{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,2]],"date-time":"2026-05-02T06:26:27Z","timestamp":1777703187888,"version":"3.51.4"},"reference-count":45,"publisher":"SAGE Publications","issue":"1","license":[{"start":{"date-parts":[[2015,9,23]],"date-time":"2015-09-23T00:00:00Z","timestamp":1442966400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/journals.sagepub.com\/page\/policies\/text-and-data-mining-license"}],"content-domain":{"domain":["journals.sagepub.com"],"crossmark-restriction":true},"short-container-title":["Journal of Intelligent &amp; Fuzzy Systems"],"published-print":{"date-parts":[[2015,9,23]]},"abstract":"<jats:title>Abstract<\/jats:title>\n                  <jats:p>In this study a general methodology employing fuzzy analytic hierarchy process and fuzzy goal programming is developed for selection problems. The proposed methodology has two main sub-phases. In the first phase, fuzzy triangular numbers are used in order to represent the comparisons among decision criteria. Then lower and upper bounds as well as mid-values of priorities belonging to each decision criteria are computed. In the second phase these values and fuzzy triangular numbers are entered into the goal programming model and the model is solved to give the final priorities of decision criteria. Then the weighted sum of ratings for each selection alternative are found where the weights are final priorities from goal programming model. The proposed methodology is presented on a real life roadheader selection problem from mining industry. The results revealed that the methodology is easily applicable and provides satisfactory results.<\/jats:p>","DOI":"10.3233\/ifs-151569","type":"journal-article","created":{"date-parts":[[2015,10,6]],"date-time":"2015-10-06T11:59:43Z","timestamp":1444132783000},"page":"53-62","update-policy":"https:\/\/doi.org\/10.1177\/sage-journals-update-policy","source":"Crossref","is-referenced-by-count":11,"title":["Integration of fuzzy analytic hierarchy process and multi-objective fuzzy goal programming for selection problems: An\u00a0application on roadheader selection"],"prefix":"10.1177","volume":"29","author":[{"given":"Pinar Mizrak","family":"Ozfirat","sequence":"first","affiliation":[{"name":"Industrial Engineering Department, Celal Bayar University, Manisa, Turkey"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Muharrem Kemal","family":"Ozfirat","sequence":"additional","affiliation":[{"name":"Mining Engineering Department, Dokuz Eylul University, Izmir, Turkey"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Tahir","family":"Malli","sequence":"additional","affiliation":[{"name":"Mining Engineering Department, Dokuz Eylul University, Izmir, Turkey"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Bayram","family":"Kahraman","sequence":"additional","affiliation":[{"name":"Mining Engineering Department, Dokuz Eylul University, Izmir, Turkey"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"179","published-online":{"date-parts":[[2015,9,23]]},"reference":[{"key":"e_1_3_1_2_2","article-title":"Consensus building in a local context for the AHP-GDM with the individual numerical scale and prioritization method, in press","author":"Dong YC","unstructured":"DongYCFanZPYuSConsensus building in a local context for the AHP-GDM with the individual numerical scale and prioritization method, in pressIEEE Transactions on Fuzzy Systems","journal-title":"IEEE Transactions on Fuzzy Systems"},{"key":"e_1_3_1_3_2","article-title":"Consistency-driven automatic methodology to set interval numerical scales of 2-tuple linguistic term sets and its use in the linguistic GDM with preference relations","author":"Dong YC","unstructured":"DongYCHerrera-ViedmaEConsistency-driven automatic methodology to set interval numerical scales of 2-tuple linguistic term sets and its use in the linguistic GDM with preference relationsIEEE Transactions on Cyberneticsin press","journal-title":"IEEE Transactions on Cybernetics"},{"key":"e_1_3_1_4_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2012.03.053"},{"key":"e_1_3_1_5_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2013.03.019"},{"key":"e_1_3_1_6_2","doi-asserted-by":"publisher","DOI":"10.1109\/TFUZZ.2010.2073713"},{"key":"e_1_3_1_7_2","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-011-3220-y"},{"key":"e_1_3_1_8_2","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-007-1249-8"},{"key":"e_1_3_1_9_2","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-011-3505-1"},{"key":"e_1_3_1_10_2","doi-asserted-by":"publisher","DOI":"10.1007\/s13369-014-1070-2"},{"key":"e_1_3_1_11_2","doi-asserted-by":"publisher","DOI":"10.1007\/s13369-013-0691-1"},{"key":"e_1_3_1_12_2","doi-asserted-by":"publisher","DOI":"10.1007\/s13369-012-0514-9"},{"key":"e_1_3_1_13_2","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-011-3323-5"},{"key":"e_1_3_1_14_2","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-008-1719-7"},{"key":"e_1_3_1_15_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2012.01.149"},{"key":"e_1_3_1_16_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ins.2014.01.024"},{"key":"e_1_3_1_17_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2010.09.109"},{"key":"e_1_3_1_18_2","doi-asserted-by":"publisher","DOI":"10.1179\/mnt.2002.111.2.136"},{"key":"e_1_3_1_19_2","doi-asserted-by":"publisher","DOI":"10.1007\/s00254-006-0495-7"},{"key":"e_1_3_1_20_2","first-page":"507","article-title":"Multicriteria selection for alumina\u2013cement plant location in East-Azerbaijan province of Iran","volume":"105","author":"Ataei M","year":"2005","unstructured":"AtaeiM2005Multicriteria selection for alumina\u2013cement plant location in East-Azerbaijan province of IranJournal of South