{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,6]],"date-time":"2026-03-06T14:07:46Z","timestamp":1772806066837,"version":"3.50.1"},"reference-count":37,"publisher":"SAGE Publications","issue":"2","license":[{"start":{"date-parts":[[2015,10,5]],"date-time":"2015-10-05T00:00:00Z","timestamp":1444003200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/journals.sagepub.com\/page\/policies\/text-and-data-mining-license"}],"content-domain":{"domain":["journals.sagepub.com"],"crossmark-restriction":true},"short-container-title":["Journal of Intelligent &amp; Fuzzy Systems"],"published-print":{"date-parts":[[2015,10,5]]},"abstract":"<jats:title>Abstract<\/jats:title>\n                  <jats:p>Due to the more complex structure, greater size, and longer constructing period, most construction projects are facing more and greater risks than before and need more effective methods and tools to manage risks. However, because of the complex mathematic formulas, the difficulty of collecting data, or low profit margin etc., professionals are finding that few risk management methods and tools are sufficient, and they typically rely on their experience in practical construction-project risk management. To solve these problems, we present Building Information Modeling (BIM) as a new technology and the future of the Architectural, Engineering and Construction (AEC) industry. This combined with Earned Value Analysis (EVA) for providing a BIM-based construction project cost and schedule risk early warning model (BIM-CPCSREWM) to better and effectively manage construction project risks. Herein we will present a background and a description of the proposed model, develop the system prototype of BIM-CPCSREWM, and utilize a practical medicine construction project to illustrate the model\u2019s validity.<\/jats:p>","DOI":"10.3233\/ifs-141178","type":"journal-article","created":{"date-parts":[[2015,10,6]],"date-time":"2015-10-06T12:03:15Z","timestamp":1444132995000},"page":"469-477","update-policy":"https:\/\/doi.org\/10.1177\/sage-journals-update-policy","source":"Crossref","is-referenced-by-count":23,"title":["Study on BIM-based construction project cost\u00a0and schedule risk early warning"],"prefix":"10.1177","volume":"29","author":[{"given":"Chengshuang","family":"Sun","sequence":"first","affiliation":[{"name":"School of Management, Harbin Institute of Technology, Harbin, China"}]},{"given":"Qingpeng","family":"Man","sequence":"additional","affiliation":[{"name":"School of Management, Harbin Institute of Technology, Harbin, China"}]},{"given":"Yaowu","family":"Wang","sequence":"additional","affiliation":[{"name":"School of Management, Harbin Institute of Technology, Harbin, China"}]}],"member":"179","published-online":{"date-parts":[[2015,10,5]]},"reference":[{"key":"e_1_3_2_2_2","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0000210"},{"key":"e_1_3_2_3_2","first-page":"1","article-title":"BIM-based sustainability analysis: An evaluation of building performance analysis software","author":"Azhar S","year":"2009","unstructured":"AzharSJustinBRizwanF2009BIM-based sustainability analysis: An evaluation of building performance analysis softwareProceedings of the 45th ASC National Conference14","journal-title":"Proceedings of the 45th ASC National Conference"},{"key":"e_1_3_2_4_2","doi-asserted-by":"publisher","DOI":"10.1016\/S0263-7863(02)00017-0"},{"key":"e_1_3_2_5_2","first-page":"324","article-title":"Cost controlling using earned value analysis in construction industries","volume":"1","author":"Bhosekar SK","year":"2012","unstructured":"BhosekarSKVyasG2012Cost controlling using earned value analysis in construction industriesInternational Journal of Engineering and Innovative Technology1324332","journal-title":"International Journal of Engineering and Innovative Technology"},{"key":"e_1_3_2_6_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2010.08.003"},{"key":"e_1_3_2_7_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.advengsoft.2012.02.003"},{"key":"e_1_3_2_8_2","doi-asserted-by":"publisher","DOI":"10.1109\/ICIME.2010.5477476"},{"key":"e_1_3_2_9_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2012.11.001"},{"key":"e_1_3_2_10_2","unstructured":"EastmanC2008BIM handbook: A guide to building information modeling for owners managers designers engineers and contractorsJohn Wiley & Sons Inc.NJ USA"},{"key":"e_1_3_2_11_2","unstructured":"FischerMKunzJ2004The Scope and Role of Information Technology in ConstructionPalo Alto CACenter for Integrated Facility Engineering Stanford University"},{"key":"e_1_3_2_12_2","unstructured":"GeWL2011BIM the second dimension \u2013 BIM application for different project participantsChina Architecture & Building Press(In Chinese)"},{"key":"e_1_3_2_13_2","unstructured":"General Services Administration GSA Building Information Modeling Guide Series 01 \u2013 Overview http:\/\/www.gsa.gov\/bim"},{"key":"e_1_3_2_14_2","unstructured":"GledsonBHenryDBleanchP2012Does size matter? Experiences and perspectives of BIM implementation from large and SME construction contractors1st UK Academic Conference on Building Information Management57Northumbria UniversityNewcastle upon Tyne UK"},{"key":"e_1_3_2_15_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2009.11.003"},{"key":"e_1_3_2_16_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2011.12.011"},{"key":"e_1_3_2_17_2","first-page":"14","article-title":"BIM as a risk management platform enabling integrated practice and\u00a0delivery","author":"Harvey R","year":"2009","unstructured":"HarveyRBahgatTGerberDKotronisJPyshD2009BIM as a risk management platform enabling integrated practice and\u00a0deliveryJournal of Building Information Modeling1417","journal-title":"Journal of Building Information Modeling"},{"key":"e_1_3_2_18_2","unstructured":"E. Hoffer BIM Adoption \u2013 Catalyzed by Industry Trends. http:\/\/www.greenbuildingcommunity.com\/feature_full.php?cpfeatureid=29823 August 22 2008."