{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,12,19]],"date-time":"2025-12-19T22:05:49Z","timestamp":1766181949618,"version":"build-2065373602"},"reference-count":148,"publisher":"MDPI AG","issue":"11","license":[{"start":{"date-parts":[[2022,11,21]],"date-time":"2022-11-21T00:00:00Z","timestamp":1668988800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0\/"}],"funder":[{"name":"Universidad de La Sabana","award":["INGPhD-45-2021"],"award-info":[{"award-number":["INGPhD-45-2021"]}]},{"name":"French Embassy in Colombia for a cotutelle thesis call 2021 and by Eiffel Excellence Scholarship\u2014PhD stream","award":["INGPhD-45-2021"],"award-info":[{"award-number":["INGPhD-45-2021"]}]}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Algorithms"],"abstract":"<jats:p>In traditional scheduling problems, job processing times are considered constant and known in advance. This assumption is, however, a simplification when it comes to hand-intensive real-life production contexts because workers usually induce variability in the job processing times due to several factors such as learning, monotony, fatigue, psychological factors, etc. These effects can decrease or increase the actual processing time when workers execute a job. The academic literature has reported several modeling and resolution approaches to deal with the phenomenon in a variety of configurations. However, there is no comprehensive review of these research outputs to the best of our knowledge. In this paper, we follow a systematic approach to review relevant contributions addressing the scheduling problem with learning and deterioration effects. Modeling approaches for learning and deterioration effects, objective functions, and solution methods employed in the literature are the main topics for the taxonomy proposed in this review. A total of 455 papers from 1999 to 2021 are included and analyzed. Different areas of interest are presented, and some opportunities for future research are identified.<\/jats:p>","DOI":"10.3390\/a15110439","type":"journal-article","created":{"date-parts":[[2022,11,22]],"date-time":"2022-11-22T03:08:37Z","timestamp":1669086517000},"page":"439","update-policy":"https:\/\/doi.org\/10.3390\/mdpi_crossmark_policy","source":"Crossref","is-referenced-by-count":8,"title":["Taxonomy of Scheduling Problems with Learning and Deterioration Effects"],"prefix":"10.3390","volume":"15","author":[{"given":"Yenny Alexandra","family":"Paredes-Astudillo","sequence":"first","affiliation":[{"name":"School of Engineering, Universidad de La Sabana, Ch\u00eda 250001, Colombia"},{"name":"Univ Lyon, INSA Lyon, Universit\u00e9 Claude Bernard Lyon 1, Univ Lyon 2, DISP-UR4570, 69621 Villeurbanne, France"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-6251-3667","authenticated-orcid":false,"given":"Jairo R.","family":"Montoya-Torres","sequence":"additional","affiliation":[{"name":"School of Engineering, Universidad de La Sabana, Ch\u00eda 250001, Colombia"}]},{"given":"Val\u00e9rie","family":"Botta-Genoulaz","sequence":"additional","affiliation":[{"name":"Univ Lyon, INSA Lyon, Universit\u00e9 Claude Bernard Lyon 1, Univ Lyon 2, DISP-UR4570, 69621 Villeurbanne, France"}]}],"member":"1968","published-online":{"date-parts":[[2022,11,21]]},"reference":[{"key":"ref_1","unstructured":"Pinedo, M.L. (2016). Scheduling: Theory, Algorithms, and Systems, Springer."},{"key":"ref_2","doi-asserted-by":"crossref","first-page":"491","DOI":"10.1007\/s10479-012-1098-1","article-title":"Scheduling problems with position dependent job processing times: Computational complexity results","volume":"196","author":"Rudek","year":"2012","journal-title":"Ann. Oper. Res."