{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,2]],"date-time":"2026-05-02T06:41:01Z","timestamp":1777704061601,"version":"3.51.4"},"reference-count":116,"publisher":"SAGE Publications","issue":"2","license":[{"start":{"date-parts":[[2019,12,4]],"date-time":"2019-12-04T00:00:00Z","timestamp":1575417600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/journals.sagepub.com\/page\/policies\/text-and-data-mining-license"}],"content-domain":{"domain":["journals.sagepub.com"],"crossmark-restriction":true},"short-container-title":["Journal of Intelligent &amp; Fuzzy Systems"],"published-print":{"date-parts":[[2020,2,6]]},"abstract":"<jats:p>Project portfolio selection (PSP) problems have been explored for more than two decades. As a result, in the last two decades, the literature of PSP has experienced a sharp increase. Despite this increase, the literature has not been thoroughly reviewed. The main goal of this paper is to investigate and explain the features, state of the art, research directions, and real-world applications of PSP. To pursue this goal, the paper investigates PSP form aspects of PPS criteria, uncertainty modelling tools, selection and optimization methods, and application areas. More than 105 journal papers have been reviewed. The review has resulted in the categorization of applied tools in PPS in addition to the presentation of new research directions.<\/jats:p>","DOI":"10.3233\/jifs-182847","type":"journal-article","created":{"date-parts":[[2019,12,6]],"date-time":"2019-12-06T11:21:29Z","timestamp":1575631289000},"page":"1675-1689","update-policy":"https:\/\/doi.org\/10.1177\/sage-journals-update-policy","source":"Crossref","is-referenced-by-count":18,"title":["Project portfolio selection problems: Two decades review from 1999 to 2019"],"prefix":"10.1177","volume":"38","author":[{"given":"Vahid","family":"Mohagheghi","sequence":"first","affiliation":[{"name":"Department of Industrial Engineering, Shahed University, Tehran, Iran"}]},{"given":"S.","family":"Meysam Mousavi","sequence":"additional","affiliation":[{"name":"Department of Industrial Engineering, Shahed University, Tehran, Iran"}]},{"given":"Mohammad","family":"Mojtahedi","sequence":"additional","affiliation":[{"name":"Faculty of Built Environment, The University of New South Wales, Sydney, Australia"}]}],"member":"179","published-online":{"date-parts":[[2019,12,4]]},"reference":[{"key":"e_1_3_2_2_2","doi-asserted-by":"publisher","DOI":"10.1016\/S0263-7863(98)00032-5"},{"key":"e_1_3_2_3_2","unstructured":"AtanassovK.T. Intuitionistic fuzzy sets Central Tech Library Bulgarian Academy Science Sofia Bulgaria 1983."},{"key":"e_1_3_2_4_2","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-319-47054-2_51"},{"key":"e_1_3_2_5_2","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-319-71008-2_27"},{"key":"e_1_3_2_6_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.engappai.2011.09.015"},{"key":"e_1_3_2_7_2","doi-asserted-by":"publisher","DOI":"10.1080\/00137910600695593"},{"key":"e_1_3_2_8_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.fiae.2015.05.006"},{"key":"e_1_3_2_9_2","doi-asserted-by":"publisher","DOI":"10.4236\/am.2010.13023"},{"key":"e_1_3_2_10_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.seps.2018.07.001"},{"key":"e_1_3_2_11_2","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-319-05915-0_3"},{"key":"e_1_3_2_12_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2009.06.012"},{"key":"e_1_3_2_13_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijar.2006.07.003"},{"key":"e_1_3_2_14_2","doi-asserted-by":"publisher","DOI":"10.1007\/s10799-012-0126-9"},{"key":"e_1_3_2_15_2","doi-asserted-by":"publisher","DOI":"10.1504\/IJBIR.2008.016652"},{"key":"e_1_3_2_16_2","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-642-33021-6_30"},{"key":"e_1_3_2_17_2","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-319-05170-3_32"},{"key":"e_1_3_2_18_2","doi-asserted-by":"publisher","DOI":"10.3390\/su9081302"},{"key":"e_1_3_2_19_2","doi-asserted-by":"publisher","DOI":"10.1007\/s10479-019-03214-1"},{"key":"e_1_3_2_20_2","doi-asserted-by":"publisher","DOI":"10.3390\/su8050485"},{"key":"e_1_3_2_21_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2004.09.009"},{"key":"e_1_3_2_22_2","first-page":"254","volume-title":"Data