},{"key":"e_1_3_2_19_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2013.01.007"},{"key":"e_1_3_2_20_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.aej.2013.07.003"},{"key":"e_1_3_2_21_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2008.11.001"},{"key":"e_1_3_2_22_2","article-title":"Big BIM, little BIM","author":"Jernigan FE","year":"2008","unstructured":"JerniganFE2008Big BIM, little BIMThe practical approach to building information modeling: Integrated practice done the right way! 4site PressMaryland, USA","journal-title":"The practical approach to building information modeling: Integrated practice done the right way! 4site Press"},{"key":"e_1_3_2_23_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2012.10.015"},{"key":"e_1_3_2_24_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2008.07.003"},{"key":"e_1_3_2_25_2","first-page":"687","article-title":"Development of 5D system for visualizing risk degree and progress schedule for construction project","author":"Kang LS","year":"2011","unstructured":"KangLS2011Development of 5D system for visualizing risk degree and progress schedule for construction projectProceedings of the 2011 ASCE international Workshop on Computing in Civil Engineering687690","journal-title":"Proceedings of the 2011 ASCE international Workshop on Computing in Civil Engineering"},{"key":"e_1_3_2_26_2","article-title":"HMSO","author":"Latham M","year":"1994","unstructured":"LathamM1994HMSOConstruction the teamLondon","journal-title":"Construction the team"},{"key":"e_1_3_2_27_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2008.03.003"},{"key":"e_1_3_2_28_2","unstructured":"S. Nagrecha An introduction to Earned Value Analysis. http:\/\/www.pmiglc.org\/COMM\/Articles\/0410_nagrecha_eva-3.pdf 2002."},{"key":"e_1_3_2_29_2","unstructured":"NBIMS-US National Building Information Modeling Standard Version 1 \u2013 Part 1: Overview Principles and Methodologies. http:\/\/www.wbdg.org\/pdfs\/NBIMSv1_p1.pdf 2007."},{"key":"e_1_3_2_30_2","unstructured":"PMI A guide to the project management body of knowledge Project Management Institute (2012)."},{"key":"e_1_3_2_31_2","doi-asserted-by":"publisher","DOI":"10.1016\/0263-7863(94)90003-5"},{"key":"e_1_3_2_32_2","doi-asserted-by":"publisher","unstructured":"A. Taroun Towards a better modeling and assessment of construction risk: Insights from a literature review International Journal of Project Management http:\/\/dx.doi.org\/10.1016\/j.ijproman.2013.03004 2013.","DOI":"10.1016\/j.ijproman.2013.03004"},{"key":"e_1_3_2_33_2","doi-asserted-by":"publisher","DOI":"10.1016\/S0263-7863(98)00038-6"},{"key":"e_1_3_2_34_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.emj.2010.10.003"},{"key":"e_1_3_2_35_2","unstructured":"Wisconsin Department of Administration. BIM Implementation Announcement ftp:\/\/doaftp1380.wi.gov\/master_spec\/BIM%20Guidelines%20&%20Standards\/BIM%20Implementation%20Announcement.pdf 2009."},{"key":"e_1_3_2_36_2","first-page":"106","article-title":"Accidents at the construction site in northern area: Malaysian experienced","volume":"4","author":"Zakaria Z","year":"2010","unstructured":"ZakariaZ2010Accidents at the construction site in northern area: Malaysian experiencedManagement Science and Engineering4106116","journal-title":"Management Science and Engineering"},{"key":"e_1_3_2_37_2","doi-asserted-by":"publisher","DOI":"10.3846\/jcem.2010.03"},{"key":"e_1_3_2_38_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2010.09.013"}],"container-title":["Journal of Intelligent &amp; Fuzzy Systems"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/journals.sagepub.com\/doi\/pdf\/10.3233\/IFS-141178","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/journals.sagepub.com\/doi\/full-xml\/10.3233\/IFS-141178","content-type":"application\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/journals.sagepub.com\/doi\/pdf\/10.3233\/IFS-141178","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2026,2,10]],"date-time":"2026-02-10T10:50:18Z","timestamp":1770720618000},"score":1,"resource":{"primary":{"URL":"https:\/\/journals.sagepub.com\/doi\/10.3233\/IFS-141178"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,10,5]]},"references-count":37,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2015,10,5]]}},"alternative-id":["10.3233\/IFS-141178"],"URL":"https:\/\/doi.org\/10.3233\/ifs-141178","relation":{},"ISSN":["1064-1246","1875-8967"],"issn-type":[{"value":"1064-1246","type":"print"},{"value":"1875-8967","type":"electronic"}],"subject":[],"published":{"date-parts":[[2015,10,5]]}}}