{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,2]],"date-time":"2026-05-02T06:44:32Z","timestamp":1777704272532,"version":"3.51.4"},"reference-count":27,"publisher":"SAGE Publications","issue":"4","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["IFS"],"published-print":{"date-parts":[[2021,4,12]]},"abstract":"<jats:p>The construction of construction projects is an important industry of national social and economic development, and price management control is an important part of construction projects, and has become an important factor for major construction companies in China to manage construction projects. At present, the internal construction price management is not the best, nor the most ideal. Few investments exceed the budget, mainly due to defects in effective construction price management, lack of advanced technology and lack of prospects for prepayment, which make it difficult to match the actual and expected results of construction project price management. The actual results are always unsatisfactory. In this paper, the engineering cost estimation model is studied, and the neural network comprehensive prediction model is established to improve the accuracy and application technology of the prediction model. By using the building of BIM technology and neural network model, and effectively using the price advantage of ICT, it is used in the construction industry, and the cost is strictly controlled, so as to bring huge profits to the enterprise and promote the development of the enterprise.<\/jats:p>","DOI":"10.3233\/jifs-189502","type":"journal-article","created":{"date-parts":[[2020,12,18]],"date-time":"2020-12-18T10:11:14Z","timestamp":1608286274000},"page":"6669-6681","source":"Crossref","is-referenced-by-count":10,"title":["Construction cost management strategy based on BIM technology and neural network model"],"prefix":"10.1177","volume":"40","author":[{"given":"Xiaojing","family":"Ding","sequence":"first","affiliation":[{"name":"Department Of Architecture Engineering, Shijiazhuang University of Applied Technology, Shijiazhuang, Hebei, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Qiulan","family":"Lu","sequence":"additional","affiliation":[{"name":"School of Shijiazhuang Institute of Technology, Shijiazhuang University, Shijiazhuang, Hebei, China"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"179","reference":[{"issue":"6","key":"10.3233\/JIFS-189502_ref1","doi-asserted-by":"crossref","first-page":"59","DOI":"10.1061\/(ASCE)0887-3801(2007)21:6(441)","article-title":"Component-based framework for implementing integrated architectural\/engineering\/construction project systems","volume":"21","author":"Halfawy","year":"2007","journal-title":"Journal of Computing in Civil Engineering"},{"key":"10.3233\/JIFS-189502_ref2","unstructured":"EastmanChuck, TeicholzPaul, SacksRafael, et al. BIM Handbook (Second Edition), New York: John Wiley & Sons (2011), 12\u201316 ."},{"key":"10.3233\/JIFS-189502_ref3","doi-asserted-by":"crossref","unstructured":"CetalEastman, BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors, New York: John Wiley and Sons, 2008.","DOI":"10.1002\/9780470261309"},{"key":"10.3233\/JIFS-189502_ref4","doi-asserted-by":"crossref","first-page":"357","DOI":"10.1016\/j.autcon.2008.10.003","article-title":"Building information modeling framework: A research and delivery foundation for industry stackeholders","volume":"18","author":"Bilal","year":"2009","journal-title":"Automation in Construction"},{"key":"10.3233\/JIFS-189502_ref5","unstructured":"Ernstrom B. and Hanson D. , The constructors guide to BIM[M], New York, AGC of America, 23(2) (2005), 110\u2013116."},{"issue":"4","key":"10.3233\/JIFS-189502_ref6","first-page":"19","article-title":"Software used for Freedom Tower gets updated","volume":"1","author":"Phair","year":"2005","journal-title":"Building Designand Constructio"},{"key":"10.3233\/JIFS-189502_ref7","first-page":"11","article-title":"4D Construction Sequence Planning-New Process and Data Model, CIB-W78 24th International Conference on Information Technology in Construction","volume":"23","author":"Tulke","year":"2007","journal-title":"Maribor"},{"issue":"2","key":"10.3233\/JIFS-189502_ref8","first-page":"939","article-title":"Interaction of processes and phases inproject scheduling using BIM for AECFM integration","volume":"13","author":"Ospina-Alvarado","year":"2010","journal-title":"Construction Research Congress"},{"key":"10.3233\/JIFS-189502_ref9","doi-asserted-by":"crossref","unstructured":"Tauscher, Mikulakova, Beucke, K\u00f6nig. Automated generation of construction schedulesbased on the IFC object model, Computing in Civil Engineering 12 (2009), 666\u2013674.","DOI":"10.1061\/41052(346)66"},{"issue":"6","key":"10.3233\/JIFS-189502_ref10","doi-asserted-by":"crossref","first-page":"433","DOI":"10.1016\/S0926-5805(98)00053-3","article-title":"Generating, evaluating and visualizingconstruction schedules with 4D-CAD tools","volume":"7","author":"Liston","year":"1998","journal-title":"Automation in Construction"},{"key":"10.3233\/JIFS-189502_ref11","doi-asserted-by":"crossref","unstructured":"James, D. Goedert, Pavan. Integrating construction process documentation into Building information modeling, Construction Engineering and Management 12(7) (2010), 509\u2013515.","DOI":"10.1061\/(ASCE)0733-9364(2008)134:7(509)"},{"issue":"9","key":"10.3233\/JIFS-189502_ref12","doi-asserted-by":"crossref","first-page":"1237","DOI":"10.1061\/(ASCE)CO.1943-7862.0000689","article-title":"Forecasting