{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,2]],"date-time":"2026-05-02T07:15:25Z","timestamp":1777706125775,"version":"3.51.4"},"reference-count":65,"publisher":"SAGE Publications","issue":"2","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["IFS"],"published-print":{"date-parts":[[2023,8,1]]},"abstract":"<jats:p>Disputes are inevitable in construction. Tremendous losses caused by dispute are so amazing that professionals try to figure out how to manage it. It is a practical way to study the dispute problem from the perspective of governance theory. In this study, the paper intends to investigate the characteristics of contractual governance for disputes. Based on governance theory, the framework of contractual governance for dispute is constituted of governance structure (GS) and governance mechanism (GM). The flexibility of GS and GMs are all explored so as to better draft the contracts. By a multiple cases study, a new conceptual model instructing governance picture for construction disputes was proposed which was mainly inspired from literature. The cases study shows that the GS determination is rigidly drafted and executed while the mostly GMs are flexibly designed. The rigid GS has an advantage to a stable foundation and the flexible GMs are apt to coordinate the disputes.<\/jats:p>","DOI":"10.3233\/jifs-224227","type":"journal-article","created":{"date-parts":[[2023,6,2]],"date-time":"2023-06-02T13:24:14Z","timestamp":1685712254000},"page":"3039-3051","source":"Crossref","is-referenced-by-count":1,"title":["Contract flexibility for dispute resolution based on governance theory in China"],"prefix":"10.1177","volume":"45","author":[{"given":"Bingsong","family":"Tang","sequence":"first","affiliation":[{"name":"College of Economics and Management, Nanjing University of Aeronautics and Astronautics, Nanjing, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Nan","family":"Li","sequence":"additional","affiliation":[{"name":"College of Economics and Management, Nanjing University of Aeronautics and Astronautics, Nanjing, China"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"179","reference":[{"issue":"2","key":"10.3233\/JIFS-224227_ref1","doi-asserted-by":"crossref","first-page":"95","DOI":"10.1108\/eb021042","article-title":"Conflicts, claims and disputes in construction","volume":"4","author":"Kumaraswamy","year":"1997","journal-title":"Engineering Construction and Architectural Management"},{"issue":"3","key":"10.3233\/JIFS-224227_ref2","doi-asserted-by":"crossref","first-page":"456","DOI":"10.1109\/TEM.2006.877445","article-title":"Are construction disputes inevitable?","volume":"53","author":"Cheung","year":"2006","journal-title":"IEEE Transactions on Engineering Management"},{"key":"10.3233\/JIFS-224227_ref3","doi-asserted-by":"crossref","unstructured":"Chen Y.Q. , Zhang Y.B. and Zhang S.J. , Impacts of different types of owner-contractor conflict on cost performance in construction projects, Journal of Construction Engineering and Management 140(6) (2014), Article ID 040114017.","DOI":"10.1061\/(ASCE)CO.1943-7862.0000852"},{"issue":"3","key":"10.3233\/JIFS-224227_ref4","doi-asserted-by":"crossref","first-page":"526","DOI":"10.1108\/17538371011056129","article-title":"Coping with an unexpected event: Project managers\u2019 contrasting sensemaking in a stakeholder conflict in China","volume":"3","author":"Tukiainen","year":"2010","journal-title":"International Journal of Managing Projects in Business"},{"key":"10.3233\/JIFS-224227_ref5","unstructured":"Pe\u00f1a-Mora F. , Sosa C. and Mc Cone S. , Dispute avoidance andresolution in large scale civil engineering system. Prentice-Hall, Upper Saddle River, N.J., 2002."},{"key":"10.3233\/JIFS-224227_ref6","unstructured":"Bevir M. , A theory of governance. Berkeley, CA: University of California, 2013."