{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,2]],"date-time":"2026-05-02T06:29:42Z","timestamp":1777703382075,"version":"3.51.4"},"reference-count":47,"publisher":"SAGE Publications","issue":"1","license":[{"start":{"date-parts":[[2017,1,13]],"date-time":"2017-01-13T00:00:00Z","timestamp":1484265600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/journals.sagepub.com\/page\/policies\/text-and-data-mining-license"}],"content-domain":{"domain":["journals.sagepub.com"],"crossmark-restriction":true},"short-container-title":["Journal of Intelligent &amp; Fuzzy Systems"],"published-print":{"date-parts":[[2017,1,13]]},"abstract":"<jats:p>Earned value is a renowned project management technique that integrates the information on cost and schedule of projects to evaluate their current status. Despite the ability of earned value management (EVM) to measure and control the current status, it is not able to estimate the projects\u2019 future performances because EVM does not consider the changes in environmental circumstances or other elements that could influence on the future performance of the project. In the contrary with EVM, the risk analysis technique regards risky conditions for the future performance of the project by recognizing and analyzing the opportunities and threats. In this paper, a new evaluation model of the EVM blended with the risk analysis is presented to improve the project future performance forecasting. In addition, these indices and evaluations are defined under real-life uncertain conditions using linguistic variables represented by interval-valued triangular fuzzy numbers. Finally, a case study from the recent literature for construction industry is given in this paper to show the effectiveness of the proposed EVM model under uncertain conditions.<\/jats:p>","DOI":"10.3233\/jifs-151139","type":"journal-article","created":{"date-parts":[[2017,1,17]],"date-time":"2017-01-17T12:59:51Z","timestamp":1484657991000},"page":"97-113","update-policy":"https:\/\/doi.org\/10.1177\/sage-journals-update-policy","source":"Crossref","is-referenced-by-count":14,"title":["An earned value model with risk analysis for project management under uncertain conditions"],"prefix":"10.1177","volume":"32","author":[{"given":"Navid","family":"Moradi","sequence":"first","affiliation":[{"name":"Department of Industrial Engineering, Faculty of Engineering, Shahed University, Tehran, Iran"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"S. Meysam","family":"Mousavi","sequence":"additional","affiliation":[{"name":"Department of Industrial Engineering, Faculty of Engineering, Shahed University, Tehran, Iran"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Behnam","family":"Vahdani","sequence":"additional","affiliation":[{"name":"Faculty of Industrial and Mechanical Engineering, Qazvin Branch, Islamic Azad University, Qazvin, Iran"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"179","published-online":{"date-parts":[[2017,1,13]]},"reference":[{"key":"e_1_3_1_2_2","doi-asserted-by":"publisher","DOI":"10.1007\/978-1-4419-1014-1"},{"key":"e_1_3_1_3_2","unstructured":"PMI Guide A Project Management Body of Knowledge (PMBOK\u00a0\u00ae GUIDE) Project Management Institute 2011."},{"key":"e_1_3_1_4_2","first-page":"17","article-title":"Applying management reserve to software project management","author":"Lipke W.","year":"1999","unstructured":"LipkeW., Applying management reserve to software project management, Journal of Defense Software Engineering (1999), 17\u201321.","journal-title":"Journal of Defense Software Engineering"},{"key":"e_1_3_1_5_2","doi-asserted-by":"publisher","DOI":"10.1177\/875697280303400403"},{"key":"e_1_3_1_6_2","doi-asserted-by":"publisher","DOI":"10.1016\/S0263-7863(02)00049-2"},{"issue":"3","key":"e_1_3_1_7_2","first-page":"15","article-title":"Earned schedule\u2013ten years after","author":"Lipke W.","year":"2013","unstructured":"LipkeW., Earned schedule\u2013ten years after, The Measurable News (3) (2013), 15\u201321.","journal-title":"The Measurable News"},{"issue":"2","key":"e_1_3_1_8_2","first-page":"13","article-title":"Earned schedule: A breakthrough extension to earned value theory? A retrospective analysis of real project data","volume":"1","author":"Henderson K.","year":"2003","unstructured":"HendersonK., Earned schedule: A breakthrough extension to earned value theory? A retrospective analysis of real project data, The Measurable News 1(2) (2003), 13\u201323.","journal-title":"The Measurable News"},{"issue":"1","key":"e_1_3_1_9_2","first-page":"15","article-title":"Further developments in earned schedule","volume":"1","author":"Henderson