{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,2]],"date-time":"2026-05-02T06:45:03Z","timestamp":1777704303371,"version":"3.51.4"},"reference-count":61,"publisher":"SAGE Publications","issue":"3","license":[{"start":{"date-parts":[[2018,7,24]],"date-time":"2018-07-24T00:00:00Z","timestamp":1532390400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/journals.sagepub.com\/page\/policies\/text-and-data-mining-license"}],"content-domain":{"domain":["journals.sagepub.com"],"crossmark-restriction":true},"short-container-title":["Journal of Intelligent &amp; Fuzzy Systems"],"published-print":{"date-parts":[[2018,10]]},"abstract":"<jats:p>Project managers normally investigate how to reduce the total completion time of projects undertaken subject to the pre-determined objectives. The purpose of this paper is compression of total projects\u2019 duration subject to influencing factors such as cost, time, quality and risk. In the present study, by considering factors affecting project success such as cost, time, quality and risk, project crashing and fast tracking are both employed then a fuzzy multi-objective non-linear model is proposed. Each project is associated with uncertainty and the lack of consideration of these uncertainties might lead to project failure. In addition, a fuzzy approach has been employed for incorporating the uncertainties associated with activities. In the proposed model, crashing and fast tracking of projects were considered simultaneously for the first time. According to a real case study considered in this paper, after using the proposed model, the cost of compression is also reduced. In addition, we determined which activities have to be crashed or fast tracked in order to attain the objective. The proposed methodology can be practically applied through mega projects such as construction and \u201cEngineering, Procurement, and Construction\u201d (EPC) projects where the deadline closes to being achieved. As another contribution, a unique feature of the proposed model is its capability for taking both crashing and fast-tracking simultaneously into consideration.<\/jats:p>","DOI":"10.3233\/jifs-18171","type":"journal-article","created":{"date-parts":[[2018,7,27]],"date-time":"2018-07-27T19:32:28Z","timestamp":1532719948000},"page":"3615-3631","update-policy":"https:\/\/doi.org\/10.1177\/sage-journals-update-policy","source":"Crossref","is-referenced-by-count":37,"title":["Project crashing using a fuzzy multi-objective model considering time, cost, quality and risk under fast tracking technique: A case study"],"prefix":"10.1177","volume":"35","author":[{"given":"Mohammad Reza","family":"Feylizadeh","sequence":"first","affiliation":[{"name":"Department of Industrial Engineering, Shiraz Branch, Islamic Azad University, Shiraz, Iran"}]},{"given":"Amin","family":"Mahmoudi","sequence":"additional","affiliation":[{"name":"Department of Industrial Engineering, Shiraz Branch, Islamic Azad University, Shiraz, Iran"}]},{"given":"Morteza","family":"Bagherpour","sequence":"additional","affiliation":[{"name":"Department of Industrial Engineering, Iran University of Science and Technology, Tehran, Iran"}]},{"given":"Deng-Feng","family":"Li","sequence":"additional","affiliation":[{"name":"School of Economics and Management, Fuzhou University, Fuzhou, China"}]}],"member":"179","published-online":{"date-parts":[[2018,7,24]]},"reference":[{"key":"e_1_3_2_2_2","doi-asserted-by":"crossref","unstructured":"Project Management Institute. A guide to the project management body of knowledge (PMBOK\u00ae guide). Project Management Institute 2013.","DOI":"10.1002\/pmj.21345"},{"key":"e_1_3_2_3_2","doi-asserted-by":"publisher","DOI":"10.1109\/GSIS.2017.8077684"},{"key":"e_1_3_2_4_2","unstructured":"Project Management Institute Practice Standard for Scheduling\u2014second edition Project Management Institute 2011."},{"key":"e_1_3_2_5_2","doi-asserted-by":"publisher","DOI":"10.1017\/CBO9781139174084"},{"key":"e_1_3_2_6_2","doi-asserted-by":"publisher","DOI":"10.1287\/mnsc.30.11.1283"},{"key":"e_1_3_2_7_2","doi-asserted-by":"publisher","DOI":"10.1515\/9780691214696"},{"key":"e_1_3_2_8_2","volume-title":"Multiple criteria optimization: Theory, computation, and application","author":"Steuer R.E.","year":"1986","unstructured":"SteuerR.E., Multiple criteria optimization: Theory, computation, and application, Wiley, 1986."