{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,2]],"date-time":"2026-05-02T06:59:25Z","timestamp":1777705165333,"version":"3.51.4"},"reference-count":41,"publisher":"SAGE Publications","issue":"4","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["IFS"],"published-print":{"date-parts":[[2024,4,18]]},"abstract":"<jats:p>This study explores the impact of public health events, multi-modal projects, multi-project environments, and multi-capacity resource constraints on project scheduling. It describes the comprehensive resource-constrained project scheduling problem (MCMRCMPSP) specifically for public health events, and proposes two approaches for modelling and solving the problem. The objective is to enhance the practical relevance of project scheduling and enrich the problem itself. To improve efficiency and the algorithm for scheduling problems, an enhanced quantum algorithm based on the quantum particle swarm algorithm (QPSO) is proposed. The enhancements include Gaussian variation and a tournament selection strategy. Furthermore, the article integrates multiple heuristic rules with the algorithm to minimize illogical computations, improve computational efficiency, and enhance solution quality. The proposed algorithm\u2019s effectiveness is validated through performance tests and practical application experiments. The results show that the algorithm has superior convergence performance and solution accuracy compared with the traditional QPSO, particle swarm algorithm (PSO), genetic algorithm, ant colony algorithm, and cuckoo algorithm. Thus, the algorithm provides a targeted resource scheduling plan for real-world cases. This research contributes to the field of project scheduling problems and proposes a new solution.<\/jats:p>","DOI":"10.3233\/jifs-236757","type":"journal-article","created":{"date-parts":[[2024,3,5]],"date-time":"2024-03-05T11:44:02Z","timestamp":1709639042000},"page":"10095-10114","source":"Crossref","is-referenced-by-count":0,"title":["A study of comprehensive resource scheduling under public health events: An improved heuristic quantum algorithm"],"prefix":"10.1177","volume":"46","author":[{"given":"Jun long","family":"Peng","sequence":"first","affiliation":[{"name":"Changsha University of Science & Technology, Chang Sha City, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Xiao","family":"Liu","sequence":"additional","affiliation":[{"name":"Changsha University of Science & Technology, Chang Sha City, China"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"179","reference":[{"issue":"3","key":"10.3233\/JIFS-236757_ref1","doi-asserted-by":"crossref","first-page":"e0265087","DOI":"10.1371\/journal.pone.0265087","article-title":"Research on the factors of extremely short construction period under the sufficient resources based on Grey-DEMATEL-ISM","volume":"17","author":"Peng","year":"2022","journal-title":"PloS One"},{"issue":"11","key":"10.3233\/JIFS-236757_ref2","first-page":"55","article-title":"Optimal Matching of Urban Emergency Medical Supplies Under Major Public Health Events","volume":"33","author":"Xiao-wei","year":"2020","journal-title":"China Journal of Highway and Transport"},{"issue":"1","key":"10.3233\/JIFS-236757_ref3","doi-asserted-by":"crossref","first-page":"93","DOI":"10.1287\/mnsc.16.1.93","article-title":"Multiproject scheduling with limited resources: A zero-one programming approach","volume":"16","author":"Pritsker","year":"1969","journal-title":"Management Science"},{"issue":"2","key":"10.3233\/JIFS-236757_ref4","doi-asserted-by":"crossref","first-page":"395","DOI":"10.1016\/j.ejor.2019.01.063","article-title":"A survey of hybrid metaheuristics for the resource-constrained project scheduling problem","volume":"280","author":"Pellerin","year":"2020","journal-title":"European Journal of Operational Research"},{"issue":"1","key":"10.3233\/JIFS-236757_ref5","doi-asserted-by":"crossref","first-page":"11","DOI":"10.1016\/0166-218X(83)90012-4","article-title":"Scheduling subject to resource constraints: Classification and complexity","volume":"5","author":"Blazewicz","year":"1983","journal-title":"Discrete