Mining and Knowledge Management","author":"Dong J.","year":"2005","unstructured":"DongJ., LaiK.K., WangS., XML-based schemes for business project portfolio selection, In Data Mining and Knowledge Management, Springer Berlin Heidelberg, 2005, pp. 254\u2013262."},{"key":"e_1_3_2_23_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.sbspro.2016.06.161"},{"key":"e_1_3_2_24_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ins.2012.11.018"},{"key":"e_1_3_2_25_2","doi-asserted-by":"publisher","DOI":"10.3141\/1848-18"},{"key":"e_1_3_2_26_2","doi-asserted-by":"publisher","DOI":"10.1057\/palgrave.jors.2600767"},{"issue":"4","key":"e_1_3_2_27_2","first-page":"1099","article-title":"Proposing a hybrid approach to predict, schedule and select the most robust project portfolio under uncertainty","volume":"5","author":"Ghodoosi M.R.","year":"2016","unstructured":"GhodoosiM.R., MaftahiR., YousefiV., Proposing a hybrid approach to predict, schedule and select the most robust project portfolio under uncertainty, European Online Journal of Natural and Social Sciences 5(4) (2016), 1099.","journal-title":"European Online Journal of Natural and Social Sciences"},{"key":"e_1_3_2_28_2","doi-asserted-by":"publisher","DOI":"10.1002\/malq.19760220120"},{"key":"e_1_3_2_29_2","doi-asserted-by":"publisher","DOI":"10.1007\/978-1-4615-0280-7_6"},{"key":"e_1_3_2_30_2","doi-asserted-by":"publisher","DOI":"10.1057\/jors.2008.104"},{"key":"e_1_3_2_31_2","doi-asserted-by":"publisher","DOI":"10.1007\/s10696-011-9107-2"},{"key":"e_1_3_2_32_2","doi-asserted-by":"publisher","DOI":"10.1080\/02331931003700699"},{"key":"e_1_3_2_33_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2010.01.041"},{"key":"e_1_3_2_34_2","doi-asserted-by":"publisher","DOI":"10.1007\/s10100-008-0057-z"},{"key":"e_1_3_2_35_2","doi-asserted-by":"publisher","DOI":"10.1287\/opre.2015.1382"},{"key":"e_1_3_2_36_2","doi-asserted-by":"publisher","DOI":"10.1007\/s13762-019-02248-z"},{"key":"e_1_3_2_37_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2014.07.001"},{"key":"e_1_3_2_38_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2014.03.023"},{"key":"e_1_3_2_39_2","doi-asserted-by":"publisher","DOI":"10.1080\/00207540802230363"},{"key":"e_1_3_2_40_2","doi-asserted-by":"publisher","DOI":"10.1111\/deci.12214"},{"key":"e_1_3_2_41_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.amc.2014.08.082"},{"key":"e_1_3_2_42_2","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.ins.2016.02.050","article-title":"Project selection and adjustment based on uncertain measure","volume":"352","author":"Huang X.","year":"2016","unstructured":"HuangX., ZhaoT., Project selection and adjustment based on uncertain measure, Information Sciences 352 (2016), 1\u201314.","journal-title":"Information