{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,2]],"date-time":"2026-02-02T10:52:27Z","timestamp":1770029547728,"version":"3.49.0"},"reference-count":54,"publisher":"SAGE Publications","issue":"2","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["IFS"],"published-print":{"date-parts":[[2021,9,15]]},"abstract":"<jats:p>Failure modes and effects analysis (FMEA) is a useful reliability analysis technique to identify potential failure modes in a wide range of industries. However, the conventional FMEA method is deficient in dealing with the risk evaluation and prioritization method. To overcome the shortcomings, this paper presents a new risk priority model using Best-Worst Method based on D numbers (D-BWM) and the Measurement of Alternatives and Ranking according to COmpromise Solution based on D numbers (D-MARCOS). First, D numbers are used to deal with the uncertainty of FMEA team members\u2019 subjective judgment. Second, the distance-based method is proposed to determine the objective weight of each team member. Then, the D-BWM was used to determine the weight of risk factors. The combination rule of D number theory combined the evaluation information of multiple members into group opinions. Finally, D-MARCOS method is proposed to obtain the risk priority of the failure modes. An example and the results of comparative analysis show the method is effective.<\/jats:p>","DOI":"10.3233\/jifs-202765","type":"journal-article","created":{"date-parts":[[2021,7,16]],"date-time":"2021-07-16T10:17:53Z","timestamp":1626430673000},"page":"2833-2846","source":"Crossref","is-referenced-by-count":10,"title":["An integrated FMEA approach using Best-Worst and MARCOS methods based on D numbers for prioritization of failures"],"prefix":"10.1177","volume":"41","author":[{"given":"Jianping","family":"Fan","sequence":"first","affiliation":[{"name":"School of Economics and Management, Shanxi University, Taiyuan, China"}]},{"given":"Shuting","family":"Wang","sequence":"additional","affiliation":[{"name":"School of Economics and Management, Shanxi University, Taiyuan, China"}]},{"given":"Meiqin","family":"Wu","sequence":"additional","affiliation":[{"name":"School of Economics and Management, Shanxi University, Taiyuan, China"}]}],"member":"179","reference":[{"key":"10.3233\/JIFS-202765_ref2","doi-asserted-by":"crossref","unstructured":"Efe B. , Analysis of operational safety risks in shipbuilding using failure mode and effect analysis approach, Ocean Engineering 187 (2019).","DOI":"10.1016\/j.oceaneng.2019.106214"},{"key":"10.3233\/JIFS-202765_ref3","doi-asserted-by":"crossref","first-page":"441","DOI":"10.1016\/j.asoc.2016.01.007","article-title":"Fuzzy FMEA application to improve decision-making process in an emergency department","volume":"43","author":"Chanamool","year":"2016","journal-title":"Applied Soft Computing"},{"issue":"13","key":"10.3233\/JIFS-202765_ref4","doi-asserted-by":"crossref","first-page":"2991","DOI":"10.1080\/00207540110056162","article-title":"A new approach for evaluation of risk priorities of failure modes in FMEA","volume":"39","author":"Franceschini","year":"2001","journal-title":"International Journal of Production Research"},{"key":"10.3233\/JIFS-202765_ref5","doi-asserted-by":"crossref","first-page":"394","DOI":"10.1016\/j.ress.2017.09.017","article-title":"A combined multi-criteria approach to support FMECA analyses: A real-world case","volume":"169","author":"Carpitella","year":"2018","journal-title":"Reliability Engineering & System Safety"},{"issue":"2","key":"10.3233\/JIFS-202765_ref6","doi-asserted-by":"crossref","first-page":"203","DOI":"10.1016\/0951-8320(95)00068-D","article-title":"Fuzzy-logic prioritization of failures in a system failure mode, effects and criticality analysis","volume":"50","author":"Bowles","year":"1995","journal-title":"Reliability Engineering & System Safety"},{"issue":"4","key":"10.3233\/JIFS-202765_ref7","doi-asserted-by":"crossref","first-page":"1085","DOI":"10.1007\/s00500-014-1321-x","article-title":"Failure mode and effects analysis using intuitionistic fuzzy hybrid TOPSIS approach","volume":"19","author":"Liu","year":"2015","journal-title":"Soft