Applied Mathematics"},{"key":"10.3233\/JIFS-236757_ref6","doi-asserted-by":"crossref","first-page":"104503","DOI":"10.1016\/j.autcon.2022.104503","article-title":"Improved genetic algorithm based on time windows decomposition for solving resource-constrained project scheduling problem","volume":"142","author":"Hua","year":"2022","journal-title":"Automation in Construction"},{"issue":"8","key":"10.3233\/JIFS-236757_ref7","first-page":"711","article-title":"Two approaches to problems of resourceallocation among project activities\u2014a comparative study","volume":"31","author":"S\u0142owi\u00e1ski","year":"1980","journal-title":"Journal of the Operational Research Society"},{"issue":"2","key":"10.3233\/JIFS-236757_ref8","doi-asserted-by":"crossref","first-page":"408","DOI":"10.1016\/S0377-2217(99)00490-7","article-title":"A multicriteria heuristic method to improve resource allocation in multiproject scheduling","volume":"127","author":"Lova","year":"2000","journal-title":"European Journal of Operational Research"},{"issue":"7","key":"10.3233\/JIFS-236757_ref10","first-page":"28","article-title":"An Improved Reactive Scheduling Problem of Multi-mode RCPSP","volume":"31","author":"Wu-liang","year":"2022","journal-title":"Operations Research and Management Science"},{"issue":"2","key":"10.3233\/JIFS-236757_ref11","doi-asserted-by":"crossref","first-page":"261","DOI":"10.1080\/00207548908942546","article-title":"Multiple projects-multiple resources-constrained scheduling: some studies","volume":"27","author":"Mohanty","year":"1989","journal-title":"The International Journal of Production Research"},{"issue":"2","key":"10.3233\/JIFS-236757_ref12","doi-asserted-by":"crossref","first-page":"161","DOI":"10.1287\/mnsc.28.2.161","article-title":"Multi-project scheduling: Categorization of heuristic rules performance","volume":"28","author":"Kurtulus","year":"1982","journal-title":"Management Science"},{"key":"10.3233\/JIFS-236757_ref13","doi-asserted-by":"crossref","first-page":"103052","DOI":"10.1016\/j.autcon.2019.103052","article-title":"Memetic algorithm for solving resource constrained project scheduling problems","volume":"111","author":"Rahman","year":"2020","journal-title":"Automation in Construction"},{"issue":"12","key":"10.3233\/JIFS-236757_ref14","doi-asserted-by":"crossref","first-page":"1803","DOI":"10.1287\/mnsc.38.12.1803","article-title":"A branch-and-bound procedure for the multiple resource-constrained project scheduling problem","volume":"38","author":"Demeulemeester","year":"1992","journal-title":"Management Science"},{"issue":"2","key":"10.3233\/JIFS-236757_ref15","doi-asserted-by":"crossref","first-page":"201","DOI":"10.1287\/opre.45.2.201","article-title":"A branch-and-bound procedure for the generalized resource-constrained project scheduling problem","volume":"45","author":"Demeulemeester","year":"1997","journal-title":"Operations Research"},{"issue":"5","key":"10.3233\/JIFS-236757_ref16","doi-asserted-by":"crossref","first-page":"714","DOI":"10.1287\/mnsc.44.5.714","article-title":"An exact algorithm for the resource-constrained project scheduling problem based on a new mathematical formulation","volume":"44","author":"Mingozzi","year":"1998","journal-title":"Management Science"},{"issue":"3","key":"10.3233\/JIFS-236757_ref17","doi-asserted-by":"crossref","first-page":"395","DOI":"10.1287\/opre.12.3.395","article-title":"Some properties of schedules for large projects with limited resources","volume":"12","author":"Wiest","year":"1964","journal-title":"Operations Research"},{"issue":"2","key":"10.3233\/JIFS-236757_ref18","doi-asserted-by":"crossref","first-page":"375","DOI":"10.1016\/j.ejor.2004.04.008","article-title":"Justification andRCPSP: A technique that pays","volume":"165","author":"Valls","year":"2005","journal-title":"European Journal of OperationalResearch"},{"issue":"5","key":"10.3233\/JIFS-236757_ref19","doi-asserted-by":"crossref","first-page":"433","DOI":"10.1002\/nav.10029","article-title":"A self-adapting genetic algorithm for project scheduling under resource constraints","volume":"49","author":"Hartmann","year":"2002","journal-title":"Naval