{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,9]],"date-time":"2026-03-09T23:53:32Z","timestamp":1773100412238,"version":"3.50.1"},"reference-count":37,"publisher":"Tech Science Press","issue":"2","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["CMC"],"published-print":{"date-parts":[[2025]]},"DOI":"10.32604\/cmc.2025.066267","type":"journal-article","created":{"date-parts":[[2025,6,12]],"date-time":"2025-06-12T02:17:48Z","timestamp":1749694668000},"page":"3649-3672","source":"Crossref","is-referenced-by-count":1,"title":["An SAC-AMBER Algorithm for Flexible Job Shop Scheduling with Material Kit"],"prefix":"10.32604","volume":"84","author":[{"given":"Bo","family":"Li","sequence":"first","affiliation":[]},{"given":"Xiaoying","family":"Yang","sequence":"additional","affiliation":[]},{"given":"Zhijie","family":"Pei","sequence":"additional","affiliation":[]},{"given":"Xin","family":"Yang","sequence":"additional","affiliation":[]},{"given":"Yaqi","family":"Wu","sequence":"additional","affiliation":[]}],"member":"17807","published-online":{"date-parts":[[2025]]},"reference":[{"key":"ref1","doi-asserted-by":"crossref","first-page":"211","DOI":"10.1016\/j.jmsy.2022.12.008","article-title":"An energy-efficient multi-objective scheduling for flexible job-shop-type remanufacturing system","volume":"66","author":"Zhang","year":"2023","journal-title":"J Manuf Syst"},{"key":"ref2","doi-asserted-by":"crossref","first-page":"130","DOI":"10.1016\/j.jmsy.2022.08.004","article-title":"Dynamic scheduling of tasks in cloud manufacturing with multi-agent reinforcement learning","volume":"65","author":"Wang","year":"2022","journal-title":"J Manuf Syst"},{"key":"ref3","doi-asserted-by":"crossref","first-page":"107815","DOI":"10.1016\/j.knosys.2021.107815","article-title":"Dynamic opposite learning enhanced dragonfly algorithm for solving large-scale flexible job shop scheduling problem","volume":"238","author":"Yang","year":"2022","journal-title":"Knowl-Based Syst"},{"key":"ref4","first-page":"375","article-title":"A strengthened dominance relation NSGA-III algorithm based on differential evolution to solve job shop scheduling problem","volume":"78","author":"Zeng","year":"2024","journal-title":"Comput Mater Contin"},{"key":"ref5","doi-asserted-by":"crossref","first-page":"111940","DOI":"10.1016\/j.knosys.2024.111940","article-title":"Flexible job shop scheduling via deep reinforcement learning with meta-path-based heterogeneous graph neural network","volume":"296","author":"Wan","year":"2024","journal-title":"Knowl-Based Syst"},{"key":"ref6","first-page":"2337","article-title":"An improved Harris Hawk optimization algorithm for flexible job shop scheduling problem","volume":"78","author":"Lv","year":"2024","journal-title":"Comput Mater Contin"},{"key":"ref7","doi-asserted-by":"crossref","first-page":"836","DOI":"10.3390\/machines10100836","article-title":"Multi-objective parallel machine scheduling with eligibility constraints for the kitting of metal structural parts","volume":"10","author":"Zhu","year":"2022","journal-title":"Machines"},{"key":"ref8","doi-asserted-by":"crossref","first-page":"641","DOI":"10.3390\/sym16060641","article-title":"An adaptive search algorithm for multiplicity dynamic flexible job shop scheduling with new order arrivals","volume":"16","author":"Ding","year":"2024","journal-title":"Symmetry"},{"key":"ref9","doi-asserted-by":"crossref","first-page":"5215","DOI":"10.3390\/app13085215","article-title":"A two-phase iterative mathematical programming-based heuristic for a flexible job shop scheduling problem with transportation","volume":"13","author":"Lim","year":"2023","journal-title":"Appl Sci"},{"key":"ref10","first-page":"1706","article-title":"Multi-objective flexible job shop scheduling using genetic algorithms","volume":"29","author":"Boudjemline","year":"2022","journal-title":"Teh Vjesn"},{"key":"ref11","doi-asserted-by":"crossref","first-page":"298","DOI":"10.1016\/j.jmsy.2021.05.018","article-title":"A hybrid Jaya algorithm for solving flexible job shop scheduling problem considering multiple critical paths","volume":"60","author":"Fan","year":"2021","journal-title":"J Manuf Syst"},{"key":"ref12","doi-asserted-by":"crossref","first-page":"123556","DOI":"10.1016\/j.eswa.2024.123556","article-title":"A new