{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,2]],"date-time":"2026-05-02T06:41:40Z","timestamp":1777704100231,"version":"3.51.4"},"reference-count":39,"publisher":"SAGE Publications","issue":"2","license":[{"start":{"date-parts":[[2019,12,20]],"date-time":"2019-12-20T00:00:00Z","timestamp":1576800000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/journals.sagepub.com\/page\/policies\/text-and-data-mining-license"}],"content-domain":{"domain":["journals.sagepub.com"],"crossmark-restriction":true},"short-container-title":["Journal of Intelligent &amp; Fuzzy Systems"],"published-print":{"date-parts":[[2020,2,6]]},"abstract":"<jats:p>In this paper, we study the single-machine scheduling problem and obtain some new results on the special time-delay structure and mixed precedence constraints. We first demonstrate the complexity of the ordinary problem under different circumstances and obtain two cases, namely a polynomial solvable case and an NP-complete case. Then, we present a fuzzy extension of the ordinary problem, based on which a representation of the non-dominated solutions is given for the fuzzy scheduling problem. Finally, we demonstrate the complexity of fuzzy extension problems under different time delays by proposing corresponding algorithms.<\/jats:p>","DOI":"10.3233\/jifs-191007","type":"journal-article","created":{"date-parts":[[2019,12,20]],"date-time":"2019-12-20T11:49:22Z","timestamp":1576842562000},"page":"2231-2244","update-policy":"https:\/\/doi.org\/10.1177\/sage-journals-update-policy","source":"Crossref","is-referenced-by-count":0,"title":["Single-machine scheduling problem with fuzzy time delays and mixed precedence constraints"],"prefix":"10.1177","volume":"38","author":[{"given":"Hui","family":"Wu","sequence":"first","affiliation":[{"name":"School of Mechatronic Engineering and Automation, Shanghai University, Shanghai, China"},{"name":"Science and Information College, Qingdao Agricultural University, Qingdao, Shandong Province, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Bing","family":"Wang","sequence":"additional","affiliation":[{"name":"School of Mechatronic Engineering and Automation, Shanghai University, Shanghai, China"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"179","published-online":{"date-parts":[[2019,12,20]]},"reference":[{"issue":"3","key":"e_1_3_1_2_2","doi-asserted-by":"crossref","first-page":"1172","DOI":"10.1016\/j.apm.2014.07.028","article-title":"Single-machine scheduling problems with precedence constraints and simple linear deterioration","volume":"39","author":"Wang J.B.","year":"2015","unstructured":"WangJ.B. and WangJ.J., Single-machine scheduling problems with precedence constraints and simple linear deterioration, Applied Mathematical Modelling 39(3-4) (2015), 1172\u20131182.","journal-title":"Applied Mathematical Modelling"},{"issue":"5","key":"e_1_3_1_3_2","doi-asserted-by":"crossref","first-page":"676","DOI":"10.1016\/j.orl.2016.07.016","article-title":"A 2.542-approximation for precedence constrained single machine scheduling with release dates and total weighted completion time objective","volume":"44","author":"Skutella M.","year":"2016","unstructured":"SkutellaM., A 2.542-approximation for precedence constrained single machine scheduling with release dates and total weighted completion time objective, Operations Research Letters 44(5) (2016), 676\u2013679.","journal-title":"Operations Research Letters"},{"issue":"3","key":"e_1_3_1_4_2","doi-asserted-by":"crossref","first-page":"309","DOI":"10.1007\/s10951-015-0428-y","article-title":"Exact algorithms for single-machine scheduling with time windows and precedence constraints","volume":"19","author":"Davari M.","year":"2016","unstructured":"DavariM., DemeulemeesterE., LeusR. and NobibonF.T., Exact algorithms for single-machine scheduling with time windows and precedence constraints, Journal of Scheduling 19(3) (2016), 