{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,2]],"date-time":"2026-05-02T06:50:59Z","timestamp":1777704659405,"version":"3.51.4"},"reference-count":50,"publisher":"SAGE Publications","issue":"6","license":[{"start":{"date-parts":[[2018,10,10]],"date-time":"2018-10-10T00:00:00Z","timestamp":1539129600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/journals.sagepub.com\/page\/policies\/text-and-data-mining-license"}],"content-domain":{"domain":["journals.sagepub.com"],"crossmark-restriction":true},"short-container-title":["Journal of Intelligent &amp; Fuzzy Systems"],"published-print":{"date-parts":[[2018,12,24]]},"abstract":"<jats:p>Sustainability is one of the most significant problems in today\u2019s world and the concept of sustainable development is being an important objective in construction projects. Since the large projects have enormous and different activities that should be scheduled by considering resource constraint and precedence relationship between them, the resource-constrained project scheduling problem (RCPSP) is a NP-hard problem. In this study, fuzzy project scheduling model is presented to solve RCPSP under uncertainty in availability of the resources and activities duration simultaneously. Subcontractors have incentive to share their resources in the form of coalition in order to reduce activities time and cost. In this research, cooperative game methods are introduced for fair allocating utility of the project, as well as, present supper-additivity, stability and satisfaction level of each coalition. Finally, sustainability concept is analyzed in RCPSP and cooperation of subcontractors in a coalition form, whereas in the previous researches these topics addressed separately or generally in project scheduling to minimize the makespan and maximize the profit of project. The results of the proposed model indicate that the subcontractors can obtain more profit and the balance between sustainability indicators in project management arises by collaboration.<\/jats:p>","DOI":"10.3233\/jifs-171821","type":"journal-article","created":{"date-parts":[[2018,10,12]],"date-time":"2018-10-12T10:50:09Z","timestamp":1539341409000},"page":"6255-6267","update-policy":"https:\/\/doi.org\/10.1177\/sage-journals-update-policy","source":"Crossref","is-referenced-by-count":5,"title":["Sustainability in fuzzy resource constraint project scheduling in a cooperative environment under uncertainty: Iran\u2019s Chitgar lake case study"],"prefix":"10.1177","volume":"35","author":[{"given":"Mojtaba","family":"Moradi","sequence":"first","affiliation":[{"name":"College of Industrial Engineering, South Tehran Branch, Islamic Azad University, Entezari Aly, Oskoui st, Choobi Brg, Tehran, Iran"}]},{"given":"Ashkan","family":"Hafezalkotob","sequence":"additional","affiliation":[{"name":"College of Industrial Engineering, South Tehran Branch, Islamic Azad University, Entezari Aly, Oskoui st, Choobi Brg, Tehran, Iran"}]},{"given":"Vahidreza","family":"Ghezavati","sequence":"additional","affiliation":[{"name":"College of Industrial Engineering, South Tehran Branch, Islamic Azad University, Entezari Aly, Oskoui st, Choobi Brg, Tehran, Iran"}]}],"member":"179","published-online":{"date-parts":[[2018,10,10]]},"reference":[{"key":"e_1_3_1_2_2","doi-asserted-by":"publisher","DOI":"10.1016\/S1066-7938(00)00090-7"},{"key":"e_1_3_1_3_2","doi-asserted-by":"publisher","DOI":"10.1016\/0166-218X(83)90012-4"},{"key":"e_1_3_1_4_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.amc.2005.11.160"},{"key":"e_1_3_1_5_2","doi-asserted-by":"publisher","DOI":"10.1007\/s10551-005-7054-0"},{"issue":"6","key":"e_1_3_1_6_2","first-page":"1193","article-title":"A methodology to identify sustainability indicatorsin construction project management\u2014Application to infrastructure projects in Spain","volume":"10","author":"Fern\u00e1ndez-S\u00e1nchez G.","year":"2010","unstructured":"G.Fern\u00e1ndez-S\u00e1nchez and F.Rodr\u00edguez-L\u00f3pez, A methodology to identify sustainability indicatorsin construction project management\u2014Application to infrastructure projects in