{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,2]],"date-time":"2026-05-02T07:04:15Z","timestamp":1777705455784,"version":"3.51.4"},"reference-count":72,"publisher":"SAGE Publications","issue":"1","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["IFS"],"published-print":{"date-parts":[[2021,12,31]]},"abstract":"<jats:p>Engineering economics is an essential issue in investments and can be quietly difficult to make decisions especially in indefinite, vague and incomplete environments because of human thought. Usage of fuzzy sets gives better solutions in vagueness. Fuzzy sets could be an agreeable tool when no probabilities are accessible for states of nature and decisions are given under incompleteness. In this study, fuzzy engineering economics studies are summarized for showing fuzzy sets usage in engineering economics applications and finding gaps for future studies. The possible suggested are given in conclusion.<\/jats:p>","DOI":"10.3233\/jifs-219173","type":"journal-article","created":{"date-parts":[[2021,6,30]],"date-time":"2021-06-30T05:35:10Z","timestamp":1625031310000},"page":"37-46","source":"Crossref","is-referenced-by-count":8,"title":["Fuzzy sets theory and applications in engineering economy"],"prefix":"10.1177","volume":"42","author":[{"ORCID":"https:\/\/orcid.org\/0000-0003-0614-0461","authenticated-orcid":false,"given":"Eda","family":"Bolt\u00fcrk","sequence":"first","affiliation":[{"name":"Department of Industrial Engineering, Istanbul Technical University, Macka, Istanbul Turkey"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"179","reference":[{"key":"10.3233\/JIFS-219173_ref1","doi-asserted-by":"crossref","first-page":"338","DOI":"10.1016\/S0019-9958(65)90241-X","article-title":"Fuzzy sets","volume":"8","author":"Zadeh","year":"1965","journal-title":"Information Control"},{"issue":"3","key":"10.3233\/JIFS-219173_ref2","doi-asserted-by":"crossref","first-page":"199","DOI":"10.1016\/0020-0255(75)90036-5","article-title":"The concept of a linguistic variable and its application to approximate reasoning","volume":"8","author":"Zadeh","year":"1975","journal-title":"Information Sciences"},{"issue":"1","key":"10.3233\/JIFS-219173_ref3","doi-asserted-by":"crossref","first-page":"87","DOI":"10.1016\/S0165-0114(86)80034-3","article-title":"Intuitionistic fuzzy sets","volume":"20","author":"Atanassov","year":"1986","journal-title":"Fuzzy sets and Systems"},{"issue":"1","key":"10.3233\/JIFS-219173_ref4","doi-asserted-by":"crossref","first-page":"23","DOI":"10.1080\/03081078608934952","article-title":"On the theory of bags","volume":"13","author":"Yager","year":"1986","journal-title":"International Journal of General System"},{"issue":"6","key":"10.3233\/JIFS-219173_ref5","first-page":"529","article-title":"Hesitant fuzzy sets","volume":"25","author":"Torra","year":"2010","journal-title":"International Journal of Intelligent Systems"},{"issue":"1","key":"10.3233\/JIFS-219173_ref6","doi-asserted-by":"crossref","first-page":"37","DOI":"10.1016\/0165-0114(89)90215-7","article-title":"More on intuitionistic fuzzy sets","volume":"33","author":"Atanassov","year":"1989","journal-title":"Fuzzy sets and systems"},{"issue":"1","key":"10.3233\/JIFS-219173_ref8","doi-asserted-by":"crossref","first-page":"16","DOI":"10.1109\/TFUZZ.2006.889755","article-title":"Uncertain fuzzy reasoning: A case study in modelling expert decision making","volume":"15","author":"Garibaldi","year":"2007","journal-title":"IEEE Transactions on Fuzzy Systems"},{"issue":"4","key":"10.3233\/JIFS-219173_ref9","first-page":"409","article-title":"Picture fuzzy sets","volume":"30","author":"Cuong","year":"2014","journal-title":"Journal of Computer Science and Cybernetics"},{"issue":"5","key":"10.3233\/JIFS-219173_ref10","doi-asserted-by":"crossref","first-page":"1222","DOI":"10.1109\/TFUZZ.2016.2604005","article-title":"Generalized orthopair fuzzy sets","volume":"25","author":"Yager","year":"2016","journal-title":"IEEE Transactions on Fuzzy