artificial bee colony algorithm for the flexible job shop scheduling problem with extra resource constraints in numeric control centers","volume":"249","author":"Liao","year":"2024","journal-title":"Expert Syst Appl"},{"key":"ref13","doi-asserted-by":"crossref","first-page":"108634","DOI":"10.1016\/j.engappai.2024.108634","article-title":"Matheuristic and learning-oriented multi-objective artificial bee colony algorithm for energy-aware flexible assembly job shop scheduling problem","volume":"133","author":"Hu","year":"2024","journal-title":"Eng Appl Artif Intell"},{"key":"ref14","doi-asserted-by":"crossref","first-page":"110845","DOI":"10.1016\/j.cie.2024.110845","article-title":"Memetic algorithm based on non-dominated levels for flexible job shop scheduling problem with learn-forgetting effect and worker cooperation","volume":"200","author":"Han","year":"2025","journal-title":"Comput Ind Eng"},{"key":"ref15","doi-asserted-by":"crossref","first-page":"109926","DOI":"10.1016\/j.cie.2024.109926","article-title":"An improved MOEA\/D for low-carbon many-objective flexible job shop scheduling problem","volume":"188","author":"Wang","year":"2024","journal-title":"Comput Ind Eng"},{"key":"ref16","doi-asserted-by":"crossref","first-page":"1673","DOI":"10.1109\/TASE.2024.3369019","article-title":"A two-stage individual feedback NSGA-III for dynamic many-objective flexible job shop scheduling problem","volume":"22","author":"Feng","year":"2025","journal-title":"IEEE Trans Autom Sci Eng"},{"key":"ref17","doi-asserted-by":"crossref","first-page":"68760","DOI":"10.1109\/ACCESS.2023.3292548","article-title":"A memetic algorithm with reinforcement learning for sociotechnical production scheduling","volume":"11","author":"Grumbach","year":"2023","journal-title":"IEEE Access"},{"key":"ref18","doi-asserted-by":"crossref","first-page":"1457","DOI":"10.1109\/TASE.2023.3248229","article-title":"Stochastic economic lot scheduling via self-attention based deep reinforcement learning","volume":"21","author":"Song","year":"2024","journal-title":"IEEE Trans Autom Sci Eng"},{"key":"ref19","doi-asserted-by":"crossref","first-page":"1007","DOI":"10.1109\/TII.2023.3272661","article-title":"Large-scale dynamic scheduling for flexible job-shop with random arrivals of new jobs by hierarchical reinforcement learning","volume":"20","author":"Lei","year":"2024","journal-title":"IEEE Trans Ind Inform"},{"key":"ref20","doi-asserted-by":"crossref","first-page":"2018","DOI":"10.3390\/pr11072018","article-title":"Efficient multi-objective optimization on dynamic flexible job shop scheduling using deep reinforcement learning approach","volume":"11","author":"Wu","year":"2023","journal-title":"Processes"},{"key":"ref21","doi-asserted-by":"crossref","first-page":"386","DOI":"10.3390\/pr13020386","article-title":"Solving dynamic multi-objective flexible job shop scheduling problems using a dual-level integrated deep Q-network approach","volume":"13","author":"Xu","year":"2025","journal-title":"Processes"},{"key":"ref22","first-page":"749","article-title":"Collaborative scheduling of machining-assembly in complex multiple parallel production lines environment considering kitting constraints","volume":"14","author":"Xu","year":"2023","journal-title":"Int J Ind Eng Comput"},{"key":"ref23","doi-asserted-by":"crossref","first-page":"351","DOI":"10.1016\/j.jmsy.2024.08.006","article-title":"A multi-level action coupling reinforcement learning approach for online two-stage flexible assembly flow shop scheduling","volume":"76","author":"Qiu","year":"2024","journal-title":"J Manuf Syst"},{"key":"ref24","doi-asserted-by":"crossref","first-page":"102855","DOI":"10.1016\/j.aei.2024.102855","article-title":"An adaptive melody search algorithm based on low-level heuristics for material feeding scheduling optimization in a hybrid kitting system","volume":"62","author":"Huang","year":"2024","journal-title":"Adv Eng Inform"},{"key":"ref25","doi-asserted-by":"crossref","first-page":"144","DOI":"10.1007\/s40747-024-01772-x","article-title":"Preference learning based deep reinforcement learning for flexible job shop scheduling problem","volume":"11","author":"Liu","year":"2025","journal-title":"Complex Intell Syst"},{"key":"ref26","doi-asserted-by":"crossref","first-page":"5699","DOI":"10.1038\/s41598-025-89527-7","article-title":"An