Spain, EcologicalIndicators [Internet] Elsevier BV 10(6) (2010), 1193\u2013201.","journal-title":"EcologicalIndicators [Internet] Elsevier BV"},{"key":"e_1_3_1_7_2","doi-asserted-by":"publisher","DOI":"10.1080\/09613210701203874"},{"key":"e_1_3_1_8_2","doi-asserted-by":"publisher","DOI":"10.1002\/bse.323"},{"key":"e_1_3_1_9_2","first-page":"2012","article-title":"Maximizing Labor Stability As a Sustainability Performance Indicator inProject Scheduling","author":"Florez L.","unstructured":"L.Florez, D.Castro and A.L.Medaglia, Maximizing Labor Stability As a Sustainability Performance Indicator inProject Scheduling. Construction Research Congress 2012 [Internet], American Society of Civil Engineers; 2012.","journal-title":"Construction Research Congress 2012 [Internet], American Society of Civil Engineers"},{"issue":"02","key":"e_1_3_1_10_2","first-page":"40","article-title":"Sustainability in project management competencies: Analyzing the competence gap of project managers","volume":"02","author":"Silvius A.J.G.","year":"2014","unstructured":"A.J.G.Silvius and R.P.J.Schipper, Sustainability in project management competencies: Analyzing the competence gap of project managers, Journal of Human Resource and Sustainability Studies [Internet] Scientific Research Publishing Inc, 02(02) (2014), 40\u201358.","journal-title":"Journal of Human Resource and Sustainability Studies [Internet] Scientific Research Publishing Inc"},{"key":"e_1_3_1_11_2","first-page":"14","article-title":"Sustainable management of construction projects","author":"Schultman F.","year":"2007","unstructured":"F.Schultman and N.Sunke, Sustainable management of construction projects. \u201cInCIB world building congress\u201d, construction for development, 2007, pp, 14\u201317.","journal-title":"\u201cInCIB world building congress\u201d, construction for development"},{"key":"e_1_3_1_12_2","doi-asserted-by":"publisher","DOI":"10.1016\/S0165-0114(01)00146-4"},{"key":"e_1_3_1_13_2","doi-asserted-by":"publisher","DOI":"10.1016\/S1568-4946(02)00065-0"},{"key":"e_1_3_1_14_2","doi-asserted-by":"publisher","DOI":"10.1007\/11539902_22"},{"issue":"2","key":"e_1_3_1_15_2","first-page":"289","article-title":"Project scheduling under uncertainty: Survey and research potentials","volume":"165","author":"Herroelen W.","year":"2005","unstructured":"W.Herroelen and R.Leus, Project scheduling under uncertainty: Survey and research potentials, EuropeanJournal of Operational Research [Internet] Elsevier BV 165(2) (2005), 289\u2013306.","journal-title":"EuropeanJournal of Operational Research [Internet] Elsevier BV"},{"key":"e_1_3_1_16_2","doi-asserted-by":"publisher","DOI":"10.1007\/s10951-006-0326-4"},{"key":"e_1_3_1_17_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2006.09.055"},{"key":"e_1_3_1_18_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2007.09.012"},{"key":"e_1_3_1_19_2","doi-asserted-by":"publisher","DOI":"10.1111\/j.1937-5956.2009.01023.x"},{"key":"e_1_3_1_20_2","doi-asserted-by":"publisher","DOI":"10.1561\/0200000021"},{"key":"e_1_3_1_21_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2010.07.021"},{"key":"e_1_3_1_22_2","doi-asserted-by":"publisher","DOI":"10.1061\/9780784412329.047"},{"key":"e_1_3_1_23_2","doi-asserted-by":"publisher","DOI":"10.1002\/int.21552"},{"key":"e_1_3_1_24_2","doi-asserted-by":"publisher","DOI":"10.3182\/20130708-3-CN-2036.00116"},{"key":"e_1_3_1_25_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.engappai.2012.07.012"},{"key":"e_1_3_1_26_2","first-page":"270","article-title":"A novel petri-net based resource constrained multi-project scheduling method","author":"Hu W.","year":"2014","unstructured":"W.Hu and H.Wang, A novel petri-net based resource constrained multi-project scheduling method, Lecture Notes in Computer Science [Internet] Springer International Publishing (2014), 270\u2013284.","journal-title":"Lecture Notes in Computer Science [Internet] Springer International Publishing"},{"key":"e_1_3_1_27_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2013.10.002"},{"key":"e_1_3_1_28_2","doi-asserted-by":"publisher","DOI":"10.3233\/IFS-130878"},{"key":"e_1_3_1_29_2","first-page":"2014","article-title":"A