},{"key":"e_1_3_2_9_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.fss.2007.05.005"},{"key":"e_1_3_2_10_2","doi-asserted-by":"publisher","DOI":"10.1016\/S0019-9958(65)90241-X"},{"key":"e_1_3_2_11_2","doi-asserted-by":"publisher","DOI":"10.1080\/01969727308545912"},{"key":"e_1_3_2_12_2","doi-asserted-by":"publisher","DOI":"10.1016\/0165-0114(78)90031-3"},{"key":"e_1_3_2_13_2","doi-asserted-by":"publisher","DOI":"10.1057\/jors.1980.44"},{"key":"e_1_3_2_14_2","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-642-48753-8_3"},{"key":"e_1_3_2_15_2","doi-asserted-by":"publisher","DOI":"10.1016\/S0165-0114(98)00463-1"},{"key":"e_1_3_2_16_2","doi-asserted-by":"publisher","DOI":"10.1016\/S0165-0114(98)00066-9"},{"key":"e_1_3_2_17_2","doi-asserted-by":"publisher","DOI":"10.1016\/S0165-0114(98)00022-0"},{"key":"e_1_3_2_18_2","unstructured":"AllahdadiM. and NehiH.M. Fuzzy linear programming with interval linear programming approach 13(1) (2011) 1\u201312."},{"issue":"1","key":"e_1_3_2_19_2","first-page":"19","article-title":"Solving fully fuzzy linear programming problem by the ranking function","volume":"2","author":"Allahviranloo T.","year":"2008","unstructured":"AllahviranlooT., LotfiF.H., KiasaryM.K., KianiN.A. and AlizadehL., Solving fully fuzzy linear programming problem by the ranking function, Appl Math Sci 2(1) (2008), 19\u201332.","journal-title":"Appl Math Sci"},{"key":"e_1_3_2_20_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.apm.2013.03.014"},{"key":"e_1_3_2_21_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.asoc.2015.11.025"},{"key":"e_1_3_2_22_2","doi-asserted-by":"publisher","DOI":"10.1016\/0377-2217(94)00202-9"},{"key":"e_1_3_2_23_2","doi-asserted-by":"publisher","DOI":"10.1016\/S0263-7863(98)00043-X"},{"key":"e_1_3_2_24_2","doi-asserted-by":"crossref","unstructured":"LeuS. ChenA. and YangC. A GA-based fuzzy optimal model for construction time \u00b1 cost 19 (2001) 47\u201358.","DOI":"10.1016\/S0263-7863(99)00035-6"},{"key":"e_1_3_2_25_2","doi-asserted-by":"publisher","DOI":"10.1016\/S0263-7863(99)00061-7"},{"issue":"2","key":"e_1_3_2_26_2","doi-asserted-by":"crossref","first-page":"1305","DOI":"10.1016\/j.amc.2006.02.029","article-title":"On the discrete time, cost and quality trade-off problem","volume":"181","author":"Tareghian H.R.","year":"2006","unstructured":"TareghianH.R. and TaheriS.H., On the discrete time, cost and quality trade-off problem, Appl Math Comput 181(2) (2006), 1305\u20131312.","journal-title":"Appl Math Comput"},{"key":"e_1_3_2_27_2","doi-asserted-by":"crossref","unstructured":"ChenS. MeiT. LuoM. X. Y. ICIA\u201907. International and undefined 2007 Identification of nonlinear system based on a new hybrid gradient-based PSO algorithm 2007. ieeexplore.ieee.org.","DOI":"10.1109\/ICIA.2007.4295739"},{"issue":"1","key":"e_1_3_2_28_2","doi-asserted-by":"crossref","first-page":"308","DOI":"10.1016\/j.amc.2009.05.004","article-title":"Optimization models and a GA-based algorithm for stochastic time-cost trade-off problem","volume":"215","author":"Ke H.","year":"2009","unstructured":"KeH., MaW. and NiY., Optimization models and a GA-based algorithm for stochastic time-cost trade-off problem, Appl Math Comput 215(1) (2009), 308\u2013313.","journal-title":"Appl Math Comput"},{"issue":"18","key":"e_1_3_2_29_2","doi-asserted-by":"crossref","first-page":"9462","DOI":"10.1016\/j.amc.2012.03.035","article-title":"Modeling stochastic project time\u2013 cost trade-offs with time-dependent activity durations","volume":"218","author":"Ke H.","year":"2012","unstructured":"KeH., MaW. and ChenX., Modeling stochastic project time\u2013 cost trade-offs with time-dependent activity durations, Appl Math Comput 218(18) (2012), 9462\u20139469.","journal-title":"Appl Math Comput"},{"key":"e_1_3_2_30_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2010.05.046"},{"key":"e_1_3_2_31_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2012.04.019"},{"key":"e_1_3_2_32_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2011.05.004"},{"key":"e_1_3_2_33_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2013.08.081"},{"key":"e_1_3_2_34_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.asoc.2014.01.040"},{"key":"e_1_3_2_35_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2014.11.032"},{"key":"e_1_3_2_36_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2015.12.041"},{"key":"e_1_3_2_37_2","doi-asserted-by":"publisher","DOI":"10.3233\/IFS-141478"},{"key":"e_1_3_2_38_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.procs.2015.09.065"},{"key":"e_1_3_2_39_2","first-page":"27","article-title":"A mathematical model for crashing projects by considering time, cost, quality and risk","volume":"2","author":"Mahmoudi A.","year":"2017","unstructured":"MahmoudiA. and FeylizadehM.R., A mathematical