{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,10,16]],"date-time":"2026-10-16T19:02:57Z","timestamp":1792177377868,"version":"4.4.0"},"reference-count":21,"publisher":"European Society of Computational Methods in Sciences and Engineering","issue":"3","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["JCM"],"published-print":{"date-parts":[[2024,6,17]]},"abstract":"<jats:p>The study designed a risk assessment scheme to reduce the risk of highway bridge construction in highland mountainous areas, and optimised the existing hierarchical analysis method used for risk weight calculation, using entropy weight and fuzzy numbers for improvement, and designed an optimised fuzzy hierarchical entropy weight comprehensive risk assessment model. The results found that the maximum affiliation degree of site safety management risk is 0.39, which is a low-level risk; the maximum affiliation degree of personnel safety and operation quality category is 0.42, which is an intermediate risk; the maximum affiliation degree of machinery and equipment is 0.40, which is a high-level risk; the maximum affiliation degree of construction materials is 0.69, which is a low-level risk; and the maximum affiliation degree of environment category is 0.51, which is an intermediate risk. The maximum affiliation of the overall construction risk is 0.369, which indicates that the fuzzy comprehensive evaluation of the project is an intermediate risk. The results of the study show that the proposed construction risk assessment scheme for highway bridges in highland mountainous areas can provide certain reference for the construction of highland mountainous areas and avoid the corresponding safety risks.<\/jats:p>","DOI":"10.3233\/jcm-247192","type":"journal-article","created":{"date-parts":[[2024,6,18]],"date-time":"2024-06-18T11:40:52Z","timestamp":1718710852000},"page":"1617-1630","source":"Crossref","is-referenced-by-count":2,"title":["Construction risk of highway bridges in plateau and mountainous areas based on safety risk assessment"],"prefix":"10.66113","volume":"24","author":[{"given":"Yinglong","family":"Yue","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"55691","reference":[{"issue":"1","key":"10.3233\/JCM-247192_ref1","doi-asserted-by":"crossref","first-page":"210","DOI":"10.1061\/(ASCE)SU.1943-5428.0000386","article-title":"Establishment and repetition survey of primary GNSS control network of Hong Kong-Zhuhai-Macao Bridge","volume":"148","author":"Wu","year":"2022","journal-title":"J Surv Eng."},{"issue":"4","key":"10.3233\/JCM-247192_ref2","doi-asserted-by":"crossref","first-page":"130","DOI":"10.1007\/s12665-022-10243-w","article-title":"Understand space-time accessibility using a visual metaphor: a case study in Hong Kong-Zhuhai-Macao Belt","volume":"81","author":"Jiang","year":"2022","journal-title":"Environ Earth Sci."},{"issue":"4","key":"10.3233\/JCM-247192_ref3","doi-asserted-by":"crossref","first-page":"e23438","DOI":"10.1002\/ajhb.23438","article-title":"A biocultural examination of home food production and child growth in highland Peru","volume":"32","author":"Morgan","year":"2020","journal-title":"Am J Hum Biol."},{"issue":"2","key":"10.3233\/JCM-247192_ref4","doi-asserted-by":"crossref","first-page":"04021104","DOI":"10.1061\/(ASCE)BE.1943-5592.0001822","article-title":"Systematic metadata analysis of wind-exposed long-span bridges for road vehicle safety assessments","volume":"27","author":"Reymert","year":"2022","journal-title":"J Bridge Eng."},{"key":"10.3233\/JCM-247192_ref5","doi-asserted-by":"crossref","first-page":"107169","DOI":"10.1016\/j.measurement.2019.107169","article-title":"Safety analysis for bridge pier under nearby road construction and operation","volume":"15","author":"Liu","year":"2020","journal-title":"Measurement."},{"key":"10.3233\/JCM-247192_ref6","doi-asserted-by":"crossref","first-page":"111504","DOI":"10.1016\/j.compstruct.2019.111504","article-title":"Design and field evaluation of a hybrid FRP composite - Lightweight concrete road bridge","volume":"230","author":"Siwowski","year":"2019","journal-title":"Compos Struct."},{"key":"10.3233\/JCM-247192_ref7","doi-asserted-by":"crossref","first-page":"102199","DOI":"10.1016\/j.strusafe.2022.102199","article-title":"Investigation of multiple-presence factor for traffic loads on road-rail bridges based on a novel extreme value analysis approach","volume":"96","author":"Dai","year":"2022","journal-title":"Struct Saf."},{"issue":"5","key":"10.3233\/JCM-247192_ref8","doi-asserted-by":"crossref","first-page":"2868","DOI":"10.1002\/suco.202100147","article-title":"Assessment of existing reinforced-concrete bridges under road-traffic loads according to the new Italian guidelines","volume":"22","author":"Cosenza","year":"2021","journal-title":"Struct Concr."