{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,2]],"date-time":"2026-05-02T03:53:25Z","timestamp":1777694005721,"version":"3.51.4"},"reference-count":50,"publisher":"SAGE Publications","issue":"1","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["ICA"],"published-print":{"date-parts":[[2018,12,3]]},"DOI":"10.3233\/ica-180582","type":"journal-article","created":{"date-parts":[[2018,8,14]],"date-time":"2018-08-14T15:53:41Z","timestamp":1534262021000},"page":"49-63","source":"Crossref","is-referenced-by-count":15,"title":["Evolutionary one-machine scheduling in the context of electric vehicles charging"],"prefix":"10.1177","volume":"26","author":[{"given":"Carlos","family":"Menc\u00eda","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Mar\u00eda R.","family":"Sierra","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ra\u00fal","family":"Menc\u00eda","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ramiro","family":"Varela","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"179","reference":[{"key":"10.3233\/ICA-180582_ref1","unstructured":"Brucker P, Knust S. Complex Scheduling. Springer, 2006."},{"key":"10.3233\/ICA-180582_ref2","doi-asserted-by":"crossref","first-page":"42","DOI":"10.1016\/S0377-2217(82)80007-6","article-title":"The one-machine sequencing problem","volume":"11","author":"Carlier","year":"1982","journal-title":"European Journal of Operational Research"},{"key":"10.3233\/ICA-180582_ref3","doi-asserted-by":"crossref","first-page":"253","DOI":"10.1007\/s10951-008-0067-7","article-title":"Job shop scheduling with setup times, deadlines and precedence constraints","volume":"11","author":"Balas","year":"2008","journal-title":"Journal of Scheduling"},{"key":"10.3233\/ICA-180582_ref4","doi-asserted-by":"crossref","first-page":"306","DOI":"10.1016\/j.cie.2015.04.002","article-title":"Electric vehicle charging under power and balance constraints as dynamic scheduling","volume":"85","author":"Hern\u00e1ndez-Arauzo","year":"2015","journal-title":"Computers and Industrial Engineering"},{"key":"10.3233\/ICA-180582_ref5","doi-asserted-by":"crossref","first-page":"287","DOI":"10.1016\/S0167-5060(08)70356-X","article-title":"Optimization and approximation in deterministic sequencing and scheduling: A survey","volume":"5","author":"Graham","year":"1979","journal-title":"Annals of Discrete Mathematics"},{"key":"10.3233\/ICA-180582_ref6","unstructured":"Menc\u00eda C, Sierra MR, Menc\u00eda R, Varela R. In: Genetic Algorithm for Scheduling Charging Times of Electric Vehicles Subject to Time Dependent Power Availability. Ferr\u00e1ndez\u00a0Vicente JM, \u00c1lvarez-S\u00e1nchez JR, de\u00a0la Paz\u00a0L\u00f3pez F, Toledo\u00a0Moreo J, Adeli H, editors, Cham: Springer International Publishing, 2017; 160-169."},{"key":"10.3233\/ICA-180582_ref7","doi-asserted-by":"crossref","unstructured":"Talbi E. Metaheuristics-From Design to Implementation. Wiley, 2009.","DOI":"10.1002\/9780470496916"},{"key":"10.3233\/ICA-180582_ref8","doi-asserted-by":"crossref","unstructured":"Reynolds RG, Sverdlik W. Problem solving using cultural algorithms. In: Proceedings of the First IEEE Conference on Evolutionary Computation, IEEE World Congress on Computational Intelligence, Orlando, Florida, USA, June 27-29, 1994. IEEE; 1994; 645-650. Available from: https:\/\/doi.org\/10.1109\/ICEC.1994.349983.","DOI":"10.1109\/ICEC.1994.349983"},{"key":"10.3233\/ICA-180582_ref10","doi-asserted-by":"crossref","unstructured":"Gan L, Topcu U, Low S. Optimal decentralized protocol for electric vehicle charging. In: IEEE Conference on Decision and Control and European Control Conference, CDC-ECE, 2011; 5798-5804.","DOI":"10.1109\/CDC.2011.6161220"},{"issue":"1","key":"10.3233\/ICA-180582_ref11","doi-asserted-by":"crossref","first-page":"368","DOI":"10.1109\/TSG.2011.2163174","article-title":"Load scheduling and dispatch for aggregators of plug-in electric vehicles","volume":"3","author":"Wu","year":"2012","journal-title":"IEEE Transactions on Smart Grid"},{"issue":"1","key":"10.3233\/ICA-180582_ref12","doi-asserted-by":"crossref","first-page":"67","DOI":"10.1109\/TCST.2011.2174059","article-title":"Decentralized charging control of large populations of plug-in electric vehicles","volume":"21","author":"Ma","year":"2013","journal-title":"IEEE