Systems"},{"issue":"1","key":"10.3233\/JIFS-219173_ref11","doi-asserted-by":"crossref","first-page":"337","DOI":"10.3233\/JIFS-181401","article-title":"Spherical fuzzy sets and spherical fuzzy topsis method","volume":"36","author":"Kutlu G\u00fcndo\u011fdu","year":"2019","journal-title":"Journal of Intelligent & Fuzzy Systems"},{"key":"10.3233\/JIFS-219173_ref12","doi-asserted-by":"crossref","first-page":"663","DOI":"10.1007\/s12652-019-01377-0","article-title":"Fermatean fuzzy sets","volume":"11","author":"Senapati","year":"2020","journal-title":"Journal of Ambient Intelligence and Humanized Computing"},{"issue":"1","key":"10.3233\/JIFS-219173_ref18","first-page":"87","article-title":"Fuzzy risk analysis of harbour engineering investment by hierarchy system approach","volume":"6","author":"Lin","year":"1992","journal-title":"China Ocean Engineering"},{"issue":"3","key":"10.3233\/JIFS-219173_ref19","doi-asserted-by":"crossref","first-page":"263","DOI":"10.1142\/S0218488503002077","article-title":"Using fuzzy set theory to analyse investments and select portfoliosof tangible investments in uncertain environments","volume":"11","author":"Terce\u00f1o","year":"2003","journal-title":"Fuzziness andKnowlege-Based Systems"},{"issue":"6","key":"10.3233\/JIFS-219173_ref23","first-page":"579","article-title":"Investment analysis using forecasted cash flows by grey and fuzzy logics","volume":"14","author":"Kahraman","year":"2008","journal-title":"Journal of Multiple-Valued Logic and Soft Computing"},{"issue":"2","key":"10.3233\/JIFS-219173_ref28","doi-asserted-by":"crossref","first-page":"113","DOI":"10.1080\/00137919408903117","article-title":"Fuzzy cash flow analysis using present worth criterion","volume":"39","author":"Chiu","year":"1994","journal-title":"Engineering Economist"},{"key":"10.3233\/JIFS-219173_ref29","first-page":"518","article-title":"Fuzzy economic and strategic design","volume":"2","author":"Kahraman","year":"1996","journal-title":"Paper presented at the IEEE Symposium on Emerging Technologies & Factory Automation ETFA"},{"issue":"4","key":"10.3233\/JIFS-219173_ref30","doi-asserted-by":"crossref","first-page":"331","DOI":"10.1080\/00137919808903203","article-title":"Measures of liquidity risk supplementing fuzzy discounted cash flow analysis","volume":"43","author":"Karsak","year":"1998","journal-title":"Engineering Economist"},{"issue":"1","key":"10.3233\/JIFS-219173_ref31","first-page":"38","article-title":"Example for dealing with the impreciseness of future cash flows during the selection of economic alternatives","volume":"6","author":"Sanchez","year":"1999","journal-title":"International Journal of Industrial Engineering: Theory Applications and Practice"},{"issue":"1\u20133","key":"10.3233\/JIFS-219173_ref32","doi-asserted-by":"crossref","first-page":"330","DOI":"10.1016\/S0924-0136(00)00679-8","article-title":"Evaluation methodologies for technology selection","volume":"107","author":"Chan","year":"2000","journal-title":"Journal of Materials Processing Technology"},{"issue":"4","key":"10.3233\/JIFS-219173_ref33","first-page":"19","article-title":"Fuzzy analysis of thermal-economic engineering","volume":"36","author":"Zheng","year":"1996","journal-title":"Qinghua Daxue Xuebao\/Journal of Tsinghua University"},{"issue":"1","key":"10.3233\/JIFS-219173_ref34","doi-asserted-by":"crossref","first-page":"283","DOI":"10.1109\/59.852134","article-title":"Fuzzy engineering economic analysis","volume":"15","author":"Dimitrovski","year":"2000","journal-title":"IEEE Transactions on Power Systems"},{"issue":"1","key":"10.3233\/JIFS-219173_ref35","doi-asserted-by":"crossref","first-page":"45","DOI":"10.1016\/S0925-5273(03)00195-6","article-title":"Quantification of flexibility in advanced manufacturing systems using fuzzy concept","volume":"89","author":"Beskese","year":"2004","journal-title":"International Journal of Production Economics"},{"issue":"4","key":"10.3233\/JIFS-219173_ref36","first-page":"501","article-title":"Applying fuzzy engineering economics to evaluate project investment feasibility of wind generation","volume":"8","author":"Sheen","year":"2009","journal-title":"WSEAS Transactions on Systems"},{"key":"10.3233\/JIFS-219173_ref38","unstructured":"Al Sheikh D. , El-Cheikh M. and Omran J. , Economic analysis for rail projects using fuzzy set theory, Civil-Comp Proceedings 98 (2012)."