{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,13]],"date-time":"2026-02-13T17:18:07Z","timestamp":1771003087731,"version":"3.50.1"},"reference-count":13,"publisher":"SAGE Publications","issue":"6","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["JCM"],"published-print":{"date-parts":[[2021,12,7]]},"abstract":"<jats:p>This paper mainly discusses the system integration mode of industrialized residential collaborative design, and proposes a system integration model based on Building Information Modeling (BIM) and Integrated Project Delivery (IPD) industrialized residential collaborative design, which solves the collaborative design problem of industrialized residential life cycle. This system integration mode will industrialize residential coordination. The key elements of the design are integrated to form a complete system methodology. Through the analysis of variance, the average and standard deviation of the respondents\u2019 scores were tested for significance. Then I used Fuzzy Set Theory to analyze the membership degree of key elements to verify my argument.<\/jats:p>","DOI":"10.3233\/jcm-215392","type":"journal-article","created":{"date-parts":[[2021,8,13]],"date-time":"2021-08-13T13:13:59Z","timestamp":1628860439000},"page":"1711-1726","source":"Crossref","is-referenced-by-count":1,"title":["The integration of Building Information Modeling (BIM) and Integrated Project Delivery (IPD) in industrial buildings: Evidence from China"],"prefix":"10.1177","volume":"21","author":[{"given":"Jianguo","family":"Wei","sequence":"first","affiliation":[{"name":"National Engineering Laboratory of Highway Maintenance Technology, School of Traffic and Transportation Engineering, Changsha University of Science and Technology, Changsha, Hunan, China"},{"name":"School of Traffic and Transportation Engineering, Changsha University of Science and Technology, Changsha, Hunan, China"}]},{"given":"Song","family":"Shi","sequence":"additional","affiliation":[{"name":"School of Traffic and Transportation Engineering, Changsha University of Science and Technology, Changsha, Hunan, China"},{"name":"Xuchang Construction Investment Holding Co., Ltd., Xuchang, Henan, China"}]},{"given":"Hui","family":"Xia","sequence":"additional","affiliation":[{"name":"School of Management, Henan University of Urban Construction, Pingdingshan, Henan, China"}]}],"member":"179","reference":[{"key":"10.3233\/JCM-215392_ref1","first-page":"164","article-title":"A tool for automatically tracking object changes in BIM to assist construction managers in coordinating and managing trades","author":"Girmscheid","year":"2014","journal-title":"Journal of Architectural Engineering"},{"issue":"4","key":"10.3233\/JCM-215392_ref2","doi-asserted-by":"crossref","first-page":"377","DOI":"10.1016\/j.foar.2013.07.003","article-title":"Integrated design approach for improving architectural forms in industrialized building systems","volume":"2","author":"Jaganathan","year":"2013","journal-title":"Frontiers of Architectural Research"},{"key":"10.3233\/JCM-215392_ref3","doi-asserted-by":"crossref","first-page":"195202","DOI":"10.1016\/j.autcon.2013.09.006","article-title":"Life cycle design and prefabrication in buildings: a review and case studies in Hong Kong","volume":"39","author":"Jaillon","year":"2014","journal-title":"Automation in Construction"},{"key":"10.3233\/JCM-215392_ref4","doi-asserted-by":"crossref","unstructured":"H. Kim and F. Grobler, Design Coordination in Building Information Modeling (BIM) Using Ontological Consistency Checking, in: International Workshop on Computing in Civil Engineering, 2009, pp. 410420.","DOI":"10.1061\/41052(346)41"},{"issue":"10","key":"10.3233\/JCM-215392_ref5","doi-asserted-by":"crossref","first-page":"1076","DOI":"10.1061\/(ASCE)0733-9364(2005)131:10(1076)","article-title":"Constructing relationally integrated teams","volume":"131","author":"Kumaraswamy","year":"2005","journal-title":"Journal of Construction Engineering and Management"},{"key":"10.3233\/JCM-215392_ref6","doi-asserted-by":"crossref","unstructured":"Z. Li and D. He, Discuss A Method of Collaborative Construction Project Information Management Based on BIM, in: International Conference on Construction and Real Estate Management, 2013.","DOI":"10.1061\/9780784413135.047"},{"issue":"1","key":"10.3233\/JCM-215392_ref7","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.destud.2010.06.004","article-title":"Comparing collaborative co-located and distributed design processes in digital and traditional sketching environments: a protocol study using the function-behaviour-structure coding scheme","volume":"32","author":"Tang","year":"2011","journal-title":"Design Studies"},{"key":"10.3233\/JCM-215392_ref8","first-page":"5013001","article-title":"State of integration: investigation of integration in the A\/E\/C community","author":"Uihlein","year":"2013","journal-title":"Journal of Architectural Engineering"},{"issue":"11","key":"10.3233\/JCM-215392_ref9","doi-asserted-by":"crossref","first-page":"4013012","DOI":"10.1061\/(ASCE)CO.1943-7862.0000744","article-title":"Quantifying performance for the integrated project delivery system as compared to established delivery systems","volume":"139","author":"Asmar","year":"2013","journal-title":"Journal of Construction Engineering and Management"},{"issue":"5","key":"10.3233\/JCM-215392_ref10","doi-asserted-by":"crossref","first-page":"4014091","DOI":"10.1061\/(ASCE)ME.1943-5479.0000334","article-title":"Critical look into the relationship between information and communication technology and integrated project delivery in public sector construction","volume":"31","author":"Azhar","year":"2015","journal-title":"Journal of Management in Engineering"},{"issue":"4","key":"10.3233\/JCM-215392_ref11","doi-asserted-by":"crossref","first-page":"248254","DOI":"10.1061\/(ASCE)LA.1943-4170.0000024","article-title":"Integrated project delivery case study: guidelines for drafting partnering contract","volume":"2","author":"El-adaway","year":"2010","journal-title":"Journal of Legal Affairs and Dispute Resolution in Engineering and Construction"},{"issue":"8","key":"10.3233\/JCM-215392_ref12","doi-asserted-by":"crossref","first-page":"815","DOI":"10.1061\/(ASCE)CO.1943-7862.0000188","article-title":"Understanding construction industry experience and attitudes toward integrated project delivery","volume":"136","author":"Kent","year":"2010","journal-title":"Journal of Construction Engineering and Management"},{"key":"10.3233\/JCM-215392_ref13","doi-asserted-by":"crossref","first-page":"87","DOI":"10.1016\/j.autcon.2013.11.003","article-title":"Framework for the coordinated application of two different integrated project delivery platforms","volume":"38","author":"Monteiro","year":"2014","journal-title":"Automation in Construction"}],"container-title":["Journal of Computational Methods in Sciences and Engineering"],"original-title":[],"link":[{"URL":"https:\/\/content.iospress.com\/download?id=10.3233\/JCM-215392","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2026,2,13]],"date-time":"2026-02-13T16:31:25Z","timestamp":1771000285000},"score":1,"resource":{"primary":{"URL":"https:\/\/journals.sagepub.com\/doi\/full\/10.3233\/JCM-215392"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021,12,7]]},"references-count":13,"journal-issue":{"issue":"6"},"URL":"https:\/\/doi.org\/10.3233\/jcm-215392","relation":{},"ISSN":["1472-7978","1875-8983"],"issn-type":[{"value":"1472-7978","type":"print"},{"value":"1875-8983","type":"electronic"}],"subject":[],"published":{"date-parts":[[2021,12,7]]}}}