{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,8,18]],"date-time":"2026-08-18T04:05:01Z","timestamp":1787025901631,"version":"build-2736575974"},"reference-count":23,"publisher":"SAGE Publications","issue":"2","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["MGS"],"published-print":{"date-parts":[[2018,6,26]]},"DOI":"10.3233\/mgs-180286","type":"journal-article","created":{"date-parts":[[2018,7,13]],"date-time":"2018-07-13T13:49:49Z","timestamp":1531489789000},"page":"161-175","source":"Crossref","is-referenced-by-count":3,"title":["A hybrid genetic algorithm with a neighborhood function for flexible job shop scheduling"],"prefix":"10.1177","volume":"14","author":[{"given":"Mohammed El-Amine","family":"Meziane","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Noria","family":"Taghezout","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"179","reference":[{"key":"10.3233\/MGS-180286_ref1","doi-asserted-by":"crossref","unstructured":"E.-G. Talbi, F. Yalaoui and L. Amodeo, Metaheuristics for Production Systems, 1st ed., S.I. Publishing, Ed. London, United Kingdom: Springer, 2016.","DOI":"10.1007\/978-3-319-23350-5"},{"key":"10.3233\/MGS-180286_ref2","doi-asserted-by":"crossref","unstructured":"J. Liangxiao and D. Zhongjun, An improved genetic algorithm for flexible job shop scheduling problem, in 2nd International Conference on Information Science and Control Engineering, Shanghai, China (2015), 127\u2013131.","DOI":"10.1109\/ICISCE.2015.36"},{"issue":"1","key":"10.3233\/MGS-180286_ref3","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1002\/(SICI)1099-1425(200001\/02)3:1<3::AID-JOS32>3.0.CO;2-Y","article-title":"Effective neighbourhood functions for the flexible job shop problem","volume":"3","author":"Mastrolilli","year":"2000","journal-title":"Journal of Scheduling"},{"issue":"1","key":"10.3233\/MGS-180286_ref4","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1109\/TSMCC.2002.1009117","article-title":"Approach by localization and mult-iobjective evolutionary optimization for flexible job-shop scheduling problems","volume":"32","author":"Kacem","year":"2002","journal-title":"IEEE Transactions on Systems, Man, and Cybernetics, Part C"},{"issue":"4","key":"10.3233\/MGS-180286_ref5","doi-asserted-by":"crossref","first-page":"652","DOI":"10.1109\/TSMCC.2007.897494","article-title":"Assignment and scheduling in flexible job-shops by hierarchical optimization","volume":"37","author":"Zribi","year":"2007","journal-title":"IEEE Transactions on Systems, Man, and Cybernetics"},{"issue":"1","key":"10.3233\/MGS-180286_ref6","doi-asserted-by":"crossref","first-page":"151","DOI":"10.1016\/j.ijpe.2007.01.014","article-title":"Minimizing the makespan for the MPM job-shop with availability constraints","volume":"112","author":"Zribi","year":"2008","journal-title":"International Journal of Production Economics"},{"issue":"2","key":"10.3233\/MGS-180286_ref7","first-page":"1491","article-title":"Flexible job\u2013shop scheduling problem using simulated annealing","volume":"3","author":"Raich","year":"2012","journal-title":"International Journal of Research & Reviewes in Computer Science"},{"issue":"5","key":"10.3233\/MGS-180286_ref8","first-page":"2320","article-title":"Minimizing manufacturing cost in flexible job-shop scheduling problems","volume":"1","author":"Sridhar","year":"2013","journal-title":"International Journal of Artificial Intelligence and Mechatronics"},{"issue":"1","key":"10.3233\/MGS-180286_ref9","doi-asserted-by":"crossref","first-page":"519","DOI":"10.1007\/s00170-013-5510-z","article-title":"A heuristic algorithm for solving flexible job shop scheduling problem","volume":"71","author":"Ziaee","year":"2014","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"key":"10.3233\/MGS-180286_ref10","doi-asserted-by":"crossref","unstructured":"H. Yiyong, W. Wei and F. Shigeru, Improvements to genetic algorithm for flexible job shop scheduling with overlapping in operations, in 16th International Conference on Computer and Information Science (ICIS), Wuhan, China (2017), 791-796.","DOI":"10.1109\/ICIS.2017.7960100"},{"issue":"1","key":"10.3233\/MGS-180286_ref11","first-page":"21","article-title":"A hybrid multi objective algorithm for flexible job shop scheduling","volume":"1","author":"Fattahi","year":"2009","journal-title":"International Journal of Mathematical and Statistical Sciences"},{"issue":"2","key":"10.3233\/MGS-180286_ref12","doi-asserted-by":"crossref","first-page":"409","DOI":"10.1016\/j.cie.2005.01.018","article-title":"An effective hybrid optimization