},{"issue":"3","key":"10.3233\/JIFS-224227_ref7","doi-asserted-by":"crossref","first-page":"296","DOI":"10.1016\/S0263-2373(99)00009-2","article-title":"The versatile project-based organization: Governance and operational control","volume":"17","author":"Turner","year":"1999","journal-title":"European Management Journal"},{"issue":"3","key":"10.3233\/JIFS-224227_ref8","first-page":"550","article-title":"Contractual governance as a source of institutionalised waste in construction A review, implications, and road map for future research directions","volume":"10","author":"Saad","year":"2017","journal-title":"International Journal of Managing Projects in Business"},{"issue":"8","key":"10.3233\/JIFS-224227_ref9","doi-asserted-by":"crossref","first-page":"707","DOI":"10.1002\/smj.249","article-title":"Do formal contracts and relational governance function as substitutes or complements?","volume":"23","author":"Poppo","year":"2002","journal-title":"Strategy Management Journal"},{"key":"10.3233\/JIFS-224227_ref10","doi-asserted-by":"crossref","unstructured":"Zhang S. , Zhang S. , Gao Y. and Ding X. , Contractual Governance: Effects of Risk Allocation on Contractors\u2019 Cooperative Behavior in Construction Projects, Journal of Construction Engineering and Management 142(6) (2016), Article ID 04016005.","DOI":"10.1061\/(ASCE)CO.1943-7862.0001111"},{"issue":"4","key":"10.3233\/JIFS-224227_ref11","doi-asserted-by":"crossref","first-page":"391","DOI":"10.1061\/(ASCE)1052-3928(2008)134:4(391)","article-title":"Exploring the influence of contract governance on construction dispute negotiation","volume":"134","author":"Cheung","year":"2008","journal-title":"Journal of Professional Issues in Engineering Education and Practice"},{"key":"10.3233\/JIFS-224227_ref12","doi-asserted-by":"crossref","unstructured":"Yan L. , and Zhang L. , Interplay of Contractual Governance and Trust in Improving Construction Project Performance: Dynamic Perspective, Journal of Management in Engineering 36(4) (2020), Article ID 04020029.","DOI":"10.1061\/(ASCE)ME.1943-5479.0000791"},{"issue":"3","key":"10.3233\/JIFS-224227_ref13","doi-asserted-by":"crossref","first-page":"429","DOI":"10.1016\/j.ijproman.2017.12.005","article-title":"Interplay of relational and contractual governance in public-private partnerships: The mediating role of relational norms, trust and partners\u2019 contribution","volume":"36","author":"Benitez-Avila","year":"2018","journal-title":"International Journal of Project Management"},{"issue":"6","key":"10.3233\/JIFS-224227_ref14","first-page":"35","article-title":"Rigid governance and flexible governance: the choice of rural cooperative finance","volume":"21","author":"You","year":"2018","journal-title":"Journal of Fujian Agricultural and Forestry University (Philosophy and Social Science)"},{"issue":"8","key":"10.3233\/JIFS-224227_ref15","doi-asserted-by":"crossref","first-page":"1466","DOI":"10.1016\/j.ijproman.2017.08.006","article-title":"Investigating the relationship between communication-conflict interaction and project success among construction project teams","volume":"35","author":"Wu","year":"2017","journal-title":"International Journal of Project Management"},{"issue":"2","key":"10.3233\/JIFS-224227_ref16","doi-asserted-by":"crossref","first-page":"65","DOI":"10.1061\/(ASCE)ME.1943-5479.0000001","article-title":"Analysis of dispute review boards application in U.S. construction projects from 1975 to 2007","volume":"26","author":"Menassa","year":"2010","journal-title":"Journal of Management in Engineering"},{"key":"10.3233\/JIFS-224227_ref17","unstructured":"Tillet G. , Resolving Conflict: A Practical Approach, Sydney Univ. Press, Sydney, Australia, 1991."},{"key":"10.3233\/JIFS-224227_ref18","unstructured":"Hellard R.B. , Managing Construction Conflict, Longman Scientific Technology, Harlow, U.K., 1987."