},{"issue":"15","key":"10.3233\/JIFS-219173_ref40","doi-asserted-by":"crossref","first-page":"5007","DOI":"10.1007\/s00500-018-3234-6","article-title":"Pythagorean fuzzy engineering economic analysis of solar power plants","volume":"22","author":"\u00c7oban","year":"2018","journal-title":"Soft Computing"},{"key":"10.3233\/JIFS-219173_ref41","first-page":"299","article-title":"Fuzzy flexibility analysis in automated manufacturing systems","volume":"3","author":"Kahraman","year":"1995","journal-title":"Paper presented at the IEEE Symposium on Emerging Technologies & Factory Automation"},{"issue":"7","key":"10.3233\/JIFS-219173_ref42","first-page":"241","article-title":"Fuzzy logic approach for hydroelectricproject evaluation","volume":"36","author":"Iliev","year":"2003","journal-title":"Paper presented at the IFAC ProceedingsVolumes (IFAC-PapersOnline)"},{"issue":"1\u20134","key":"10.3233\/JIFS-219173_ref44","doi-asserted-by":"crossref","first-page":"77","DOI":"10.1016\/j.ins.2003.11.004","article-title":"Measuring flexibility of computer integrated manufacturing systems using fuzzy cash flow analysis","volume":"168","author":"Kahraman","year":"2004","journal-title":"Information Sciences"},{"key":"10.3233\/JIFS-219173_ref50","first-page":"6","article-title":"Mapping fuzzy approach in engineering economics","volume":"81","author":"Shahriari","year":"2011","journal-title":"International Research Journal of Finance and Economics"},{"issue":"3","key":"10.3233\/JIFS-219173_ref51","doi-asserted-by":"crossref","first-page":"1151","DOI":"10.3233\/IFS-151722","article-title":"Engineeringeconomic analyses using intuitionistic and hesitant fuzzy sets,s","volume":"29","author":"Kahraman","year":"2015","journal-title":"Journal of Intelligent and Fuzzy System"},{"issue":"3","key":"10.3233\/JIFS-219173_ref53","doi-asserted-by":"crossref","first-page":"254","DOI":"10.5755\/j01.ee.29.3.19392","article-title":"Evaluation of investment alternatives using present value analysis with simplified neutrosophic sets","volume":"29","author":"Aydin","year":"2018","journal-title":"Engineering Economics"},{"key":"10.3233\/JIFS-219173_ref54","first-page":"141","article-title":"Wind energy investment analyses based on fuzzy sets","volume":"149","author":"Kahraman","year":"2018","journal-title":"Energy Management-Collective And Computational Intelligence With Theory and Applications"},{"issue":"1","key":"10.3233\/JIFS-219173_ref55","doi-asserted-by":"crossref","first-page":"627","DOI":"10.3233\/JIFS-179436","article-title":"Investment analysis using neutrosophic present and future worth techniques","volume":"38","author":"Aydin","year":"2020","journal-title":"Journal of Intelligent and Fuzzy Systems"},{"issue":"4","key":"10.3233\/JIFS-219173_ref57","doi-asserted-by":"crossref","first-page":"359","DOI":"10.1080\/00137919508903160","article-title":"Benefit\/cost analysis using fuzzy concept","volume":"40","author":"Wang","year":"1995","journal-title":"Engineering Economist"},{"issue":"1","key":"10.3233\/JIFS-219173_ref58","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/S0165-0114(96)00019-X","article-title":"The theory of approximate prices: Analytical foundations of experimental cost-benefit analysis in a fuzzy-decision space","volume":"87","author":"Dompere","year":"1997","journal-title":"Fuzzy Sets and Systems"},{"issue":"1","key":"10.3233\/JIFS-219173_ref59","doi-asserted-by":"crossref","first-page":"45","DOI":"10.1016\/S0925-5273(99)00103-6","article-title":"Justification of manufacturing technologies using fuzzy benefit\/cost ratio analysis","volume":"66","author":"Kahraman","year":"2000","journal-title":"International Journal of Production