Transactions on Control Systems Technology"},{"key":"10.3233\/ICA-180582_ref13","doi-asserted-by":"crossref","unstructured":"Kim HJ, Lee J, Park GL. Constraint-based charging scheduler design for electric vehicles. In: Proceedings of the 4th Asian conference on Intelligent Information and Database Systems-Volume Part III. ACIIDS\u201912. Berlin, Heidelberg: Springer-Verlag; 2012; 266-275.","DOI":"10.1007\/978-3-642-28493-9_29"},{"key":"10.3233\/ICA-180582_ref14","doi-asserted-by":"crossref","unstructured":"Kang J, Duncan SJ, Mavris DN. Real-time scheduling techniques for electric vehicle charging in support of frequency regulation. Procedia Computer Science. 2013; 16: 767-775.","DOI":"10.1016\/j.procs.2013.01.080"},{"key":"10.3233\/ICA-180582_ref15","doi-asserted-by":"crossref","first-page":"354","DOI":"10.1016\/j.apenergy.2016.05.034","article-title":"A multi-agent based scheduling algorithm for adaptive electric vehicles charging","volume":"177","author":"Xydas","year":"2016","journal-title":"Applied Energy"},{"issue":"5","key":"10.3233\/ICA-180582_ref16","doi-asserted-by":"crossref","first-page":"2211","DOI":"10.1109\/TSG.2015.2396772","article-title":"Scalable real-time electric vehicles charging with discrete charging rates","volume":"6","author":"Binetti","year":"2015","journal-title":"IEEE Transactions on Smart Grid"},{"key":"10.3233\/ICA-180582_ref17","doi-asserted-by":"crossref","first-page":"285","DOI":"10.1016\/j.energy.2016.01.063","article-title":"Optimal scheduling of renewable micro-grids considering plug-in hybrid electric vehicle charging demand","volume":"100","author":"Kamankesh","year":"2016","journal-title":"Energy"},{"key":"10.3233\/ICA-180582_ref18","doi-asserted-by":"crossref","unstructured":"Subramanian A, Garc\u00e1 M, Dom\u00ednguez-Garc\u00eda A, Callaway D, Poollaand K, Varaiya P. Real-time scheduling of deferrable electric loads. In: Proceedings of American Control Conference (ACC), 2012; 3643-3650.","DOI":"10.1109\/ACC.2012.6315670"},{"issue":"6","key":"10.3233\/ICA-180582_ref19","doi-asserted-by":"crossref","first-page":"2600","DOI":"10.1109\/TVT.2013.2295591","article-title":"Charging scheduling of electric vehicles with local renewable energy under uncertain electric vehicle arrival and grid power price","volume":"63","author":"Zhang","year":"2014","journal-title":"IEEE Transactions on Vehicular Technology"},{"key":"10.3233\/ICA-180582_ref20","doi-asserted-by":"crossref","first-page":"29","DOI":"10.1016\/j.apenergy.2016.06.019","article-title":"Smart electric vehicle charging scheduler for overloading prevention of an industry client power distribution transformer","volume":"178","author":"Godina","year":"2016","journal-title":"Applied Energy"},{"key":"10.3233\/ICA-180582_ref21","doi-asserted-by":"crossref","first-page":"1168","DOI":"10.1016\/j.energy.2016.10.141","article-title":"Stochastic scheduling of aggregators of plug-in electric vehicles for participation in energy and ancillary service markets","volume":"118","author":"Alipour","year":"2017","journal-title":"Energy"},{"key":"10.3233\/ICA-180582_ref22","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.apenergy.2016.07.071","article-title":"Optimal day-ahead scheduling of integrated urban energy systems","volume":"180","author":"Jin","year":"2016","journal-title":"Applied Energy"},{"key":"10.3233\/ICA-180582_ref23","first-page":"1","article-title":"Smart electric vehicle charging scheduling at capacity limited charging sites","author":"Ottesen","year":"2016","journal-title":"Censes Working Paper 3\/2016, Norwegian University of Science and Technology"},{"issue":"6","key":"10.3233\/ICA-180582_ref24","first-page":"640","article-title":"Intelligent system for electric vehicle charging: Design and operation","volume":"88","author":"Sedano","year":"2013","journal-title":"DYNA"},{"key":"10.3233\/ICA-180582_ref26","doi-asserted-by":"crossref","first-page":"1025","DOI":"10.1287\/opre.42.6.1025","article-title":"The total tardiness problem: Review and extensions","volume":"42","author":"Koulamas","year":"1994","journal-title":"Operations Research"},{"issue":"1","key":"10.3233\/ICA-180582_ref27","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/S0377-2217(98)00367-1","article-title":"Scheduling with limited machine availability","volume":"121","author":"Schmidt","year":"2000","journal-title":"European Journal of Operational Research"},{"key":"10.3233\/ICA-180582_ref28","unstructured":"Garey MR, Johnson DS. Computers and Intractability. Freeman, 1979."