},{"key":"10.3233\/JIFS-224227_ref19","doi-asserted-by":"crossref","unstructured":"Chen Y.Q. , Zhang Y.B. and Zhang S.J. , Impacts of different types of owner-contractor conflict on cost performance in construction projects, Journal of Construction Engineering and Management 140(6) (2014), Article ID 040114017.","DOI":"10.1061\/(ASCE)CO.1943-7862.0000852"},{"issue":"3","key":"10.3233\/JIFS-224227_ref20","first-page":"39","article-title":"Constructive claims: Disputes and delays in construction projects can result in loss and cost for fire contractors","author":"Ives.","year":"2010","journal-title":"Fire Risk Management"},{"issue":"2","key":"10.3233\/JIFS-224227_ref21","first-page":"97","article-title":"Construction lawyers\u2019 attitudes and experience with ADR","volume":"18","author":"Brooker","year":"2002","journal-title":"Construction Law Journal"},{"issue":"1","key":"10.3233\/JIFS-224227_ref22","first-page":"21","article-title":"Common categories and causes of construction claims","volume":"13","author":"Kumaraswamy","year":"1997","journal-title":"Construction Law Journal"},{"issue":"2","key":"10.3233\/JIFS-224227_ref23","first-page":"509","article-title":"Dispute avoidance procedure: Observing the influence of legal culture towards a workable legal system, Pertanika","volume":"23","author":"Mohd-Danuri","year":"2015","journal-title":"Journal of Social Sciences and Humanities"},{"issue":"3","key":"10.3233\/JIFS-224227_ref24","doi-asserted-by":"crossref","first-page":"223","DOI":"10.1061\/(ASCE)0733-9364(2001)127:3(223)","article-title":"Model for understanding, preventing and resolving project disputes","volume":"127","author":"Mitropoulos","year":"2001","journal-title":"Journal of Construction Engineering Management"},{"issue":"6","key":"10.3233\/JIFS-224227_ref25","first-page":"367","article-title":"The effectiveness of the dispute resolution advisor system: a critical appraisal","volume":"16","author":"Cheung","year":"1998","journal-title":"International Journal Project Management"},{"issue":"3","key":"10.3233\/JIFS-224227_ref26","doi-asserted-by":"crossref","first-page":"88","DOI":"10.1061\/(ASCE)0742-597X(2004)20:3(88)","article-title":"Convergent views of neutrals and users about alternative dispute resolution","volume":"20","author":"Cheung","year":"2004","journal-title":"Journal of Management in Engineering"},{"issue":"1","key":"10.3233\/JIFS-224227_ref27","doi-asserted-by":"crossref","first-page":"70","DOI":"10.1061\/(ASCE)0742-597X(2000)16:1(70)","article-title":"Project Dispute Resolution Satisfaction classification through neural network","volume":"16","author":"Cheung","year":"2000","journal-title":"Journal of Management in Engineering"},{"issue":"3","key":"10.3233\/JIFS-224227_ref28","doi-asserted-by":"crossref","first-page":"494","DOI":"10.1016\/j.ijproman.2015.12.008","article-title":"Selection and use of Alternative Dispute Resolution (ADR) in construction projects \u2013 Past and future research","volume":"34","author":"Lee","year":"2016","journal-title":"International Journal of Project Management"},{"issue":"4","key":"10.3233\/JIFS-224227_ref29","doi-asserted-by":"crossref","first-page":"187","DOI":"10.1061\/(ASCE)1532-6748(2003)3:4(187)","article-title":"Resolution of construction disputes: A review of current methodologies","volume":"3","author":"Harmon","year":"2003","journal-title":"Leadership Management. Engineering"},{"issue":"5","key":"10.3233\/JIFS-224227_ref30","first-page":"51","article-title":"Innovations to manage disputes","volume":"16","author":"Thompson","year":"2000","journal-title":"Journal of Management Engineering"},{"issue":"4","key":"10.3233\/JIFS-224227_ref31","first-page":"113","article-title":"Social work brought into social governance: the generation of technology and art by rigid governance and