{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,12,18]],"date-time":"2025-12-18T09:38:46Z","timestamp":1766050726934,"version":"3.38.0"},"reference-count":49,"publisher":"Tech Science Press","issue":"1","license":[{"start":{"date-parts":[[2024,10,20]],"date-time":"2024-10-20T00:00:00Z","timestamp":1729382400000},"content-version":"vor","delay-in-days":293,"URL":"https:\/\/doi.org\/10.32604\/TSP-CROSSMARKPOLICY"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["CMC"],"published-print":{"date-parts":[[2024]]},"DOI":"10.32604\/cmc.2024.054473","type":"journal-article","created":{"date-parts":[[2024,9,23]],"date-time":"2024-09-23T07:58:36Z","timestamp":1727078316000},"page":"843-866","update-policy":"https:\/\/doi.org\/10.32604\/tsp-crossmarkpolicy","source":"Crossref","is-referenced-by-count":3,"title":["Dynamical Artificial Bee Colony for Energy-Efficient Unrelated Parallel Machine Scheduling with Additional Resources and Maintenance"],"prefix":"10.32604","volume":"81","author":[{"given":"Yizhuo","family":"Zhu","sequence":"first","affiliation":[]},{"given":"Shaosi","family":"He","sequence":"additional","affiliation":[]},{"given":"Deming","family":"Lei","sequence":"additional","affiliation":[]}],"member":"17807","published-online":{"date-parts":[[2024]]},"reference":[{"key":"ref1","doi-asserted-by":"crossref","first-page":"271","DOI":"10.1016\/0377-2217(90)90215-W","article-title":"A state-of-the-art review of parallel-machine scheduling research","volume":"47","author":"Cheng","year":"1990","journal-title":"Eur. J. Oper. Res."},{"key":"ref2","first-page":"193","article-title":"Parallel machine scheduling problems: A survey","volume":"18","author":"Mokotoff","year":"2011","journal-title":"Asia-Pacific. J. Oper. Res."},{"key":"ref3","doi-asserted-by":"crossref","first-page":"71","DOI":"10.1016\/j.cor.2017.06.019","article-title":"Solving a bi-objective unrelated parallel batch processing machines scheduling problem: A comparison study","volume":"88","author":"Shahidi-Zadeh","year":"2017","journal-title":"Comput. Oper. Res."},{"key":"ref4","first-page":"1849","article-title":"A novel collaborative evolutionary algorithm with two-population for multi-objective flexible job shop scheduling","volume":"137","author":"Wang","year":"2023","journal-title":"Comput. Model. Eng. Sci."},{"key":"ref5","first-page":"325","article-title":"Scheduling an energy-aware parallel machine system with deteriorating and learning effects considering multiple optimization objectives and stochastic processing time","volume":"135","author":"Wang","year":"2023","journal-title":"Comput. Model. Eng. Sci."},{"key":"ref6","doi-asserted-by":"crossref","first-page":"1945","DOI":"10.1016\/S0305-0548(02)00118-1","article-title":"Parallel machine scheduling with earliness-tardiness penalties and additional resource constraints","volume":"30","author":"Ventura","year":"2003","journal-title":"Comput. Oper. Res."},{"key":"ref7","doi-asserted-by":"crossref","first-page":"28","DOI":"10.1016\/j.eswa.2016.08.039","article-title":"A two-stage adaptive fruit fly optimization algorithm for unrelated parallel machine scheduling problem with additional resource constraints","volume":"65","author":"Zheng","year":"2016","journal-title":"Expert. Syst. Appl."},{"key":"ref8","doi-asserted-by":"crossref","first-page":"482","DOI":"10.1016\/j.ejor.2017.01.002","article-title":"Models and matheuristics for the unrelated parallel machine scheduling problem with additional resources","volume":"260","author":"Fanjul-Peyro","year":"2017","journal-title":"Eur. J. Oper. Res."},{"key":"ref9","doi-asserted-by":"crossref","first-page":"839","DOI":"10.1016\/j.ejor.2018.05.056","article-title":"Algorithms for the unrelated parallel machine scheduling problem with a resource constraint","volume":"271","author":"Fleszar","year":"2018","journal-title":"Eur. J. Oper. Res."},{"key":"ref10","doi-asserted-by":"crossref","first-page":"790","DOI":"10.1109\/TSMC.2016.2616347","article-title":"A collaborative multiobjective fruit fly optimization algorithm for the resource constrained unrelated parallel machine green scheduling problem","volume":"48","author":"Zheng","year":"2018","journal-title":"IEEE Trans. Syst. Man Cyber. Syst."},{"key":"ref11","doi-asserted-by":"crossref","first-page":"28","DOI":"10.1016\/j.eswa.2017.09.054","article-title":"Heuristic algorithms for the unrelated parallel machine scheduling problem with one scarce additional resource","volume":"93","author":"Villa","year":"2018","journal-title":"Expert. Syst. Appl."