{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,31]],"date-time":"2026-01-31T04:06:32Z","timestamp":1769832392648,"version":"3.49.0"},"reference-count":37,"publisher":"SAGE Publications","issue":"2","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["IFS"],"published-print":{"date-parts":[[2024,2,14]]},"abstract":"<jats:p>For solving the distributed assembly flow shop scheduling problem with fuzzy processing time (FDAPFSP), a regional biogeography-based optimization algorithm (RBBO) is proposed to minimize the maximum fuzzy completion time. The mathematical model is provided. In RBBO, all habitats are divided into regions based on the habitat suitability index, and the habitats of each region are subject to cross-regional migration and replacement procedures. A critical factory optimization strategy is developed to enhance local search capability. Taguchi method is used to determine the parameters of RBBO. In ten FDAPFSP instances, comparative testing of RBBO algorithm with various heuristic and swarm intelligence algorithms are conducted. The computation results show that in ten FDAPFSP cases, the proposed RBBO outperforms other algorithms in nine out of ten FDAPFSP cases.<\/jats:p>","DOI":"10.3233\/jifs-235854","type":"journal-article","created":{"date-parts":[[2023,12,29]],"date-time":"2023-12-29T12:23:41Z","timestamp":1703852621000},"page":"3827-3841","source":"Crossref","is-referenced-by-count":3,"title":["A regional biogeography-based optimization algorithm for the distributed assembly permutation flow-shop scheduling problem with fuzzy processing time"],"prefix":"10.1177","volume":"46","author":[{"given":"Long","family":"Cheng","sequence":"first","affiliation":[{"name":"School of Mechanical Engineering, Anhui Polytechnic University, Wuhu, Anhui, China"}]},{"given":"Lei","family":"Wang","sequence":"additional","affiliation":[{"name":"School of Mechanical Engineering, Anhui Polytechnic University, Wuhu, Anhui, China"},{"name":"AnHui Key Laboratory of Detection Technology and Energy Saving Devices, Anhui Polytechnic University, Wuhu, China"}]},{"given":"Jingcao","family":"Cai","sequence":"additional","affiliation":[{"name":"School of Mechanical Engineering, Anhui Polytechnic University, Wuhu, Anhui, China"},{"name":"AnHui Key Laboratory of Detection Technology and Energy Saving Devices, Anhui Polytechnic University, Wuhu, China"}]}],"member":"179","reference":[{"issue":"4","key":"10.3233\/JIFS-235854_ref1","doi-asserted-by":"crossref","first-page":"754","DOI":"10.1016\/j.cor.2009.06.019","article-title":"The distributed permutation flowshop scheduling problem","volume":"37","author":"Naderi","year":"2009","journal-title":"Computers and Operations Research"},{"issue":"14","key":"10.3233\/JIFS-235854_ref2","doi-asserted-by":"crossref","first-page":"2895","DOI":"10.1080\/0020754050056417","article-title":"Flowshop-scheduling problems with makespan criterion: a review","volume":"43","author":"Reza Hejazi","year":"2005","journal-title":"International Journal of Production Research"},{"issue":"4","key":"10.3233\/JIFS-235854_ref3","doi-asserted-by":"crossref","first-page":"557","DOI":"10.1080\/17517575.2018.1545160","article-title":"Integrated scheduling for a distributed manufacturing system: a stochastic multi-objective model","volume":"13","author":"Fu","year":"2019","journal-title":"Enterprise Information Systems"},{"key":"10.3233\/JIFS-235854_ref4","first-page":"1","article-title":"A distributionally robust approach for the two-machine permutation flow shop scheduling","author":"Lu","year":"2023","journal-title":"Annals of Operations Research"},{"issue":"9","key":"10.3233\/JIFS-235854_ref5","doi-asserted-by":"crossref","first-page":"1269","DOI":"10.1080\/0305215X.2013.827673","article-title":"An effective hybrid immune algorithm for solving the distributed permutation flow-shop scheduling problem","volume":"46","author":"Ye","year":"2014","journal-title":"Engineering