309\u2013334.","journal-title":"Journal of Scheduling"},{"key":"e_1_3_1_5_2","doi-asserted-by":"crossref","first-page":"105","DOI":"10.1016\/j.disopt.2017.02.004","article-title":"Bi-criteria pareto-scheduling on a single machine with due indices and precedence constraints","volume":"25","author":"Gao Y.","year":"2017","unstructured":"GaoY. and YuanJ.J., Bi-criteria pareto-scheduling on a single machine with due indices and precedence constraints, Discrete Optimization 25 (2017), 105\u2013119.","journal-title":"Discrete Optimization"},{"issue":"6","key":"e_1_3_1_6_2","doi-asserted-by":"crossref","first-page":"583","DOI":"10.1007\/s10951-016-0497-6","article-title":"Single machine scheduling with a generalized job-dependent cumulative effect","volume":"20","author":"Rustogi K.","year":"2017","unstructured":"RustogiK. and StrusevichV.A., Single machine scheduling with a generalized job-dependent cumulative effect, Journal of Scheduling 20(6) (2017), 583\u2013592.","journal-title":"Journal of Scheduling"},{"issue":"9","key":"e_1_3_1_7_2","doi-asserted-by":"crossref","first-page":"1334","DOI":"10.1587\/transfun.E101.A.1334","article-title":"Online Combinatorial Optimization with Multiple Projections and Its Application to Scheduling Problem","volume":"101","author":"Fujita T.","year":"2018","unstructured":"FujitaT., HatanoK., KijimaS. and TakimotoE., Online Combinatorial Optimization with Multiple Projections and Its Application to Scheduling Problem, Ieice Transactions on Fundamentals of Electronics Communications and Computer Sciences E101A(9) (2018), 1334\u20131343.","journal-title":"Ieice Transactions on Fundamentals of Electronics Communications and Computer Sciences"},{"issue":"4","key":"e_1_3_1_8_2","doi-asserted-by":"crossref","first-page":"438","DOI":"10.1016\/j.orl.2018.05.007","article-title":"A (2+epsilon)-approximation for precedence constrained single machine scheduling with release dates and total weighted completion time objective","volume":"46","author":"Sitters R.","year":"2018","unstructured":"SittersR. and YangL.Y., A (2+epsilon)-approximation for precedence constrained single machine scheduling with release dates and total weighted completion time objective, Operations Research Letters 46(4) (2018), 438\u2013442.","journal-title":"Operations Research Letters"},{"issue":"1","key":"e_1_3_1_9_2","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1007\/s10951-017-0519-z","article-title":"A survey on how the structure of precedence constraints may change the complexity class of scheduling problems","volume":"21","author":"Prot D.","year":"2018","unstructured":"ProtD. and Bellenguez-MorineauO., A survey on how the structure of precedence constraints may change the complexity class of scheduling problems, Journal of Scheduling 21(1) (2018), 3\u201316.","journal-title":"Journal of Scheduling"},{"key":"e_1_3_1_10_2","doi-asserted-by":"publisher","DOI":"10.3233\/JIFS-17766"},{"issue":"1","key":"e_1_3_1_11_2","doi-asserted-by":"crossref","first-page":"43","DOI":"10.1016\/j.ejor.2018.06.004","article-title":"Precedence Theorems and Dynamic Programming for the Single-Machine Weighted Tardiness Problem","volume":"272","author":"Rostami S.","year":"2019","unstructured":"RostamiS., CreemersS. and LeusR., Precedence Theorems and Dynamic Programming for the Single-Machine Weighted Tardiness Problem, European Journal of Operational Research 272(1) (2019), 43\u201349.","journal-title":"European Journal of Operational Research"},{"issue":"2","key":"e_1_3_1_12_2","doi-asserted-by":"crossref","first-page":"284","DOI":"10.1016\/0377-2217(94)00162-6","article-title":"Single machine scheduling problem with fuzzy precedence relation","volume":"87","author":"Ishii H.","year":"1995","unstructured":"IshiiH. and TadaM., Single machine scheduling problem with fuzzy precedence relation, European Journal of Operational Research 87(2) (1995), 