{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,2]],"date-time":"2026-05-02T06:58:30Z","timestamp":1777705110822,"version":"3.51.4"},"reference-count":30,"publisher":"SAGE Publications","issue":"1","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["IFS"],"published-print":{"date-parts":[[2023,1,5]]},"abstract":"<jats:p>Mineshaft development mode design and decision-making is a complex system theory problem with significant implications for the mine\u2019s investment cost, operational safety, and production efficiency. Because of the many factors that influence mine shaft development mode decision-making, various decision-makers have different worries and inclinations, resulting in greater subjectivity and uncertainty in the decision-making process. The concept of a specialty chain was born out of a belief in group decision-making. By merging and assessing the decision-making information of different groups in the same specialty chain, a systematic decision-making index database of the mine shaft development model was created. To elucidate the correlation model and hierarchical link between the decision-making indexes, the Interpretative Structure Model (ISM) was applied. The multilevel decision-making index system of mine shaft development mode was established. The decision-making group structure was optimized. The relative importance of the Analytical Hierarchy Process (AHP) was modified to determine the scale. A collaborative weight determination method of multiple decision-making groups was established to reduce the influence of individual subjective consciousness on decision-making results. The ISM-GAHP-FCA decision-making model of mine shaft development mode was built in conjunction with Fuzzy Comprehensive Analysis (FCA) to increase fuzzy decision-making information\u2019s integration and analysis ability. The decision-making outcomes from the analysis of 10 typical mine shaft types in China are adaptable to the actual situation. The model can effectively express the hierarchy, significance, and fuzziness of mine shaft development mode decision-making indexes and limit the interference of decision-maker subjectivity on decision-making results.<\/jats:p>","DOI":"10.3233\/jifs-212119","type":"journal-article","created":{"date-parts":[[2022,10,11]],"date-time":"2022-10-11T10:53:22Z","timestamp":1665485602000},"page":"1323-1336","source":"Crossref","is-referenced-by-count":1,"title":["Decision model of mine shaft development mode based on ISM-GAHP-FCA"],"prefix":"10.1177","volume":"44","author":[{"given":"Tuantuan","family":"Chen","sequence":"first","affiliation":[{"name":"CCTEG Wuhan Engineering Company, Wuhan, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Delin","family":"Xin","sequence":"additional","affiliation":[{"name":"CCTEG Wuhan Engineering Company, Wuhan, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Zhongwen","family":"Zhang","sequence":"additional","affiliation":[{"name":"CCTEG Wuhan Engineering Company, Wuhan, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Hu","family":"Chen","sequence":"additional","affiliation":[{"name":"CCTEG Wuhan Engineering Company, Wuhan, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Qiangqiang","family":"Jiang","sequence":"additional","affiliation":[{"name":"CCTEG Wuhan Engineering Company, Wuhan, China"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"179","reference":[{"key":"10.3233\/JIFS-212119_ref1","first-page":"367","article-title":"Delivering sustainable development goals: the need for a new international resource governance framework","volume":"543","author":"Nickless","year":"2017","journal-title":"Annals of Geophysics"},{"issue":"03","key":"10.3233\/JIFS-212119_ref2","doi-asserted-by":"crossref","first-page":"105","DOI":"10.1016\/j.tust.2017.12.010","article-title":"Application and prospect of hard rock tbm for deep roadway construction in coal mines","volume":"73","author":"Huang.","year":"2018","journal-title":"Tunnelling and Underground Space Technology"},{"issue":"03","key":"10.3233\/JIFS-212119_ref3","first-page":"146","article-title":"Disaster risk warning model of tbm construction in long inclined-shaft coalmine","volume":"34","author":"Chen","year":"2019","journal-title":"Journal of Catastrophology"},{"issue":"3","key":"10.3233\/JIFS-212119_ref4","doi-asserted-by":"crossref","first-page":"104666","DOI":"10.1016\/j.ijrmms.2021.104666","article-title":"Ming, Mechanisms of deterioration in a bored raise in brittle rock","volume":"139","author":"Hall","year":"2021","journal-title":"International Journal of Rock Mechanics and Mining Sciences"},{"key":"10.3233\/JIFS-212119_ref5","unstructured":"Zhang Z.W. and Jia C.G. , Selection and characteristics of development mode of Guojiahe coal mine, , Coal Engineering 48(02) (2016), 8-10+13."