},{"issue":"1","key":"10.3233\/JCM-247192_ref9","doi-asserted-by":"crossref","first-page":"103","DOI":"10.32604\/csse.2021.014680","article-title":"A network security risk assessment method based on a B_NAG model","volume":"38","author":"Wang","year":"2021","journal-title":"Comput Syst Sci Eng."},{"key":"10.3233\/JCM-247192_ref10","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.patrec.2021.01.008","article-title":"Large group activity security risk assessment and risk early warning based on random forest algorithm","volume":"144","author":"Chen","year":"2021","journal-title":"Pattern Recognit. Lett"},{"issue":"10","key":"10.3233\/JCM-247192_ref11","first-page":"102","article-title":"Cyber security risk assessment for seaports: A case study of a container port","volume":"103","author":"Gunes","year":"2021","journal-title":"Comput Secur."},{"key":"10.3233\/JCM-247192_ref12","doi-asserted-by":"crossref","unstructured":"Priscilla GG, Renjith VR. Evolution of safety and security risk assessment methodologies towards the use of Bayesian networks in process industries. Process Saf Environ. 2021; 149: 758-775.","DOI":"10.1016\/j.psep.2021.03.031"},{"key":"10.3233\/JCM-247192_ref13","doi-asserted-by":"crossref","first-page":"109","DOI":"10.1016\/j.ress.2022.109009","article-title":"Novel method of dynamic event tree keeping the number of simulations in risk analysis small","volume":"231","author":"Kaneko","year":"2023","journal-title":"Reliab Eng Syst Saf."},{"issue":"2","key":"10.3233\/JCM-247192_ref14","doi-asserted-by":"crossref","first-page":"215","DOI":"10.1504\/EJIE.2022.121188","article-title":"Solving an integrated mathematical model for crew pairing and rostering problems by an ant colony optimisation algorithm","volume":"16","author":"Saemi","year":"2022","journal-title":"Eur J Ind Eng."},{"key":"10.3233\/JCM-247192_ref15","doi-asserted-by":"crossref","first-page":"105591","DOI":"10.1016\/j.ssci.2021.105591","article-title":"Identification of core risk factors and risk diffusion effect of urban underground engineering in China: A social network analysis","volume":"147","author":"Chen","year":"2022","journal-title":"Safety Sci."},{"key":"10.3233\/JCM-247192_ref16","doi-asserted-by":"crossref","first-page":"A134","DOI":"10.1051\/0004-6361\/202244955","article-title":"An improved representative particle monte carlo method for the simulation of particle growth","volume":"670","author":"Beutel","year":"2023","journal-title":"Astron Astrophys."},{"key":"10.3233\/JCM-247192_ref17","doi-asserted-by":"crossref","first-page":"106293","DOI":"10.1016\/j.engfailanal.2022.106293","article-title":"Evaluation of failure risk for prestressed anchor cables based on the AHP-ideal point method: An engineering application","volume":"138","author":"Zhu","year":"2022","journal-title":"Eng Fail Anal."},{"issue":"9","key":"10.3233\/JCM-247192_ref18","doi-asserted-by":"crossref","first-page":"822","DOI":"10.1071\/CP20116","article-title":"Selecting elite tomato genotypes through a modified analytical hierarchy process","volume":"71","author":"Eynizadeh","year":"2020","journal-title":"Crop Pasture Sci."},{"key":"10.3233\/JCM-247192_ref19","doi-asserted-by":"crossref","first-page":"110000","DOI":"10.1016\/j.asoc.2023.110000","article-title":"Consideration of reciprocal judgments through decomposed fuzzy analytical hierarchy process: A case study in the pharmaceutical industry","volume":"134","author":"Cebi","year":"2023","journal-title":"Appl Soft Compu."},{"key":"10.3233\/JCM-247192_ref20","doi-asserted-by":"crossref","first-page":"127","DOI":"10.1016\/j.envsci.2021.03.002","article-title":"Climate policy decision making in contexts of deep uncertainty-from optimisation to robustness","volume":"120","author":"Workman","year":"2021","journal-title":"Environ Sci Policy."},{"key":"10.3233\/JCM-247192_ref21","doi-asserted-by":"crossref","first-page":"104672","DOI":"10.1016\/j.engappai.2022.104672","article-title":"Fuzzy subspace clustering noisy image segmentation algorithm with adaptive local variance & non-local information and mean membership linking","volume":"110","author":"Wei","year":"2022","journal-title":"Eng Appl Artif Intell."}],"container-title":["Journal of Computational Methods in Sciences and Engineering"],"original-title":[],"link":[{"URL":"https:\/\/content.iospress.com\/download?id=10.3233\/JCM-247192","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2026,4,21]],"date-time":"2026-04-21T22:07:32Z","timestamp":1776809252000},"score":1,"resource":{"primary":{"URL":"https:\/\/journals.sagepub.com\/doi\/full\/10.3233\/JCM-247192"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2024,6,17]]},"references-count":21,"journal-issue":{"issue":"3"},"URL":"https:\/\/doi.org\/10.3233\/jcm-247192","relation":{},"ISSN":["1472-7978","1875-8983"],"issn-type":[{"value":"1472-7978","type":"print"},{"value":"1875-8983","type":"electronic"}],"subject":[],"published":{"date-parts":[[2024,6,17]]}}}