Computing"},{"issue":"1","key":"10.3233\/JIFS-202765_ref8","doi-asserted-by":"crossref","first-page":"61","DOI":"10.1016\/j.eswa.2011.06.044","article-title":"Fuzzy failure modes and effects analysis by using fuzzy TOPSIS-based fuzzy AHP","volume":"39","author":"Kutlu","year":"2012","journal-title":"Expert Systems with Applications"},{"issue":"8","key":"10.3233\/JIFS-202765_ref9","doi-asserted-by":"crossref","first-page":"18032","DOI":"10.1007\/s10845-016-1214-1","article-title":"Risk measurement and prioritization of auto parts manufacturing processes based on process failure analysis, interval data envelopment analysis and grey relational analysis","volume":"29","author":"Baghery","year":"2018","journal-title":"Journal of Intelligent Manufacturing"},{"key":"10.3233\/JIFS-202765_ref10","doi-asserted-by":"crossref","first-page":"26","DOI":"10.1016\/j.jobe.2017.10.013","article-title":"A practical solution for HVAC prognostics: Failure mode and effects analysis in building maintenance","volume":"15","author":"Yang","year":"2018","journal-title":"Journal of Building Engineering"},{"key":"10.3233\/JIFS-202765_ref11","doi-asserted-by":"crossref","first-page":"82","DOI":"10.1016\/j.jpba.2012.02.009","article-title":"Risk analysis of analytical validations by probabilistic modification of FMEA","volume":"64-65","author":"Barends","year":"2012","journal-title":"Journal of Pharmaceutical and Biomedical Analysis"},{"issue":"10","key":"10.3233\/JIFS-202765_ref12","doi-asserted-by":"crossref","first-page":"2012","DOI":"10.1080\/00207721.2012.760669","article-title":"Failure mode and effects analysis using intuitionistic fuzzy hybrid weighted Euclidean distance operator","volume":"45","author":"Liu","year":"2014","journal-title":"International Journal of Systems Science"},{"issue":"1","key":"10.3233\/JIFS-202765_ref13","doi-asserted-by":"crossref","first-page":"85","DOI":"10.1002\/qre.1217","article-title":"ANP\/RPN: a multi criteria evaluation of the Risk Priority Number","volume":"28","author":"Zammori","year":"2012","journal-title":"Quality and Reliability Engineering International"},{"issue":"2","key":"10.3233\/JIFS-202765_ref14","doi-asserted-by":"crossref","first-page":"566","DOI":"10.1109\/TR.2018.2869787","article-title":"Failure mode and effect analysis in a linguistic context: A consensus-based multiattribute group decision-making approach","volume":"68","author":"Zhang","year":"2019","journal-title":"Ieee Transactions on Reliability"},{"issue":"5","key":"10.3233\/JIFS-202765_ref15","doi-asserted-by":"crossref","first-page":"761","DOI":"10.1002\/qre.1633","article-title":"A novel approach for FMEA: Combination of Interval 2-Tuple linguistic variables and gray relational analysis","volume":"31","author":"Liu","year":"2015","journal-title":"Quality and Reliability Engineering International"},{"issue":"2","key":"10.3233\/JIFS-202765_ref16","doi-asserted-by":"crossref","first-page":"203","DOI":"10.1016\/0951-8320(95)00068-D","article-title":"Fuzzy-logic prioritization of failures in a system failure mode, effects and criticality analysis","volume":"50","author":"Bowles","year":"1995","journal-title":"Reliability Engineering & System Safety"},{"issue":"9","key":"10.3233\/JIFS-202765_ref17","doi-asserted-by":"crossref","first-page":"1072","DOI":"10.1108\/03684929910300295","article-title":"Failure mode and effects analysis using fuzzy method and grey theory","volume":"28","author":"Chang","year":"1999","journal-title":"Kybernetes"},{"issue":"4","key":"10.3233\/JIFS-202765_ref18","doi-asserted-by":"crossref","first-page":"473","DOI":"10.1002\/qre.1500","article-title":"A rough TOPSIS approach for failure mode and effects analysis in uncertain environments","volume":"30","author":"Song","year":"2014","journal-title":"Quality and Reliability Engineering International"},{"issue":"9","key":"10.3233\/JIFS-202765_ref19","doi-asserted-by":"crossref","first-page":"17","DOI":"10.3390\/s17092086","article-title":"Fuzzy risk evaluation in failure mode and effects analysis using a D numbers based multi-sensor information fusion method","volume":"17","author":"Deng","year":"2017","journal-title":"Sensors"},{"issue":"6","key":"10.3233\/JIFS-202765_ref20","doi-asserted-by":"crossref","first-page":"1524","DOI":"10.1111\/j.1937-5956.2012.01363.x","article-title":"Failure