{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,5]],"date-time":"2026-01-05T07:34:07Z","timestamp":1767598447861,"version":"3.45.0"},"reference-count":57,"publisher":"Tech Science Press","issue":"3","license":[{"start":{"date-parts":[[2025,5,25]],"date-time":"2025-05-25T00:00:00Z","timestamp":1748131200000},"content-version":"vor","delay-in-days":144,"URL":"https:\/\/doi.org\/10.32604\/TSP-CROSSMARKPOLICY"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["CMC"],"published-print":{"date-parts":[[2025]]},"DOI":"10.32604\/cmc.2025.058334","type":"journal-article","created":{"date-parts":[[2025,4,21]],"date-time":"2025-04-21T04:13:06Z","timestamp":1745208786000},"page":"5623-5641","update-policy":"https:\/\/doi.org\/10.32604\/tsp-crossmarkpolicy","source":"Crossref","is-referenced-by-count":1,"title":["A Q-Learning-Assisted Co-Evolutionary Algorithm for Distributed Assembly Flexible Job Shop Scheduling Problems"],"prefix":"10.32604","volume":"83","author":[{"given":"Song","family":"Gao","sequence":"first","affiliation":[]},{"given":"Shixin","family":"Liu","sequence":"additional","affiliation":[]}],"member":"17807","published-online":{"date-parts":[[2025]]},"reference":[{"key":"ref1","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.ejor.2023.02.001","article-title":"A review and classification on distributed permutation flowshop scheduling problems","volume":"312","author":"Perez-Gonzalez","year":"2024","journal-title":"Eur J Oper Res"},{"key":"ref2","doi-asserted-by":"crossref","first-page":"625","DOI":"10.26599\/TST.2021.9010009","article-title":"Distributed scheduling problems in intelligent manufacturing systems","volume":"26","author":"Fu","year":"2021","journal-title":"Tsinghua Sci Technol"},{"key":"ref3","first-page":"1","article-title":"An iterated greedy algorithm with reinforcement learning for distributed hybrid FlowShop problems with job merging","volume":"PP","author":"Tao","year":"2024","journal-title":"IEEE Trans Evol Comput"},{"key":"ref4","doi-asserted-by":"crossref","first-page":"232","DOI":"10.1109\/TEVC.2024.3354850","article-title":"A bi-learning evolutionary algorithm for transportation-constrained and distributed energy-efficient flexible scheduling","volume":"29","author":"Pan","year":"2025","journal-title":"IEEE Trans Evol Comput"},{"key":"ref5","doi-asserted-by":"crossref","first-page":"121205","DOI":"10.1016\/j.eswa.2023.121205","article-title":"An effective reformative memetic algorithm for distributed flexible job-shop scheduling problem with order cancellation","volume":"237","author":"Zhu","year":"2024","journal-title":"Expert Syst Appl"},{"key":"ref6","doi-asserted-by":"crossref","first-page":"86","DOI":"10.1080\/00207543.2024.2356628","article-title":"Scheduling stochastic distributed flexible job shops using an multi-objective evolutionary algorithm with simulation evaluation","volume":"63","author":"Fu","year":"2025","journal-title":"Int J Prod Res"},{"key":"ref7","doi-asserted-by":"crossref","first-page":"121050","DOI":"10.1016\/j.eswa.2023.121050","article-title":"A Q-learning-based hyper-heuristic evolutionary algorithm for the distributed flexible job-shop scheduling problem with crane transportation","volume":"234","author":"Zhang","year":"2023","journal-title":"Expert Syst Appl"},{"key":"ref8","doi-asserted-by":"crossref","first-page":"107458","DOI":"10.1016\/j.engappai.2023.107458","article-title":"A knowledge-guided bi-population evolutionary algorithm for energy-efficient scheduling of distributed flexible job shop problem","volume":"128","author":"Yu","year":"2024","journal-title":"Eng Appl Artif Intell"},{"key":"ref9","doi-asserted-by":"crossref","first-page":"111943","DOI":"10.1016\/j.asoc.2024.111943","article-title":"Integrated scheduling of multi-constraint open shop and vehicle routing: mathematical model and learning-driven brain storm optimization algorithm","volume":"163","author":"Fu","year":"2024","journal-title":"Appl Soft Comput"},{"key":"ref10","doi-asserted-by":"crossref","first-page":"109217","DOI":"10.1016\/j.cie.2023.109217","article-title":"Multi-Objective brain storm