new approach to time-cost-quality tradeoff problem for construction project","author":"Fu F.","unstructured":"F.Fu and C.Zhang, A new approach to time-cost-quality tradeoff problem for construction project, 2014 International Conference on Management Science & Engineering 21th Annual Conference Proceedings [Internet] IEEE, 2014.","journal-title":"2014 International Conference on Management Science & Engineering 21th Annual Conference Proceedings [Internet] IEEE"},{"key":"e_1_3_1_30_2","doi-asserted-by":"publisher","DOI":"10.1111\/mice.12166"},{"key":"e_1_3_1_31_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.procs.2015.12.359"},{"key":"e_1_3_1_32_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.protcy.2016.08.185"},{"issue":"1","key":"e_1_3_1_33_2","article-title":"Uncertain resource-constrained project scheduling problem with net present value criterion","volume":"4","author":"Zhao C.","year":"2016","unstructured":"C.Zhao, H.Ke and Z.Chen, Uncertain resource-constrained project scheduling problem with net present value criterion, Journal of Uncertainty Analysis and Applications [Internet] Springer Nature 4(1) (2016).","journal-title":"Journal of Uncertainty Analysis and Applications [Internet] Springer Nature"},{"key":"e_1_3_1_34_2","doi-asserted-by":"publisher","DOI":"10.2139\/ssrn.2771609"},{"key":"e_1_3_1_35_2","doi-asserted-by":"publisher","DOI":"10.1111\/itor.12301"},{"key":"e_1_3_1_36_2","doi-asserted-by":"publisher","DOI":"10.1080\/21681015.2016.1140089"},{"key":"e_1_3_1_37_2","doi-asserted-by":"publisher","DOI":"10.1007\/s40999-016-0031-4"},{"issue":"2","key":"e_1_3_1_38_2","first-page":"565","article-title":"Bi-level multiple mode resource-constrained project scheduling problems under hybrid uncertainty","volume":"12","author":"Zhang Z.","year":"2015","unstructured":"Z.Zhang and J.Xu, Bi-level multiple mode resource-constrained project scheduling problems under hybrid uncertainty, Journal of Industrial and Management Optimization [Internet] American Institute of Mathematical Sciences (AIMS) 12(2) (2015), 565\u2013593.","journal-title":"Journal of Industrial and Management Optimization [Internet] American Institute of Mathematical Sciences (AIMS)"},{"key":"e_1_3_1_39_2","first-page":"66","article-title":"An adjustable robust optimization model for the resource-constrained project scheduling problem with uncertain activity durations","volume":"71","author":"Bruni M.E.","year":"2017","unstructured":"M.E.Bruni, L.Di Puglia Pugliese, P.Beraldi and F.Guerriero, An adjustable robust optimization model for the resource-constrained project scheduling problem with uncertain activity durations, Omega [Internet], Elsevier BV 71 (2017), 66\u201384.","journal-title":"Omega [Internet], Elsevier BV"},{"key":"e_1_3_1_40_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2016.12.040"},{"issue":"5","key":"e_1_3_1_41_2","first-page":"125","article-title":"An imperialist competitive algorithm for resource constrained project scheduling with activities flotation","volume":"17","author":"Akeshteh Z.","year":"2017","unstructured":"Z.Akeshteh and F.Mardukhi, An imperialist competitive algorithm for resource constrained project scheduling with activities flotation, IJCSNS 17(5) (2017), 125.","journal-title":"IJCSNS"},{"issue":"1","key":"e_1_3_1_42_2","first-page":"45","article-title":"A new fuzzy multi-objective multi-mode resource-constrained project scheduling model","volume":"11","author":"Sajadi S.M.","year":"2017","unstructured":"S.M.Sajadi, P.Azimi, A.Ghamginzadeh and A.Rahimzadeh, A new fuzzy multi-objective multi-mode resource-constrained project scheduling model, International Journal of Mathematics in Operational Research [Internet] Inderscience Publishers 11(1) (2017), 45.","journal-title":"International Journal of Mathematics in Operational Research [Internet] Inderscience Publishers"},{"key":"e_1_3_1_43_2","article-title":"A mixed-integer linear programming model for solvingfuzzy stochastic resource constrained project scheduling problem","author":"Alipouri Y.","year":"2017","unstructured":"Y.Alipouri, M.H.Sebt, A.Ardeshir