modes and effects analysis: An evaluation of group versus individual performance","volume":"22","author":"Guerrero","year":"2013","journal-title":"Production and Operations Management"},{"key":"10.3233\/JIFS-202765_ref21","doi-asserted-by":"crossref","unstructured":"Faghih-Roohi S. , Akcay A. , Zhang Y. , Shekarian E. and de Jong E. , A group risk assessment approach for the selection of pharmaceutical product shipping lanes, International Journal of Production Economics 229 (2020).","DOI":"10.1016\/j.ijpe.2020.107774"},{"issue":"6","key":"10.3233\/JIFS-202765_ref22","doi-asserted-by":"crossref","first-page":"1768","DOI":"10.1016\/j.cor.2008.05.002","article-title":"Failure mode and effects analysis using a group-based evidential reasoning approach","volume":"36","author":"Chin","year":"2009","journal-title":"Computers & Operations Research"},{"issue":"8","key":"10.3233\/JIFS-202765_ref23","doi-asserted-by":"crossref","first-page":"2084","DOI":"10.1016\/j.engfailanal.2011.06.014","article-title":"Risk evaluation in failure mode and effects analysis of aircraft turbine rotor blades using Dempster-Shafer evidence theory under uncertainty","volume":"18","author":"Yang","year":"2011","journal-title":"Engineering Failure Analysis"},{"key":"10.3233\/JIFS-202765_ref25","doi-asserted-by":"crossref","first-page":"113605","DOI":"10.1109\/ACCESS.2019.2934495","article-title":"A novel failure mode and effects analysis method based on fuzzy evidential reasoning rules","volume":"7","author":"Jiang","year":"2019","journal-title":"IEEE Access"},{"key":"10.3233\/JIFS-202765_ref26","doi-asserted-by":"crossref","first-page":"136","DOI":"10.1016\/j.engappai.2018.10.005","article-title":"A novel evidential FMEA method by integrating fuzzy belief structure and grey relational projection method","volume":"77","author":"Li","year":"2019","journal-title":"Engineering Applications of Artificial Intelligence"},{"key":"10.3233\/JIFS-202765_ref27","doi-asserted-by":"crossref","first-page":"579","DOI":"10.1016\/j.asoc.2014.11.036","article-title":"A novel approach for failure mode and effects analysis using combination weighting and fuzzy VIKOR method","volume":"28","author":"Liu","year":"2015","journal-title":"Applied Soft Computing"},{"key":"10.3233\/JIFS-202765_ref28","doi-asserted-by":"crossref","first-page":"8","DOI":"10.1016\/j.cie.2019.106233","article-title":"Failure mode and effects analysis using extended matter-element model and AHP","volume":"140","author":"Wang","year":"2020","journal-title":"Computers & Industrial Engineering"},{"key":"10.3233\/JIFS-202765_ref29","doi-asserted-by":"crossref","first-page":"13","DOI":"10.1016\/j.asoc.2019.105505","article-title":"An extended FMEA approach based on the Z-MOORA and fuzzy BWM for prioritization of failures","volume":"81","author":"Ghoushchi","year":"2019","journal-title":"Applied Soft Computing"},{"issue":"6","key":"10.3233\/JIFS-202765_ref30","doi-asserted-by":"crossref","first-page":"1676","DOI":"10.1002\/qre.2468","article-title":"Failure mode and effects analysis by integrating Bayesian fuzzy assessment number and extended gray relational analysis-technique for order preference by similarity to ideal solution method","volume":"35","author":"Nie","year":"2019","journal-title":"Quality and Reliability Engineering International"},{"issue":"4","key":"10.3233\/JIFS-202765_ref31","doi-asserted-by":"crossref","first-page":"501","DOI":"10.1002\/qre.2268","article-title":"Failure mode and effects analysis based on D numbers and TOPSIS","volume":"34","author":"Bian","year":"2018","journal-title":"Quality and Reliability Engineering International"},{"issue":"10","key":"10.3233\/JIFS-202765_ref32","doi-asserted-by":"crossref","first-page":"4670","DOI":"10.1016\/j.eswa.2014.01.031","article-title":"Failure mode and effects analysis using D numbers and grey relational projection method","volume":"41","author":"Liu","year":"2014","journal-title":"Expert Systems with Applications"},{"key":"10.3233\/JIFS-202765_ref33","doi-asserted-by":"crossref","first-page":"49","DOI":"10.1016\/j.omega.2014.11.009","article-title":"Best-worst