},{"issue":"10","key":"10.3233\/JIFS-212119_ref6","first-page":"74","article-title":"Design scheme on industrial site location and development mode of xiaojiawan coal mine","volume":"46","author":"Zhang","year":"2014","journal-title":"Coal Engineering"},{"issue":"08","key":"10.3233\/JIFS-212119_ref9","doi-asserted-by":"crossref","first-page":"660","DOI":"10.1016\/j.tust.2018.08.055","article-title":"Experiences of gripper TBM application in shaft coal mine: A case study in Zhangji coal mine, China","volume":"81","author":"Tang","year":"2018","journal-title":"Tunnelling and Underground Space Technology"},{"key":"10.3233\/JIFS-212119_ref10","doi-asserted-by":"crossref","first-page":"693","DOI":"10.1016\/j.prostr.2020.10.080","article-title":"Numerical simulation of cement grouting of saturated soil during a mine shaft sinking using the artificial ground freezing","volume":"28","author":"Helnin","year":"2020","journal-title":"Procedia Structural Integrity"},{"key":"10.3233\/JIFS-212119_ref11","doi-asserted-by":"crossref","first-page":"283","DOI":"10.1016\/j.jclepro.2012.10.042","article-title":"An ISM approach for the barrier analysis in implementing green supply chain management","volume":"47","author":"Mathiyazhagan","year":"2013","journal-title":"Journal of Cleaner Production"},{"issue":"3","key":"10.3233\/JIFS-212119_ref12","doi-asserted-by":"crossref","first-page":"1575","DOI":"10.1002\/bse.2455","article-title":"Evaluation of criti cal constructs for measurement of sustainable supply chain practices in lean-agile firms of Indian origin: A hybrid ISM-ANP approach","volume":"29","author":"Digalwar","year":"2020","journal-title":"Business Strategy and the Environment"},{"issue":"4","key":"10.3233\/JIFS-212119_ref13","doi-asserted-by":"crossref","first-page":"8218","DOI":"10.1016\/j.eswa.2008.10.006","article-title":"The application of fuzzy analytic hierarchy process (FAHP) approach to selection of optimum underground mining method for Jajarm Bauxite Mine, Iran","volume":"36","author":"Naghadehi","year":"2009","journal-title":"Expert Systems with Applications"},{"issue":"11","key":"10.3233\/JIFS-212119_ref14","first-page":"7","article-title":"Application of fuzzy optimization theory in the selection of mine development scheme","volume":"30","author":"Wu","year":"2014","journal-title":"Modern Mining"},{"issue":"1","key":"10.3233\/JIFS-212119_ref15","doi-asserted-by":"crossref","first-page":"45","DOI":"10.17794\/rgn.2018.1.6","article-title":"The development of a novel model for mining method selection in a fuzzy environment; case study: Tazareh Coal Mine, Semnan Province, Iran","volume":"33","author":"Ooriad","year":"2018","journal-title":"Rudarsko geolo\u0160ko naftni zbornik"},{"key":"10.3233\/JIFS-212119_ref16","doi-asserted-by":"crossref","first-page":"22","DOI":"10.1016\/j.inffus.2020.11.010","article-title":"Online-review analysis based large-scale group decision-making for determining passenger demands and evaluating passenger satisfaction: Case study of high-speed rail system in China[J]","volume":"69","author":"Chen","year":"2021","journal-title":"Information Fusion"},{"key":"10.3233\/JIFS-212119_ref17","doi-asserted-by":"crossref","first-page":"232","DOI":"10.1016\/j.knosys.2017.10.002","article-title":"A hesitant fuzzy mathematical programming method for hybrid multi-criteria group decision making with hesitant fuzzy truth degrees","volume":"138","author":"Wan","year":"2017","journal-title":"Knowledge-Based Systems"},{"issue":"8","key":"10.3233\/JIFS-212119_ref18","doi-asserted-by":"crossref","first-page":"1021","DOI":"10.1007\/s12613-020-2002-7","article-title":"Risk management for mine closure: A cloud model and hybrid semi-quantitative decision method","volume":"27","author":"Cui","year":"2020","journal-title":"International Journal of Minerals, Metallurgy and Materials"},{"issue":"5","key":"10.3233\/JIFS-212119_ref19","doi-asserted-by":"crossref","first-page":"907","DOI":"10.5267\/j.ijiec.2012.04.003","article-title":"Handling equipment selection in open pit mines by using an integrated model based on group decision making","volume":"3","author":"Yazdani-Chamzini","year":"2012","journal-title":"International Journal of Industrial Engineering Computations"},{"key":"10.3233\/JIFS-212119_ref20","doi-asserted-by":"crossref","first-page":"271","DOI":"10.1016\/j.inffus.2019.04.002","article-title":"Unbalanced double hierarchy linguistic term set: the TOPSIS method for multi-expert qualitative decision making involving green mine selection","volume":"51","author":"Fu","year":"2019","journal-title":"Information