{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,17]],"date-time":"2026-03-17T19:16:31Z","timestamp":1773774991218,"version":"3.50.1"},"reference-count":28,"publisher":"SAGE Publications","issue":"4","license":[{"start":{"date-parts":[[2015,10,23]],"date-time":"2015-10-23T00:00:00Z","timestamp":1445558400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/journals.sagepub.com\/page\/policies\/text-and-data-mining-license"}],"content-domain":{"domain":["journals.sagepub.com"],"crossmark-restriction":true},"short-container-title":["Journal of Intelligent &amp; Fuzzy Systems"],"published-print":{"date-parts":[[2015,10,23]]},"abstract":"<jats:title>Abstract<\/jats:title>\n                  <jats:p>Product collaborative design scheduling problem (PCDSP) has received increasing attention in the engineering field for its popularity in manufacturing and supply chain systems. Although many scholars have achieved many useful results in Job-shop scheduling problem (JSP), the research work of PCDSP is still lacking. Moreover, the fuzziness, dynamics and multi-objective of PCD pose a great challenge for enterprises making quick response to unplanned perturbations. Thus, in this paper, multi-objective dynamic fuzzy scheduling and its solution algorithm are presented. Emergencies cases are analyzed and dynamic scheduling procedure based on event-driven and lifecycle-driven is developed firstly. The fuzziness of PCD process is studied meanwhile fuzzy triangular number and fuzzy trapezoid number are used to express the fuzziness. Based on this, a multi-objective dynamic fuzzy scheduling model aiming to minimum the makespan and tardiness penalty is constructed. As a solution, multi-objective dynamic adaptive scheduling algorithm, based on bi-layer coding strategy and self-adaptive double point crossover and self-adaptive mutation, is proposed following closely. Finally, analytic results from a case of a wind turbine are used to illustrate the model and method proposed in this paper. With the analysis, it can provide insight into ways of improving the strategic and operational decision making for enterprises.<\/jats:p>","DOI":"10.3233\/ifs-141491","type":"journal-article","created":{"date-parts":[[2015,11,3]],"date-time":"2015-11-03T11:20:15Z","timestamp":1446549615000},"page":"1355-1365","update-policy":"https:\/\/doi.org\/10.1177\/sage-journals-update-policy","source":"Crossref","is-referenced-by-count":2,"title":["Multi-objective dynamic fuzzy scheduling and its algorithm in product collaborative design considering emergency"],"prefix":"10.1177","volume":"29","author":[{"given":"Yu","family":"Guodong","sequence":"first","affiliation":[{"name":"State Key Laboratory of Mechanical Transmission, Chongqing University, Chongqing, China"}]},{"given":"Yang","family":"Yu","sequence":"additional","affiliation":[{"name":"State Key Laboratory of Mechanical Transmission, Chongqing University, Chongqing, China"}]},{"given":"Zhao","family":"Xi","sequence":"additional","affiliation":[{"name":"Qingdao Cigarette Factor, China Tobacco Shandong Industrial Corporation, Qingdao, China"}]},{"given":"Liu","family":"Aijun","sequence":"additional","affiliation":[{"name":"Department of Supply Chain Management, W. P. Carey School of Business, Arizona State University, Arizona, USA"}]}],"member":"179","published-online":{"date-parts":[[2015,10,23]]},"reference":[{"key":"e_1_3_2_2_2","doi-asserted-by":"publisher","DOI":"10.1080\/00207540802356770"},{"key":"e_1_3_2_3_2","doi-asserted-by":"publisher","DOI":"10.1007\/s10845-005-1656-3"},{"key":"e_1_3_2_4_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2008.11.024"},{"key":"e_1_3_2_5_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.jpdc.2014.01.006"},{"key":"e_1_3_2_6_2","doi-asserted-by":"publisher","DOI":"10.1287\/mnsc.1060.0617"},{"key":"e_1_3_2_7_2","doi-asserted-by":"publisher","DOI":"10.1109\/3468.553229"},{"key":"e_1_3_2_8_2","doi-asserted-by":"publisher","DOI":"10.1016\/S0377-2217(98)00027-7"},{"key":"e_1_3_2_9_2","doi-asserted-by":"publisher","DOI":"10.1016\/S0377-2217(02)00758-0"},{"key":"e_1_3_2_10_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2006.11.003"},{"issue":"7","key":"e_1_3_2_11_2","first-page":"1274","article-title":"Product