{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,11]],"date-time":"2026-05-11T20:58:00Z","timestamp":1778533080961,"version":"3.51.4"},"reference-count":86,"publisher":"SAGE Publications","issue":"1","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["ICA"],"published-print":{"date-parts":[[2018,12,3]]},"DOI":"10.3233\/ica-180583","type":"journal-article","created":{"date-parts":[[2018,8,14]],"date-time":"2018-08-14T15:53:29Z","timestamp":1534262009000},"page":"65-84","source":"Crossref","is-referenced-by-count":11,"title":["Satisfying flexible due dates in fuzzy job shop by means of hybrid evolutionary algorithms1"],"prefix":"10.1177","volume":"26","author":[{"given":"Juan Jos\u00e9","family":"Palacios","sequence":"first","affiliation":[{"name":"Department of Computer Science, Campus de Viesques s\/n, Gij\u00f3n, University of Oviedo, Spain"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"In\u00e9s","family":"Gonz\u00e1lez-Rodr\u00edguez","sequence":"additional","affiliation":[{"name":"Department of Mathematics, Statistics and Computing, Los Castros s\/n, Santander, University of Cantabria, Spain"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Camino R.","family":"Vela","sequence":"additional","affiliation":[{"name":"Department of Computer Science, Campus de Viesques s\/n, Gij\u00f3n, University of Oviedo, Spain"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Jorge","family":"Puente","sequence":"additional","affiliation":[{"name":"Department of Computer Science, Campus de Viesques s\/n, Gij\u00f3n, University of Oviedo, Spain"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"179","reference":[{"key":"10.3233\/ICA-180583_ref1","doi-asserted-by":"crossref","first-page":"380","DOI":"10.1016\/j.ins.2014.03.060","article-title":"Fuzzy job-shop scheduling problems: A review","volume":"278","author":"Abdullah","year":"2014","journal-title":"Information Sciences"},{"key":"10.3233\/ICA-180583_ref2","unstructured":"Adeli H, Karim A. Construction scheduling, Cost Optimization and Management. CRC Press, 2003."},{"key":"10.3233\/ICA-180583_ref3","doi-asserted-by":"crossref","first-page":"187","DOI":"10.3233\/ICA-170539","article-title":"A smart elevator scheduler that considers dynamic changes of energy cost and user traffic","volume":"24","author":"Ahn","year":"2017","journal-title":"Integrated Computer-Aided Engineering"},{"key":"10.3233\/ICA-180583_ref4","doi-asserted-by":"crossref","first-page":"427","DOI":"10.1016\/j.ejor.2008.09.012","article-title":"Min-max and min-max regret versions of combinatorial optimization problems: A survey","volume":"197","author":"Aissi","year":"2009","journal-title":"European Journal of Operational Research"},{"issue":"2","key":"10.3233\/ICA-180583_ref5","doi-asserted-by":"crossref","first-page":"345","DOI":"10.1016\/j.ejor.2015.04.004","article-title":"The third comprehensive survey on scheduling problems with setup times\/costs","volume":"246","author":"Allahverdi","year":"2015","journal-title":"European Journal of Operational Research"},{"key":"10.3233\/ICA-180583_ref6","doi-asserted-by":"crossref","first-page":"86","DOI":"10.1016\/j.ejor.2003.08.027","article-title":"Executing production schedules in the face of uncertainties: A review and some future directions","volume":"161","author":"Aytung","year":"2005","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"10.3233\/ICA-180583_ref7","doi-asserted-by":"crossref","first-page":"249","DOI":"10.1017\/S0269888910000202","article-title":"New trends in constraint satisfaction, planning, and scheduling: a survey","volume":"25","author":"Bart\u00e1k","year":"2010","journal-title":"The