Optimization"},{"issue":"3","key":"10.3233\/JIFS-235854_ref6","doi-asserted-by":"crossref","first-page":"641","DOI":"10.1080\/00207543.2011.644819","article-title":"An efficient tabu search algorithm for the distributed permutation flowshop scheduling problem","volume":"51","author":"Gao","year":"2013","journal-title":"International Journal of Production Research"},{"issue":"5","key":"10.3233\/JIFS-235854_ref7","doi-asserted-by":"crossref","first-page":"616","DOI":"10.1287\/mnsc.39.5.616","article-title":"Minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem","volume":"39","author":"Lee","year":"1993","journal-title":"Manage Sci"},{"issue":"10","key":"10.3233\/JIFS-235854_ref8","doi-asserted-by":"crossref","first-page":"2926","DOI":"10.1080\/00207543.2018.1550269","article-title":"Flow shop scheduling problems with assembly operations: a review and new trends","volume":"57","author":"Komaki","year":"2019","journal-title":"International Journal of Production Research"},{"key":"10.3233\/JIFS-235854_ref9","doi-asserted-by":"crossref","first-page":"124","DOI":"10.1016\/j.swevo.2017.04.007","article-title":"A backtracking search hyper-heuristic for the distributed assembly flow-shop scheduling problem","volume":"36","author":"Lin","year":"2017","journal-title":"Swarm and Evolutionary Computation"},{"key":"10.3233\/JIFS-235854_ref10","doi-asserted-by":"crossref","first-page":"76","DOI":"10.1016\/j.ijpe.2015.07.027","article-title":"Heuristics and metaheuristics for the distributed assembly permutation flow shop scheduling problem with sequence dependent setup times","volume":"169","author":"Hatami","year":"2015","journal-title":"International Journal of Production Economics"},{"issue":"4","key":"10.3233\/JIFS-235854_ref11","doi-asserted-by":"crossref","first-page":"1233","DOI":"10.1080\/00207543.2022.2031331","article-title":"A novel shuffled frog-leaping algorithm with reinforcement learning for distributed assembly hybrid flow shop scheduling","volume":"61","author":"Cai","year":"2023","journal-title":"International Journal of Production Research"},{"issue":"3","key":"10.3233\/JIFS-235854_ref12","doi-asserted-by":"crossref","first-page":"944","DOI":"10.1080\/00207543.2014.948575","article-title":"Multi-objective meta-heuristics to solve three-stage assembly flow shop scheduling problem with machine availability constraints","volume":"53","author":"Shoaardebili","year":"2015","journal-title":"International Journal of Production Research"},{"issue":"6","key":"10.3233\/JIFS-235854_ref13","doi-asserted-by":"crossref","first-page":"494","DOI":"10.1080\/21681015.2021.2010820","article-title":"A two-stage assembly flow-shop scheduling problem with bi-level products structure and machines\u2019 availability constraints","volume":"39","author":"Ali","year":"2022","journal-title":"Journal of Industrial and Production Engineering"},{"issue":"17","key":"10.3233\/JIFS-235854_ref14","doi-asserted-by":"crossref","first-page":"5292","DOI":"10.1080\/00207543.2013.807955","article-title":"The Distributed Assembly Permutation Flow Shop Scheduling Problem","volume":"51","author":"Hatami","year":"2013","journal-title":"International Journal of Production Research"},{"issue":"13","key":"10.3233\/JIFS-235854_ref15","first-page":"1","article-title":"The distributed assembly permutation flowshop scheduling problem with flexible assembly and batch delivery","volume":"59","author":"Yang","year":"2020","journal-title":"International Journal of Production Research"},{"issue":"5","key":"10.3233\/JIFS-235854_ref16","doi-asserted-by":"crossref","first-page":"719","DOI":"10.1080\/0305215X.2022.2032017","article-title":"Bi-objective optimization using an improved NSGA-II for energy-efficient scheduling of a distributed assembly blocking flowshop","volume":"55","author":"Niu","year":"2023","journal-title":"Engineering