and M.H.F.Zarandi, A mixed-integer linear programming model for solvingfuzzy stochastic resource constrained project scheduling problem, Operational Research [Internet] Springer Nature (2017).","journal-title":"Operational Research [Internet] Springer Nature"},{"key":"e_1_3_1_44_2","first-page":"1","article-title":"An improved fuzzy critical chain approach in order to face uncertainty in project scheduling","author":"Roghanian E.","year":"2017","unstructured":"E.Roghanian, M.Alipour and M.Rezaei, An improved fuzzy critical chain approach in order to face uncertainty in project scheduling, International Journal of Construction Management [Internet] Informa UK Limited (2017), 1\u201313.","journal-title":"International Journal of Construction Management [Internet] Informa UK Limited"},{"issue":"5","key":"e_1_3_1_45_2","article-title":"Implications of \u201cvictim pays\u201d infeasibilities for interconnected games with an illustration for aquifer sharing under unequal access costs","volume":"40","author":"Just R.E.","year":"2004","unstructured":"R.E.Just and S.Netanyahu, Implications of \u201cvictim pays\u201d infeasibilities for interconnected games with an illustration for aquifer sharing under unequal access costs, Water Resources Research [Internet] Wiley-Blackwell 40(5) (2004).","journal-title":"Water Resources Research [Internet] Wiley-Blackwell"},{"key":"e_1_3_1_46_2","first-page":"1","article-title":"Multi-resource trade-off problem of the project contractors in a cooperative environment: Highway construction case study","author":"Hafezalkotob A.","year":"2017","unstructured":"A.Hafezalkotob, E.Hosseinpour, M.Moradi and K.Khalili-Damghani, Multi-resource trade-off problem of the project contractors in a cooperative environment: Highway construction case study, International Journal of Management Science and Engineering Management [Internet] Informa UK Limited (2017), 1\u201310.","journal-title":"International Journal of Management Science and Engineering Management [Internet] Informa UK Limited"},{"key":"e_1_3_1_47_2","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-642-13725-9_2"},{"key":"e_1_3_1_48_2","doi-asserted-by":"publisher","DOI":"10.3846\/20294913.2011.580578"},{"issue":"3","key":"e_1_3_1_49_2","first-page":"04013066","article-title":"Cooperative game theoretic framework for joint resource management in construction","volume":"140","author":"Asgari S.","year":"2014","unstructured":"S.Asgari, A.Afshar and K.Madani, Cooperative game theoretic framework for joint resource management in construction, Journal of Construction Engineering and Management [Internet] American Society of Civil Engineers (ASCE) 140(3) (2014), 04013066.","journal-title":"Journal of Construction Engineering and Management [Internet] American Society of Civil Engineers (ASCE)"},{"key":"e_1_3_1_50_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.amc.2014.10.080"},{"key":"e_1_3_1_51_2","doi-asserted-by":"publisher","DOI":"10.1016\/S0167-2681(99)00008-6"}],"container-title":["Journal of Intelligent &amp; Fuzzy Systems"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/journals.sagepub.com\/doi\/pdf\/10.3233\/JIFS-171821","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/journals.sagepub.com\/doi\/full-xml\/10.3233\/JIFS-171821","content-type":"application\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/journals.sagepub.com\/doi\/pdf\/10.3233\/JIFS-171821","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2026,4,29]],"date-time":"2026-04-29T09:41:43Z","timestamp":1777455703000},"score":1,"resource":{"primary":{"URL":"https:\/\/journals.sagepub.com\/doi\/10.3233\/JIFS-171821"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018,10,10]]},"references-count":50,"journal-issue":{"issue":"6","published-print":{"date-parts":[[2018,12,24]]}},"alternative-id":["10.3233\/JIFS-171821"],"URL":"https:\/\/doi.org\/10.3233\/jifs-171821","relation":{},"ISSN":["1064-1246","1875-8967"],"issn-type":[{"value":"1064-1246","type":"print"},{"value":"1875-8967","type":"electronic"}],"subject":[],"published":{"date-parts":[[2018,10,10]]}}}