},{"key":"ref_3","doi-asserted-by":"crossref","first-page":"607","DOI":"10.1177\/001872089103300602","article-title":"Strategic behavior, workload, and performance in task scheduling","volume":"33","author":"Moray","year":"1991","journal-title":"Hum. Factor"},{"key":"ref_4","doi-asserted-by":"crossref","first-page":"443","DOI":"10.1518\/001872095779049282","article-title":"Taxonomy of scheduling systems as a basis for the study of strategic behavior","volume":"37","author":"Dessouky","year":"1995","journal-title":"Hum. Factor"},{"key":"ref_5","doi-asserted-by":"crossref","first-page":"122","DOI":"10.2514\/8.155","article-title":"Factors Affecting the Cost of Airplanes Presented","volume":"3","author":"Wright","year":"1936","journal-title":"J. Aeronaut. Sci."},{"key":"ref_6","doi-asserted-by":"crossref","first-page":"173","DOI":"10.1016\/S0377-2217(98)00246-X","article-title":"Single-machine scheduling with learning functions","volume":"115","author":"Biskup","year":"1999","journal-title":"Eur. J. Oper. Res."},{"key":"ref_7","doi-asserted-by":"crossref","first-page":"387","DOI":"10.1016\/0360-8352(88)90041-1","article-title":"Single facility scheduling with nonlinear processing times","volume":"14","author":"Gupta","year":"1988","journal-title":"Comput. Ind. Eng."},{"key":"ref_8","doi-asserted-by":"crossref","first-page":"315","DOI":"10.1016\/j.ejor.2007.05.040","article-title":"A state-of-the-art review on scheduling with learning effects","volume":"188","author":"Biskup","year":"2008","journal-title":"Eur. J. Oper. Res."},{"key":"ref_9","doi-asserted-by":"crossref","first-page":"221","DOI":"10.1590\/S0103-65132005000200007","article-title":"Aloca\u00e7\u00e3o de modelos de produtos a equipes de trabalhadores baseada em modelos de curvas de aprendizagem","volume":"15","author":"Anzanello","year":"2005","journal-title":"Production"},{"key":"ref_10","doi-asserted-by":"crossref","first-page":"39","DOI":"10.1016\/j.ergon.2008.05.001","article-title":"Taxonomy for integrating scheduling theory and human factors: Review and research opportunities","volume":"39","author":"Lodree","year":"2009","journal-title":"Int. J. Ind. Ergon."},{"key":"ref_11","doi-asserted-by":"crossref","first-page":"1642","DOI":"10.1080\/00207543.2017.1355576","article-title":"Scheduling problems under learning effects: Classification and cartography","volume":"56","author":"Azzouz","year":"2018","journal-title":"Int. J. Prod. Res."},{"key":"ref_12","doi-asserted-by":"crossref","first-page":"807","DOI":"10.1016\/j.ejor.2021.03.036","article-title":"Fatigue, personnel scheduling and operations: Review and research opportunities","volume":"295","author":"Xu","year":"2021","journal-title":"Eur. J. Oper. Res."},{"key":"ref_13","doi-asserted-by":"crossref","first-page":"422","DOI":"10.1016\/j.cie.2018.10.030","article-title":"Applications of learning curves in production and operations management: A systematic literature review","volume":"131","author":"Glock","year":"2019","journal-title":"Comput. Ind. Eng."},{"key":"ref_14","doi-asserted-by":"crossref","first-page":"220","DOI":"10.1080\/09500790008666974","article-title":"Should all literature reviews be systematic?","volume":"14","author":"Badger","year":"2000","journal-title":"Eval. Res. Educ."},{"key":"ref_15","doi-asserted-by":"crossref","first-page":"333","DOI":"10.1016\/j.jbusres.2019.07.039","article-title":"Literature review as a research methodology: An overview and guidelines","volume":"104","author":"Snyder","year":"2019","journal-title":"J. Bus. Res."},{"key":"ref_16","doi-asserted-by":"crossref","first-page":"321","DOI":"10.1007\/s11192-020-03387-8","article-title":"A tale of two databases: The use of Web of Science and Scopus in academic papers","volume":"123","author":"Zhu","year":"2020","journal-title":"Scientometrics"},{"key":"ref_17","doi-asserted-by":"crossref","first-page":"5401","DOI":"10.1080\/00207543.2020.1718794","article-title":"Production scheduling in the context of Industry 4.0: Review and trends","volume":"58","author":"Parente","year":"2020","journal-title":"Int. J. Prod. Res."