284\u2013288.","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"e_1_3_1_13_2","doi-asserted-by":"crossref","first-page":"330","DOI":"10.15807\/jorsj.42.330","article-title":"Single-machine scheduling with mixed precedence constraints","volume":"42","author":"Levner E.","year":"1999","unstructured":"LevnerE. and VlachM., Single-machine scheduling with mixed precedence constraints, Journal of the Operations Research Society of Japan 42(3) (1999), 330\u2013341.","journal-title":"Journal of the Operations Research Society of Japan"},{"issue":"5","key":"e_1_3_1_14_2","doi-asserted-by":"crossref","first-page":"450","DOI":"10.1007\/s11741-005-0032-z","article-title":"Single Machine Scheduling Problem with Fuzzy Due Dates and Fuzzy Precedence","volume":"9","author":"Xie Y.","year":"2005","unstructured":"XieY., XieJ.Y. and HuangQ.H., Single Machine Scheduling Problem with Fuzzy Due Dates and Fuzzy Precedence, Journal of Shanghai University 9(5) (2005), 450\u2013454.","journal-title":"Journal of Shanghai University"},{"issue":"2","key":"e_1_3_1_15_2","first-page":"346","article-title":"Batch scheduling problem with due-date and fuzzy precedence relation","volume":"48","author":"Li X.S.","year":"2012","unstructured":"LiX.S., IshiiH. and ChenM.H., Batch scheduling problem with due-date and fuzzy precedence relation, KYBERNETIKA 48(2) (2012), 346\u2013356.","journal-title":"KYBERNETIKA"},{"issue":"9","key":"e_1_3_1_16_2","doi-asserted-by":"crossref","first-page":"2707","DOI":"10.1080\/00207543.2014.975866","article-title":"Single machine parallel-batching scheduling problem with fuzzy due-date and fuzzy precedence relation","volume":"53","author":"Li X.S.","year":"2015","unstructured":"LiX.S., IshiiH. and ChenM.H., Single machine parallel-batching scheduling problem with fuzzy due-date and fuzzy precedence relation, International Journal of Production Research 53(9) (2015), 2707\u20132717.","journal-title":"International Journal of Production Research"},{"issue":"6","key":"e_1_3_1_17_2","first-page":"121","article-title":"Single machine due date assignment scheduling problem with preceden3ce constraints and controllable processing times in fuzzy environment","volume":"15","author":"Li J.","year":"2018","unstructured":"LiJ., XuD. and LiH., Single machine due date assignment scheduling problem with preceden3ce constraints and controllable processing times in fuzzy environment, Iranian Journal of Fuzzy Systems 15(6) (2018), 121\u2013143.","journal-title":"Iranian Journal of Fuzzy Systems"},{"key":"e_1_3_1_18_2","doi-asserted-by":"publisher","DOI":"10.1007\/s10700-015-9225-5"},{"issue":"2","key":"e_1_3_1_19_2","doi-asserted-by":"crossref","first-page":"87","DOI":"10.1016\/0167-6377(94)90064-7","article-title":"One-machine generalized precedence constrained scheduling problems","volume":"16","author":"Wikum E.D.","year":"1994","unstructured":"WikumE.D., LlewellynD.C. and NemhauserG.L., One-machine generalized precedence constrained scheduling problems, Operations Research Letters 16(2) (1994), 87\u201399.","journal-title":"Operations Research Letters"},{"issue":"3","key":"e_1_3_1_20_2","doi-asserted-by":"crossref","first-page":"247","DOI":"10.1016\/0166-218X(96)00110-2","article-title":"Single machine scheduling subject to precedence delays","volume":"70","author":"Finta L.","year":"1996","unstructured":"FintaL. and LiuZ., Single machine scheduling subject to precedence delays, Discrete Applied Mathematics 70(3) (1996), 247\u2013266.","journal-title":"Discrete Applied Mathematics"},{"issue":"3","key":"e_1_3_1_21_2","doi-asserted-by":"crossref","first-page":"387","DOI":"10.1016\/S0165-0114(02)00138-0","article-title":"Scheduling with fuzzy delays and fuzzy precedences","volume":"134","author":"Muthusamy K.","year":"2003","unstructured":"MuthusamyK., ShaoC.S., VlachM. and IshiiH., Scheduling with fuzzy delays and fuzzy precedences, Fuzzy Sets & Systems 134(3) (2003), 