Sciences"},{"key":"e_1_3_2_43_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.knosys.2015.10.030"},{"key":"e_1_3_2_44_2","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-319-47540-0_6"},{"key":"e_1_3_2_45_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.jclepro.2008.06.001"},{"key":"e_1_3_2_46_2","doi-asserted-by":"publisher","DOI":"10.1109\/ICMIT.2008.4654378"},{"key":"e_1_3_2_47_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2018.05.028"},{"key":"e_1_3_2_48_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2014.12.013"},{"key":"e_1_3_2_49_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.jbusres.2015.06.016"},{"key":"e_1_3_2_50_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2014.03.002"},{"key":"e_1_3_2_51_2","doi-asserted-by":"publisher","DOI":"10.1111\/poms.12727"},{"key":"e_1_3_2_52_2","doi-asserted-by":"publisher","DOI":"10.1504\/IJSSM.2013.056391"},{"key":"e_1_3_2_53_2","doi-asserted-by":"publisher","DOI":"10.1002\/pmj.21404"},{"key":"e_1_3_2_54_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ins.2012.07.024"},{"key":"e_1_3_2_55_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.asoc.2012.07.030"},{"key":"e_1_3_2_56_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.asoc.2014.11.028"},{"key":"e_1_3_2_57_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.omega.2019.01.007"},{"key":"e_1_3_2_58_2","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-642-54924-3_69"},{"key":"e_1_3_2_59_2","doi-asserted-by":"publisher","DOI":"10.1007\/s11518-015-5281-1"},{"key":"e_1_3_2_60_2","doi-asserted-by":"publisher","DOI":"10.1057\/jors.2014.75"},{"key":"e_1_3_2_61_2","doi-asserted-by":"publisher","DOI":"10.1007\/s10700-018-9283-6"},{"key":"e_1_3_2_62_2","doi-asserted-by":"publisher","DOI":"10.3233\/JIFS-169215"},{"key":"e_1_3_2_63_2","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-319-23929-3_6"},{"key":"e_1_3_2_64_2","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-540-73165-8_5"},{"key":"e_1_3_2_65_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.asoc.2018.12.017"},{"key":"e_1_3_2_66_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.asoc.2016.09.022"},{"key":"e_1_3_2_67_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2017.08.034"},{"issue":"3","key":"e_1_3_2_68_2","first-page":"1793","article-title":"Color image segmentation using type-2 fuzzy sets","volume":"1","author":"Maity S.","year":"2009","unstructured":"MaityS., SilJ., Color image segmentation using type-2 fuzzy sets, International Journal of Computer and Electrical Engineering 1(3) (2009), 1793\u20138163.","journal-title":"International Journal of Computer and Electrical Engineering"},{"key":"e_1_3_2_69_2","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-319-71008-2_26"},{"key":"e_1_3_2_70_2","doi-asserted-by":"publisher","DOI":"10.1108\/IMDS-09-2016-0412"},{"key":"e_1_3_2_71_2","doi-asserted-by":"publisher","DOI":"10.1007\/978-1-4471-5143-2_16"},{"key":"e_1_3_2_72_2","doi-asserted-by":"publisher","DOI":"10.1504\/IJMCDM.2013.052474"},{"key":"e_1_3_2_73_2","first-page":"10","article-title":"Type-2 fuzzy sets: Some questions and answers","volume":"1","author":"Mendel J.M.","year":"2003","unstructured":"MendelJ.M., Type-2 fuzzy sets: Some questions and answers, IEEE Connections, Newsletter of the IEEE Neural Networks Society 1 (2003), 10\u201313.","journal-title":"IEEE Connections, Newsletter of the IEEE Neural Networks Society"},{"key":"e_1_3_2_74_2","doi-asserted-by":"publisher","DOI":"10.1109\/MCI.2007.380672"},{"issue":"6","key":"e_1_3_2_75_2","first-page":"89","article-title":"A new framework for high-technology project evaluation and project portfolio selection based on Pythagorean fuzzy WASPAS, MOORA and mathematical modeling","volume":"16","author":"Mohagheghi V.","year":"2019","unstructured":"MohagheghiV., MousaviS.M., A new framework for high-technology project evaluation and project portfolio selection based on Pythagorean fuzzy WASPAS, MOORA and mathematical modeling, Iranian Journal of Fuzzy Systems 16(6) (2019), 89\u2013106.","journal-title":"Iranian Journal of Fuzzy Systems"},{"key":"e_1_3_2_76_2","first-page":"1732","volume-title":"2015 IEEE International Conference on Industrial Engineering and Engineering Management","author":"Mohagheghi V.","year":"2015","unstructured":"MohagheghiV., MousaviS.M., SiadatA., A new approach in considering vagueness and lack of knowledge for selecting sustainable portfolio of production projects, 2015 IEEE International Conference on Industrial Engineering and Engineering Management, 2015a, pp. 1732\u20131736."