model for crashing projects by considering time, cost, quality and risk, J Proj Manage 2 (2017), 27\u201336.","journal-title":"J Proj Manage"},{"key":"e_1_3_2_40_2","doi-asserted-by":"publisher","DOI":"10.1108\/GS-12-2017-0042"},{"key":"e_1_3_2_41_2","doi-asserted-by":"publisher","DOI":"10.1016\/S0165-0114(99)00119-0"},{"key":"e_1_3_2_42_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2010.07.014"},{"key":"e_1_3_2_43_2","doi-asserted-by":"publisher","DOI":"10.1177\/0954405411424001"},{"issue":"3","key":"e_1_3_2_44_2","first-page":"477","article-title":"A fuzzy neural network to estimate at completion costs of construction projects","volume":"3","author":"Feylizadeh M.R.","year":"2012","unstructured":"FeylizadehM.R., HendalianpourA. and BagherpourM., A fuzzy neural network to estimate at completion costs of construction projects, Int J Ind Eng Comput 3(3) (2012), 477\u2013484.","journal-title":"Int J Ind Eng Comput"},{"key":"e_1_3_2_45_2","unstructured":"JebaseeliM.E. and DhayabaranD.P. Solution procedure for fuzzy project crashing problem through goal programming technique 4(5) (2015) 158\u2013170."},{"issue":"20","key":"e_1_3_2_46_2","first-page":"53","article-title":"Fuzzy multi-objective linear programming for project management decision under uncertain environment with AHP based weighted average method","volume":"9","author":"Hossain M.S.","year":"2016","unstructured":"HossainM.S., MahmudS. and HossainM.M., Fuzzy multi-objective linear programming for project management decision under uncertain environment with AHP based weighted average method, doi.org, 9(20) (2016), 53\u201360.","journal-title":"doi.org"},{"key":"e_1_3_2_47_2","doi-asserted-by":"publisher","DOI":"10.3233\/IFS-120680"},{"key":"e_1_3_2_48_2","doi-asserted-by":"publisher","DOI":"10.5267\/j.dsl.2018.3.002"},{"key":"e_1_3_2_49_2","doi-asserted-by":"publisher","DOI":"10.3233\/IFS-2012-0505"},{"key":"e_1_3_2_50_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ins.2017.05.016"},{"key":"e_1_3_2_51_2","doi-asserted-by":"publisher","DOI":"10.3233\/IFS-2012-0510"},{"key":"e_1_3_2_52_2","doi-asserted-by":"publisher","DOI":"10.3233\/IFS-141154"},{"key":"e_1_3_2_53_2","doi-asserted-by":"publisher","DOI":"10.1108\/GS-01-2018-0007"},{"key":"e_1_3_2_54_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.asoc.2017.10.017"},{"key":"e_1_3_2_55_2","doi-asserted-by":"publisher","DOI":"10.1142\/S0219622017500110"},{"key":"e_1_3_2_56_2","doi-asserted-by":"publisher","DOI":"10.1080\/18756891.2013.862357"},{"key":"e_1_3_2_57_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2011.04.137"},{"key":"e_1_3_2_58_2","unstructured":"Project Management Institute Practice standard for project risk management Project Management Institute 2009."},{"key":"e_1_3_2_59_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.apm.2010.07.037"},{"issue":"2","key":"e_1_3_2_60_2","first-page":"211","article-title":"An order acceptance using FAHP and TOPSIS methods: A case study of Iranian vehicle belt production industry","volume":"3","author":"Parsaei S.","year":"2012","unstructured":"ParsaeiS., KeramatiM.A., ZorriassatineF. and FeylizadehM.R., An order acceptance using FAHP and TOPSIS methods: A case study of Iranian vehicle belt production industry, Int J Ind Eng Comput 3(2) (2012), 211\u2013224.","journal-title":"Int J Ind Eng Comput"},{"key":"e_1_3_2_61_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ins.2011.02.022"},{"key":"e_1_3_2_62_2","doi-asserted-by":"publisher","DOI":"10.1109\/DEST.2013.6611344"}],"container-title":["Journal of Intelligent &amp; Fuzzy Systems"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/journals.sagepub.com\/doi\/pdf\/10.3233\/JIFS-18171","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/journals.sagepub.com\/doi\/full-xml\/10.3233\/JIFS-18171","content-type":"application\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/journals.sagepub.com\/doi\/pdf\/10.3233\/JIFS-18171","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2026,4,29]],"date-time":"2026-04-29T09:40:54Z","timestamp":1777455654000},"score":1,"resource":{"primary":{"URL":"https:\/\/journals.sagepub.com\/doi\/10.3233\/JIFS-18171"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018,7,24]]},"references-count":61,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2018,10]]}},"alternative-id":["10.3233\/JIFS-18171"],"URL":"https:\/\/doi.org\/10.3233\/jifs-18171","relation":{},"ISSN":["1064-1246","1875-8967"],"issn-type":[{"value":"1064-1246","type":"print"},{"value":"1875-8967","type":"electronic"}],"subject":[],"published":{"date-parts":[[2018,7,24]]}}}