},{"key":"ref12","doi-asserted-by":"crossref","first-page":"423","DOI":"10.1007\/s10845-015-1117-6","article-title":"Design of an efficient genetic algorithm for resource-constrained unrelated parallel machine scheduling with machine eligibility restrictions","volume":"29","author":"Afzalirad","year":"2018","journal-title":"J. Intell. Manuf."},{"key":"ref13","doi-asserted-by":"crossref","first-page":"415","DOI":"10.1016\/j.cor.2019.07.016","article-title":"Enriched metaheuristics for the resource unrelated parallel machine scheduling problem","volume":"111","author":"Vallada","year":"2019","journal-title":"Comput.Oper. Res."},{"key":"ref14","doi-asserted-by":"crossref","first-page":"171533","DOI":"10.1109\/ACCESS.2019.2955975","article-title":"Optimize unrelated parallel machine scheduling problems with multiple limited additional resources, sequence-dependent setup times and release date constraints","volume":"7","author":"Al-Harkan","year":"2019","journal-title":"IEEE Access"},{"key":"ref15","article-title":"Models and an exact method for the unrelated parallel machine scheduling problem with setups and resources","volume":"5","author":"Fanjul-Peyro","year":"2020, Art. no. 100022","journal-title":"Expert Syst. Appl. X"},{"key":"ref16","doi-asserted-by":"crossref","first-page":"6013","DOI":"10.1080\/00207543.2022.2121869","article-title":"GRASP algorithm for the unrelated parallel machines scheduling problem with additional resources during processing and setups","volume":"61","author":"Lopez-Esteve","year":"2023","journal-title":"Int. J. Prod. Res."},{"key":"ref17","doi-asserted-by":"crossref","first-page":"2212","DOI":"10.1080\/00207543.2021.1885068","article-title":"Constraint programming approach for multiresource-constrained unrelated parallel machine scheduling problem with sequence-dependent setup times","volume":"60","author":"Pinar","year":"2022","journal-title":"Int. J. Prod. Res."},{"key":"ref18","doi-asserted-by":"crossref","first-page":"1458","DOI":"10.1016\/j.cor.2011.08.017","article-title":"Unrelated parallel machine scheduling with aging effects and multi-maintenance activities","volume":"39","author":"Yang","year":"2012","journal-title":"Comput. Oper. Res."},{"key":"ref19","doi-asserted-by":"crossref","first-page":"182","DOI":"10.1016\/j.jmsy.2015.07.002","article-title":"Multi-objective optimization of parallel machine scheduling integrated with multi-resources preventive maintenance planning","volume":"37","author":"Wang","year":"2015","journal-title":"J. Manuf. Syst."},{"key":"ref20","doi-asserted-by":"crossref","first-page":"90","DOI":"10.1016\/j.ejor.2015.12.047","article-title":"Parallel-machine scheduling with maintenance: Praising the assignment problem","volume":"252","author":"Gara-Ali","year":"2016","journal-title":"Eur. J. Oper. Res."},{"key":"ref21","doi-asserted-by":"crossref","first-page":"364","DOI":"10.1016\/j.cie.2018.07.006","article-title":"Including preventive maintenance activities in an unrelated parallel machine environment with dependent setup times","volume":"123","author":"Avalos-Rosales","year":"2018","journal-title":"Comput. Ind. Eng."},{"key":"ref22","doi-asserted-by":"crossref","first-page":"121223","DOI":"10.1109\/ACCESS.2019.2937747","article-title":"A novel imperialist competitive algorithm with multi-elite individuals guidance for multi-object unrelated parallel machine scheduling problem","volume":"7","author":"Wang","year":"2019","journal-title":"IEEE Access"},{"key":"ref23","doi-asserted-by":"crossref","DOI":"10.3390\/sym13091574","article-title":"A novel shuffled frog-leaping algorithm for unrelated parallel machine scheduling with deteriorating maintenance and setup time","volume":"13","author":"Lei","year":"2021, Art. no. 1574","journal-title":"Symmetry"},{"key":"ref24","doi-asserted-by":"crossref","first-page":"139089","DOI":"10.1109\/ACCESS.2021.3118986","article-title":"Feature-extraction-based iterated algorithm to solve the unrelated parallel machine problem with periodic maintenance activities","volume":"9","author":"Pang","year":"2021","journal-title":"IEEE Access"},{"key":"ref25","doi-asserted-by":"crossref","DOI":"10.1016\/j.cie.2020.106320","article-title":"An artificial bee colony with division for distributed unrelated parallel machine scheduling with preventive maintenance","volume":"141","author":"Lei","year":"2020, Art. no. 106320","journal-title":"Comput. Ind. Eng."