Knowledge Engineering Review"},{"key":"10.3233\/ICA-180583_ref8","doi-asserted-by":"crossref","first-page":"86","DOI":"10.1016\/j.csda.2006.02.009","article-title":"Practical representations of incomplete probabilistic knowledge","volume":"51","author":"Baudrit","year":"2006","journal-title":"Computational Statistics & Data Analysis"},{"key":"10.3233\/ICA-180583_ref9","doi-asserted-by":"crossref","first-page":"331","DOI":"10.1007\/s10700-015-9225-5","article-title":"Survey on fuzzy shop scheduling","volume":"15","author":"Behnamian","year":"2016","journal-title":"Fuzzy Optimization and Decision Making"},{"issue":"4","key":"10.3233\/ICA-180583_ref10","doi-asserted-by":"crossref","first-page":"141","DOI":"10.1287\/mnsc.17.4.B141","article-title":"Decision-making in a fuzzy environment","volume":"17","author":"Bellman","year":"1970","journal-title":"Management Science"},{"key":"10.3233\/ICA-180583_ref11","doi-asserted-by":"crossref","unstructured":"Benjamin J, Julstrom BA. Breaking ties with secondary fitness in a genetic algorithm for the bin packing problem. In Proceedings of 12th annual conference on Genetic and Evolutionary Computation. GECCO\u20192010. ACM, 2010; 657-664.","DOI":"10.1145\/1830483.1830605"},{"key":"10.3233\/ICA-180583_ref12","doi-asserted-by":"crossref","first-page":"315","DOI":"10.1007\/s10951-008-0080-x","article-title":"A theoretic and practical framework for scheduling in stochastic environment","volume":"12","author":"Bidot","year":"2009","journal-title":"Journal of Scheduling"},{"key":"10.3233\/ICA-180583_ref13","doi-asserted-by":"crossref","first-page":"87","DOI":"10.1007\/BF01719250","article-title":"A generalized permutation approach to jobshop scheduling with genetic algorithms","volume":"17","author":"Bierwirth","year":"1995","journal-title":"OR Spectrum"},{"key":"10.3233\/ICA-180583_ref14","doi-asserted-by":"crossref","first-page":"835","DOI":"10.1016\/j.ejor.2017.03.030","article-title":"Extended GRASP for the job shop scheduling problem with total weighted tardiness objective","volume":"261","author":"Bierwirth","year":"2017","journal-title":"European Journal of Operational Research"},{"key":"10.3233\/ICA-180583_ref15","doi-asserted-by":"crossref","unstructured":"Bierwirth C, Mattfeld DC, Kopfer H. On permutation representations for scheduling problems. In PPSN IV: Proceedings of the 4th International Conference on Parallel Problem Solving from Nature. 1996; 310-318, London, UK. Springer-Verlag.","DOI":"10.1007\/3-540-61723-X_995"},{"issue":"6","key":"10.3233\/ICA-180583_ref16","doi-asserted-by":"crossref","first-page":"4135","DOI":"10.1016\/j.asoc.2011.02.032","article-title":"Hybrid metaheuristics in combinatorial optimization: A survey","volume":"11","author":"Blum","year":"2011","journal-title":"Applied Soft Computing"},{"key":"10.3233\/ICA-180583_ref17","doi-asserted-by":"crossref","first-page":"967","DOI":"10.1016\/j.cor.2010.09.015","article-title":"A hybrid shifting bottleneck-tabu serach heuristic for the job shop total weighted tardiness problem","volume":"38","author":"B\u00fclb\u00fcl","year":"2011","journal-title":"Computers & Operations Research"},{"issue":"1","key":"10.3233\/ICA-180583_ref18","doi-asserted-by":"crossref","first-page":"11","DOI":"10.1016\/0165-0114(81)90030-0","article-title":"The use of fuzzy variables in pert","volume":"5","author":"Chanas","year":"1981","journal-title":"Fuzzy Sets and Systems"},{"issue":"3","key":"10.3233\/ICA-180583_ref19","doi-asserted-by":"crossref","first-page":"551","DOI":"10.1111\/itor.12199","article-title":"A research survey: review of flexible job shop scheduling techniques","volume":"23","author":"Chaudhry","year":"2016","journal-title":"International Transactions in Operational Research"},{"key":"10.3233\/ICA-180583_ref20","unstructured":"Chen Y, Hu J, Hirasawa K, Yu S. Solving deceptive problems using a genetic algorithm with reserve selection. In IEEE Congress on Evolutionary Computation, 2008; CEC 2008, 2008."