K.","year":"2004","unstructured":"HendersonK., Further developments in earned schedule, The Measurable News 1(1) (2004), 15\u201322.","journal-title":"The Measurable News"},{"key":"e_1_3_1_10_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2005.10.004"},{"key":"e_1_3_1_11_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2013.12.005"},{"key":"e_1_3_1_12_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2005.07.003"},{"key":"e_1_3_1_13_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2008.02.009"},{"key":"e_1_3_1_14_2","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-009-2406-z"},{"key":"e_1_3_1_15_2","doi-asserted-by":"publisher","DOI":"10.1139\/cjce-2014-0029"},{"key":"e_1_3_1_16_2","doi-asserted-by":"publisher","DOI":"10.5296\/bms.v4i1.3906"},{"key":"e_1_3_1_17_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.jclepro.2014.05.031"},{"issue":"2","key":"e_1_3_1_18_2","first-page":"219","article-title":"A comparative model of evm and project\u2019s schedule risk analysis using Monte Carlo simulation","volume":"2","author":"Mojabi B.","year":"2013","unstructured":"MojabiB., RadfarR. and NazemiJ., A comparative model of evm and project\u2019s schedule risk analysis using Monte Carlo simulation, International Journal of Information, Security and Systems Management 2(2) (2013), 219\u2013225.","journal-title":"International Journal of Information, Security and Systems Management"},{"key":"e_1_3_1_19_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2013.02.002"},{"key":"e_1_3_1_20_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2015.06.003"},{"key":"e_1_3_1_21_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2015.04.003"},{"key":"e_1_3_1_22_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.omega.2014.06.001"},{"key":"e_1_3_1_23_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.actaastro.2012.09.010"},{"key":"e_1_3_1_24_2","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-319-12754-5_5"},{"key":"e_1_3_1_25_2","doi-asserted-by":"publisher","DOI":"10.1016\/S0019-9958(65)90241-X"},{"key":"e_1_3_1_26_2","doi-asserted-by":"publisher","DOI":"10.1007\/978-94-015-8702-0_11"},{"key":"e_1_3_1_27_2","volume-title":"Applied fuzzy arithmetic","author":"Hanss M.","year":"2005","unstructured":"HanssM., Applied fuzzy arithmetic, Springer-Verlag Berlin Heidelberg, 2005."},{"key":"e_1_3_1_28_2","doi-asserted-by":"publisher","DOI":"10.3233\/IFS-130785"},{"key":"e_1_3_1_29_2","doi-asserted-by":"publisher","DOI":"10.1007\/s13369-015-1779-6"},{"issue":"9","key":"e_1_3_1_30_2","first-page":"1312","article-title":"Evaluating construction projects by a new group decision-making model based on intuitionistic fuzzy logic concepts","volume":"28","author":"Mousavi S.M.","year":"2015","unstructured":"MousaviS.M., GitinavardH. and VahdaniB., Evaluating construction projects by a new group decision-making model based on intuitionistic fuzzy logic concepts, International Journal of Engineering-Transactions C: Aspects 28(9) (2015), 1312\u20131319.","journal-title":"International Journal of Engineering-Transactions C: Aspects"},{"key":"e_1_3_1_31_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.engappai.2014.12.004"},{"issue":"6","key":"e_1_3_1_32_2","first-page":"589","article-title":"An artificial intelligence model-based locally linear neuro-fuzzy for construction project selection","volume":"25","author":"Mousavi S.M.","year":"2015","unstructured":"MousaviS.M., VahdaniB., HashemiH. and EbrahimnejadS., An artificial intelligence model-based locally linear neuro-fuzzy for construction project selection, Journal of Multiple-Valued Logic and Soft Computing 25(6) (2015), 589\u2013604.","journal-title":"Journal of Multiple-Valued Logic and Soft Computing"},{"issue":"1","key":"e_1_3_1_33_2","first-page":"45","article-title":"Designing a model of intuitionistic fuzzy VIKOR in multi-attribute group decision-making problems","volume":"13","author":"Mousavi S.M.","year":"2016","unstructured":"MousaviS.M., VahdaniB. and Sadigh BehzadiS., Designing a model of intuitionistic fuzzy VIKOR in multi-attribute group decision-making problems, Iranian Journal of Fuzzy Systems 13(1) (2016), 45\u201365.","journal-title":"Iranian Journal of Fuzzy Systems"},{"issue":"2","key":"e_1_3_1_34_2","first-page":"214","article-title":"A new balancing and ranking method based on hesitant fuzzy sets for solving decision-making problems under uncertainty","volume":"28","author":"Gitinavard H.","year":"2014","unstructured":"GitinavardH., MousaviS.M. and VahdaniB., A new balancing and ranking method based on hesitant fuzzy sets for solving decision-making problems under uncertainty, International Journal of Engineering-Transactions