},{"key":"ref26","doi-asserted-by":"crossref","DOI":"10.1016\/j.eswa.2022.117577","article-title":"An adaptive artificial bee colony for unrelated parallel machine scheduling with additional resource and maintenance","volume":"205","author":"Lei","year":"2022, Art. no. 117577","journal-title":"Expert. Syst. Appl."},{"key":"ref27","doi-asserted-by":"crossref","first-page":"688","DOI":"10.1016\/j.jclepro.2017.04.018","article-title":"Energy-conscious unrelated parallel machine scheduling under time-of-use electricity tariffs","volume":"156","author":"Che","year":"2017","journal-title":"J. Clean. Prod."},{"key":"ref28","doi-asserted-by":"crossref","first-page":"996","DOI":"10.1111\/itor.12566","article-title":"Bi-criteria formulation for green scheduling with unrelated parallel machines with sequence-dependent setup times","volume":"28","author":"Cota","year":"2021","journal-title":"Int. Trans. Oper. Res."},{"key":"ref29","doi-asserted-by":"crossref","first-page":"232","DOI":"10.1016\/j.jclepro.2018.10.048","article-title":"Energy cost minimization for unrelated parallel machine scheduling under real time and demand charge pricing","volume":"208","author":"Abikarram","year":"2019","journal-title":"J. Clean. Prod."},{"key":"ref30","doi-asserted-by":"crossref","first-page":"6826","DOI":"10.1080\/00207543.2019.1685708","article-title":"A new unrelated parallel machine scheduling problem with tool changes to minimise the total energy consumption","volume":"58","author":"Zhang","year":"2020","journal-title":"Int. J. Prod. Res."},{"key":"ref31","doi-asserted-by":"crossref","first-page":"168688","DOI":"10.1109\/ACCESS.2019.2954601","article-title":"A novel multi-objective scheduling method for energy based unrelated parallel machines with auxiliary resource constraints","volume":"7","author":"Wang","year":"2019","journal-title":"IEEE Access"},{"key":"ref32","doi-asserted-by":"crossref","DOI":"10.1016\/j.jclepro.2019.119393","article-title":"Energy-efficient scheduling in an unrelated parallel-machine environment under time-of-use electricity tariffs","volume":"249","author":"Saberi-Aliabad","year":"2020, Art. no. 119393","journal-title":"J. Clean. Prod."},{"key":"ref33","doi-asserted-by":"crossref","first-page":"743","DOI":"10.1109\/TASE.2020.2995078","article-title":"An approximation algorithm for unrelated parallel machine scheduling under TOU electricity tariffs","volume":"18","author":"Pei","year":"2020","journal-title":"IEEE Trans. Auto. Sci. Eng."},{"key":"ref34","doi-asserted-by":"crossref","DOI":"10.1016\/j.eswa.2021.114843","article-title":"A combinatorial evolutionary algorithm for unrelated parallel machine scheduling problem with sequence and machine-dependent setup times, limited worker resources and learning effect","volume":"175","author":"Zhang","year":"2021, Art. no. 114843","journal-title":"Expert. Syst. Appl."},{"key":"ref35","doi-asserted-by":"crossref","first-page":"1159","DOI":"10.1007\/s00170-010-3140-2","article-title":"Pareto-based discrete artificial bee colony algorithm for multi-objective flexible job shop scheduling problem","volume":"55","author":"Li","year":"2011","journal-title":"Int. J. Adv. Manuf. Techno."},{"key":"ref36","first-page":"3279","article-title":"Unrelated parallel machine scheduling with sequence and machine-dependent setup times and due date constraints","volume":"8","author":"Ying","year":"2012","journal-title":"Int. J. Innov. Comput."},{"key":"ref37","doi-asserted-by":"crossref","first-page":"172","DOI":"10.1016\/j.cor.2014.05.013","article-title":"ABC-based manufacturing scheduling for unrelated parallel machines with machine-dependent and job sequence-dependent setup times","volume":"51","author":"Ying","year":"2014","journal-title":"Comput. Oper. Res."},{"key":"ref38","doi-asserted-by":"crossref","first-page":"2105","DOI":"10.1007\/s00170-014-6614-9","article-title":"An artificial bee colony algorithm approach for unrelated parallel machine scheduling with processing set restrictions, job sequence-dependent setup times, and due date","volume":"77","author":"Caniyilmaz","year":"2015","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"ref39","doi-asserted-by":"crossref","first-page":"168","DOI":"10.1016\/j.asoc.2018.02.018","article-title":"A hybrid ABC-TS algorithm for the unrelated parallel-batching machines scheduling problem with deteriorating jobs and maintenance activity","volume":"66","author":"Lu","year":"2018","journal-title":"Appl. Soft Comput."