design process planning method based on synchronous mapping from directed graph to design structure matrix and polychromatic sets","volume":"14","author":"Zhi-yi P","year":"2008","unstructured":"Zhi-yiPXiangHYing-GuangL2008Product design process planning method based on synchronous mapping from directed graph to design structure matrix and polychromatic setsComputer Integrated Manufacturing Systems14712741280","journal-title":"Computer Integrated Manufacturing Systems"},{"key":"e_1_3_2_12_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2010.03.009"},{"key":"e_1_3_2_13_2","first-page":"74","article-title":"Multi-mode optimal scheduling of product design project based on person-task-resource matching degree","volume":"3","author":"Ying-zi L","year":"2012","unstructured":"Ying-ziLXiao-dongZShuoZZhi-qiangZ2012Multi-mode optimal scheduling of product design project based on person-task-resource matching degreeIndustrial Engineering and Management37480","journal-title":"Industrial Engineering and Management"},{"key":"e_1_3_2_14_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2013.04.005"},{"key":"e_1_3_2_15_2","doi-asserted-by":"publisher","DOI":"10.1080\/002075499191300"},{"key":"e_1_3_2_16_2","doi-asserted-by":"publisher","DOI":"10.1007\/s10845-010-0434-z"},{"key":"e_1_3_2_17_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2011.11.034"},{"key":"e_1_3_2_18_2","doi-asserted-by":"publisher","DOI":"10.1115\/1.2717224"},{"key":"e_1_3_2_19_2","doi-asserted-by":"publisher","DOI":"10.1142\/S021968670500059X"},{"key":"e_1_3_2_20_2","doi-asserted-by":"publisher","DOI":"10.1007\/s10845-010-0435-y"},{"key":"e_1_3_2_21_2","doi-asserted-by":"publisher","DOI":"10.1080\/00207540110119991"},{"issue":"18","key":"e_1_3_2_22_2","first-page":"2190","article-title":"Multi-objective dynamic scheduling optimization strategy based on rolling-horizon procedure","volume":"20","author":"Chaoyong Z","year":"2009","unstructured":"ChaoyongZXinyuLXiaojuanW2009Multi-objective dynamic scheduling optimization strategy based on rolling-horizon procedureChina Mechanical Engineering201821902197","journal-title":"China Mechanical Engineering"},{"key":"e_1_3_2_23_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ins.2014.03.060"},{"key":"e_1_3_2_24_2","article-title":"A memetic approach to fuzzy job shop based on expectation model","author":"Rodr\u00edguez I","year":"2007","unstructured":"Rodr\u00edguezIPuenteJVelaCR2007A memetic approach to fuzzy job shop based on expectation modelProceedings of Fuzzy-IEEE","journal-title":"Proceedings of Fuzzy-IEEE"},{"key":"e_1_3_2_25_2","doi-asserted-by":"publisher","DOI":"10.1080\/00207540902814348"},{"key":"e_1_3_2_26_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ins.2011.04.010"},{"key":"e_1_3_2_27_2","doi-asserted-by":"publisher","DOI":"10.3724\/SP.J.1089.2010.10878"},{"key":"e_1_3_2_28_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ins.2013.10.023"},{"key":"e_1_3_2_29_2","doi-asserted-by":"publisher","DOI":"10.1007\/s10845-009-0304-8"}],"container-title":["Journal of Intelligent &amp; Fuzzy Systems"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/journals.sagepub.com\/doi\/pdf\/10.3233\/IFS-141491","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/journals.sagepub.com\/doi\/full-xml\/10.3233\/IFS-141491","content-type":"application\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/journals.sagepub.com\/doi\/pdf\/10.3233\/IFS-141491","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2026,2,10]],"date-time":"2026-02-10T08:52:28Z","timestamp":1770713548000},"score":1,"resource":{"primary":{"URL":"https:\/\/journals.sagepub.com\/doi\/10.3233\/IFS-141491"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,10,23]]},"references-count":28,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2015,10,23]]}},"alternative-id":["10.3233\/IFS-141491"],"URL":"https:\/\/doi.org\/10.3233\/ifs-141491","relation":{},"ISSN":["1064-1246","1875-8967"],"issn-type":[{"value":"1064-1246","type":"print"},{"value":"1875-8967","type":"electronic"}],"subject":[],"published":{"date-parts":[[2015,10,23]]}}}