},{"key":"10.3233\/ICA-180582_ref29","doi-asserted-by":"crossref","first-page":"487","DOI":"10.1287\/opre.8.4.487","article-title":"Algorithms for solving production scheduling problems","volume":"8","author":"Giffler","year":"1960","journal-title":"Operations Research"},{"key":"10.3233\/ICA-180582_ref30","doi-asserted-by":"crossref","first-page":"21","DOI":"10.1007\/s10479-005-2443-4","article-title":"Schedule generation schemes for the job shop problem with sequence-dependent setup times: Dominance properties and computational analysis","volume":"138","author":"Artigues","year":"2005","journal-title":"Annals of Operations Research"},{"issue":"3","key":"10.3233\/ICA-180582_ref31","doi-asserted-by":"crossref","first-page":"269","DOI":"10.3233\/ICA-160519","article-title":"Genetic algorithms for the scheduling problem with arbitrary precedence relations and skilled operators","volume":"23","author":"Menc\u00eda","year":"2016","journal-title":"Integrated Computer-Aided Engineering"},{"key":"10.3233\/ICA-180582_ref32","doi-asserted-by":"crossref","first-page":"94","DOI":"10.1016\/0377-2217(93)E0294-8","article-title":"Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem","volume":"80","author":"Sprecher","year":"1995","journal-title":"European Journal of Operational Research"},{"issue":"6","key":"10.3233\/ICA-180582_ref33","doi-asserted-by":"crossref","first-page":"900","DOI":"10.1109\/72.329686","article-title":"A parallel genetic\/neural network learning algorithm for MIMD shared memory machines","volume":"5","author":"Hung","year":"1994","journal-title":"IEEE Trans Neural Networks"},{"key":"10.3233\/ICA-180582_ref34","doi-asserted-by":"crossref","first-page":"283","DOI":"10.1016\/j.jcsr.2013.07.027","article-title":"Two-phase genetic algorithm for size optimization of free-form steel space-frame roof structures","volume":"90","author":"Kociecki","year":"2013","journal-title":"Journal of Constructional Steel Research"},{"key":"10.3233\/ICA-180582_ref35","doi-asserted-by":"crossref","first-page":"168","DOI":"10.1016\/j.engappai.2014.10.012","article-title":"Shape optimization of free-form steel space-frame roof structures with complex geometries using evolutionary computing","volume":"38","author":"Kociecki","year":"2015","journal-title":"Engineering Applications of Artificial Intelligence"},{"issue":"8","key":"10.3233\/ICA-180582_ref36","doi-asserted-by":"crossref","first-page":"691","DOI":"10.1111\/mice.12280","article-title":"Mountain railway alignment optimization with bidirectional distance transform and genetic algorithm","volume":"32","author":"Li","year":"2017","journal-title":"Computer-Aided Civil and Infraestructure Engineering"},{"issue":"3","key":"10.3233\/ICA-180582_ref37","doi-asserted-by":"crossref","first-page":"237","DOI":"10.3233\/ICA-160522","article-title":"Real-time optimization of collective non-separable problems through distributed embodied evolution","volume":"23","author":"Prieto","year":"2016","journal-title":"Integrated Computer-Aided Engineering"},{"issue":"4","key":"10.3233\/ICA-180582_ref38","doi-asserted-by":"crossref","first-page":"369","DOI":"10.3233\/ICA-160527","article-title":"A hardware oriented ad-hoc computer-based method for binary structuring element decomposition based on genetic algorithms","volume":"23","author":"Pillon","year":"2016","journal-title":"Integrated Computer-Aided Engineering"},{"issue":"2","key":"10.3233\/ICA-180582_ref39","doi-asserted-by":"crossref","first-page":"161","DOI":"10.3233\/ICA-150508","article-title":"Evolutionary computation for resource leveling optimization in project management","volume":"23","author":"Kyriklidis","year":"2016","journal-title":"Integrated Computer-Aided Engineering"},{"issue":"2","key":"10.3233\/ICA-180582_ref40","doi-asserted-by":"crossref","first-page":"187","DOI":"10.3233\/ICA-170539","article-title":"A smart elevator scheduler that considers dynamic changes of energy cost and user traffic","volume":"24","author":"Ahn","year":"2017","journal-title":"Integrated Computer-Aided