optimization for integrated scheduling of distributed flow shop and distribution with maximal processing quality and minimal total weighted earliness and tardiness","volume":"179","author":"Hou","year":"2023","journal-title":"Comput Ind Eng"},{"key":"ref11","doi-asserted-by":"crossref","first-page":"106744","DOI":"10.1016\/j.cor.2024.106744","article-title":"Multi-objective evolutionary algorithm based flexible assembly job-shop rescheduling with component sharing for order insertion","volume":"169","author":"Sun","year":"2024","journal-title":"Comput Oper Res"},{"key":"ref12","doi-asserted-by":"crossref","first-page":"5259","DOI":"10.1080\/00207543.2020.1775911","article-title":"An improved artificial bee colony for multi-objective distributed unrelated parallel machine scheduling","volume":"59","author":"Lei","year":"2021","journal-title":"Int J Prod Res"},{"key":"ref13","doi-asserted-by":"crossref","first-page":"215","DOI":"10.1109\/TASE.2023.3349167","article-title":"Scheduling a distributed permutation flowshop with uniform machines and release dates","volume":"22","author":"Bai","year":"2024","journal-title":"IEEE Trans Autom Sci Eng"},{"key":"ref14","doi-asserted-by":"crossref","first-page":"361","DOI":"10.1109\/TASE.2022.3151648","article-title":"Improved meta-heuristics for solving distributed lot-streaming permutation flow shop scheduling problems","volume":"20","author":"Pan","year":"2023","journal-title":"IEEE Trans Autom Sci Eng"},{"key":"ref15","doi-asserted-by":"crossref","first-page":"82","DOI":"10.1016\/j.jmsy.2023.09.002","article-title":"A hybrid genetic tabu search algorithm for distributed flexible job shop scheduling problems","volume":"71","author":"Xie","year":"2023","journal-title":"J Manuf Syst"},{"key":"ref16","doi-asserted-by":"crossref","first-page":"101419","DOI":"10.1016\/j.swevo.2023.101419","article-title":"Inverse model and adaptive neighborhood search based cooperative optimizer for energy-efficient distributed flexible job shop scheduling","volume":"83","author":"Cao","year":"2023","journal-title":"Swarm Evol Comput"},{"key":"ref17","doi-asserted-by":"crossref","first-page":"121667","DOI":"10.1016\/j.eswa.2023.121667","article-title":"A tri-individual iterated greedy algorithm for the distributed hybrid flow shop with blocking","volume":"237","author":"Liu","year":"2024","journal-title":"Expert Syst Appl"},{"key":"ref18","doi-asserted-by":"crossref","first-page":"7409","DOI":"10.1109\/TASE.2024.3371940","article-title":"Distributed heterogeneous flow shop scheduling method for dual-carbon goals","volume":"22","author":"Yan","year":"2024","journal-title":"IEEE Trans Autom Sci Eng"},{"key":"ref19","doi-asserted-by":"crossref","first-page":"122734","DOI":"10.1016\/j.eswa.2023.122734","article-title":"An effective memetic algorithm for distributed flexible job shop scheduling problem considering integrated sequencing flexibility","volume":"242","author":"Tang","year":"2024","journal-title":"Expert Syst Appl"},{"key":"ref20","doi-asserted-by":"crossref","first-page":"107493","DOI":"10.1016\/j.cie.2021.107493","article-title":"Integrating flexible preventive maintenance activities into two-stage assembly flow shop scheduling with multiple assembly machines","volume":"159","author":"Zhang","year":"2021","journal-title":"Comput Ind Eng"},{"key":"ref21","doi-asserted-by":"crossref","first-page":"122744","DOI":"10.1016\/j.eswa.2023.122744","article-title":"Deadlock control and hybrid social spider scheduling algorithm for two-stage assembly permutation flowshop with limited buffers","volume":"245","author":"Cao","year":"2024","journal-title":"Expert Syst Appl"},{"key":"ref22","doi-asserted-by":"crossref","first-page":"484","DOI":"10.1016\/j.jmsy.2023.08.008","article-title":"Mathematical model and adaptive simulated annealing algorithm for mixed-model assembly job-shop scheduling with lot streaming","volume":"70","author":"Cheng","year":"2023","journal-title":"J Manuf Syst"},{"key":"ref23","doi-asserted-by":"crossref","first-page":"614","DOI":"10.1080\/0305215X.2021.1887168","article-title":"Scheduling in a flexible job shop