Optimization"},{"issue":"6","key":"10.3233\/JIFS-235854_ref17","doi-asserted-by":"crossref","first-page":"1755","DOI":"10.1080\/00207543.2022.2047238","article-title":"An effective memetic algorithm for the distributed flowshop scheduling problem with an assemble machine","volume":"61","author":"Huang","year":"2023","journal-title":"International Journal of Production Research"},{"issue":"6","key":"10.3233\/JIFS-235854_ref18","doi-asserted-by":"crossref","first-page":"702","DOI":"10.1109\/TEVC.2008.919004","article-title":"Biogeography-based optimization.","volume":"12","author":"Simon","year":"2008","journal-title":"IEEE Transactions on Evolutionary Computation"},{"issue":"2","key":"10.3233\/JIFS-235854_ref19","doi-asserted-by":"crossref","first-page":"89","DOI":"10.1016\/j.swevo.2011.05.002","article-title":"Biogeography based optimization for optimal meter placement for security constrained state estimation","volume":"1","author":"Jamuna","year":"2011","journal-title":"Swarm and Evolutionary Computation"},{"key":"10.3233\/JIFS-235854_ref20","doi-asserted-by":"crossref","first-page":"128","DOI":"10.1016\/j.cie.2016.05.005","article-title":"An effective hybrid biogeography-basedoptimization algorithm for the distributed assembly permutationflow-shop scheduling problem","volume":"97","author":"Lin","year":"2016","journal-title":"Computers & IndustrialEngineering"},{"issue":"4","key":"10.3233\/JIFS-235854_ref21","doi-asserted-by":"crossref","first-page":"610","DOI":"10.1016\/j.cie.2010.01.002","article-title":"Fuzzy job shop scheduling problem with availabilityconstraints","volume":"58","author":"Lei","year":"2010","journal-title":"Computers & Industrial Engineering"},{"issue":"1\u20132","key":"10.3233\/JIFS-235854_ref22","doi-asserted-by":"crossref","first-page":"157","DOI":"10.1007\/s00170-007-0945-8","article-title":"Pareto archive particle swarm optimization for multi-objective fuzzy job shop scheduling problems","volume":"37","author":"Lei","year":"2008","journal-title":"International Journal of Advanced Manufacturing Technology"},{"issue":"9\u201310","key":"10.3233\/JIFS-235854_ref23","doi-asserted-by":"crossref","first-page":"2690","DOI":"10.1080\/00207543.2014.975855","article-title":"Biogeography-based optimisation for flexible manufacturing system scheduling problem","volume":"53","author":"Paslara","year":"2015","journal-title":"International Journal of Production Research"},{"issue":"16","key":"10.3233\/JIFS-235854_ref24","doi-asserted-by":"crossref","first-page":"4805","DOI":"10.1080\/00207543.2015.1094584","article-title":"A hybrid discrete biogeography-based optimization for the permutation flow shop scheduling problem","volume":"54","author":"Lin","year":"2016","journal-title":"International Journal of Production Research"},{"issue":"1","key":"10.3233\/JIFS-235854_ref25","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1166\/jcies.2012.1001","article-title":"Welcome to the journal of computational intelligence and electronic systems","volume":"1","author":"Ruidan","year":"2012","journal-title":"Journal of Computational Intelligence and Electronic Systems"},{"issue":"3","key":"10.3233\/JIFS-235854_ref26","doi-asserted-by":"crossref","first-page":"544","DOI":"10.1080\/18756891.2016.1175817","article-title":"Migration ratio model analysis of biogeography-based optimization algorithm and performance comparison","volume":"9","author":"Wang","year":"2016","journal-title":"International Journal of Computational Intelligence Systems"},{"issue":"6","key":"10.3233\/JIFS-235854_ref27","doi-asserted-by":"crossref","first-page":"1880","DOI":"10.1080\/00207543.2014.965356","article-title":"Biogeography based optimization (BBO) algorithm to minimise non-productive time during holemaking process","volume":"53","author":"Tamjidy","year":"2015","journal-title":"International Journal of Production Research"},{"issue":"10","key":"10.3233\/JIFS-235854_ref28","doi-asserted-by":"crossref","first-page":"745","DOI":"10.1080\/08839514.2021.1935586","article-title":"An