Research Logistics (NRL)"},{"key":"10.3233\/JIFS-236757_ref20","first-page":"5125","article-title":"Particle swarm optimization for multi resource constrained project scheduling problem with varying resource levels","volume":"47","author":"Joy","year":"2021","journal-title":"Materials Today: Proceedings"},{"issue":"1","key":"10.3233\/JIFS-236757_ref21","doi-asserted-by":"crossref","first-page":"123","DOI":"10.1287\/opre.2018.1767","article-title":"Work package sizing and project performance","volume":"67","author":"Li","year":"2019","journal-title":"Operations Research"},{"issue":"1","key":"10.3233\/JIFS-236757_ref23","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1016\/S0377-2217(98)00204-5","article-title":"Resource-constrained project scheduling: Notation, classification, models and methods","volume":"112","author":"Brucker","year":"1999","journal-title":"European Journal of Operational Research"},{"key":"10.3233\/JIFS-236757_ref24","doi-asserted-by":"crossref","first-page":"91","DOI":"10.1016\/j.eswa.2016.03.017","article-title":"Priority-based heuristics for the multi-skill resource constrained project scheduling problem","volume":"57","author":"Almeida","year":"2016","journal-title":"Expert Systems with Applications"},{"issue":"6","key":"10.3233\/JIFS-236757_ref25","doi-asserted-by":"crossref","first-page":"718","DOI":"10.1287\/mnsc.49.6.718.16027","article-title":"The value of resource flexibility in the resource-constrained job assignment problem","volume":"49","author":"Vairaktarakis","year":"2003","journal-title":"Management Science"},{"issue":"39","key":"10.3233\/JIFS-236757_ref28","doi-asserted-by":"crossref","first-page":"18253","DOI":"10.1021\/acs.iecr.9b02455","article-title":"Multi-mode resourceconstrained project scheduling with alternative prerequisites: Newmodels and computational studies","volume":"58","author":"Wang","year":"2019","journal-title":"Industrial & EngineeringChemistry Research"},{"issue":"1","key":"10.3233\/JIFS-236757_ref29","doi-asserted-by":"crossref","first-page":"58","DOI":"10.1080\/07408178508975272","article-title":"Multi-project scheduling: Analysis of project performance","volume":"17","author":"Kurtulus","year":"1985","journal-title":"IIE Transactions"},{"key":"10.3233\/JIFS-236757_ref30","doi-asserted-by":"crossref","first-page":"295","DOI":"10.1007\/s10951-015-0422-4","article-title":"An integer programming approach to the multimode resource-constrained multiproject scheduling problem","volume":"19","author":"Toffolo","year":"2016","journal-title":"Journal of Scheduling"},{"key":"10.3233\/JIFS-236757_ref31","doi-asserted-by":"crossref","first-page":"95","DOI":"10.1007\/s10479-014-1555-0","article-title":"Multi-project scheduling with two-stage decomposition","volume":"217","author":"Can","year":"2014","journal-title":"Annals of Operations Research"},{"key":"10.3233\/JIFS-236757_ref34","doi-asserted-by":"crossref","first-page":"113370","DOI":"10.1016\/j.eswa.2020.113370","article-title":"An improved quantum particle swarm optimization algorithm for environmental economic dispatch","volume":"152","author":"Xin-gang","year":"2020","journal-title":"Expert Systems with Applications"},{"issue":"1","key":"10.3233\/JIFS-236757_ref35","doi-asserted-by":"crossref","first-page":"4647","DOI":"10.1002\/dac.4647","article-title":"New method of traffic flow forecasting based on quantum particle swarm optimization strategy for intelligent transportation system,e","volume":"34","author":"Zhang","year":"2021","journal-title":"International Journal of Communication Systems"},{"issue":"14","key":"10.3233\/JIFS-236757_ref36","doi-asserted-by":"crossref","first-page":"4924","DOI":"10.1002\/dac.4924","article-title":"A multi-objective distance vector-hop localization algorithm based on differential evolution quantum particle swarm optimization,e","volume":"34","author":"Han","year":"2021","journal-title":"International Journal of Communication Systems"},{"issue":"10","key":"10.3233\/JIFS-236757_ref37","first-page":"2010","article-title":"Research on Fuzzy Flexible Job Shop Scheduling Problem Based