},{"key":"10.3233\/ICA-180583_ref21","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1016\/j.fss.2011.06.003","article-title":"The role of fuzzy sets in decision sciences: Old techniques and new directions","volume":"184","author":"Dubois","year":"2011","journal-title":"Fuzzy Sets and Systems"},{"key":"10.3233\/ICA-180583_ref22","doi-asserted-by":"crossref","first-page":"231","DOI":"10.1016\/S0377-2217(02)00558-1","article-title":"Fuzzy scheduling: Modelling flexible constraints vs. coping with incomplete knowledge","volume":"147","author":"Dubois","year":"2003","journal-title":"European Journal of Operational Research"},{"key":"10.3233\/ICA-180583_ref23","doi-asserted-by":"crossref","first-page":"215","DOI":"10.1007\/BF00128646","article-title":"Fuzzy constraints in job-shop scheduling","volume":"6","author":"Dubois","year":"1995","journal-title":"Journal of Intelligent Manufacturing"},{"key":"10.3233\/ICA-180583_ref24","doi-asserted-by":"crossref","first-page":"273","DOI":"10.1023\/B:REOM.0000032115.22510.b5","article-title":"Probability-possibility transformations, triangular fuzzy sets and probabilistic inequalities","volume":"10","author":"Dubois","year":"2004","journal-title":"Reliable Computing"},{"key":"10.3233\/ICA-180583_ref25","doi-asserted-by":"crossref","first-page":"85","DOI":"10.1016\/0020-0255(85)90027-1","article-title":"A review of fuzzy set aggregation connectives","volume":"36","author":"Dubois","year":"1985","journal-title":"Information Sciences"},{"key":"10.3233\/ICA-180583_ref26","first-page":"103","article-title":"On possibility\/probability transformations","author":"Dubois","year":"1993","journal-title":"In Fuzzy Logic, volume\u00a012 of Theory and Decision Library"},{"key":"10.3233\/ICA-180583_ref27","unstructured":"Engin O, Yilmaz MK, Kahraman C, Baysal ME, Sarucan A. A scatter search method for fuzzy job shop scheduling problem with availability constraints. In Proceedings of the World Congress on Engineering 2011 (WCE 2011), volume\u00a0II, 2011; 1144-1148, London (U.K.). Newswood Limited."},{"key":"10.3233\/ICA-180583_ref28","doi-asserted-by":"crossref","first-page":"2599","DOI":"10.1016\/j.cor.2006.12.019","article-title":"A genetic local search algorithm for minimizing total weighted tardiness in the job-shop scheduling problem","volume":"35","author":"Essafi","year":"2008","journal-title":"Computers & Operations Research"},{"key":"10.3233\/ICA-180583_ref29","doi-asserted-by":"crossref","first-page":"524","DOI":"10.1007\/11504894_71","article-title":"A fuzzy genetic algorithm for real-world job-shop scheduling","volume":"3533","author":"Fayad","year":"2005","journal-title":"Innovations in Applied Artificial Intelligence, Lecture Notes in Computer Science"},{"key":"10.3233\/ICA-180583_ref30","doi-asserted-by":"crossref","first-page":"557","DOI":"10.1109\/91.649907","article-title":"Jobshop scheduling with imprecise durations: a fuzzy approach","volume":"7","author":"Fortemps","year":"1997","journal-title":"IEEE Transactions of Fuzzy Systems"},{"key":"10.3233\/ICA-180583_ref31","doi-asserted-by":"crossref","first-page":"2097","DOI":"10.1007\/s00500-012-0880-y","article-title":"An efficient hybrid evolutionary algorithm for scheduling with setup times and weighted tardiness