Economics"},{"key":"10.3233\/JIFS-219173_ref60","first-page":"20","article-title":"A fuzzy cost-benefit function to select economical products for processing in a closed-loop supply chain","volume":"5262","author":"Pochampally","year":"2004","journal-title":"Paper presented at the Proceedings of SPIE - the International Society for Optical Engineering"},{"issue":"5","key":"10.3233\/JIFS-219173_ref61","doi-asserted-by":"crossref","first-page":"547","DOI":"10.1002\/int.20213","article-title":"Fuzzy multi-attribute cost-benefit analysis of e-services","volume":"22","author":"Kahraman","year":"2007","journal-title":"International Journal of Intelligent Systems"},{"key":"10.3233\/JIFS-219173_ref64","first-page":"1490","article-title":"Fuzzy uncertainty analysis and multi-period cost-benefit analysis","volume":"3","author":"Carmen","year":"2012","journal-title":"Paper presented at the Innovation and Sustainable Competitive Advantage: From Regional Development to World Economies - Proceedings of the 18th International Business Information Management Association Conference"},{"issue":"28","key":"10.3233\/JIFS-219173_ref66","doi-asserted-by":"crossref","first-page":"15293","DOI":"10.1016\/j.ijhydene.2014.07.107","article-title":"Cost-benefit analysis of different hydrogen production technologies using AHP and fuzzy AHP","volume":"39","author":"Thengane","year":"2014","journal-title":"International Journal of Hydrogen Energy"},{"issue":"11","key":"10.3233\/JIFS-219173_ref68","first-page":"10114","article-title":"The fuzzy cost benefit analysis of design for product development process with perspective of remanufacturing","volume":"10","author":"Fulari","year":"2015","journal-title":"International Journal of Applied Engineering Research"},{"key":"10.3233\/JIFS-219173_ref69","doi-asserted-by":"crossref","first-page":"9","DOI":"10.1016\/j.ssci.2015.12.025","article-title":"Developing a two-step fuzzy cost-benefit analysis for strategies to continuity management and disaster recovery","volume":"85","author":"Rabbani","year":"2016","journal-title":"Safety Science"},{"key":"10.3233\/JIFS-219173_ref70","doi-asserted-by":"crossref","unstructured":"Kahraman C. , Onar S.C. and Oztaysi B. , A comparison of wind energy investment alternatives using interval-valued intuitionistic fuzzy benefit\/cost analysis, Sustainability (Switzerland) 8(2) (2016).","DOI":"10.3390\/su8020118"},{"issue":"5","key":"10.3233\/JIFS-219173_ref71","doi-asserted-by":"crossref","first-page":"1512","DOI":"10.1007\/s40815-016-0252-3","article-title":"A fuzzy cognitive map approach applied in Cost\u2013Benefit analysis for highway projects","volume":"19","author":"Ba\u011fdatli","year":"2017","journal-title":"Fuzzy Systems"},{"issue":"6","key":"10.3233\/JIFS-219173_ref72","doi-asserted-by":"crossref","first-page":"25","DOI":"10.11113\/jt.v81.13623","article-title":"Gaussian fuzzy analytic hierarchy process for the evaluation of benefit, cost, and risk analysis in the indonesian oil and gas processing area","volume":"81","author":"Wicaksono","year":"2019","journal-title":"Jurnal Teknologi"},{"issue":"9","key":"10.3233\/JIFS-219173_ref74","first-page":"1375","article-title":"Fuzzy-grey ideal point method for estimating the life cycle cost and effectiveness of torpedo","volume":"28","author":"Liang","year":"2006","journal-title":"Xi Tong Gong Cheng Yu Dian Zi Ji Shu\/Systems Engineering and Electronics"},{"key":"10.3233\/JIFS-219173_ref76","doi-asserted-by":"crossref","unstructured":"Bagdatli M.E.C. , Fuzzy logic-based life-cycle cost analysis of road pavements, Journal of Transportation Engineering Part B: Pavements 144(4) (2018).","DOI":"10.1061\/JPEODX.0000081"},{"key":"10.3233\/JIFS-219173_ref77","doi-asserted-by":"crossref","unstructured":"Goh K.C. , Goh H.H. and Chong H. -. , Integration model of fuzzy AHP and life-cycle cost analysis for evaluating highway infrastructure investments, Journal of Infrastructure Systems 25(1) (2019).","DOI":"10.1061\/(ASCE)IS.1943-555X.0000473"},{"key":"10.3233\/JIFS-219173_ref78","doi-asserted-by":"crossref","unstructured":"Plebankiewicz E. , Meszek W. , Zima K. and Wieczorek D. , Probabilistic and fuzzy approaches for estimating the life cycle costs of buildings under conditions of exposure to risk, Sustainability (Switzerland) 12(1) (2020).","DOI":"10.3390\/su12010226"},{"issue":"SUPPL. 