African Institute of Mining and Metallurgy105507514","journal-title":"Journal of South African Institute of Mining and Metallurgy"},{"key":"e_1_3_1_21_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.tust.2005.03.004"},{"key":"e_1_3_1_22_2","doi-asserted-by":"publisher","DOI":"10.1179\/037178404225004968"},{"key":"e_1_3_1_23_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.tust.2007.02.001"},{"key":"e_1_3_1_24_2","doi-asserted-by":"publisher","DOI":"10.1134\/S1062739149060178"},{"key":"e_1_3_1_25_2","doi-asserted-by":"publisher","DOI":"10.2478\/amsc-2013-0018"},{"key":"e_1_3_1_26_2","doi-asserted-by":"publisher","DOI":"10.1016\/S0019-9958(65)90241-X"},{"key":"e_1_3_1_27_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2008.10.006"},{"key":"e_1_3_1_28_2","doi-asserted-by":"publisher","DOI":"10.1007\/s13369-014-1173-9"},{"key":"e_1_3_1_29_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.asoc.2009.09.002"},{"key":"e_1_3_1_30_2","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-013-4856-6"},{"key":"e_1_3_1_31_2","doi-asserted-by":"publisher","DOI":"10.1007\/11881599_38"},{"key":"e_1_3_1_32_2","unstructured":"SaatyTLAlexanderJM1981Thinking With Models: Mathematical Models in the Physical Biological and Social SciencesLondonPergamon"},{"key":"e_1_3_1_33_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ergon.2004.01.002"},{"key":"e_1_3_1_34_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.tust.2009.11.002"},{"key":"e_1_3_1_35_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.tust.2006.04.003"},{"key":"e_1_3_1_36_2","first-page":"663","article-title":"Improvement of potential in mining development and tunneling systems in the national coal board","author":"Tucker A","year":"1985","unstructured":"TuckerA1985Improvement of potential in mining development and tunneling systems in the national coal boardThe Mining Engineer663669","journal-title":"The Mining Engineer"},{"key":"e_1_3_1_37_2","first-page":"149","article-title":"Rock machinability studies for the assessment of selective tunneling machine performance","author":"Fowell RJ","year":"1980","unstructured":"FowellRJPycroftAS1980Rock machinability studies for the assessment of selective tunneling machine performance21st National Rock Mech Symp149158USA, Miss","journal-title":"21st National Rock Mech Symp"},{"key":"e_1_3_1_38_2","first-page":"241","article-title":"Rock classification and assessment for rapid excavation","author":"Fowell RJ","year":"1982","unstructured":"FowellRJJohnsonST1982Rock classification and assessment for rapid excavationProceedings of the Symposium on Strata Mech, Newcastle Upon Tyne241244","journal-title":"Proceedings of the Symposium on Strata Mech, Newcastle Upon Tyne"},{"key":"e_1_3_1_39_2","first-page":"1263","article-title":"Performance prediction: A key issue in mechanical hard rock mining","author":"Rostami J","year":"1994","unstructured":"RostamiJOzdemirLNeilDM1994Performance prediction: A key issue in mechanical hard rock miningThe Mining Engineer12631267","journal-title":"The Mining Engineer"},{"key":"e_1_3_1_40_2","unstructured":"Riedmuller G Schubert W 2000 Tunneling in Fault Zones\u2013Innovative Approaches Pacific Rocks Girard Liebman Breeds Doe Balkema Rotterdam 113 124"},{"key":"e_1_3_1_41_2","first-page":"633","article-title":"Estimation of optimum specific energy based on rock properties for assessment of roadheader performance","volume":"11","author":"Balci C","year":"2004","unstructured":"BalciCDemircinMACopurHTuncdemirH2004Estimation of optimum specific energy based on rock properties for assessment of roadheader performanceJournal of South African Institute of Mining and Metallurgy11633641","journal-title":"Journal of South African Institute of Mining and Metallurgy"},{"key":"e_1_3_1_42_2","first-page":"815","article-title":"The performance of a roadheader in high strength rock formations in K\u00fc\u00e7\u00fcksu tunnel, underground space use, May, Istanbul, pp","author":"Bilgin N","year":"2005","unstructured":"BilginNTumacDFeridunogluCKarakasARAkgulM2005The performance of a roadheader in high strength rock formations in K\u00fc\u00e7\u00fcksu tunnel, underground space use, May, Istanbul, ppIn: Proceeding of the 31st ITA-AITES World Tunnel Congress815820","journal-title":"In: Proceeding of the 31st ITA-AITES World Tunnel Congress"},{"key":"e_1_3_1_43_2","doi-asserted-by":"publisher","DOI":"10.1134\/S1062739148030173"},{"key":"e_1_3_1_44_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.tust.2013.09.009"},{"key":"e_1_3_1_45_2","doi-asserted-by":"publisher","DOI":"10.3233\/IFS-120743"},{"key":"e_1_3_1_46_2","unstructured":"Lingo 9.0 LINDO Systems Inc. USA"}],"container-title":["Journal of Intelligent &amp; Fuzzy Systems"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/journals.sagepub.com\/doi\/pdf\/10.3233\/IFS-151569","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/journals.sagepub.com\/doi\/full-xml\/10.3233\/IFS-151569","content-type":"application\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/journals.sagepub.com\/doi\/pdf\/10.3233\/IFS-151569","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2026,4,29]],"date-time":"2026-04-29T09:38:05Z","timestamp":1777455485000},"score":1,"resource":{"primary":{"URL":"https:\/\/journals.sagepub.com\/doi\/10.3233\/IFS-151569"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,9,23]]},"references-count":45,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2015,9,23]]}},"alternative-id":["10.3233\/IFS-151569"],"URL":"https:\/\/doi.org\/10.3233\/ifs-151569","relation":{},"ISSN":["1064-1246","1875-8967"],"issn-type":[{"value":"1064-1246","type":"print"},{"value":"1875-8967","type":"electronic"}],"subject":[],"published":{"date-parts":[[2015,9,23]]}}}