},{"key":"e_1_3_2_77_2","doi-asserted-by":"publisher","DOI":"10.1007\/s13369-015-1779-6"},{"issue":"6","key":"e_1_3_2_78_2","first-page":"41","article-title":"A new multi-objective optimization approach For sustainable project portfolio selection: A realworld application under interval-valued fuzzy environment","volume":"13","author":"Mohagheghi V.","year":"2016","unstructured":"MohagheghiV., MousaviS.M., VahdaniB., A new multi-objective optimization approach For sustainable project portfolio selection: A realworld application under interval-valued fuzzy environment, Iranian Journal of Fuzzy Systems 13(6) (2016), 41\u201368.","journal-title":"Iranian Journal of Fuzzy Systems"},{"key":"e_1_3_2_79_2","doi-asserted-by":"publisher","DOI":"10.1007\/s00521-016-2262-3"},{"issue":"13","key":"e_1_3_2_80_2","first-page":"65","article-title":"The project portfolio selection and scheduling problem: Mathematical model and algorithms","volume":"6","author":"Naderi B.","year":"2013","unstructured":"NaderiB., The project portfolio selection and scheduling problem: Mathematical model and algorithms, Journal of Optimization in Industrial Engineering 6(13) (2013), 65\u201372.","journal-title":"Journal of Optimization in Industrial Engineering"},{"issue":"12","key":"e_1_3_2_81_2","first-page":"85","article-title":"Project portfolio selection with the maximization of net present value","volume":"6","author":"Nikkhah Nasab M.","year":"2013","unstructured":"Nikkhah NasabM. and NajafiA.A., Project portfolio selection with the maximization of net present value, Journal of Optimization in Industrial Engineering 6(12) (2013), 85\u201392.","journal-title":"Journal of Optimization in Industrial Engineering"},{"key":"e_1_3_2_82_2","doi-asserted-by":"publisher","DOI":"10.1007\/s10732-018-9367-z"},{"key":"e_1_3_2_83_2","doi-asserted-by":"publisher","DOI":"10.1007\/s10479-014-1556-z"},{"key":"e_1_3_2_84_2","doi-asserted-by":"publisher","DOI":"10.4018\/ijsds.2013100103"},{"key":"e_1_3_2_85_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.simpat.2018.10.001"},{"key":"e_1_3_2_86_2","doi-asserted-by":"publisher","DOI":"10.1504\/IJTM.2011.038592"},{"key":"e_1_3_2_87_2","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-642-33021-6_33"},{"key":"e_1_3_2_88_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2015.07.006"},{"key":"e_1_3_2_89_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.dss.2016.01.006"},{"key":"e_1_3_2_90_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.omega.2016.05.007"},{"key":"e_1_3_2_91_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.dss.2012.05.053"},{"key":"e_1_3_2_92_2","doi-asserted-by":"publisher","DOI":"10.1142\/S0219622009003429"},{"key":"e_1_3_2_93_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.petrol.2017.05.022"},{"key":"e_1_3_2_94_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2015.06.057"},{"key":"e_1_3_2_95_2","doi-asserted-by":"publisher","DOI":"10.1007\/s00521-017-3014-8"},{"key":"e_1_3_2_96_2","doi-asserted-by":"publisher","DOI":"10.1007\/s40092-017-0242-6"},{"issue":"6","key":"e_1_3_2_97_2","first-page":"529","article-title":"Hesitant fuzzy sets","volume":"25","author":"Torra V.","year":"2010","unstructured":"TorraV., Hesitant fuzzy sets, International Journal of Intelligent Systems 25(6) (2010), 529\u2013539.","journal-title":"International Journal of Intelligent