minimization","volume":"16","author":"Gonz\u00e1lez","year":"2012","journal-title":"Soft Computing"},{"key":"10.3233\/ICA-180583_ref32","first-page":"80","article-title":"A multiobjective approach to fuzzy job shop problem using genetic algorithms","volume":"4788","author":"Gonz\u00e1lez\u00a0Rodr\u00edguez","year":"2007","journal-title":"CAEPIA 2007, Lecture Notes in Artificial Intelligence"},{"issue":"3","key":"10.3233\/ICA-180583_ref33","doi-asserted-by":"crossref","first-page":"655","DOI":"10.1109\/TSMCA.2008.918603","article-title":"Semantics of schedules for the fuzzy job shop problem","volume":"38","author":"Gonz\u00e1lez\u00a0Rodr\u00edguez","year":"2008","journal-title":"IEEE Transactions on Systems, Man and Cybernetics, Part A"},{"key":"10.3233\/ICA-180583_ref34","doi-asserted-by":"crossref","first-page":"287","DOI":"10.1016\/S0167-5060(08)70356-X","article-title":"Optimization and approximation in deterministic sequencing and scheduling: A survey","volume":"4","author":"Graham","year":"1979","journal-title":"Annals of Discrete Mathematics"},{"key":"10.3233\/ICA-180583_ref35","doi-asserted-by":"crossref","first-page":"289","DOI":"10.1016\/j.ejor.2004.04.002","article-title":"Project scheduling under uncertainty: Survey and research potentials","volume":"165","author":"Herroelen","year":"2005","journal-title":"European Journal of Operational Research"},{"key":"10.3233\/ICA-180583_ref36","doi-asserted-by":"crossref","first-page":"77","DOI":"10.3233\/ICA-130452","article-title":"Multiobjective bilevel optimization for production-distribution planning problems using hybrid genetic algorithm","volume":"21","author":"Jia","year":"2014","journal-title":"Integrated Computer-Aided Engineering"},{"key":"10.3233\/ICA-180583_ref37","doi-asserted-by":"crossref","first-page":"722","DOI":"10.1016\/j.ejor.2012.01.056","article-title":"Lexicographic \u03b1-robustness: An alternative to min-max criteria","volume":"220","author":"Kala\u00ef","year":"2012","journal-title":"European Journal of Operational Research"},{"key":"10.3233\/ICA-180583_ref38","doi-asserted-by":"crossref","first-page":"667","DOI":"10.1016\/j.fss.2008.09.001","article-title":"Choosing robust solutions in discrete optimization problems with fuzzy costs","volume":"160","author":"Kasperski","year":"2009","journal-title":"Fuzzy Sets and Systems"},{"issue":"5","key":"10.3233\/ICA-180583_ref39","doi-asserted-by":"crossref","first-page":"474","DOI":"10.1109\/TEVC.2005.850260","article-title":"A tutorial for competent memetic algorithms: Model, taxonomy, and design issues","volume":"9","author":"Krasnogor","year":"2005","journal-title":"IEEE Transactions on Evolutionary Computation"},{"key":"10.3233\/ICA-180583_ref40","doi-asserted-by":"crossref","first-page":"44","DOI":"10.1016\/j.cor.2015.07.011","article-title":"A study on local search neighbourhoods for the job shop scheduling problem with total weighted tardiness objective","volume":"261","author":"Kuhpfahl","year":"2016","journal-title":"Computers & Operations Research"},{"key":"10.3233\/ICA-180583_ref41","doi-asserted-by":"crossref","first-page":"173","DOI":"10.3233\/ICA-150508","article-title":"Evolutionary computation for resource leveling optimization in project management","volume":"23","author":"Kyriklidis","year":"2016","journal-title":"Integrated Computer-Aided Engineering"},{"issue":"2","key":"10.3233\/ICA-180583_ref42","first-page":"129","article-title":"MH, Murga RH, Inza I, Dizdarevic S","volume":"13","author":"Larra\u00f1aga","year":"1999","journal-title":"Genetic algorithms for the travelling salesman problem: A review of representations and operators. Artificial Intelligence