followed by some parallel assembly stations considering lot streaming","volume":"54","author":"Daneshamooz","year":"2022","journal-title":"Eng Optim"},{"key":"ref24","doi-asserted-by":"crossref","first-page":"120043","DOI":"10.1016\/j.eswa.2023.120043","article-title":"A teaching-learning-based optimization with feedback for L-R fuzzy flexible assembly job shop scheduling problem with batch splitting","volume":"224","author":"Sun","year":"2023","journal-title":"Expert Syst Appl"},{"key":"ref25","doi-asserted-by":"crossref","first-page":"108491","DOI":"10.1016\/j.engappai.2024.108491","article-title":"A hybrid estimation of distribution algorithm for solving assembly flexible job shop scheduling in a distributed environment","volume":"133","author":"Du","year":"2024","journal-title":"Eng Appl Artif Intell"},{"key":"ref26","doi-asserted-by":"crossref","first-page":"108634","DOI":"10.1016\/j.engappai.2024.108634","article-title":"Matheuristic and learning-oriented multi-objective artificial bee colony algorithm for energy-aware flexible assembly job shop scheduling problem","volume":"133","author":"Hu","year":"2024","journal-title":"Eng Appl Artif Intell"},{"key":"ref27","doi-asserted-by":"crossref","first-page":"5867","DOI":"10.1080\/00207543.2020.1794075","article-title":"Adaptive scheduling for assembly job shop with uncertain assembly times based on dual Q-learning","volume":"59","author":"Wang","year":"2021","journal-title":"Int J Prod Res"},{"key":"ref28","doi-asserted-by":"crossref","first-page":"6292","DOI":"10.1080\/00207543.2024.2313087","article-title":"A modified memetic algorithm with multi-operation precise joint movement neighbourhood structure for the assembly job shop scheduling problem","volume":"62","author":"Ba","year":"2024","journal-title":"Int J Prod Res"},{"key":"ref29","doi-asserted-by":"crossref","first-page":"108126","DOI":"10.1016\/j.cie.2022.108126","article-title":"A cooperative memetic algorithm with feedback for the energy-aware distributed flow-shops with flexible assembly scheduling","volume":"168","author":"Wang","year":"2022","journal-title":"Comput Ind Eng"},{"key":"ref30","doi-asserted-by":"crossref","first-page":"6692","DOI":"10.1109\/TII.2022.3192881","article-title":"A population-based iterated greedy algorithm for distributed assembly no-wait flow-shop scheduling problem","volume":"19","author":"Zhao","year":"2023","journal-title":"IEEE Trans Ind Inform"},{"key":"ref31","doi-asserted-by":"crossref","first-page":"101497","DOI":"10.1016\/j.swevo.2024.101497","article-title":"A Q-learning memetic algorithm for energy-efficient heterogeneous distributed assembly permutation flowshop scheduling considering priorities","volume":"85","author":"Luo","year":"2024","journal-title":"Swarm Evol Comput"},{"key":"ref32","doi-asserted-by":"crossref","first-page":"1755","DOI":"10.1080\/00207543.2022.2047238","article-title":"An effective memetic algorithm for the distributed flowshop scheduling problem with an assemble machine","volume":"61","author":"Huang","year":"2023","journal-title":"Int J Prod Res"},{"key":"ref33","doi-asserted-by":"crossref","first-page":"107818","DOI":"10.1016\/j.engappai.2023.107818","article-title":"A feedback learning-based selection hyper-heuristic for distributed heterogeneous hybrid blocking flow-shop scheduling problem with flexible assembly and setup time","volume":"131","author":"Shao","year":"2024","journal-title":"Eng Appl Artif Intell"},{"key":"ref34","doi-asserted-by":"crossref","first-page":"101485","DOI":"10.1016\/j.swevo.2024.101485","article-title":"A genetic algorithm with critical path-based variable neighborhood search for distributed assembly job shop scheduling problem","volume":"85","author":"Tian","year":"2024","journal-title":"Swarm Evol Comput"},{"key":"ref35","doi-asserted-by":"crossref","first-page":"109780","DOI":"10.1016\/j.compeleceng.2024.109780","article-title":"Review on ensemble meta-heuristics and reinforcement learning for manufacturing scheduling problems","volume":"120","author":"Fu","year":"2024","journal-title":"Comput Electr