on Hybrid QPSO","volume":"32","author":"Li","year":"2020","journal-title":"Journal of System Simulation"},{"issue":"17","key":"10.3233\/JIFS-236757_ref38","doi-asserted-by":"crossref","first-page":"8392","DOI":"10.3390\/app12178392","article-title":"An Overview of Variants and Advancements of PSO Algorithm","volume":"12","author":"Jain","year":"2022","journal-title":"Applied Sciences"},{"key":"10.3233\/JIFS-236757_ref39","doi-asserted-by":"crossref","first-page":"165","DOI":"10.1016\/j.energy.2017.05.013","article-title":"Multi-objective quantum-behaved particle swarm optimization for economic environmental hydrothermal energy system scheduling","volume":"131","author":"Feng","year":"2017","journal-title":"Energy"},{"issue":"2","key":"10.3233\/JIFS-236757_ref40","doi-asserted-by":"crossref","first-page":"322","DOI":"10.3724\/SP.J.1087.2008.00322","article-title":"Chaos particle swarm optimization algorithm","volume":"28","author":"Gao","year":"2008","journal-title":"Journal of Computer Applications"},{"issue":"02","key":"10.3233\/JIFS-236757_ref41","doi-asserted-by":"crossref","first-page":"1450011","DOI":"10.1142\/S1469026814500114","article-title":"Clustering stock data for multi-objective portfolio optimization","volume":"13","author":"Long","year":"2014","journal-title":"International Journal of Computational Intelligence and Applications"},{"issue":"1","key":"10.3233\/JIFS-236757_ref42","doi-asserted-by":"crossref","first-page":"23","DOI":"10.1016\/j.ejor.2005.01.065","article-title":"Experimental investigation of heuristics for resource-constrained project scheduling: An update","volume":"174","author":"Kolisch","year":"2006","journal-title":"European Journal of Operational Research"},{"issue":"10","key":"10.3233\/JIFS-236757_ref43","first-page":"1775","article-title":"Bat optimal algorithm combined uniform mutation with Gaussian mutation","volume":"32","author":"Li","year":"2017","journal-title":"Control and Decision"},{"issue":"2","key":"10.3233\/JIFS-236757_ref45","doi-asserted-by":"crossref","first-page":"93","DOI":"10.1111\/j.1467-8667.2005.00420.x","article-title":"Multimode project scheduling based on particle swarm optimization","volume":"21","author":"Zhang","year":"2006","journal-title":"Computer-aided Civil and Infrastructure Engineering"},{"issue":"1","key":"10.3233\/JIFS-236757_ref46","doi-asserted-by":"crossref","first-page":"41","DOI":"10.1016\/j.aei.2004.07.001","article-title":"Ant colony optimization techniques for the vehicle routing problem","volume":"18","author":"Bell","year":"2004","journal-title":"Advanced Engineering Informatics"},{"key":"10.3233\/JIFS-236757_ref47","doi-asserted-by":"crossref","first-page":"5994","DOI":"10.4028\/www.scientific.net\/AMR.433-440.5994","article-title":"The effects of parameter settings on the performance of genetic algorithm through experimental design and statistical analysis","volume":"433","author":"Kolahan","year":"2012","journal-title":"Advanced Materials Research"},{"key":"10.3233\/JIFS-236757_ref48","doi-asserted-by":"crossref","first-page":"117029","DOI":"10.1016\/j.eswa.2022.117029","article-title":"Multi-objective stochastic project scheduling with alternative execution methods: An improved quantum-behaved particle swarm optimization approach","volume":"203","author":"Zhou","year":"2022","journal-title":"Expert Systems with Applications"}],"container-title":["Journal of Intelligent &amp; Fuzzy Systems"],"original-title":[],"link":[{"URL":"https:\/\/content.iospress.com\/download?id=10.3233\/JIFS-236757","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2026,4,29]],"date-time":"2026-04-29T09:43:05Z","timestamp":1777455785000},"score":1,"resource":{"primary":{"URL":"https:\/\/journals.sagepub.com\/doi\/full\/10.3233\/JIFS-236757"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2024,4,18]]},"references-count":41,"journal-issue":{"issue":"4"},"URL":"https:\/\/doi.org\/10.3233\/jifs-236757","relation":{},"ISSN":["1064-1246","1875-8967"],"issn-type":[{"value":"1064-1246","type":"print"},{"value":"1875-8967","type":"electronic"}],"subject":[],"published":{"date-parts":[[2024,4,18]]}}}