Review"},{"key":"10.3233\/ICA-180583_ref43","doi-asserted-by":"crossref","first-page":"157","DOI":"10.1007\/s00170-007-0945-8","article-title":"Pareto archive particle swarm optimization for multi-objective fuzzy job shop scheduling problems","volume":"37","author":"Lei","year":"2008","journal-title":"International Journal of Advanced Manufacturing Technology"},{"key":"10.3233\/ICA-180583_ref44","doi-asserted-by":"crossref","first-page":"253","DOI":"10.1007\/s00170-009-2379-y","article-title":"Solving fuzzy job shop scheduling problems using random key genetic algorithm","volume":"49","author":"Lei","year":"2010","journal-title":"International Journal of Advanced Manufacturing Technologies"},{"key":"10.3233\/ICA-180583_ref45","unstructured":"Luke S, Panait L. Lexicographic parsimony pressure. In Proceedings of the 4th Annual Conference on Genetic and Evolutionary Computation. GECCO\u201902, 2002; 829-836."},{"key":"10.3233\/ICA-180583_ref46","doi-asserted-by":"crossref","first-page":"135","DOI":"10.1016\/j.engappai.2012.07.012","article-title":"Project scheduling under uncertainty using fuzzy modelling and solving techniques","volume":"26","author":"Masmoudi","year":"2013","journal-title":"Engineering Applications of Artificial Intelligence"},{"key":"10.3233\/ICA-180583_ref47","doi-asserted-by":"crossref","first-page":"146","DOI":"10.1109\/17.277406","article-title":"Using PERT as an approximation of fuzzy project-network analysis","volume":"40","author":"McCahon","year":"1993","journal-title":"IEEE Transactions on Engineering Management"},{"key":"10.3233\/ICA-180583_ref48","doi-asserted-by":"crossref","first-page":"269","DOI":"10.3233\/ICA-160519","article-title":"Genetic algorithms for the scheduling problem with arbitrary precedence relations and skilled operators","volume":"23","author":"Menc\u00eda","year":"2016","journal-title":"Integrated Computer-Aided Engineering"},{"key":"10.3233\/ICA-180583_ref49","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.swevo.2011.11.003","article-title":"Memetic algorithms and memetic computing optimization: A literature review","volume":"2","author":"Neri","year":"2012","journal-title":"Swarm and Evolutionary Computation"},{"key":"10.3233\/ICA-180583_ref50","doi-asserted-by":"crossref","unstructured":"Neri F, Cotta C, Moscato P, editors. Handbook of Memetic Algorithms. Studies in Computational Intelligence. Springer, 2012.","DOI":"10.1007\/978-3-642-23247-3"},{"issue":"2","key":"10.3233\/ICA-180583_ref51","doi-asserted-by":"crossref","first-page":"264","DOI":"10.1109\/TCBB.2007.070202","article-title":"An adaptive multimeme algorithm for designing hiv multidrug therapies","volume":"4","author":"Neri","year":"2007","journal-title":"IEEE Transactions on Computational Biology and Bioinformatics"},{"key":"10.3233\/ICA-180583_ref52","doi-asserted-by":"crossref","first-page":"219","DOI":"10.1007\/s10489-007-0069-8","article-title":"An adaptive evolutionary algorithm with intelligent mutation local searchers for designing multidrug therapies for hiv","volume":"27","author":"Neri","year":"2007","journal-title":"Applied Intelligence"},{"key":"10.3233\/ICA-180583_ref53","doi-asserted-by":"crossref","unstructured":"Ono I, Yamamura M, Kobayashi S. A genetic algorithm for job-shop scheduling problems using job-based order crossover. In Evolutionary Computation, 1996. Proceedings of IEEE International Conference on. IEEE, 1996; 547-552.","DOI":"10.1109\/ICEC.1996.542658"},{"key":"10.3233\/ICA-180583_ref54","doi-asserted-by":"crossref","unstructured":"Palacios JJ, Derbel B. On maintaining diversity in MOEA\/D: Application to a biobjective combinatorial FJSP. In GECCO \u201915 