approach for multi-objective","volume":"48","author":"Xia","year":"2005","journal-title":"Computers and Industrial Engineering"},{"key":"10.3233\/MGS-180286_ref13","doi-asserted-by":"crossref","first-page":"236","DOI":"10.1016\/j.cie.2016.10.019","article-title":"The dual-ants colony: A novel hybrid approach for the flexible job shop scheduling problem with preventive maintenance","volume":"106","author":"El\u00a0Khoukhi","year":"2017","journal-title":"Computers & Industrial Engineering"},{"key":"10.3233\/MGS-180286_ref14","doi-asserted-by":"crossref","unstructured":"J. Tang, G. Zhang and B. Lin, A hybrid algorithm for flexible job-shop scheduling problem, Procedia Engineering 15(1) (2011), 3678\u20133683.","DOI":"10.1016\/j.proeng.2011.08.689"},{"issue":"9","key":"10.3233\/MGS-180286_ref15","doi-asserted-by":"crossref","first-page":"1204","DOI":"10.1016\/j.conengprac.2013.05.004","article-title":"Benchmarking flexible job-shop scheduling and control systems","volume":"21","author":"Trentesaux","year":"2013","journal-title":"Control Engineering Practice"},{"key":"10.3233\/MGS-180286_ref16","doi-asserted-by":"crossref","unstructured":"H. Eikelder, B. Aarts, M. Verhoeven and E. Aarts, Sequential and Parallel Local Search Algorithms for Job Shop Scheduling, B.M. Springer, Ed. Boston, USA: Springer Book Archive, 1999.","DOI":"10.1007\/978-1-4615-5775-3_25"},{"key":"10.3233\/MGS-180286_ref17","unstructured":"M. Ennigrou, Approche multiagents basee sur la recherche tabou pour le job shop flexible, in 14eme Congres Francophone AFRIF-AFIA de Reconnaissance des Formes et Intelligence Artificielle RFIA, Toulouse, France (2004), 28\u201330."},{"key":"10.3233\/MGS-180286_ref18","unstructured":"M. Gen, J. Gao and L. Lin, Multistage-based genetic algorithm for flexible job-shop scheduling problem, in Studies in Computational Intelligence, B.H. Springer, Ed. Berlin, Germany: Springer 187 (2009), 183\u2013196."},{"key":"10.3233\/MGS-180286_ref19","doi-asserted-by":"crossref","unstructured":"K.-M. Lee, T. Yamakawa and K.-M. Lee, A genetic algorithm for general machine scheduling problems, in Knowledge-Based Intelligent Electronic Systems, Proceedings KES 98, Adelaide, SA, Australia, Australia (1998), 60\u201366.","DOI":"10.1109\/KES.1998.725893"},{"key":"10.3233\/MGS-180286_ref20","doi-asserted-by":"crossref","unstructured":"S.G. Ponnambalam, N. Jawahar and B.S. Girish, An ant colony optimization algorithm for flexible job shop scheduling problem, in New Advanced Technologies, A. Lazinica, Ed. InTech, Mar. March (2010), ch. 4, 74\u201395,https:\/\/www.intechopen.com\/books\/new-advanced-technologies\/an-ant-colony-optimization-algorithm-for-flexible-job-shop-scheduling-problem.","DOI":"10.5772\/9425"},{"key":"10.3233\/MGS-180286_ref21","doi-asserted-by":"crossref","unstructured":"P. Raja and S. Pugazhenthi, Path planning for mobile robots in dynamic environments using particle swarm optimization, in Advances in Recent Technologies in Communication and Computing, 2009. ARTCom \u201909. International Conference on, Kottayam, Kerala, India (2009), 27\u201328.","DOI":"10.1109\/ARTCom.2009.24"},{"key":"10.3233\/MGS-180286_ref22","doi-asserted-by":"crossref","unstructured":"A. Bekkar et al., An iterative greedy insertion technique for flexible job shop scheduling problem, in 8th IFAC Conference on Manufacturing Modelling, Management and Control, Troyes, France (2016), 1956\u20131961.","DOI":"10.1016\/j.ifacol.2016.07.917"},{"issue":"4","key":"10.3233\/MGS-180286_ref23","doi-asserted-by":"crossref","first-page":"706","DOI":"10.1016\/j.compind.2014.02.005","article-title":"ORCA-FMS: A dynamic architecture for the optimized and reactive control of flexible manufacturing scheduling","volume":"65","author":"Pach","year":"2014","journal-title":"Computers in Industry"}],"container-title":["Multiagent and Grid Systems"],"original-title":[],"link":[{"URL":"https:\/\/content.iospress.com\/download?id=10.3233\/MGS-180286","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2026,5,1]],"date-time":"2026-05-01T05:26:26Z","timestamp":1777613186000},"score":1,"resource":{"primary":{"URL":"https:\/\/www.medra.org\/servlet\/aliasResolver?alias=iospress&doi=10.3233\/MGS-180286"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018,6,26]]},"references-count":23,"journal-issue":{"issue":"2"},"URL":"https:\/\/doi.org\/10.3233\/mgs-180286","relation":{},"ISSN":["1875-9076","1574-1702"],"issn-type":[{"value":"1875-9076","type":"electronic"},{"value":"1574-1702","type":"print"}],"subject":[],"published":{"date-parts":[[2018,6,26]]}}}