Engineering"},{"key":"10.3233\/ICA-180582_ref41","first-page":"162","article-title":"Applying adaptive algorithms to epistatic domains","author":"Davis","year":"1985","journal-title":"In: IJCAI"},{"key":"10.3233\/ICA-180582_ref42","doi-asserted-by":"crossref","first-page":"113","DOI":"10.1287\/opre.40.1.113","article-title":"Job shop scheduling by simulated annealing","volume":"40","author":"Van Laarhoven","year":"1992","journal-title":"Operations Research"},{"key":"10.3233\/ICA-180582_ref43","doi-asserted-by":"crossref","first-page":"145","DOI":"10.1007\/s10951-005-6364-5","article-title":"An advanced tabu search Algorithm for The job shop problem","volume":"8","author":"Nowicki","year":"2005","journal-title":"Journal of Scheduling"},{"key":"10.3233\/ICA-180582_ref44","doi-asserted-by":"crossref","first-page":"282","DOI":"10.1016\/j.cor.2006.02.024","article-title":"A very fast TS\/SA algorithm for the job shop scheduling problem","volume":"35","author":"Zhang","year":"2008","journal-title":"Computers and Operations Research"},{"key":"10.3233\/ICA-180582_ref45","doi-asserted-by":"crossref","first-page":"391","DOI":"10.1287\/mnsc.34.3.391","article-title":"The shifting bottleneck procedure for job shop scheduling","volume":"34","author":"Adams","year":"1988","journal-title":"Managament Science"},{"issue":"3","key":"10.3233\/ICA-180582_ref46","first-page":"79","article-title":"A scheduling policy for improving tardiness performance","volume":"2","author":"Papakostas","year":"2009","journal-title":"Asian International Journal of Science and Technology"},{"key":"10.3233\/ICA-180582_ref47","unstructured":"Rossi F, Beek PV, Walsh T. Handbook of constraint programming (foundations of artificial intelligence). New York, NY, USA: Elsevier Science Inc., 2006."},{"key":"10.3233\/ICA-180582_ref48","doi-asserted-by":"crossref","unstructured":"Shaw P. Using constraint programming and local search methods to solve vehicle routing problems. In: Maher MJ, Puget J, editors. Principles and Practice of Constraint Programming\u00a0\u2013 CP98, 4th International Conference, Pisa, Italy, October 26-30, 1998, Proceedings. vol. 1520 of Lecture Notes in Computer Science. Springer; 1998; 417\u2013431. Available from: https:\/\/doi.org\/10.1007\/3-540-49481-2_30.","DOI":"10.1007\/3-540-49481-2_30"},{"issue":"1","key":"10.3233\/ICA-180582_ref49","doi-asserted-by":"crossref","first-page":"110","DOI":"10.1109\/TEVC.2015.2429314","article-title":"Automated design of production scheduling heuristics: A review","volume":"20","author":"Branke","year":"2016","journal-title":"IEEE Trans Evolutionary Computation"},{"issue":"4","key":"10.3233\/ICA-180582_ref50","doi-asserted-by":"crossref","first-page":"313","DOI":"10.3233\/ICA-160529","article-title":"Covariance matrix adaptation pareto archived evolution strategy with hypervolume-sorted adaptive grid algorithm","volume":"23","author":"Rostami","year":"2016","journal-title":"Integrated Computer-Aided Engineering"},{"issue":"3","key":"10.3233\/ICA-180582_ref51","doi-asserted-by":"crossref","first-page":"279","DOI":"10.3233\/ICA-170542","article-title":"A region division based diversity maintaining approach for many-objective optimization","volume":"24","author":"Pan","year":"2017","journal-title":"Integrated Computer-Aided Engineering"},{"key":"10.3233\/ICA-180582_ref52","first-page":"1","article-title":"Optimizing the energy-spectrum efficiency of cellular systems by evolutionary multi-objective algorithm","author":"Wang","year":"2018","journal-title":"Integrated Computer-Aided Engineering"}],"container-title":["Integrated Computer-Aided Engineering"],"original-title":[],"link":[{"URL":"https:\/\/content.iospress.com\/download?id=10.3233\/ICA-180582","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2026,4,29]],"date-time":"2026-04-29T09:14:13Z","timestamp":1777454053000},"score":1,"resource":{"primary":{"URL":"https:\/\/journals.sagepub.com\/doi\/full\/10.3233\/ICA-180582"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018,12,3]]},"references-count":50,"journal-issue":{"issue":"1"},"URL":"https:\/\/doi.org\/10.3233\/ica-180582","relation":{},"ISSN":["1069-2509","1875-8835"],"issn-type":[{"value":"1069-2509","type":"print"},{"value":"1875-8835","type":"electronic"}],"subject":[],"published":{"date-parts":[[2018,12,3]]}}}