},{"key":"ref40","doi-asserted-by":"crossref","first-page":"5259","DOI":"10.1080\/00207543.2020.1775911","article-title":"An improved artificial bee colony for multi-objective distributed unrelated parallel machine scheduling","volume":"59","author":"Lei","year":"2020","journal-title":"Int. J. Prod. Res."},{"key":"ref41","doi-asserted-by":"crossref","first-page":"2483","DOI":"10.1007\/s10586-019-03022-z","article-title":"A hybrid multi-objective artificial bee colony algorithm for flexible task scheduling problems in cloud computing system","volume":"23","author":"Li","year":"2020","journal-title":"Cluster Comput."},{"key":"ref42","doi-asserted-by":"crossref","DOI":"10.1016\/j.swevo.2020.100804","article-title":"A distributed heterogeneous permutation flowshop scheduling problem with lot-streaming and carryover sequence-dependent setup time","volume":"60","author":"Meng","year":"2021, Art. no. 100804","journal-title":"Swarm Evol. Comput."},{"key":"ref43","doi-asserted-by":"crossref","first-page":"115","DOI":"10.1016\/j.knosys.2018.02.029","article-title":"A novel hybrid multi-objective artificial bee colony algorithm for blocking lot-streaming flow shop scheduling problems","volume":"148","author":"Gong","year":"2018","journal-title":"Knowl-Based Syst."},{"key":"ref44","doi-asserted-by":"crossref","DOI":"10.1016\/j.asoc.2021.108371","article-title":"An adaptive artificial bee colony with reinforcement learning for distributed three-stage assembly scheduling with maintenance","volume":"117","author":"Wang","year":"2022, Art. no. 108371","journal-title":"Appl. Soft Comput."},{"key":"ref45","doi-asserted-by":"crossref","DOI":"10.1016\/j.asoc.2024.111254","article-title":"A feedback-based artificial bee colony algorithm for energy-efficient flexible flow shop scheduling problem with batch processing machines","volume":"153","author":"Wang","year":"2024, Art. no. 111254","journal-title":"Appl. Soft Comput."},{"key":"ref46","doi-asserted-by":"crossref","first-page":"182","DOI":"10.1109\/4235.996017","article-title":"A fast and elitist multiobjective genetic algorithm: NSGA-II","volume":"6","author":"Deb","year":"2002","journal-title":"IEEE Trans. Evolu. Comput."},{"key":"ref47","doi-asserted-by":"crossref","first-page":"257","DOI":"10.1109\/4235.797969","article-title":"Multi-objective evolutionary algorithms: A comparative case study and the strength Pareto approach","volume":"3","author":"Zitzler","year":"1999","journal-title":"IEEE Trans. Evolu. Comput."},{"key":"ref48","doi-asserted-by":"crossref","first-page":"157","DOI":"10.1007\/s00170-007-0945-8","article-title":"Pareto archive particle swarm optimization for multi-objective fuzzy job shop scheduling problems","volume":"37","author":"Lei","year":"2008","journal-title":"Int. J. Adv. Manuf. Tech."},{"key":"ref49","series-title":"Proc. ICAIS","first-page":"711","article-title":"On metrics for comparing nondominated sets","author":"Knowles","year":"2002"}],"container-title":["Computers, Materials &amp; Continua"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.techscience.com\/files\/cmc\/2024\/TSP_CMC-81-1\/TSP_CMC_54473\/TSP_CMC_54473.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,3,7]],"date-time":"2025-03-07T02:33:51Z","timestamp":1741314831000},"score":1,"resource":{"primary":{"URL":"https:\/\/www.techscience.com\/cmc\/v81n1\/58314"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2024]]},"references-count":49,"journal-issue":{"issue":"1","published-online":{"date-parts":[[2024]]},"published-print":{"date-parts":[[2024]]}},"URL":"https:\/\/doi.org\/10.32604\/cmc.2024.054473","relation":{},"ISSN":["1546-2226"],"issn-type":[{"type":"electronic","value":"1546-2226"}],"subject":[],"published":{"date-parts":[[2024]]},"assertion":[{"value":"2024-05-29","order":0,"name":"received","label":"Received","group":{"name":"publication_history","label":"Publication History"}},{"value":"2024-08-23","order":1,"name":"accepted","label":"Accepted","group":{"name":"publication_history","label":"Publication History"}},{"value":"2024-10-15","order":2,"name":"published","label":"Published Online","group":{"name":"publication_history","label":"Publication History"}}]}}