Proceedings of the 2015 Annual Conference on Genetic and Evolutionary Computation. ACM, July 2015; 719-726.","DOI":"10.1145\/2739480.2754774"},{"key":"10.3233\/ICA-180583_ref55","doi-asserted-by":"crossref","first-page":"74","DOI":"10.1016\/j.cor.2014.08.023","article-title":"Genetic tabu search for the fuzzy flexible job shop problem","volume":"54","author":"Palacios","year":"2015","journal-title":"Computers & Operations Research"},{"issue":"2","key":"10.3233\/ICA-180583_ref56","doi-asserted-by":"crossref","first-page":"145","DOI":"10.1007\/s11047-014-9413-1","article-title":"Robust swarm optimisation for fuzzy open shop scheduling","volume":"13","author":"Palacios","year":"2014","journal-title":"Natural Computing"},{"key":"10.3233\/ICA-180583_ref57","doi-asserted-by":"crossref","first-page":"81","DOI":"10.1016\/j.fss.2014.12.003","article-title":"Coevolutionary makespan optimisation through different ranking methods for the fuzzy flexible job shop","volume":"278","author":"Palacios","year":"2015","journal-title":"Fuzzy Sets and Systems"},{"key":"10.3233\/ICA-180583_ref58","doi-asserted-by":"crossref","first-page":"604","DOI":"10.1016\/j.asoc.2016.07.004","article-title":"Robust multiobjective optimisation for fuzzy job shop problems","volume":"56","author":"Palacios","year":"2017","journal-title":"Applied Soft Computing"},{"key":"10.3233\/ICA-180583_ref59","doi-asserted-by":"crossref","first-page":"736","DOI":"10.1016\/j.ins.2015.09.042","article-title":"Benchmarks for fuzzy job shop problems","volume":"329","author":"Palacios","year":"2016","journal-title":"Information Sciences"},{"key":"10.3233\/ICA-180583_ref60","unstructured":"Palacios JJ, Vela CR, Gonz\u00e1lez-Rodr\u00edguez I, Puente J. Schedule generation schemes for job shop problems with fuzziness. In Proceedings of ECAI 2014, volume 263 of Frontiers in Artificial Intelligence and Applications. Schaub T, Friedrich G, O\u2019Sullivan B, editors, IOS Press, 2014; 687\u2013692."},{"key":"10.3233\/ICA-180583_ref61","doi-asserted-by":"crossref","unstructured":"Palacios JJ, Vela CR, Gonz\u00e1lez-Rodr\u00edguez I, Puente J. A memetic algorithm for due-date satisfaction in fuzzy job shop scheduling. In IWINAC2017 International Work-Conference on the Interplay Between Natural and Artificial Computation. LNCS 10337. June 2017; 135\u2013145. Springer.","DOI":"10.1007\/978-3-319-59740-9_14"},{"issue":"1","key":"10.3233\/ICA-180583_ref62","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1002\/(SICI)1520-6750(199902)46:1<1::AID-NAV1>3.0.CO;2-#","article-title":"A shifting bottleneck heuristic for minimizing the total weighted tardiness in a job shop","volume":"46","author":"Pinedo","year":"1999","journal-title":"Nav. Res. Logist"},{"key":"10.3233\/ICA-180583_ref63","unstructured":"Pinedo ML. Scheduling. Theory, Algorithms, and Systems. Springer, fifth edition, 2016."},{"key":"10.3233\/ICA-180583_ref64","doi-asserted-by":"crossref","first-page":"237","DOI":"10.3233\/ICA-160522","article-title":"Real-time optimization of dynamic problems through distributed embodied evolution","volume":"23","author":"Prieto","year":"2016","journal-title":"Integrated Computer-Aided Engineering"},{"key":"10.3233\/ICA-180583_ref65","doi-asserted-by":"crossref","first-page":"175","DOI":"10.3233\/ICA-2010-0344","article-title":"A multi-criteria optimization framework for industrial shop scheduling using fuzzy set theory","volume":"17","author":"Rokni","year":"2010","journal-title":"Integrated Computer-Aided Engineering"},{"key":"10.3233\/ICA-180583_ref66","doi-asserted-by":"crossref","first-page":"3137","DOI":"10.3233\/ICA-160529","article-title":"Covariance