{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,9,3]],"date-time":"2026-09-03T16:01:31Z","timestamp":1788451291494,"version":"build-2803163510"},"reference-count":26,"publisher":"SAGE Publications","issue":"1","license":[{"start":{"date-parts":[[2017,1,13]],"date-time":"2017-01-13T00:00:00Z","timestamp":1484265600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/journals.sagepub.com\/page\/policies\/text-and-data-mining-license"}],"content-domain":{"domain":["journals.sagepub.com"],"crossmark-restriction":true},"short-container-title":["Journal of Intelligent &amp; Fuzzy Systems"],"published-print":{"date-parts":[[2017,1,13]]},"abstract":"<jats:p>\n                    Unmanned Aerial Vehicle (UAV) is very useful for information gathering in Intelligence, Surveillance, and Reconnaissance (ISR) mission. On the basis of uncertainty theory, the main purpose of this paper is to study a new kind of UAV ISR mission planning problem involving multiple objectives under uncertain environment. In particular, the mission planning objectives are influenced by the same uncertain factors simultaneously, that is to say, they are correlated or dependent with each other. In this case, the traditional multiobjective approach cannot guarantee the uncertain nature and take into account the dependence among uncertain objectives in the UAV ISR mission planning problem. In order to overcome the disadvantage in traditional approach, a new solution approach is introduced for obtaining the\n                    <mml:math xmlns:mml=\"http:\/\/www.w3.org\/1998\/Math\/MathML\" overflow=\"scroll\">\n                      <mml:msub>\n                        <mml:mi mathvariant=\"script\">P<\/mml:mi>\n                        <mml:mi mathvariant=\"monospace\">E<\/mml:mi>\n                      <\/mml:msub>\n                    <\/mml:math>\n                    Pareto efficient routes for it, which involves transforming the original ISR mission planning problem into a single objective uncertain programming problem. Two specific compromise models are proposed using this new solution approach respectively, whose validity is proved theoretically. Finally, an application case study with 13 ISR targets is provided and solved. The results show that the proposed model and solution approach have excellent consistency and efficiency in solving the uncertain UAV ISR mission planning problem presented in this paper.\n                  <\/jats:p>","DOI":"10.3233\/jifs-151781","type":"journal-article","created":{"date-parts":[[2017,1,17]],"date-time":"2017-01-17T13:13:53Z","timestamp":1484658833000},"page":"321-335","update-policy":"https:\/\/doi.org\/10.1177\/sage-journals-update-policy","source":"Crossref","is-referenced-by-count":24,"title":["Uncertain UAV ISR mission planning problem with multiple correlated objectives"],"prefix":"10.1177","volume":"32","author":[{"given":"Zutong","family":"Wang","sequence":"first","affiliation":[{"name":"Management and Safety Engineering College, Air Force Engineering University, Xi\u2019an, China"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Mingfa","family":"Zheng","sequence":"additional","affiliation":[{"name":"School of Mathematics and Statistics, Xi\u2019an Jiaotong University, Xi\u2019an, China"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Jiansheng","family":"Guo","sequence":"additional","affiliation":[{"name":"Management and Safety Engineering College, Air Force Engineering University, Xi\u2019an, China"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Hanqiao","family":"Huang","sequence":"additional","affiliation":[{"name":"Aeronautics and Astronautics Engineering College, Air Force Engineering University, Xi\u2019an, China"}],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"179","published-online":{"date-parts":[[2017,1,13]]},"reference":[{"key":"e_1_3_1_2_2","first-page":"1268","article-title":"Multi-objective uav mission planning using evolutionary computation","author":"Pohl A.J.","year":"2008","unstructured":"PohlA.J. and LamontG.B., Multi-objective uav mission planning using evolutionary computation, in Proceedings of the 40th Conference on Winter Simulation, Winter Simulation Conference, 2008, pp. 1268\u20131279.","journal-title":"Proceedings of the 40th Conference on Winter Simulation, Winter Simulation Conference"},{"key":"e_1_3_1_3_2","doi-asserted-by":"publisher","DOI":"10.1109\/MCDM.2007.369410"},{"key":"e_1_3_1_4_2","first-page":"1","article-title":"On-board multiobjective mission planning for unmanned aerial vehicles","author":"Wu P.P.-Y.","year":"2009","unstructured":"WuP.P.