Fusion"},{"issue":"3","key":"10.3233\/JIFS-212119_ref21","doi-asserted-by":"crossref","first-page":"3371","DOI":"10.3233\/JIFS-190630","article-title":"Optimal selection of design scheme in cloud environment: A novel hybrid approach of multi-criteria decision-making based on F-ANP and F-QFD","volume":"38","author":"Fan","year":"2020","journal-title":"Journal of Intelligent & Fuzzy Systems"},{"key":"10.3233\/JIFS-212119_ref22","doi-asserted-by":"crossref","first-page":"513","DOI":"10.1016\/j.cie.2016.09.025","article-title":"Intuitionistic multiplicative analytic hierarchy process in group decision making","volume":"101","author":"Ren","year":"2016","journal-title":"Computers & Industrial Engineering"},{"issue":"6","key":"10.3233\/JIFS-212119_ref23","doi-asserted-by":"crossref","first-page":"4055","DOI":"10.3233\/JIFS-17981","article-title":"Multi-criteria group decision making based on neutrosophic analytic hierarchy process","volume":"33","author":"Abdel-Basset","year":"2017","journal-title":"Journal of Intelligent & Fuzzy Systems"},{"issue":"3","key":"10.3233\/JIFS-212119_ref24","doi-asserted-by":"crossref","first-page":"3404","DOI":"10.1016\/j.eswa.2011.09.028","article-title":"Evaluation of new service concepts using rough set theory and group analytic hierarchy process","volume":"39","author":"Lee","year":"2012","journal-title":"Expert Systems with Applications"},{"issue":"2","key":"10.3233\/JIFS-212119_ref25","doi-asserted-by":"crossref","first-page":"355","DOI":"10.1007\/s10726-015-9445-7","article-title":"Group decision making with dispersion in the analytic hierarchy process","volume":"25","author":"Scala","year":"2016","journal-title":"Group Decision and Negotiation"},{"issue":"6","key":"10.3233\/JIFS-212119_ref27","doi-asserted-by":"crossref","first-page":"2572","DOI":"10.1002\/int.22394","article-title":"Power-average-operator-based hybrid multiattribute online product recommendation model for consumer decision-making[J]","volume":"36","author":"Chen","year":"2021","journal-title":"International Journal of Intelligent Systems"},{"issue":"3","key":"10.3233\/JIFS-212119_ref28","doi-asserted-by":"crossref","first-page":"1374","DOI":"10.1111\/coin.12380","article-title":"Fault diagnosis in wireless sensor network using negative selection algorithm and support vector machine","volume":"36","author":"Mohapatra","year":"2020","journal-title":"Computational Intelligence"},{"issue":"10","key":"10.3233\/JIFS-212119_ref29","first-page":"141","article-title":"Using a fuzzy AHP-VIKOR and BSC approach for evaluating aircraft maintenance unit performance","volume":"3","author":"Jamali","year":"2016","journal-title":"International Journal of Management, Accounting and Economics"},{"key":"10.3233\/JIFS-212119_ref30","doi-asserted-by":"crossref","first-page":"101682","DOI":"10.1016\/j.scs.2019.101682","article-title":"Flood risk assessment of metro systems in a subsiding environment using the interval FAHP-FCA approach","volume":"50","author":"Lyu","year":"2019","journal-title":"Sustainable Cities and Society"},{"key":"10.3233\/JIFS-212119_ref31","doi-asserted-by":"crossref","first-page":"118965","DOI":"10.1016\/j.jclepro.2019.118965","article-title":"A novel data envelopment analysis cross-model integrating interpretative structural model and analytic hierarchy process for energy efficiency evaluation and optimization modeling: Application to ethylene industries","volume":"246","author":"Han","year":"2020","journal-title":"Journal of Cleaner Production"},{"key":"10.3233\/JIFS-212119_ref32","first-page":"2227","article-title":"Blockchain technology for secure accounting management: research trends analysis","volume":"9","author":"Emilio","year":"2021","journal-title":"Mathematics"},{"key":"10.3233\/JIFS-212119_ref33","unstructured":"Zhang X. , Han Y. , Liu S. , et al. Deformation prediction analysis model for the mine shaft-wall, 33(08) (2014), 1070\u20131073."}],"container-title":["Journal of Intelligent &amp; Fuzzy Systems"],"original-title":[],"link":[{"URL":"https:\/\/content.iospress.com\/download?id=10.3233\/JIFS-212119","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2026,4,29]],"date-time":"2026-04-29T09:42:55Z","timestamp":1777455775000},"score":1,"resource":{"primary":{"URL":"https:\/\/journals.sagepub.com\/doi\/full\/10.3233\/JIFS-212119"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2023,1,5]]},"references-count":30,"journal-issue":{"issue":"1"},"URL":"https:\/\/doi.org\/10.3233\/jifs-212119","relation":{},"ISSN":["1064-1246","1875-8967"],"issn-type":[{"value":"1064-1246","type":"print"},{"value":"1875-8967","type":"electronic"}],"subject":[],"published":{"date-parts":[[2023,1,5]]}}}