matrix adaptation pareto archived evolution strategy with hypervolume-sorted adaptive grid algorithm","volume":"23","author":"Rostami","year":"2016","journal-title":"Integrated Computer-Aided Engineering"},{"key":"10.3233\/ICA-180583_ref67","doi-asserted-by":"crossref","first-page":"629","DOI":"10.1016\/j.ejor.2008.12.036","article-title":"Robustness in operational research and decision aiding: A multi-faceted issue","volume":"200","author":"Roy","year":"2010","journal-title":"European Journal of Operational Research"},{"key":"10.3233\/ICA-180583_ref68","doi-asserted-by":"crossref","first-page":"393","DOI":"10.1016\/S0377-2217(99)00094-6","article-title":"Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy duedate through genetic algorithms","volume":"120","author":"Sakawa","year":"2000","journal-title":"European Journal of Operational Research"},{"key":"10.3233\/ICA-180583_ref69","doi-asserted-by":"crossref","first-page":"325","DOI":"10.1016\/S0360-8352(99)00135-7","article-title":"An efficient genetic algorithm for job-shop scheduling problems with fuzzy processing time and fuzzy duedate","volume":"36","author":"Sakawa","year":"1999","journal-title":"Computers & Industrial Engineering"},{"issue":"1","key":"10.3233\/ICA-180583_ref70","doi-asserted-by":"crossref","first-page":"28","DOI":"10.1061\/(ASCE)0733-9364(2001)127:1(28)","article-title":"Resource scheduling using neural dynamics model of Adeli and Park","volume":"127","author":"Senouci","year":"2001","journal-title":"Journal of Construction Engineering and Management"},{"issue":"6","key":"10.3233\/ICA-180583_ref71","doi-asserted-by":"crossref","first-page":"706","DOI":"10.1007\/s12559-015-9370-8","article-title":"Nature inspired computing: An overview and some future directions","volume":"7","author":"Siddique","year":"2015","journal-title":"Cognitive Computation"},{"key":"10.3233\/ICA-180583_ref72","doi-asserted-by":"crossref","first-page":"109","DOI":"10.1080\/07408179808966443","article-title":"A computational study of branch and bound techniques for minimizing the total weighted tardiness in job shops","volume":"30","author":"Singer","year":"1998","journal-title":"IIE Transactions"},{"key":"10.3233\/ICA-180583_ref73","doi-asserted-by":"crossref","first-page":"278","DOI":"10.1016\/0377-2217(93)90182-M","article-title":"Benchmarks for basic scheduling problems","volume":"64","author":"Taillard","year":"1993","journal-title":"European Journal of Operational Research"},{"key":"10.3233\/ICA-180583_ref74","doi-asserted-by":"crossref","unstructured":"Talbi EG. Metaheuristics. From Design to Implementation. Wiley, 2009.","DOI":"10.1002\/9780470496916"},{"key":"10.3233\/ICA-180583_ref75","doi-asserted-by":"crossref","unstructured":"Wang B, Li Q, Yang X, Wang X. Robust and satisfactory job shop scheduling under fuzzy processing times and flexible due dates. In Proc. of the 2010 IEEE International Conference on Automation and Logistics. 2010; 575-580.","DOI":"10.1109\/ICAL.2010.5585349"},{"issue":"14","key":"10.3233\/ICA-180583_ref76","doi-asserted-by":"crossref","first-page":"2828","DOI":"10.1080\/00949655.2017.1344846","article-title":"Multi-objective fuzzy flexible job shop scheduling using memetic algorithm","volume":"87","author":"Wang","year":"2017","journal-title":"Journal of Statistical Computation and Simulation"},{"key":"10.3233\/ICA-180583_ref77","doi-asserted-by":"crossref","first-page":"180","DOI":"10.1016\/S0377-2217(02)00701-4","article-title":"A fuzzy robust scheduling approach for product development projects","volume":"152","author":"Wang","year":"2004","journal-title":"European Journal of Operational