{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,1]],"date-time":"2026-04-01T18:40:57Z","timestamp":1775068857619,"version":"3.50.1"},"reference-count":26,"publisher":"Frontiers Media SA","license":[{"start":{"date-parts":[[2024,4,2]],"date-time":"2024-04-02T00:00:00Z","timestamp":1712016000000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0\/"}],"content-domain":{"domain":["frontiersin.org"],"crossmark-restriction":true},"short-container-title":["Front. Appl. Math. Stat."],"abstract":"<jats:p>Scheduling is one of the many skills required for advancement in today\u2019s modern industry. The flow-shop scheduling problem is a well-known combinatorial optimization challenge. Scheduling issues for flow shops are NP-hard and challenging. The present research investigates a two-stage flow shop scheduling problem with decoupled processing and setup times, where a correlation exists between probabilities, job processing times, and setup times. This study proposes a novel heuristic algorithm that optimally sequences jobs to minimize the makespan and eliminates machine idle time, thereby reducing machine rental costs. The proposed algorithm\u2019s efficacy is demonstrated through several computational examples implemented in MATLAB 2021a. The results are compared with the existing approaches such as those by Johnson, Palmer, NEH, and Nailwal to highlight the proposed algorithm\u2019s superior performance.<\/jats:p>","DOI":"10.3389\/fams.2024.1355237","type":"journal-article","created":{"date-parts":[[2024,4,2]],"date-time":"2024-04-02T04:35:27Z","timestamp":1712032527000},"update-policy":"https:\/\/doi.org\/10.3389\/crossmark-policy","source":"Crossref","is-referenced-by-count":1,"title":["No idle flow shop scheduling models for optimization of machine rental costs with processing and separated setup times"],"prefix":"10.3389","volume":"10","author":[{"given":"Shakuntla","family":"Singla","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Harshleen","family":"Kaur","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Deepak","family":"Gupta","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Umar Muhammad","family":"Modibbo","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Jatinder","family":"Kaur","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"1965","published-online":{"date-parts":[[2024,4,2]]},"reference":[{"key":"ref1","doi-asserted-by":"publisher","first-page":"61","DOI":"10.1002\/nav.3800010110","article-title":"Optimal two-and three-stage production schedules with setup times included","volume":"1","author":"Johnson","year":"1954","journal-title":"Nav Res Logist (NRL)"},{"key":"ref2","doi-asserted-by":"publisher","first-page":"101","DOI":"10.1057\/jors.1965.8","article-title":"Sequencing jobs through a multi stage process in the minimum total time-a quick method for obtaining a near optimum","volume":"16","author":"Palmer","year":"1985","journal-title":"Oper Res"},{"key":"ref3","doi-asserted-by":"publisher","first-page":"671","DOI":"10.5267\/j.ijiec.2016.2.005","article-title":"Heuristics for no-wait flow shop scheduling problem","volume":"7","author":"Nailwal","year":"2016","journal-title":"Int J Ind Eng Comput"},{"key":"ref4","doi-asserted-by":"publisher","first-page":"91","DOI":"10.1016\/0305-0483(83)90088-9","article-title":"A heuristic algorithm for the m-machine, n-job flow shop sequencing problem","volume":"11","author":"Nawaz","year":"1983","journal-title":"Int J Manag Sci"},{"key":"ref5","doi-asserted-by":"publisher","first-page":"201","DOI":"10.1002\/nav.3800030307","article-title":"An extension of Johnson\u2019s results on job IDT scheduling","volume":"3","author":"Jackson","year":"1956","journal-title":"Nav Res Logist Q"},{"key":"ref6","doi-asserted-by":"publisher","first-page":"400","DOI":"10.1287\/opre.13.3.400","article-title":"Application of the branch and bound technique to some flow-shop scheduling problems","volume":"13","author":"Ignall","year":"1965","journal-title":"Oper Res"},{"key":"ref7","doi-asserted-by":"publisher","first-page":"B-630","DOI":"10.1287\/mnsc.16.10.B630","article-title":"A heuristic algorithm for the n job, m machine sequencing problem","volume":"16","author":"Campbell","year":"1970","journal-title":"Manag Sci"},{"key":"ref8","first-page":"912","article-title":"To minimize the rental cost for 3- stage specially structured flow shop scheduling with job weightage","volume":"2","author":"Gupta","year":"2012","journal-title":"Int J Eng Res Appl"},{"key":"ref9","doi-asserted-by":"publisher","first-page":"261","DOI":"10.1080\/05695557908974469","article-title":"Optimal two-stage production scheduling with setup times separated","volume":"11","author":"Yoshida","year":"1979","journal-title":"AIIE Trans"},{"key":"ref10","doi-asserted-by":"publisher","first-page":"1503","DOI":"10.1080\/00207549408957019","article-title":"Impact of sequence-dependent setup time on job shop scheduling performance","volume":"32","author":"Kim","year":"1994","journal-title":"Int