1","key":"10.3233\/JIFS-219173_ref79","doi-asserted-by":"crossref","first-page":"675","DOI":"10.1016\/0098-1354(95)87113-6","article-title":"Further developments in chemical plant cost estimating using fuzzy matching","volume":"19","author":"Petley","year":"1995","journal-title":"Computers and Chemical Engineering"},{"issue":"4","key":"10.3233\/JIFS-219173_ref81","doi-asserted-by":"publisher","first-page":"325","DOI":"10.1061\/(ASCE)0733-9364(2007)133:4(325)","article-title":"Fuzzy numbers in cost range estimating","volume":"133","author":"Shaheen","year":"2007","journal-title":"Journal of Construction Engineering and Management"},{"key":"10.3233\/JIFS-219173_ref82","unstructured":"El-Cheikh M. , Chan A.H.C. and Lamb J. , Fuzzy applications in cost estimating and construction planning, Paper presented at the Proceedings of the 11th International Conference on Civil, Structural and Environmental Engineering Computing, Civil-Comp 2007 (2007)."},{"key":"10.3233\/JIFS-219173_ref83","first-page":"129","article-title":"Risk based fuzzy modeling of cost estimating relationships for floating structures","volume":"1","author":"Cocodia","year":"2008","journal-title":"Paper presented at the Proceedings of the International Conference on Offshore Mechanics and Arctic Engineering - OMAE"},{"issue":"8","key":"10.3233\/JIFS-219173_ref84","doi-asserted-by":"crossref","first-page":"1137","DOI":"10.1139\/L10-036","article-title":"Application of fuzzy logic to quality assessment of infrastructure projects at conceptual cost estimating stage","volume":"37","author":"Fayek","year":"2010","journal-title":"Canadian Journal of Civil Engineering"},{"issue":"6","key":"10.3233\/JIFS-219173_ref85","first-page":"6571","article-title":"Cost estimating method of power engineering overhead line based on fuzzy analogy","volume":"32","author":"Yi","year":"2014","journal-title":"Energy Education Science and Technology Part A: Energy Science and Research"},{"key":"10.3233\/JIFS-219173_ref88","doi-asserted-by":"publisher","DOI":"10.1109\/FUZZ-IEEE.2016.7737782"},{"issue":"1","key":"10.3233\/JIFS-219173_ref89","doi-asserted-by":"crossref","first-page":"153","DOI":"10.2991\/ijcis.2017.10.1.11","article-title":"A fuzzy system forestimating premium cost of option exchange using mamdani inference:Derivatives market of mexico","volume":"10","author":"Mu\u00f1oz","year":"2017","journal-title":"International Journal ofComputational Intelligence Systems"},{"key":"10.3233\/JIFS-219173_ref90","first-page":"969","article-title":"Estimating cost of new products using fuzzy case-based reasoning and fuzzy analytic hierarchy process","volume":"5","author":"Kasie","year":"2017","journal-title":"Paper presented at the Advances in Transdisciplinary Engineering"},{"key":"10.3233\/JIFS-219173_ref91","first-page":"884","article-title":"Estimating unit cost using agent-based fuzzy collaborativeintelligence approach with entropy-consensus","volume":"73","author":"Chen","year":"2018","journal-title":"Applied SoftComputing Journal"},{"issue":"4","key":"10.3233\/JIFS-219173_ref92","doi-asserted-by":"crossref","first-page":"449","DOI":"10.1108\/JQME-05-2017-0038","article-title":"Estimating facilities maintenance cost using post-occupancy evaluation and fuzzy set theory","volume":"24","author":"Alshibani","year":"2018","journal-title":"Journal of Quality in Maintenance Engineering"},{"issue":"2","key":"10.3233\/JIFS-219173_ref93","first-page":"647","article-title":"Application of fuzzy modelling to predict construction projects cash flow","volume":"63","author":"Tabei","year":"2019","journal-title":"Periodica Polytechnica Civil Engineering"},{"issue":"20","key":"10.3233\/JIFS-219173_ref94","first-page":"3885","article-title":"A new