Research"},{"key":"10.3233\/ICA-180583_ref78","doi-asserted-by":"crossref","unstructured":"Wang Q, Liu HL, Yuan J, Chen L. Optimizing the energy-spectrum efficiency of cellular systems by evolutionary multi-objective algorithm. Integrated Computer-Aided Engineering. In press, 2018.","DOI":"10.3233\/ICA-180575"},{"key":"10.3233\/ICA-180583_ref79","doi-asserted-by":"crossref","first-page":"9320","DOI":"10.1109\/ACCESS.2016.2645818","article-title":"A hybrid discrite imperialist competition algorithm for fuzzy job-shop scheduling problems","volume":"4","author":"Wang","year":"2016","journal-title":"IEEE Access"},{"key":"10.3233\/ICA-180583_ref80","unstructured":"Westerberg CH, Levine J. Optimising plans using genetic programming. In Proceedings of the Sixth European Conference on Planning. ECP-01. 2001; pages 272-274. AAAI."},{"key":"10.3233\/ICA-180583_ref81","doi-asserted-by":"crossref","first-page":"2013","DOI":"10.3233\/ICA-170545","article-title":"Quantum inspired evolutionary algorithms with improved rotation gates for real-coded synthetic and real world optimization problems","volume":"24","author":"Wright","year":"2017","journal-title":"Integrated Computer-Aided Engineering"},{"key":"10.3233\/ICA-180583_ref82","doi-asserted-by":"crossref","unstructured":"Xiang Z, Zhenqiang B, Guijun W, Quanke P. Optimization of fuzzy job-shop scheduling with multi-process routes and its co-evolutionary algorithm. In Intelligent Computation Technology and Automation (ICICTA), 2011 International Conference on. volume\u00a01, March 2011; pages 866\u2013870. IEEE.","DOI":"10.1109\/ICICTA.2011.618"},{"issue":"1","key":"10.3233\/ICA-180583_ref83","doi-asserted-by":"crossref","first-page":"183","DOI":"10.1109\/21.87068","article-title":"On ordered weighted averaging aggregation operators in multicriteria decisionmaking","volume":"18","author":"Yager","year":"1988","journal-title":"IEEE Transactions on Systems, Man and Cybernetics"},{"issue":"3","key":"10.3233\/ICA-180583_ref84","doi-asserted-by":"crossref","first-page":"205","DOI":"10.3233\/ICA-160515","article-title":"Multi-objective inventory routing with uncertain demand using population-based metaheuristics","volume":"23","author":"Yang","year":"2016","journal-title":"Integrated Computer-Aided Engineering"},{"key":"10.3233\/ICA-180583_ref85","doi-asserted-by":"crossref","first-page":"282","DOI":"10.1016\/j.cor.2006.02.024","article-title":"A very fast TS\/SA algorithm for the job shop scheduling problem","volume":"35","author":"Zhang","year":"2008","journal-title":"Computers & Operations Research"},{"issue":"2","key":"10.3233\/ICA-180583_ref86","doi-asserted-by":"crossref","first-page":"299","DOI":"10.1109\/TEVC.2015.2457245","article-title":"Generalization of pareto-optimality for many-objective evolutionary optimization","volume":"20","author":"Zhu","year":"2016","journal-title":"IEEE T. Evol. Comput"}],"container-title":["Integrated Computer-Aided Engineering"],"original-title":[],"link":[{"URL":"https:\/\/content.iospress.com\/download?id=10.3233\/ICA-180583","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2026,4,29]],"date-time":"2026-04-29T09:14:13Z","timestamp":1777454053000},"score":1,"resource":{"primary":{"URL":"https:\/\/journals.sagepub.com\/doi\/full\/10.3233\/ICA-180583"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018,12,3]]},"references-count":86,"journal-issue":{"issue":"1"},"URL":"https:\/\/doi.org\/10.3233\/ica-180583","relation":{},"ISSN":["1069-2509","1875-8835"],"issn-type":[{"value":"1069-2509","type":"print"},{"value":"1875-8835","type":"electronic"}],"subject":[],"published":{"date-parts":[[2018,12,3]]}}}