{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,11]],"date-time":"2025-10-11T15:42:07Z","timestamp":1760197327413,"version":"build-2065373602"},"reference-count":9,"publisher":"MDPI AG","issue":"4","license":[{"start":{"date-parts":[[2018,4,12]],"date-time":"2018-04-12T00:00:00Z","timestamp":1523491200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Algorithms"],"abstract":"<jats:p>Continuous sampling plans are used to ensure a high level of quality for items produced in long-run contexts. The basic idea of these plans is to alternate between 100% inspection and a reduced rate of inspection frequency. Any inspected item that is found to be defective is replaced with a non-defective item. Because not all items are inspected, some defective items will escape to the customer. Analytical formulas have been developed that measure both the customer perceived quality and also the level of inspection effort. The analysis of continuous sampling plans does not apply to short-run contexts, where only a finite-size batch of items is to be produced. In this paper, a simulation algorithm is designed and implemented to analyze the customer perceived quality and the level of inspection effort for short-run contexts. A parameter representing the effectiveness of the test used during inspection is introduced to the analysis, and an analytical approximation is discussed. An application of the simulation algorithm that helped answer questions for the U.S. Navy is discussed.<\/jats:p>","DOI":"10.3390\/a11040046","type":"journal-article","created":{"date-parts":[[2018,4,12]],"date-time":"2018-04-12T12:19:27Z","timestamp":1523535567000},"page":"46","update-policy":"https:\/\/doi.org\/10.3390\/mdpi_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["Short-Run Contexts and Imperfect Testing for Continuous Sampling Plans"],"prefix":"10.3390","volume":"11","author":[{"given":"Mirella","family":"Rodriguez","sequence":"first","affiliation":[{"name":"Department of Statistics, University of California, Riverside, CA 92521, USA"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Daniel","family":"Jeske","sequence":"additional","affiliation":[{"name":"Department of Statistics, University of California, Riverside, CA 92521, USA"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"1968","published-online":{"date-parts":[[2018,4,12]]},"reference":[{"key":"ref_1","doi-asserted-by":"crossref","first-page":"264","DOI":"10.1214\/aoms\/1177731420","article-title":"A Sampling Inspection Plan for Continuous Production","volume":"14","author":"Dodge","year":"1943","journal-title":"Ann. Math. Stat."},{"key":"ref_2","doi-asserted-by":"crossref","first-page":"193","DOI":"10.1080\/05695557308974902","article-title":"The Dodge CSP-1 Continuous Sampling Plan under Inspection Error","volume":"5","author":"Case","year":"1973","journal-title":"AIIE Trans."},{"key":"ref_3","doi-asserted-by":"crossref","first-page":"259","DOI":"10.1080\/00401706.1977.10489547","article-title":"The Effect of Short Production Runs on CSP-1","volume":"19","author":"Blackwell","year":"1977","journal-title":"Technometrics"},{"key":"ref_4","first-page":"81","article-title":"Average Outgoing Quality Limit for Short-Run CSP-1 Plan","volume":"8","author":"Chen","year":"2005","journal-title":"Tamkang J. Sci. Eng."},{"key":"ref_5","doi-asserted-by":"crossref","first-page":"733","DOI":"10.1080\/02664769822729","article-title":"Minimum Average Fraction Inspected for Short-Run CSP-1 Plan","volume":"25","author":"Wang","year":"1998","journal-title":"J. Appl. Stat."},{"key":"ref_6","doi-asserted-by":"crossref","first-page":"59","DOI":"10.1080\/00401706.1983.10487820","article-title":"A Renewal-Process Approach to Continuous Sampling Plans","volume":"25","author":"Yang","year":"1993","journal-title":"Technometrics"},{"key":"ref_7","doi-asserted-by":"crossref","first-page":"4345","DOI":"10.1016\/0360-8352(93)90316-P","article-title":"Computerized Continuous Sampling Plans with Finite Production","volume":"25","author":"Liu","year":"1993","journal-title":"Comput. Ind. Eng."},{"key":"ref_8","first-page":"7","article-title":"Additional Continuous Sampling Inspection Plans","volume":"7","author":"Dodge","year":"1951","journal-title":"Ind. Qual. Control"},{"key":"ref_9","first-page":"455","article-title":"Comparison of Certain Types of Continuous Sampling Plans (CSPs) and its Operating Procedures\u2014A Review","volume":"4","author":"Suresh","year":"2015","journal-title":"Int. J. Sci. Res."}],"container-title":["Algorithms"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.mdpi.com\/1999-4893\/11\/4\/46\/pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,10,11]],"date-time":"2025-10-11T15:00:25Z","timestamp":1760194825000},"score":1,"resource":{"primary":{"URL":"https:\/\/www.mdpi.com\/1999-4893\/11\/4\/46"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018,4,12]]},"references-count":9,"journal-issue":{"issue":"4","published-online":{"date-parts":[[2018,4]]}},"alternative-id":["a11040046"],"URL":"https:\/\/doi.org\/10.3390\/a11040046","relation":{},"ISSN":["1999-4893"],"issn-type":[{"type":"electronic","value":"1999-4893"}],"subject":[],"published":{"date-parts":[[2018,4,12]]}}}