Eng"},{"key":"ref36","doi-asserted-by":"crossref","first-page":"106230","DOI":"10.1016\/j.engappai.2023.106230","article-title":"A Q-learning artificial bee colony for distributed assembly flow shop scheduling with factory eligibility, transportation capacity and setup time","volume":"123","author":"Wang","year":"2023","journal-title":"Eng Appl Artif Intell"},{"key":"ref37","doi-asserted-by":"crossref","first-page":"185","DOI":"10.1007\/s10845-023-02227-9","article-title":"Q-learning-based multi-objective particle swarm optimization with local search within factories for energy-efficient distributed flow-shop scheduling problem","volume":"36","author":"Zhang","year":"2025","journal-title":"J Intell Manuf"},{"key":"ref38","doi-asserted-by":"crossref","first-page":"112247","DOI":"10.1016\/j.asoc.2024.112247","article-title":"Energy-efficient multi-objective distributed assembly permutation flowshop scheduling by Q-learning based meta-heuristics","volume":"166","author":"Yu","year":"2024","journal-title":"Appl Soft Comput"},{"key":"ref39","doi-asserted-by":"crossref","first-page":"3207","DOI":"10.1109\/TSMC.2024.3358383","article-title":"An iterative greedy algorithm with Q-learning mechanism for the multiobjective distributed no-idle permutation flowshop scheduling","volume":"54","author":"Zhao","year":"2024","journal-title":"IEEE Trans Syst Man Cybern Syst"},{"key":"ref40","doi-asserted-by":"crossref","first-page":"110484","DOI":"10.1016\/j.cie.2024.110484","article-title":"A learning-driven multi-objective cooperative artificial bee colony algorithm for distributed flexible job shop scheduling problems with preventive maintenance and transportation operations","volume":"196","author":"Zhang","year":"2024","journal-title":"Comput Ind Eng"},{"key":"ref41","doi-asserted-by":"crossref","first-page":"101658","DOI":"10.1016\/j.swevo.2024.101658","article-title":"A Q-Learning based NSGA-II for dynamic flexible job shop scheduling with limited transportation resources","volume":"90","author":"Chen","year":"2024","journal-title":"Swarm Evol Comput"},{"key":"ref42","doi-asserted-by":"crossref","first-page":"2237","DOI":"10.1016\/j.asoc.2012.03.025","article-title":"Co-evolutionary genetic algorithm for fuzzy flexible job shop scheduling","volume":"12","author":"Lei","year":"2012","journal-title":"Appl Soft Comput"},{"key":"ref43","doi-asserted-by":"crossref","first-page":"101175","DOI":"10.1016\/j.swevo.2022.101175","article-title":"Integration routing and scheduling for multiple home health care centers using a multi-objective cooperation evolutionary algorithm with stochastic simulation","volume":"75","author":"Ma","year":"2022","journal-title":"Swarm Evol Comput"},{"key":"ref44","doi-asserted-by":"crossref","first-page":"101467","DOI":"10.1016\/j.swevo.2023.101467","article-title":"A cooperative evolutionary algorithm with simulated annealing for integrated scheduling of distributed flexible job shops and distribution","volume":"85","author":"Zhang","year":"2024","journal-title":"Swarm Evol Comput"},{"key":"ref45","doi-asserted-by":"crossref","first-page":"303","DOI":"10.1007\/s00170-011-3610-1","article-title":"An effective artificial bee colony algorithm for the flexible job-shop scheduling problem","volume":"60","author":"Wang","year":"2012","journal-title":"Int J Adv Manuf Technol"},{"key":"ref46","doi-asserted-by":"crossref","first-page":"904","DOI":"10.1109\/JAS.2019.1911540","article-title":"A review on swarm intelligence and evolutionary algorithms for solving flexible job shop scheduling problems","volume":"6","author":"Gao","year":"2019","journal-title":"IEEE\/CAA J Autom Sin"},{"key":"ref47","doi-asserted-by":"crossref","first-page":"754","DOI":"10.1016\/j.cor.2009.06.019","article-title":"The distributed permutation flowshop scheduling problem","volume":"37","author":"Naderi","year":"2010","journal-title":"Comput Oper Res"},{"key":"ref48","doi-asserted-by":"crossref","first-page":"515","DOI":"10.1016\/j.jclepro.2019.04.046","article-title":"Stochastic multi-objective modelling and optimization of an energy-conscious distributed permutation flow shop scheduling problem