-Y., CampbellD. and MerzT., On-board multiobjective mission planning for unmanned aerial vehicles, in Aerospace Conference, 2009 IEEE, IEEE 2009, pp. 1\u201310.","journal-title":"Aerospace Conference, 2009 IEEE"},{"key":"e_1_3_1_5_2","doi-asserted-by":"publisher","DOI":"10.1007\/s10957-011-9838-y"},{"key":"e_1_3_1_6_2","first-page":"3357","article-title":"Decentralized algorithms for vehicle routing in a stochastic time-varying environment","volume":"4","author":"Frazzoli E.","year":"2004","unstructured":"FrazzoliE. and BulloF., Decentralized algorithms for vehicle routing in a stochastic time-varying environment, in Decision and Control, 2004 CDC 43rd IEEE Conference on, 4, IEEE 2004, pp. 3357\u20133363.","journal-title":"Decision and Control, 2004 CDC 43rd IEEE Conference on"},{"key":"e_1_3_1_7_2","article-title":"On multiple uav routing with stochastic targets: Performance bounds and algorithms","author":"Enright J.","year":"2005","unstructured":"EnrightJ., FrazzoliE., SavlaK. and BulloF., On multiple uav routing with stochastic targets: Performance bounds and algorithms, in Proc of the AIAA Conf on Guidance, Navigation, and Control, 2005.","journal-title":"Proc of the AIAA Conf on Guidance, Navigation, and Control"},{"key":"e_1_3_1_8_2","doi-asserted-by":"publisher","DOI":"10.2514\/1.41616"},{"key":"e_1_3_1_9_2","doi-asserted-by":"publisher","DOI":"10.1007\/s11036-008-0101-1"},{"key":"e_1_3_1_10_2","doi-asserted-by":"publisher","DOI":"10.1109\/TAC.2010.2092850"},{"key":"e_1_3_1_11_2","doi-asserted-by":"publisher","DOI":"10.1007\/s10479-012-1261-8"},{"key":"e_1_3_1_12_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2014.03.014"},{"key":"e_1_3_1_13_2","unstructured":"LiuB. Uncertainty theory. Berlin: Springer-Verlag fourth ed. 2015."},{"issue":"1","key":"e_1_3_1_14_2","first-page":"3","article-title":"Why is there a need for uncertainty theory","volume":"6","author":"Liu B.","year":"2012","unstructured":"LiuB., Why is there a need for uncertainty theory, Journal of Uncertain Systems 6(1) (2012), 3\u201310.","journal-title":"Journal of Uncertain Systems"},{"key":"e_1_3_1_15_2","unstructured":"LiuB. Uncertainty Theory. Berlin: Springer-Verlag second ed. 2007."},{"key":"e_1_3_1_16_2","volume-title":"Uncertainty Theory: A Branch of Mathematics for Modeling Human Uncertainty","author":"Liu B.","year":"2011","unstructured":"LiuB., Uncertainty Theory: A Branch of Mathematics for Modeling Human Uncertainty, Springer-Verlag, Berlin, 2011."},{"key":"e_1_3_1_17_2","doi-asserted-by":"publisher","DOI":"10.1109\/TFUZZ.2012.2194152"},{"key":"e_1_3_1_18_2","doi-asserted-by":"publisher","DOI":"10.1007\/s10700-012-9139-4"},{"issue":"1","key":"e_1_3_1_19_2","first-page":"3","article-title":"Uncertain logic for modeling human language","volume":"5","author":"Liu B.","year":"2011","unstructured":"LiuB., Uncertain logic for modeling human language, Journal of Uncertain Systems 5(1) (2011), 3\u201320.","journal-title":"Journal of Uncertain Systems"},{"issue":"1","key":"e_1_3_1_20_2","first-page":"3","article-title":"Some research problems in uncertainty theory","volume":"3","author":"Liu B.","year":"2009","unstructured":"LiuB., Some research problems in uncertainty theory, Journal of Uncertain Systems 3(1) (2009), 3\u201310.","journal-title":"Journal of Uncertain Systems"},{"key":"e_1_3_1_21_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2014.09.012"},{"key":"e_1_3_1_22_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.cja.2014.10.014"},{"key":"e_1_3_1_23_2","first-page":"1","article-title":"Study on two-stage uncertain programming based on uncertainty theory","author":"Zheng M.","year":"2014","unstructured":"ZhengM., YiY., WangZ. and ChenJ.-F., Study on two-stage uncertain programming based on uncertainty theory, Journal of Intelligent Manufacturing (2014), 1\u201310.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"e_1_3_1_24_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.amc.2013.02.015"},{"issue":"3","key":"e_1_3_1_25_2","first-page":"1","article-title":"An approach for uav reconnaissance mission planning problem under uncertain environment","volume":"14","author":"Guo J.","year":"2014","unstructured":"GuoJ., WangZ., ZhengM. and WangY., An approach for uav reconnaissance mission planning problem under uncertain environment, International Journal of Imaging and Robotics 14(3) (2014), 1\u201315.","journal-title":"International Journal of Imaging and Robotics"},{"key":"e_1_3_1_26_2","doi-asserted-by":"publisher","DOI":"10.3934\/jimo.2015.11.13"},{"issue":"3","key":"e_1_3_1_27_2","first-page":"181","article-title":"Expected value of function of uncertain variables","volume":"4","author":"Liu Y.","year":"2010","unstructured":"LiuY. and HaM., Expected value of function of uncertain variables, Journal of Uncertain Systems 4(3) (2010), 181\u2013186.","journal-title":"Journal of Uncertain Systems"}],"container-title":["Journal of Intelligent &amp; Fuzzy Systems"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/journals.sagepub.com\/doi\/pdf\/10.3233\/JIFS-151781","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/journals.sagepub.com\/doi\/full-xml\/10.3233\/JIFS-151781","content-type":"application\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/journals.sagepub.com\/doi\/pdf\/10.3233\/JIFS-151781","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2026,4,29]],"date-time":"2026-04-29T09:38:35Z","timestamp":1777455515000},"score":1,"resource":{"primary":{"URL":"https:\/\/journals.sagepub.com\/doi\/10.3233\/JIFS-151781"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,1,13]]},"references-count":26,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2017,1,13]]}},"alternative-id":["10.3233\/JIFS-151781"],"URL":"https:\/\/doi.org\/10.3233\/jifs-151781","relation":{},"ISSN":["1064-1246","1875-8967"],"issn-type":[{"value":"1064-1246","type":"print"},{"value":"1875-8967","type":"electronic"}],"subject":[],"published":{"date-parts":[[2017,1,13]]}}}