B: Applications 28(2) (2014), 214\u2013223.","journal-title":"International Journal of Engineering-Transactions B: Applications"},{"issue":"1","key":"e_1_3_1_35_2","first-page":"45","article-title":"A new multi-criteria weighting and ranking model for group decision-making analysis based on interval-valued hesitant fuzzy sets to selection problems","volume":"13","author":"Gitinavard H.","year":"2016","unstructured":"GitinavardH., MousaviS.M. and VahdaniB., A new multi-criteria weighting and ranking model for group decision-making analysis based on interval-valued hesitant fuzzy sets to selection problems, Neural Computing and Applications 13(1) (2016), 45\u201365.","journal-title":"Neural Computing and Applications"},{"key":"e_1_3_1_36_2","doi-asserted-by":"publisher","DOI":"10.1007\/s13369-014-1032-8"},{"issue":"6","key":"e_1_3_1_37_2","first-page":"2571","article-title":"A compromise decision-making model based on VIKOR for multi-objective large-scale nonlinear programming problems with a block angular structure under uncertainty","volume":"22","author":"Vahdani B.","year":"2015","unstructured":"VahdaniB., SalimiM. and MousaviS.M., A compromise decision-making model based on VIKOR for multi-objective large-scale nonlinear programming problems with a block angular structure under uncertainty, Scientia Iranica Transaction E, Industrial Engineering 22(6) (2015), 2571\u20132584.","journal-title":"Scientia Iranica Transaction E, Industrial Engineering"},{"key":"e_1_3_1_38_2","doi-asserted-by":"publisher","DOI":"10.1016\/0165-0114(87)90148-5"},{"key":"e_1_3_1_39_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.tre.2011.05.007"},{"key":"e_1_3_1_40_2","article-title":"A new method for handling the similarity measure problems of interval-valued fuzzy numbers","author":"Chen S.J.","year":"2006","unstructured":"ChenS.J., A new method for handling the similarity measure problems of interval-valued fuzzy numbers, Proceedings of the Second International Conference on Natural Computation and the Third International Conference on Fuzzy Systems and Knowledge Discovery, 2006.","journal-title":"Proceedings of the Second International Conference on Natural Computation and the Third International Conference on Fuzzy Systems and Knowledge Discovery"},{"key":"e_1_3_1_41_2","doi-asserted-by":"publisher","DOI":"10.1016\/S0165-0114(97)00303-5"},{"key":"e_1_3_1_42_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2008.08.015"},{"key":"e_1_3_1_43_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.apm.2011.09.006"},{"key":"e_1_3_1_44_2","article-title":"Earned value project management","author":"Fleming Q.W.","year":"2000","unstructured":"FlemingQ.W. and KoppelmanJ.M., Earned value project management, Project Management Institute, 2000.","journal-title":"Project Management Institute"},{"issue":"11","key":"e_1_3_1_45_2","first-page":"26","article-title":"Forecasting schedule completion using earned value metrics revisited","volume":"1","author":"Jacob D.S.","year":"2004","unstructured":"JacobD.S. and KaneM., Forecasting schedule completion using earned value metrics revisited, The Measurable News 1(11) (2004), 26\u201330.","journal-title":"The Measurable News"},{"key":"e_1_3_1_46_2","volume-title":"Risk management, concepts and guidance","author":"Pritchard C.L.","year":"2014","unstructured":"PritchardC.L., Risk management, concepts and guidance. CRC Press, 2014."},{"key":"e_1_3_1_47_2","doi-asserted-by":"publisher","DOI":"10.1080\/08823871.1994.10462282"},{"key":"e_1_3_1_48_2","doi-asserted-by":"publisher","DOI":"10.1504\/IJADS.2014.058037"}],"container-title":["Journal of Intelligent &amp; Fuzzy Systems"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/journals.sagepub.com\/doi\/pdf\/10.3233\/JIFS-151139","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/journals.sagepub.com\/doi\/full-xml\/10.3233\/JIFS-151139","content-type":"application\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/journals.sagepub.com\/doi\/pdf\/10.3233\/JIFS-151139","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2026,4,29]],"date-time":"2026-04-29T09:38:32Z","timestamp":1777455512000},"score":1,"resource":{"primary":{"URL":"https:\/\/journals.sagepub.com\/doi\/10.3233\/JIFS-151139"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,1,13]]},"references-count":47,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2017,1,13]]}},"alternative-id":["10.3233\/JIFS-151139"],"URL":"https:\/\/doi.org\/10.3233\/jifs-151139","relation":{},"ISSN":["1064-1246","1875-8967"],"issn-type":[{"value":"1064-1246","type":"print"},{"value":"1875-8967","type":"electronic"}],"subject":[],"published":{"date-parts":[[2017,1,13]]}}}