with the total tardiness constraint","volume":"226","author":"Fu","year":"2019","journal-title":"J Clean Prod"},{"key":"ref49","doi-asserted-by":"crossref","first-page":"748","DOI":"10.1002\/tee.22625","article-title":"Parallel machine scheduling with dynamic resource allocation via a master-slave genetic algorithm","volume":"13","author":"Fu","year":"2018","journal-title":"IEEJ Trans Electr Electron Eng"},{"key":"ref50","doi-asserted-by":"crossref","first-page":"8013","DOI":"10.1109\/TCYB.2023.3280175","article-title":"Surprisingly popular-based adaptive memetic algorithm for energy-efficient distributed flexible job shop scheduling","volume":"53","author":"Li","year":"2023","journal-title":"IEEE Trans Cybern"},{"key":"ref51","doi-asserted-by":"crossref","first-page":"109115","DOI":"10.1016\/j.cie.2023.109115","article-title":"A no-tardiness job shop scheduling problem with overtime consideration and the solution approaches","volume":"178","author":"Shi","year":"2023","journal-title":"Comput Ind Eng"},{"key":"ref52","doi-asserted-by":"crossref","first-page":"184","DOI":"10.23919\/CSMS.2024.0007","article-title":"A Q-learning based hybrid meta-heuristic for integrated scheduling of disassembly and reprocessing processes considering product structures and stochasticity","volume":"4","author":"Wang","year":"2024","journal-title":"Complex Syst Model Simul"},{"key":"ref53","doi-asserted-by":"crossref","first-page":"1973","DOI":"10.1007\/s10845-015-1084-y","article-title":"Optimisation of distributed manufacturing flexible job shop scheduling by using hybrid genetic algorithms","volume":"28","author":"Chang","year":"2017","journal-title":"J Intell Manuf"},{"key":"ref54","doi-asserted-by":"crossref","first-page":"108694","DOI":"10.1016\/j.asoc.2022.108694","article-title":"A hybrid teaching and learning-based optimization algorithm for distributed sand casting job-shop scheduling problem","volume":"120","author":"Tang","year":"2022","journal-title":"Appl Soft Comput"},{"key":"ref55","doi-asserted-by":"crossref","first-page":"2105","DOI":"10.1007\/s11431-022-2096-6","article-title":"Improved gray wolf optimizer for distributed flexible job shop scheduling problem","volume":"65","author":"Li","year":"2022","journal-title":"Sci China Technol Sci"},{"key":"ref56","doi-asserted-by":"crossref","first-page":"205","DOI":"10.1007\/BF01719451","article-title":"Tabu search for the job-shop scheduling problem with multi-purpose machines","volume":"15","author":"Hurink","year":"1994","journal-title":"Oper Res Spektrum"},{"key":"ref57","doi-asserted-by":"crossref","first-page":"4260","DOI":"10.1109\/TSMC.2024.3376292","article-title":"Multiobjective scheduling of energy-efficient stochastic hybrid open shop with brain storm optimization and simulation evaluation","volume":"54","author":"Fu","year":"2024","journal-title":"IEEE Trans Syst Man Cybern Syst"}],"container-title":["Computers, Materials &amp; Continua"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/cdn.techscience.cn\/files\/cmc\/2025\/TSP_CMC-83-3\/TSP_CMC_58334\/TSP_CMC_58334.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,11,17]],"date-time":"2025-11-17T01:26:32Z","timestamp":1763342792000},"score":1,"resource":{"primary":{"URL":"https:\/\/www.techscience.com\/cmc\/v83n3\/60979"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2025]]},"references-count":57,"journal-issue":{"issue":"3","published-online":{"date-parts":[[2025]]},"published-print":{"date-parts":[[2025]]}},"URL":"https:\/\/doi.org\/10.32604\/cmc.2025.058334","relation":{},"ISSN":["1546-2226"],"issn-type":[{"type":"electronic","value":"1546-2226"}],"subject":[],"published":{"date-parts":[[2025]]},"assertion":[{"value":"2024-09-10","order":0,"name":"received","label":"Received","group":{"name":"publication_history","label":"Publication History"}},{"value":"2025-03-11","order":1,"name":"accepted","label":"Accepted","group":{"name":"publication_history","label":"Publication History"}},{"value":"2025-05-19","order":2,"name":"published","label":"Published Online","group":{"name":"publication_history","label":"Publication History"}}]}}