optimization model about enterprise equipment investment project based on integrated entropy weight and fuzzy matter element","volume":"4","author":"Xiaoping","year":"2012","journal-title":"Research Journal of Applied Sciences Engineering and Technology"},{"issue":"1","key":"10.3233\/JIFS-219173_ref99","doi-asserted-by":"crossref","first-page":"149","DOI":"10.1016\/j.cam.2005.11.026","article-title":"Chance-constrained programming models for capital budgeting with NPV as fuzzy parameters","volume":"198","author":"Huang","year":"2007","journal-title":"Journal of Computational and Applied Mathematics"},{"issue":"15","key":"10.3233\/JIFS-219173_ref100","doi-asserted-by":"crossref","first-page":"4375","DOI":"10.1007\/s00500-016-2069-2","article-title":"Possibilistic risk aversion in group decisions: Theory with application in the insurance of giga-investments valued through the fuzzy pay-off method","volume":"21","author":"Collan","year":"2017","journal-title":"Soft Computing"},{"issue":"2","key":"10.3233\/JIFS-219173_ref106","first-page":"481","article-title":"Fuzzy global sensitivity analysis of fuzzy net present value","volume":"41","author":"Sari","year":"2012","journal-title":"Control and Cybernetics"},{"key":"10.3233\/JIFS-219173_ref107","doi-asserted-by":"crossref","unstructured":"Nguyen H.T. , Sriboonchitta S. and Wu B. , A statistical basis for fuzzy engineering economics, International Journal of Fuzzy Systems 17(1) (2015).","DOI":"10.1007\/s40815-015-0010-y"},{"issue":"1","key":"10.3233\/JIFS-219173_ref108","first-page":"97","article-title":"Fuzzy economic assessment for offshore oil fields","volume":"4","author":"Lin","year":"1990","journal-title":"China Ocean Engineering"},{"issue":"2","key":"10.3233\/JIFS-219173_ref109","doi-asserted-by":"crossref","first-page":"123","DOI":"10.1080\/0013791X.2011.573616","article-title":"An alternative approach to capital investment appraisal","volume":"56","author":"Carmichael","year":"2011","journal-title":"Engineering Economist"},{"key":"10.3233\/JIFS-219173_ref110","first-page":"889","article-title":"New product development process valuation using compoundoptions with type-2 fuzzy numbers","volume":"2228","author":"Tolga","year":"2017","journal-title":"Paperpresented at the Lecture Notes in Engineering and Computer Science"},{"issue":"5","key":"10.3233\/JIFS-219173_ref111","doi-asserted-by":"crossref","first-page":"6645","DOI":"10.3233\/JIFS-190001","article-title":"A novel superiority and inferiority ranking method for engineering investment selection under interval-valued intuitionistic fuzzy environment","volume":"37","author":"Jian","year":"2019","journal-title":"Journal of Intelligent and Fuzzy Systems"},{"issue":"5","key":"10.3233\/JIFS-219173_ref117","doi-asserted-by":"crossref","first-page":"6507","DOI":"10.3233\/JIFS-189114","article-title":"Modeling humanoid robots facial expressions using Pythagorean fuzzy sets","volume":"39","author":"Kahraman","year":"2020","journal-title":"Journal of Intelligent & Fuzzy Systems"},{"key":"10.3233\/JIFS-219173_ref118","unstructured":"Bolturk E. and Kahraman C. , A Modified Interval-valued Pythagorean Fuzzy CODAS Method and Evaluation of AS\/RS Technologies, Journal of Multiple-Valued Logic & Soft Computing 33 (2019)."}],"container-title":["Journal of Intelligent &amp; Fuzzy Systems"],"original-title":[],"link":[{"URL":"https:\/\/content.iospress.com\/download?id=10.3233\/JIFS-219173","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2026,4,29]],"date-time":"2026-04-29T09:43:52Z","timestamp":1777455832000},"score":1,"resource":{"primary":{"URL":"https:\/\/journals.sagepub.com\/doi\/full\/10.3233\/JIFS-219173"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021,12,31]]},"references-count":72,"journal-issue":{"issue":"1"},"URL":"https:\/\/doi.org\/10.3233\/jifs-219173","relation":{},"ISSN":["1064-1246","1875-8967"],"issn-type":[{"value":"1064-1246","type":"print"},{"value":"1875-8967","type":"electronic"}],"subject":[],"published":{"date-parts":[[2021,12,31]]}}}