J Prod Res"},{"key":"ref11","doi-asserted-by":"publisher","first-page":"219","DOI":"10.1016\/S0305-0483(98)00042-5","article-title":"A review of scheduling research involving setup considerations","volume":"27","author":"Allahverdi","year":"1999","journal-title":"Omega Int J Mgmt Sci"},{"key":"ref12","doi-asserted-by":"publisher","first-page":"495","DOI":"10.1002\/nav.3800290311","article-title":"Flow shop no-idle or no-wait scheduling to minimize the sum of completion times","volume":"29","author":"Adiri","year":"1982","journal-title":"Nav Res Logist"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1016\/j.matpr.2021.01.090","article-title":"Optimizing rental cost with no idle constraints in two machines with weightage","author":"Gupta","year":"2021","journal-title":"Mater Today Proc"},{"key":"ref14","author":"Singla","year":"2023"},{"key":"ref15","author":"Singla","year":"2023"},{"key":"ref16","doi-asserted-by":"publisher","first-page":"425","DOI":"10.2298\/YJOR220315019S","article-title":"Mathematical model for analysing availability of threshing combine machine under reduced capacity","volume":"32","author":"Singla","year":"2022","journal-title":"Yugoslav J Oper Res"},{"key":"ref17","doi-asserted-by":"publisher","first-page":"341","DOI":"10.1007\/s41872-021-00173-0","article-title":"RAP via constraint optimization genetic algorithm","volume":"10","author":"Kumari","year":"2021","journal-title":"Life Cycle Reliab Saf Eng"},{"key":"ref18","doi-asserted-by":"publisher","first-page":"166","DOI":"10.1007\/s13198-021-01183-y","article-title":"Behavior and profit analysis of a thresher plant under steady state","volume":"13","author":"Kumari","year":"2022","journal-title":"Int J Syst Assur Eng Manag"},{"key":"ref19","doi-asserted-by":"publisher","first-page":"1688","DOI":"10.1007\/s13198-021-01524-x","article-title":"Solution of constrained problems using particle swarm optimiziation","volume":"13","author":"Kumari","year":"2022","journal-title":"Int J Syst Assur Eng Manag"},{"key":"ref20","doi-asserted-by":"publisher","first-page":"101852","DOI":"10.1016\/j.mex.2022.101852","article-title":"Performability evaluation, validation and optimization for the steam generation system of a coal-fired thermal power plant","volume":"9","author":"Malik","year":"2022","journal-title":"Methods X"},{"key":"ref21","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1155\/2013\/948541","article-title":"A heuristic approach to flow shop scheduling problem in which processing times are associated with their respective probabilities with no-idle constraint","volume":"2013","author":"Gupta","year":"2013","journal-title":"ISRN Oper Res"},{"key":"ref22","doi-asserted-by":"publisher","first-page":"845","DOI":"10.1038\/s41598-022-04887-8","article-title":"A computational efficient optimization of flow shop scheduling problems","volume":"12","author":"Liang","year":"2022","journal-title":"Sci Rep"},{"key":"ref23","doi-asserted-by":"publisher","first-page":"105977","DOI":"10.1016\/j.engappai.2023.105977","article-title":"Solving energy-efficient fuzzy hybrid flow-shop scheduling problem at a variable machine speed using an extended NSGA-II","volume":"121","author":"Wang","year":"2023","journal-title":"Eng Appl Artif Intell"},{"key":"ref24","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.ejor.2022.08.009","article-title":"A systematic review of multi-objective hybrid flow shop scheduling","volume":"309","author":"Neufeld","year":"2023","journal-title":"Eur J Oper Res"},{"key":"ref25","doi-asserted-by":"publisher","first-page":"1282","DOI":"10.1177\/0959651819827705","article-title":"Energy-efficient multi-objective scheduling algorithm for hybrid flow shop with fuzzy processing time","volume":"233","author":"Zhou","year":"2019","journal-title":"Proc Inst Mech Eng Part I J Syst Control Eng"},{"key":"ref26","doi-asserted-by":"publisher","first-page":"4123","DOI":"10.3390\/electronics12194123","article-title":"OptiDJS+: a next-generation enhanced dynamic Johnson sequencing algorithm for efficient resource scheduling in distributed overloading within cloud computing environment","volume":"12","author":"Banerjee","year":"2023","journal-title":"Electronics (Basel)"}],"container-title":["Frontiers in Applied Mathematics and Statistics"],"original-title":[],"link":[{"URL":"https:\/\/www.frontiersin.org\/articles\/10.3389\/fams.2024.1355237\/full","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,4,2]],"date-time":"2024-04-02T04:35:31Z","timestamp":1712032531000},"score":1,"resource":{"primary":{"URL":"https:\/\/www.frontiersin.org\/articles\/10.3389\/fams.2024.1355237\/full"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2024,4,2]]},"references-count":26,"alternative-id":["10.3389\/fams.2024.1355237"],"URL":"https:\/\/doi.org\/10.3389\/fams.2024.1355237","relation":{},"ISSN":["2297-4687"],"issn-type":[{"value":"2297-4687","type":"electronic"}],"subject":[],"published":{"date-parts":[[2024,4,2]]},"article-number":"1355237"}}