multi-criteria decision-making method","volume":"53","author":"Rezaei","year":"2015","journal-title":"Omega"},{"key":"10.3233\/JIFS-202765_ref34","doi-asserted-by":"crossref","first-page":"126","DOI":"10.1016\/j.omega.2015.12.001","article-title":"Best-worst multi-criteria decision-making method: Some properties and a linear model","volume":"64","author":"Rezaei","year":"2016","journal-title":"Omega-International Journal of Management Science"},{"key":"10.3233\/JIFS-202765_ref35","doi-asserted-by":"crossref","first-page":"1068","DOI":"10.1016\/j.jclepro.2017.10.098","article-title":"A multi-phase QFD-based hybrid fuzzy MCDM approach for performance evaluation: A case of smart bike-sharing programs in Changsha","volume":"171","author":"Tian","year":"2018","journal-title":"Journal of Cleaner Production"},{"key":"10.3233\/JIFS-202765_ref36","doi-asserted-by":"crossref","first-page":"316","DOI":"10.1016\/j.asoc.2017.05.036","article-title":"A novel approach for combination of individual and group decisions based on fuzzy best-worst method","volume":"59","author":"Hafezalkotob","year":"2017","journal-title":"Applied Soft Computing"},{"issue":"1","key":"10.3233\/JIFS-202765_ref38","doi-asserted-by":"crossref","first-page":"143","DOI":"10.1142\/S0219622019500433","article-title":"An Extended VIKOR Method for Multiple Attribute Decision Making with Linguistic D Numbers Based on Fuzzy Entropy","volume":"19","author":"Liu","year":"2020","journal-title":"International Journal of Information Technology & Decision Making"},{"key":"10.3233\/JIFS-202765_ref39","first-page":"19","article-title":"An extension of best-worst method with D numbers: Application in evaluation of renewable energy resources","volume":"40","author":"Mousavi-Nasab","year":"2020","journal-title":"Sustainable Energy Technologies and Assessments"},{"key":"10.3233\/JIFS-202765_ref40","doi-asserted-by":"crossref","first-page":"15","DOI":"10.1016\/j.cie.2019.106231","article-title":"Sustainable supplier selection in healthcare industries using a new MCDM method: Measurement of alternatives and ranking according to COmpromise solution (MARCOS)","volume":"140","author":"Stevic","year":"2020","journal-title":"Computers & Industrial Engineering"},{"issue":"3","key":"10.3233\/JIFS-202765_ref41","doi-asserted-by":"crossref","first-page":"18","DOI":"10.3390\/math8030457","article-title":"A new fuzzy MARCOS method for road traffic risk analysis","volume":"8","author":"Stankovic","year":"2020","journal-title":"Mathematics"},{"issue":"2","key":"10.3233\/JIFS-202765_ref42","doi-asserted-by":"crossref","first-page":"828","DOI":"10.1016\/j.eswa.2012.08.010","article-title":"Risk evaluation approaches in failure mode and effects analysis: A literature review","volume":"40","author":"Liu","year":"2013","journal-title":"Expert Systems with Applications"},{"key":"10.3233\/JIFS-202765_ref43","doi-asserted-by":"crossref","first-page":"243","DOI":"10.1016\/j.nucengdes.2016.12.001","article-title":"Dependence assessment in human reliability analysis based on D numbers and AHP","volume":"313","author":"Zhou","year":"2017","journal-title":"Nuclear Engineering and Design"},{"issue":"1","key":"10.3233\/JIFS-202765_ref44","doi-asserted-by":"crossref","first-page":"156","DOI":"10.1016\/j.eswa.2013.07.018","article-title":"Supplier selection using AHP methodology extended by D numbers","volume":"41","author":"Deng","year":"2014","journal-title":"Expert Systems with Applications"},{"issue":"2","key":"10.3233\/JIFS-202765_ref45","doi-asserted-by":"crossref","first-page":"635","DOI":"10.1016\/j.eswa.2013.07.088","article-title":"Environmental impact assessment based on D numbers","volume":"41","author":"Deng","year":"2014","journal-title":"Expert Systems with Applications"},{"issue":"9","key":"10.3233\/JIFS-202765_ref46","first-page":"2421","article-title":"D numbers: theory and applications","volume":"9","author":"Deng","year":"2012","journal-title":"Journal of Information and Computational Science"},{"issue":"1","key":"10.3233\/JIFS-202765_ref47","doi-asserted-by":"crossref","first-page":"77","DOI":"10.1007\/BF02512076","article-title":"A mathematical theory of evidence for