flexible governance","volume":"139","author":"He","year":"2016","journal-title":"Journal of Zhejiang Gongshang University"},{"issue":"7","key":"10.3233\/JIFS-224227_ref32","first-page":"81","article-title":"A primary study of the intelligence revolution and national governance modernization","author":"Gao","year":"2020","journal-title":"Social Sciences of China"},{"issue":"1","key":"10.3233\/JIFS-224227_ref33","first-page":"1","article-title":"Towards more flexible approach to governance to allow innovation: the case of UK infrastructure","volume":"13","author":"Sergeeva","year":"2020","journal-title":"Journal of Managing Projects in Business"},{"key":"10.3233\/JIFS-224227_ref34","first-page":"2020","article-title":"The dynamics of repairing multi-project control practice: a project governance viewpoint,","author":"Laine","journal-title":"Journal of Project Management"},{"issue":"3","key":"10.3233\/JIFS-224227_ref35","doi-asserted-by":"crossref","first-page":"42","DOI":"10.1177\/875697280503600305","article-title":"Governance regimes for large projects","volume":"36","author":"Miller","year":"2005","journal-title":"Project Management Journal"},{"issue":"3","key":"10.3233\/JIFS-224227_ref36","doi-asserted-by":"crossref","first-page":"296","DOI":"10.1016\/S0263-2373(99)00009-2","article-title":"The versatile project-based organization: governance and operation control","volume":"17","author":"Turner","year":"1999","journal-title":"European Management Journal"},{"key":"10.3233\/JIFS-224227_ref37","doi-asserted-by":"crossref","first-page":"762","DOI":"10.1016\/j.ijproman.2018.03.008","article-title":"Practice, projects and portfolios: Current research trends and new directions","volume":"36","author":"Clegg","year":"2018","journal-title":"Journal of Project Management"},{"issue":"2","key":"10.3233\/JIFS-224227_ref38","doi-asserted-by":"crossref","first-page":"113","DOI":"10.1016\/j.pursup.2012.04.007","article-title":"The interplayof government mechanisms in complex procurement projects","volume":"18","author":"Cani\u00ebls","year":"2012","journal-title":"Jouralof Perchasing Supply Management"},{"issue":"8","key":"10.3233\/JIFS-224227_ref39","doi-asserted-by":"crossref","first-page":"653","DOI":"10.1080\/01446193.2015.1087646","article-title":"promoting cooperation in construction projects: An integration approach of contractual incentive and trust","volume":"33","author":"Fu","year":"2015","journal-title":"Construction Management and Economics"},{"key":"10.3233\/JIFS-224227_ref40","doi-asserted-by":"crossref","unstructured":"Gao N. , Chen Y. and Wang Y. , Addressing project complexity: The role of contractual functions, Journal of Management Engineering 34(3) (2018), Article ID 04018011.","DOI":"10.1061\/(ASCE)ME.1943-5479.0000613"},{"issue":"6","key":"10.3233\/JIFS-224227_ref41","doi-asserted-by":"crossref","first-page":"723","DOI":"10.1108\/ECAM-03-2018-0137","article-title":"Dynamic changes of governance mechanisms in mega construction projects in China: The mediating role of opptortunitism","volume":"24","author":"Wang","year":"2019","journal-title":"Engineering Construction and Architectural Management"},{"issue":"1","key":"10.3233\/JIFS-224227_ref42","first-page":"212","article-title":"The effectiveness of contractual and relational governances in construction projects in China","volume":"33","author":"Lu","year":"2015","journal-title":"International Journal Project Management"},{"issue":"3","key":"10.3233\/JIFS-224227_ref43","doi-asserted-by":"crossref","first-page":"550","DOI":"10.1108\/IJMPB-07-2016-0058","article-title":"Contractual governance as a source of institutionalized waste in construction","volume":"10","author":"Sarhan","year":"2017","journal-title":"Journal of Managing Projects in Business"},{"key":"10.3233\/JIFS-224227_ref44","doi-asserted-by":"crossref","unstructured":"Yan