improved biogeography-based optimization for the long-term carpooling problem","volume":"35","author":"Kaleche","year":"2023","journal-title":"Applied Artificial Intelligence"},{"key":"10.3233\/JIFS-235854_ref29","doi-asserted-by":"crossref","unstructured":"Rajarshi, Mukherjee, Shankar and Chakraborty, Selection of edm process parameters using biogeography-based optimization algorithm, Materials and Manufacturing Processes 27(9) (2012), 954\u2013962.","DOI":"10.1080\/10426914.2011.610089"},{"issue":"4","key":"10.3233\/JIFS-235854_ref30","doi-asserted-by":"crossref","first-page":"593","DOI":"10.1080\/0305215X.2021.1886289","article-title":"Distributed assembly permutation flow-shop scheduling problem with sequence-dependent set-up times using a novel biogeography-based optimization algorithm","volume":"54","author":"Huang","year":"2023","journal-title":"Engineering Optimization"},{"key":"10.3233\/JIFS-235854_ref31","doi-asserted-by":"crossref","unstructured":"Abdolvahhab, FetanatGholamreza, and Shafipour, Mixed biogeography-based optimization for gencos\u2019 maintenance scheduling in restructured power systems, Applied Artificial Intelligence 32(1) (2018), 65\u201384.","DOI":"10.1080\/08839514.2018.1448158"},{"issue":"4","key":"10.3233\/JIFS-235854_ref32","first-page":"189","article-title":"Design and analysis of industrial experiments","volume":"9","author":"Mandel","year":"1955","journal-title":"Published for Imperial Chemical Industries by Longman Group"},{"key":"10.3233\/JIFS-235854_ref33","doi-asserted-by":"crossref","unstructured":"Besharatnia F. , Talebpour A. and Aliakbary S. , An improved grey wolves optimization algorithm for dynamic community detection and data clustering, Applied Artificial Intelligence 36(1) (2022).","DOI":"10.1080\/08839514.2021.2012000"},{"key":"10.3233\/JIFS-235854_ref34","doi-asserted-by":"crossref","first-page":"17","DOI":"10.1016\/j.ins.2014.02.123","article-title":"Chaotic krill herd algorithm","volume":"274","author":"Wang","year":"2014","journal-title":"Information Science"},{"issue":"9\u201310","key":"10.3233\/JIFS-235854_ref35","doi-asserted-by":"crossref","first-page":"2454","DOI":"10.1016\/j.apm.2013.10.052","article-title":"An effective krill herd algorithm with migration operator in biogeography-based optimization","volume":"38","author":"Wang","year":"2014","journal-title":"Appl Math Model"},{"key":"10.3233\/JIFS-235854_ref36","doi-asserted-by":"crossref","first-page":"100785","DOI":"10.1016\/j.swevo.2020.100785","article-title":"A matrix-cube-based estimation of distribution algorithm for the distributed assembly permutation flow-shop scheduling problem","volume":"60","author":"Zhang","year":"2021","journal-title":"Swarm and Evolutionary Computation"},{"key":"10.3233\/JIFS-235854_ref37","doi-asserted-by":"crossref","unstructured":"Song H.B. and Lin J. , A genetic programming hyper-heuristic for the distributed assembly permutation flow-shop scheduling problem with sequence dependent setup times, Swarm and Evolutionary Computation, 60 (2021), 100807.","DOI":"10.1016\/j.swevo.2020.100807"}],"container-title":["Journal of Intelligent &amp; Fuzzy Systems"],"original-title":[],"link":[{"URL":"https:\/\/content.iospress.com\/download?id=10.3233\/JIFS-235854","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2026,1,27]],"date-time":"2026-01-27T18:46:49Z","timestamp":1769539609000},"score":1,"resource":{"primary":{"URL":"https:\/\/journals.sagepub.com\/doi\/full\/10.3233\/JIFS-235854"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2024,2,14]]},"references-count":37,"journal-issue":{"issue":"2"},"URL":"https:\/\/doi.org\/10.3233\/jifs-235854","relation":{},"ISSN":["1064-1246","1875-8967"],"issn-type":[{"value":"1064-1246","type":"print"},{"value":"1875-8967","type":"electronic"}],"subject":[],"published":{"date-parts":[[2024,2,14]]}}}