Systems"},{"key":"e_1_3_2_98_2","doi-asserted-by":"publisher","DOI":"10.1111\/j.1475-3995.2010.00762.x"},{"key":"e_1_3_2_99_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.energy.2017.10.105"},{"key":"e_1_3_2_100_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2019.04.050"},{"key":"e_1_3_2_101_2","doi-asserted-by":"publisher","DOI":"10.1007\/s40815-017-0295-0"},{"key":"e_1_3_2_102_2","doi-asserted-by":"publisher","DOI":"10.1002\/int.21584"},{"key":"e_1_3_2_103_2","doi-asserted-by":"publisher","DOI":"10.1109\/TFUZZ.2013.2278989"},{"key":"e_1_3_2_104_2","doi-asserted-by":"publisher","DOI":"10.1007\/s00500-017-2619-2"},{"key":"e_1_3_2_105_2","unstructured":"YangQ. ShiQ. The Standard for portfolio management 3rd edn. Project Management Association Beijing 2016."},{"key":"e_1_3_2_106_2","doi-asserted-by":"publisher","DOI":"10.1007\/s10479-014-1583-9"},{"key":"e_1_3_2_107_2","doi-asserted-by":"publisher","DOI":"10.1016\/S0888-613X(01)00064-0"},{"key":"e_1_3_2_108_2","doi-asserted-by":"publisher","DOI":"10.1007\/s10479-010-0819-6"},{"key":"e_1_3_2_109_2","doi-asserted-by":"publisher","DOI":"10.1016\/S0019-9958(65)90241-X"},{"key":"e_1_3_2_110_2","doi-asserted-by":"crossref","unstructured":"ZadehL.A. The concept of a linguistic variable and its application to approximate reasoning Springer US 1974 pp. 1\u201310.","DOI":"10.1007\/978-1-4684-2106-4_1"},{"key":"e_1_3_2_111_2","doi-asserted-by":"publisher","DOI":"10.4236\/ajor.2012.24059"},{"key":"e_1_3_2_112_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2011.05.003"},{"key":"e_1_3_2_113_2","doi-asserted-by":"publisher","DOI":"10.1007\/s12293-019-00282-5"},{"key":"e_1_3_2_114_2","doi-asserted-by":"publisher","DOI":"10.1080\/01605682.2018.1506546"},{"issue":"2","key":"e_1_3_2_115_2","first-page":"157","article-title":"Project selection of robust portfolio models with incomplete information","volume":"1","author":"Zhou D.","year":"2012","unstructured":"ZhouD., HuangH., TengC., ZhaoP., Project selection of robust portfolio models with incomplete information, Journal of Finance and Investment Analysis 1(2) (2012), 157\u2013199.","journal-title":"Journal of Finance and Investment Analysis"},{"key":"e_1_3_2_116_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.knosys.2017.12.020"},{"issue":"3","key":"e_1_3_2_117_2","first-page":"44","article-title":"A Petroleum R&D Project Portfolio Investment Selection Model with Project Interactions under Uncertainty","volume":"1","author":"Zhu D.","year":"2012","unstructured":"ZhuD., WangX., A Petroleum R&D Project Portfolio Investment Selection Model with Project Interactions under Uncertainty, Journal of Petroleum Science Research 1(3) (2012), 44\u201350.","journal-title":"Journal of Petroleum Science Research"}],"container-title":["Journal of Intelligent &amp; Fuzzy Systems"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/journals.sagepub.com\/doi\/pdf\/10.3233\/JIFS-182847","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/journals.sagepub.com\/doi\/full-xml\/10.3233\/JIFS-182847","content-type":"application\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/journals.sagepub.com\/doi\/pdf\/10.3233\/JIFS-182847","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2026,4,29]],"date-time":"2026-04-29T09:40:19Z","timestamp":1777455619000},"score":1,"resource":{"primary":{"URL":"https:\/\/journals.sagepub.com\/doi\/10.3233\/JIFS-182847"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019,12,4]]},"references-count":116,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2020,2,6]]}},"alternative-id":["10.3233\/JIFS-182847"],"URL":"https:\/\/doi.org\/10.3233\/jifs-182847","relation":{},"ISSN":["1064-1246","1875-8967"],"issn-type":[{"value":"1064-1246","type":"print"},{"value":"1875-8967","type":"electronic"}],"subject":[],"published":{"date-parts":[[2019,12,4]]}}}