L. and Zhang L.H. , interplay of contractual governance and trust in improving construction project performance: dynamic perspective, Journal of Management Engineering 36(4) (2020), Article ID 04020029.","DOI":"10.1061\/(ASCE)ME.1943-5479.0000791"},{"key":"10.3233\/JIFS-224227_ref45","article-title":"Contractual and relational governance as positional-practices in ongoing public-private partnership projects","author":"Ben\u00edtez-\u00c1vila","year":"2019","journal-title":"Project ManagementJournal"},{"key":"10.3233\/JIFS-224227_ref46","doi-asserted-by":"crossref","unstructured":"Xue J.J. , Yuan H.P. and Shi B.S. , impact of contextual variables on effectiveness of partnership governance mechanisms in megaprojects: case of guanxi, Journal of Management Engineering (2016), Article ID 04016034.","DOI":"10.1061\/(ASCE)ME.1943-5479.0000476"},{"key":"10.3233\/JIFS-224227_ref47","doi-asserted-by":"crossref","first-page":"160","DOI":"10.1016\/j.ijpe.2015.09.018","article-title":"The impacts of trust and contracts on opportutism in the 3PL industry: The moderating role of demand uncertainty","volume":"170","author":"Huo","year":"2015","journal-title":"Journal of production Economics"},{"issue":"6","key":"10.3233\/JIFS-224227_ref48","first-page":"1053","article-title":"Looy, Toward an integrative perspective on alliance governance: Connecting contract design, trust dynamics and contract application","volume":"51","author":"Faems","year":"2008","journal-title":"Academic Management Journal"},{"issue":"4","key":"10.3233\/JIFS-224227_ref49","doi-asserted-by":"crossref","first-page":"640","DOI":"10.1016\/j.ijproman.2018.01.008","article-title":"Impact of quality performance ambiguity on contract\u2019s opportunistic behaviors in person-to-organization projects: The mediating roles of contract design and application","volume":"36","author":"Ning","year":"2018","journal-title":"International Journal of project Management"},{"issue":"2","key":"10.3233\/JIFS-224227_ref50","doi-asserted-by":"crossref","first-page":"99","DOI":"10.1080\/01446193.2012.726365","article-title":"A critical review of the application of TCE in the interpretation of risk allocation in PPP contracts","volume":"31","author":"Chang","year":"2013","journal-title":"Construction Management and Economics"},{"issue":"2","key":"10.3233\/JIFS-224227_ref51","doi-asserted-by":"crossref","first-page":"93","DOI":"10.1080\/01446190701819079","article-title":"The development of corporate social responsibility in the Australian construction industry","volume":"26","author":"Sonja","year":"2008","journal-title":"Construction Management and Economics"},{"issue":"7","key":"10.3233\/JIFS-224227_ref52","first-page":"1496","article-title":"The relationship between project governance mechanisms and project success: an international data set","volume":"13","author":"Young","year":"2019","journal-title":"Journal of Management Proceeding in Business"},{"issue":"2","key":"10.3233\/JIFS-224227_ref53","doi-asserted-by":"crossref","first-page":"382","DOI":"10.1108\/IJMPB-07-2017-0088","article-title":"Relationship between contractual flexibility and contractor\u2019s cooperative behavior The mediating effect of justice perception","volume":"11","author":"Song","year":"2018","journal-title":"International Journal of Managing Projects in Business"},{"issue":"10","key":"10.3233\/JIFS-224227_ref54","first-page":"1542","article-title":"An empirical study on initial trust of the owner to cooperation: the intermediary role of perceived justice of the contractor","volume":"11","author":"Du","year":"2014","journal-title":"Chinese Journal of Management"},{"key":"10.3233\/JIFS-224227_ref55","unstructured":"Barton T.D. , Happio H. and Borisova T. , Flexibility in contracting: flexibility and stability in contracts, Press: University of Lapland, Rovaniemi. 