387\u2013395.","journal-title":"Fuzzy Sets & Systems"},{"key":"e_1_3_1_22_2","doi-asserted-by":"crossref","unstructured":"XieY. XieJ.Y. and DengX.L. A single machine scheduling problem with fuzzy time delays. The 16th IFAC World Congress 2005 pp 37-42 Prague Czech Republic.","DOI":"10.3182\/20050703-6-CZ-1902.01490"},{"key":"e_1_3_1_23_2","doi-asserted-by":"crossref","unstructured":"XieY. and OuL.L. Single Machine Fuzzy Delays Scheduling Problem with Fuzzy Precedences The 6th International Conference on Fuzzy Systems and Knowledge Discovery (2009) pp. 375\u2013379 Tianjin China.","DOI":"10.1109\/FSKD.2009.40"},{"issue":"5","key":"e_1_3_1_24_2","first-page":"907","article-title":"Single Machine Scheduling Problem with Fuzzy Precedence Delays and Fuzzy Processing Times","volume":"3614","author":"Xie Y.","year":"2009","unstructured":"XieY., XieJ. and LiuJ., Single Machine Scheduling Problem with Fuzzy Precedence Delays and Fuzzy Processing Times, Lecture Notes in Computer Science 3614(5) (2009), 907\u2013910.","journal-title":"Lecture Notes in Computer Science"},{"key":"e_1_3_1_25_2","doi-asserted-by":"publisher","DOI":"10.1007\/s00186-005-0014-8"},{"key":"e_1_3_1_26_2","doi-asserted-by":"publisher","DOI":"10.1057\/palgrave.jors.2602272"},{"key":"e_1_3_1_27_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.dam.2012.05.026"},{"key":"e_1_3_1_28_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2005.01.019"},{"key":"e_1_3_1_29_2","doi-asserted-by":"publisher","DOI":"10.1080\/0305215X.2015.1099639"},{"key":"e_1_3_1_30_2","doi-asserted-by":"publisher","DOI":"10.1051\/ro\/2014004"},{"key":"e_1_3_1_31_2","doi-asserted-by":"crossref","unstructured":"DhouibE. TeghemJ. and LoukilT. Non-permutation flow-shop scheduling problem with minimal and maximal time lags: Theoretical study and heuristic. Annals of Operations Research. 2018.","DOI":"10.1007\/s10479-018-2775-5"},{"key":"e_1_3_1_32_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.nahs.2017.10.008"},{"key":"e_1_3_1_33_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.cnsns.2017.06.014"},{"key":"e_1_3_1_34_2","doi-asserted-by":"publisher","DOI":"10.1016\/j.amc.2017.11.053"},{"key":"e_1_3_1_35_2","doi-asserted-by":"publisher","DOI":"10.1007\/s40815-019-00631-z"},{"key":"e_1_3_1_36_2","doi-asserted-by":"publisher","DOI":"10.1007\/s12239-017-0067-8"},{"key":"e_1_3_1_37_2","doi-asserted-by":"publisher","DOI":"10.1287\/mnsc.16.1.77"},{"key":"e_1_3_1_38_2","unstructured":"GareyM.R. and JohnsonD.S. Computers and Intractability: AGuide to the Theory of NP-Completeness.W. H. Freeman and Company: San Fransisco. 1979."},{"key":"e_1_3_1_39_2","doi-asserted-by":"publisher","DOI":"10.1287\/mnsc.19.5.544"},{"key":"e_1_3_1_40_2","unstructured":"T\u2019KindtV. BillautJ.C. and ScottH. Multicriteria Scheduling: Theory Models and Algorithms Springer: New York 2006."}],"container-title":["Journal of Intelligent &amp; Fuzzy Systems"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/journals.sagepub.com\/doi\/pdf\/10.3233\/JIFS-191007","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/journals.sagepub.com\/doi\/full-xml\/10.3233\/JIFS-191007","content-type":"application\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/journals.sagepub.com\/doi\/pdf\/10.3233\/JIFS-191007","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2026,4,29]],"date-time":"2026-04-29T09:40:26Z","timestamp":1777455626000},"score":1,"resource":{"primary":{"URL":"https:\/\/journals.sagepub.com\/doi\/10.3233\/JIFS-191007"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019,12,20]]},"references-count":39,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2020,2,6]]}},"alternative-id":["10.3233\/JIFS-191007"],"URL":"https:\/\/doi.org\/10.3233\/jifs-191007","relation":{},"ISSN":["1064-1246","1875-8967"],"issn-type":[{"value":"1064-1246","type":"print"},{"value":"1875-8967","type":"electronic"}],"subject":[],"published":{"date-parts":[[2019,12,20]]}}}