G.L.S. Shackle","volume":"2","author":"Fioretti","year":"2001","journal-title":"Mind & Society"},{"key":"10.3233\/JIFS-202765_ref48","doi-asserted-by":"crossref","first-page":"101","DOI":"10.1016\/j.amc.2018.08.032","article-title":"Zero-sum polymatrix games with link uncertainty: A Dempster-Shafer theory solution","volume":"340","author":"Deng","year":"2019","journal-title":"Applied Mathematics and Computation"},{"key":"10.3233\/JIFS-202765_ref49","doi-asserted-by":"crossref","first-page":"95","DOI":"10.1016\/j.ress.2012.10.007","article-title":"Application of Dempster-Shafer theory for the quantification and propagation of the uncertainty caused by the use of AIS data","volume":"111","author":"Talavera","year":"2013","journal-title":"Reliability Engineering & System Safety"},{"key":"10.3233\/JIFS-202765_ref50","doi-asserted-by":"crossref","first-page":"61","DOI":"10.1016\/j.knosys.2014.09.007","article-title":"D-CFPR: D numbers extended consistent fuzzy preference relations","volume":"73","author":"Deng","year":"2015","journal-title":"Knowledge-Based Systems"},{"issue":"7","key":"10.3233\/JIFS-202765_ref51","doi-asserted-by":"crossref","first-page":"10","DOI":"10.1177\/155014773218784","article-title":"Weighted evidence combination based on distance of evidence and entropy function","volume":"12","author":"Wang","year":"2016","journal-title":"International Journal of Distributed Sensor Networks"},{"key":"10.3233\/JIFS-202765_ref52","doi-asserted-by":"crossref","first-page":"395","DOI":"10.1016\/j.anucene.2017.10.026","article-title":"Research on fault diagnosis methods for the reactor coolant system of nuclear power plant based on D-S evidence theory","volume":"112","author":"Gong","year":"2018","journal-title":"Annals of Nuclear Energy"},{"key":"10.3233\/JIFS-202765_ref53","doi-asserted-by":"crossref","first-page":"164","DOI":"10.1016\/j.engfailanal.2012.07.009","article-title":"An improved method for risk evaluation in failure modes and effects analysis of aircraft engine rotor blades","volume":"26","author":"Su","year":"2012","journal-title":"Engineering Failure Analysis"},{"issue":"4","key":"10.3233\/JIFS-202765_ref54","doi-asserted-by":"crossref","first-page":"1229","DOI":"10.1108\/K-09-2018-0509","article-title":"A risk-based integrated decision-making model for green supplier selection A case study of a construction company in Spain","volume":"49","author":"Yazdani","year":"2020","journal-title":"Kybernetes"},{"issue":"2","key":"10.3233\/JIFS-202765_ref55","doi-asserted-by":"crossref","first-page":"1195","DOI":"10.1016\/j.eswa.2007.11.028","article-title":"Risk evaluation in failure mode and effects analysis using fuzzy weighted geometric mean","volume":"36","author":"Wang","year":"2009","journal-title":"Expert Systems with Applications"},{"key":"10.3233\/JIFS-202765_ref56","doi-asserted-by":"crossref","first-page":"165","DOI":"10.1016\/j.inffus.2020.08.018","article-title":"Distributed linguistic representations in decision making: Taxonomy, key elements and applications, and challenges in data science and explainable artificial intelligence","volume":"65","author":"Wu","year":"2021","journal-title":"Information Fusion"},{"key":"10.3233\/JIFS-202765_ref59","doi-asserted-by":"crossref","unstructured":"Liu P.D. and Zhang X.H. , A novel approach to multi-criteria group decision-making problems based on linguistic D numbers, Computational & Applied Mathematics 39(2) (2020).","DOI":"10.1007\/s40314-020-1132-x"}],"container-title":["Journal of Intelligent &amp; Fuzzy Systems"],"original-title":[],"link":[{"URL":"https:\/\/content.iospress.com\/download?id=10.3233\/JIFS-202765","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2026,2,2]],"date-time":"2026-02-02T01:51:21Z","timestamp":1769997081000},"score":1,"resource":{"primary":{"URL":"https:\/\/journals.sagepub.com\/doi\/full\/10.3233\/JIFS-202765"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021,9,15]]},"references-count":54,"journal-issue":{"issue":"2"},"URL":"https:\/\/doi.org\/10.3233\/jifs-202765","relation":{},"ISSN":["1064-1246","1875-8967"],"issn-type":[{"value":"1064-1246","type":"print"},{"value":"1875-8967","type":"electronic"}],"subject":[],"published":{"date-parts":[[2021,9,15]]}}}