2015."},{"issue":"4","key":"10.3233\/JIFS-224227_ref56","first-page":"1","article-title":"Contract flexibility and dispute resolution in African manufacturing","volume":"36","author":"Bigsten","year":"2000","journal-title":"The journal of Management and Economics"},{"key":"10.3233\/JIFS-224227_ref57","first-page":"2018","article-title":"Uncertainty, opportunistic behavior, and governance in construction project: the efficacy of contracts,","author":"You","journal-title":"International Journal of Project Management"},{"key":"10.3233\/JIFS-224227_ref58","doi-asserted-by":"crossref","unstructured":"Xue J. , Yuan H. and Shi B. , Impact of contextual variables on effectiveness of partnership governance mechanisms in megaprojects: case of guanxi, Journal of Management in Engineering 33(1) (2017), Article ID 04016034.","DOI":"10.1061\/(ASCE)ME.1943-5479.0000476"},{"key":"10.3233\/JIFS-224227_ref59","doi-asserted-by":"crossref","unstructured":"Yan L. and Zhang L. , Interplay of contractual governance and trust in improving construction project performance: dynamic perspective, Journal of Management Engineering 36(4) (2020), Article ID 04020029.","DOI":"10.1061\/(ASCE)ME.1943-5479.0000791"},{"key":"10.3233\/JIFS-224227_ref60","first-page":"2019","article-title":"The relationship between project governance mechanisms and project success","author":"Young","journal-title":"International journal of Managing Projects in Business"},{"issue":"2","key":"10.3233\/JIFS-224227_ref61","doi-asserted-by":"crossref","first-page":"14","DOI":"10.3102\/0013189X012002014","article-title":"Multisite qualitative policy research: Optimizing description and generalizability","volume":"12","author":"Herriott","year":"1983","journal-title":"Education Research"},{"key":"10.3233\/JIFS-224227_ref62","doi-asserted-by":"crossref","unstructured":"Marques R.C. , Is arbitration the right way to settle conflicts in PPP arrangements, Journal of Management Engineering 34(1) (2018), Article ID 05017007.","DOI":"10.1061\/(ASCE)ME.1943-5479.0000564"},{"issue":"3","key":"10.3233\/JIFS-224227_ref63","doi-asserted-by":"crossref","first-page":"285","DOI":"10.1016\/j.ibusrev.2007.11.002","article-title":"Time pressure in acquisition negotiations:Its determinants and effects on parties\u2019 negotiation behaviourchoice","volume":"17","author":"Saor\u00edn-Iborra","year":"2008","journal-title":"International Business Review"},{"key":"10.3233\/JIFS-224227_ref64","doi-asserted-by":"crossref","unstructured":"Lv J. , Lin M. , Zhou W. and Xu. M. , How PPP Renegotiation Behaviors Evolve with Traffic Changes: Evolutionary Game Approach, Journal of Construction Engineering and Management 147(5) (2021), Article ID 04021032.","DOI":"10.1061\/(ASCE)CO.1943-7862.0002024"},{"issue":"4","key":"10.3233\/JIFS-224227_ref65","doi-asserted-by":"crossref","first-page":"1341","DOI":"10.1111\/lasr.12443","article-title":"Flexibility and authority: resolving labor disputes in a county government in Western China","volume":"53","author":"He","year":"2019","journal-title":"Law and Society Review"}],"container-title":["Journal of Intelligent &amp; Fuzzy Systems"],"original-title":[],"link":[{"URL":"https:\/\/content.iospress.com\/download?id=10.3233\/JIFS-224227","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2026,4,29]],"date-time":"2026-04-29T09:46:05Z","timestamp":1777455965000},"score":1,"resource":{"primary":{"URL":"https:\/\/journals.sagepub.com\/doi\/full\/10.3233\/JIFS-224227"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2023,8,1]]},"references-count":65,"journal-issue":{"issue":"2"},"URL":"https:\/\/doi.org\/10.3233\/jifs-224227","relation":{},"ISSN":["1064-1246","1875-8967"],"issn-type":[{"value":"1064-1246","type":"print"},{"value":"1875-8967","type":"electronic"}],"subject":[],"published":{"date-parts":[[2023,8,1]]}}}