2009","journal-title":"European Journal of Operational Research"},{"key":"10.3233\/ICA-160519_ref38","doi-asserted-by":"crossref","unstructured":"Vil\u00edm P., Laborie P. and Shaw P., Failure-directed search for constraint-based scheduling, In CPAIOR '15: Proceedings of the 12th International Conference on Integration of AI and OR Techniques in Constraint Programming for Combinatorial Optimization Problems, Springer-Verlag, 2015, pp. 437-453.","DOI":"10.1007\/978-3-319-18008-3_30"}],"container-title":["Integrated Computer-Aided Engineering"],"original-title":[],"link":[{"URL":"https:\/\/content.iospress.com\/download?id=10.3233\/ICA-160519","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2026,4,29]],"date-time":"2026-04-29T09:13:58Z","timestamp":1777454038000},"score":1,"resource":{"primary":{"URL":"https:\/\/journals.sagepub.com\/doi\/full\/10.3233\/ICA-160519"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016,6,29]]},"references-count":37,"journal-issue":{"issue":"3"},"URL":"https:\/\/doi.org\/10.3233\/ica-160519","relation":{},"ISSN":["1069-2509","1875-8835"],"issn-type":[{"value":"1069-2509","type":"print"},{"value":"1875-8835","type":"electronic"}],"subject":[],"published":{"date-parts":[[2016,6,29]]}}}