engineering news-record construction cost index using multivariate time series models","volume":"9","author":"Shahandashti","year":"2013","journal-title":"Journal of Construction Engineering and Management"},{"issue":"2","key":"10.3233\/JIFS-189502_ref13","doi-asserted-by":"crossref","first-page":"198","DOI":"10.1061\/(ASCE)0733-9364(2003)129:2(198)","article-title":"Predicting accuracy of early cost estim-ates using factor analysis and multivariate regression","volume":"129","author":"Trost","year":"2003","journal-title":"Journal of Construction Engineering and Management"},{"key":"10.3233\/JIFS-189502_ref14","first-page":"102","article-title":"The consistency of empirical comparisons of regression and analogy-based software project cost prediction","volume":"55","author":"Mair","year":"2005","journal-title":"Empirical Software Enginee-Ring"},{"issue":"10","key":"10.3233\/JIFS-189502_ref15","doi-asserted-by":"crossref","first-page":"1235","DOI":"10.1016\/j.buildenv.2004.02.013","article-title":"Comparison of construction cost estimating models based on regression analysis, neural networks, and case-based reasoning","volume":"39","author":"Kim","year":"2004","journal-title":"Building and Environment"},{"issue":"6","key":"10.3233\/JIFS-189502_ref16","first-page":"1050","article-title":"Artificial neural networks model for parametric estimating of construction project costs","volume":"52","author":"Barsoum","year":"2005","journal-title":"Journal of Engineering and Applied Science"},{"issue":"10","key":"10.3233\/JIFS-189502_ref17","doi-asserted-by":"crossref","first-page":"764","DOI":"10.1111\/j.1467-8667.2012.00786.x","article-title":"Neuro-fuzzy cost estimation model enhanced by fast messy genetic algorithms for Semiconductor hookup construction","volume":"27","author":"Hsiao","year":"2012","journal-title":"Computer-Aided Civil and Infrastructure Engineering"},{"issue":"14","key":"10.3233\/JIFS-189502_ref18","first-page":"32","article-title":"Using intelligent techniques in construction project cost estimation: 10-Year Survey","volume":"20","author":"Elfaki","year":"2014","journal-title":"Advances in Civil Engineering"},{"issue":"5","key":"10.3233\/JIFS-189502_ref19","first-page":"433","volume":"22","author":"Naik","year":"2015","journal-title":"Birth and Life of the Integrated Building"},{"issue":"2","key":"10.3233\/JIFS-189502_ref20","doi-asserted-by":"crossref","first-page":"173","DOI":"10.1108\/BEPAM-10-2016-0050","article-title":"Improving the cost estimates of complex projects in the project-based industries","volume":"7","author":"Sridarran","year":"2017","journal-title":"Built Environment Project and Asset Management"},{"issue":"1","key":"10.3233\/JIFS-189502_ref21","first-page":"1","article-title":"Research of combination forecasting model based on improved analytic hierarchy process","volume":"5","author":"Feng","year":"2018","journal-title":"EURASIP Journal on Wireless Communications and Networking"},{"issue":"1762","key":"10.3233\/JIFS-189502_ref22","doi-asserted-by":"crossref","first-page":"142","DOI":"10.4028\/www.scientific.net\/AMM.881.142","article-title":"Cost estimation model for igirder bridge superstructure using multiple linear regression and artificial neural network","volume":"4619","author":"Winalytra","year":"2018","journal-title":"Applied Mechanics and Materials"},{"issue":"4","key":"10.3233\/JIFS-189502_ref23","first-page":"15","volume":"32","author":"Shi","year":"2008","journal-title":"IEEE Computer Society"},{"issue":"6","key":"10.3233\/JIFS-189502_ref24","doi-asserted-by":"crossref","first-page":"4224","DOI":"10.1016\/j.eswa.2009.11.080","article-title":"Conceptual cost estimates using evolutionary fuzzy hybrid neural network for projects in construction industry","volume":"37","author":"Cheng","year":"2009","journal-title":"Expert Systems with Applications"},{"issue":"7","key":"10.3233\/JIFS-189502_ref25","doi-asserted-by":"crossref","first-page":"8597","DOI":"10.1016\/j.eswa.2011.01.063","article-title":"The development of a construction cost prediction model with improved prediction capacity using the advanced CBR approach","volume":"38","author":"Koo","year":"2011","journal-title":"Expert Systems with Applications"},{"key":"10.3233\/JIFS-189502_ref26","unstructured":"AshuorthAllan, Pre-Contant studies: Development, Economics, Tendering and Estimating, Oxford: Blankwell Publishing, 12(2) (2012), 45\u201353."},{"key":"10.3233\/JIFS-189502_ref27","unstructured":"Ciark F.D. and Lorenzoni A.B. , Applied cost Engineering, New York: Mareed Dekker Inc, 22(4) (2005), 12\u201319."}],"container-title":["Journal of Intelligent &amp; Fuzzy Systems"],"original-title":[],"link":[{"URL":"https:\/\/content.iospress.com\/download?id=10.3233\/JIFS-189502","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2026,4,29]],"date-time":"2026-04-29T09:40:51Z","timestamp":1777455651000},"score":1,"resource":{"primary":{"URL":"https:\/\/journals.sagepub.com\/doi\/full\/10.3233\/JIFS-189502"}},"subtitle":[],"editor":[{"given":"Varatharajan","family":"Ramachandran","sequence":"additional","affiliation":[],"role":[{"role":"editor","vocabulary":"crossref"}]}],"short-title":[],"issued":{"date-parts":[[2021,4,12]]},"references-count":27,"journal-issue":{"issue":"4"},"URL":"https:\/\/doi.org\/10.3233\/jifs-189502","relation":{},"ISSN":["1064-1246","1875-8967"],"issn-type":[{"value":"1064-1246","type":"print"},{"value":"1875-8967","type":"electronic"}],"subject":[],"published":{"date-parts":[[2021,4,12]]}}}