enhanced walrus optimization algorithm for flexible job shop scheduling with parallel batch processing operation","volume":"15","author":"Lv","year":"2025","journal-title":"Sci Rep"},{"key":"ref27","doi-asserted-by":"crossref","first-page":"101897","DOI":"10.1016\/j.swevo.2025.101897","article-title":"A discrete water source cycle algorithm design for solving production scheduling problem in flexible manufacturing systems","volume":"94","author":"Xu","year":"2025","journal-title":"Swarm Evol Comput"},{"key":"ref28","doi-asserted-by":"crossref","first-page":"1768","DOI":"10.1109\/TSTE.2024.3376369","article-title":"Two-critic deep reinforcement learning for inverter-based volt-var control in active distribution networks","volume":"15","author":"Liu","year":"2024","journal-title":"IEEE Trans Sustain Energy"},{"key":"ref29","doi-asserted-by":"crossref","first-page":"121107","DOI":"10.1016\/j.ins.2024.121107","article-title":"Blockchain-based crowdsourced deep reinforcement learning as a service","volume":"679","author":"Alagha","year":"2024","journal-title":"Inf Sci"},{"key":"ref30","doi-asserted-by":"crossref","first-page":"403","DOI":"10.1016\/j.icte.2022.06.004","article-title":"Deep reinforcement learning-based model-free path planning and collision avoidance for UAVs: a soft actor-critic with hindsight experience replay approach","volume":"9","author":"Lee","year":"2023","journal-title":"ICT Express"},{"key":"ref31","first-page":"1","article-title":"Trajectory progress-based prioritizing and intrinsic reward mechanism for robust training of robotic manipulations","volume":"22","author":"Liang","year":"2024","journal-title":"IEEE Trans Autom Sci Eng"},{"key":"ref32","doi-asserted-by":"crossref","first-page":"123019","DOI":"10.1016\/j.eswa.2023.123019","article-title":"Solving flexible job shop scheduling problems via deep reinforcement learning","volume":"245","author":"Yuan","year":"2024","journal-title":"Expert Syst Appl"},{"key":"ref33","doi-asserted-by":"crossref","first-page":"2322","DOI":"10.1111\/poms.13977","article-title":"On the multiresource flexible job-shop scheduling problem with arbitrary precedence graphs","volume":"32","author":"Kasapidis","year":"2023","journal-title":"Prod Oper Manage"},{"key":"ref34","doi-asserted-by":"crossref","first-page":"3696","DOI":"10.3390\/electronics13183696","article-title":"A deep reinforcement learning method based on a transformer model for the flexible job shop scheduling problem","volume":"13","author":"Xu","year":"2024","journal-title":"Electronics"},{"key":"ref35","doi-asserted-by":"crossref","first-page":"1600","DOI":"10.1109\/TII.2022.3189725","article-title":"Flexible job-shop scheduling via graph neural network and deep reinforcement learning","volume":"19","author":"Song","year":"2023","journal-title":"IEEE Trans Ind Inform"},{"key":"ref36","doi-asserted-by":"crossref","first-page":"117796","DOI":"10.1016\/j.eswa.2022.117796","article-title":"A multi-action deep reinforcement learning framework for flexible Job-shop scheduling problem","volume":"205","author":"Lei","year":"2022","journal-title":"Expert Syst Appl"},{"key":"ref37","doi-asserted-by":"crossref","first-page":"101655","DOI":"10.1016\/j.swevo.2024.101655","article-title":"A Q-learning-based biology migration algorithm for energy-saving flexible job shop scheduling with speed adjustable machines and transporters","volume":"90","author":"Jiang","year":"2024","journal-title":"Swarm Evol Comput"}],"container-title":["Computers, Materials &amp; Continua"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/cdn.techscience.cn\/files\/cmc\/2025\/TSP_CMC-84-2\/TSP_CMC_66267\/TSP_CMC_66267.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,11,17]],"date-time":"2025-11-17T01:53:33Z","timestamp":1763344413000},"score":1,"resource":{"primary":{"URL":"https:\/\/www.techscience.com\/cmc\/v84n2\/62933"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2025]]},"references-count":37,"journal-issue":{"issue":"2","published-online":{"date-parts":[[2025]]},"published-print":{"date-parts":[[2025]]}},"URL":"https:\/\/doi.org\/10.32604\/cmc.2025.066267","relation":{},"ISSN":["1546-2226"],"issn-type":[{"value":"1546-2226","type":"electronic"}],"subject":[],"published":{"date-parts":[[2025]]}}}