},{"key":"ref_18","doi-asserted-by":"crossref","first-page":"37","DOI":"10.1016\/j.omega.2016.12.004","article-title":"A bibliometric analysis of operations research and management science","volume":"73","author":"Yang","year":"2017","journal-title":"Omega"},{"key":"ref_19","doi-asserted-by":"crossref","unstructured":"Montoya-Torres, J.R., Mu\u00f1oz-Villamizar, A., and Mejia-Argueta, C. (2021). Mapping research in logistics and supply chain management during COVID-19 pandemic. Int. J. Logist. Res. Appl., 1\u201321.","DOI":"10.1080\/13675567.2021.1958768"},{"key":"ref_20","doi-asserted-by":"crossref","first-page":"115","DOI":"10.1002\/(SICI)1097-4571(1999)50:2<115::AID-ASI3>3.0.CO;2-J","article-title":"Combining mapping and citation analysis for evaluative bibliometric purposes: A bibliometric study","volume":"50","author":"Noyons","year":"1999","journal-title":"J. Am. Soc. Inf. Sci."},{"key":"ref_21","doi-asserted-by":"crossref","first-page":"194","DOI":"10.1016\/j.techfore.2018.07.006","article-title":"Knowledge management: A global examination based on bibliometric analysis","volume":"140","year":"2019","journal-title":"Technol. Forecast. Soc. Chang."},{"key":"ref_22","doi-asserted-by":"crossref","first-page":"523","DOI":"10.1007\/s11192-009-0146-3","article-title":"Software survey: VOSviewer, a computer program for bibliometric mapping","volume":"84","author":"Waltman","year":"2010","journal-title":"Scientometrics"},{"key":"ref_23","doi-asserted-by":"crossref","first-page":"94","DOI":"10.1109\/TEM.2016.2618764","article-title":"Stochastic Single-Machine Scheduling With Learning Effect","volume":"64","author":"Li","year":"2017","journal-title":"IEEE Trans. Eng. Manag."},{"key":"ref_24","doi-asserted-by":"crossref","first-page":"267","DOI":"10.1007\/s10287-020-00386-1","article-title":"Stochastic single machine scheduling problem as a multi-stage dynamic random decision process","volume":"18","author":"Roohnavazfar","year":"2021","journal-title":"Comput. Manag. Sci."},{"key":"ref_25","doi-asserted-by":"crossref","first-page":"7176548","DOI":"10.1155\/2020\/7176548","article-title":"Uncertain Single-Machine Scheduling with Deterioration and Learning Effect","volume":"2020","author":"Shen","year":"2020","journal-title":"J. Math."},{"key":"ref_26","doi-asserted-by":"crossref","first-page":"421","DOI":"10.1504\/EJIE.2014.064754","article-title":"Stochastic bicriteria single machine scheduling with sequence-dependent job attributes and job-dependent learning effects","volume":"8","author":"Soroush","year":"2014","journal-title":"Eur. J. Ind. Eng."},{"key":"ref_27","doi-asserted-by":"crossref","first-page":"1017","DOI":"10.1057\/jors.2013.43","article-title":"Scheduling in bicriteria single machine systems with past-sequence- dependent setup times and learning effects","volume":"65","author":"Soroush","year":"2014","journal-title":"J. Oper. Res. Soc."},{"key":"ref_28","doi-asserted-by":"crossref","first-page":"677","DOI":"10.1007\/s10951-019-00600-2","article-title":"Single machine scheduling with stochastically dependent times","volume":"22","author":"Wei","year":"2019","journal-title":"J. Sched."},{"key":"ref_29","doi-asserted-by":"crossref","first-page":"331","DOI":"10.1007\/s10951-012-0306-9","article-title":"Stochastic scheduling problems with general position-based learning effects and stochastic breakdowns","volume":"16","author":"Zhang","year":"2013","journal-title":"J. Sched."},{"key":"ref_30","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1007\/s40314-019-0789-5","article-title":"An uncertain parallel machine problem with deterioration and learning effect","volume":"38","author":"Shen","year":"2019","journal-title":"Comput. Appl. Math."},{"key":"ref_31","doi-asserted-by":"crossref","first-page":"847","DOI":"10.1016\/j.asoc.2017.12.009","article-title":"Two-objective stochastic flow-shop scheduling with deteriorating and learning effect in Industry 4.0-based manufacturing system","volume":"68","author":"Fu","year":"2018","journal-title":"Appl. Soft Comput. J."},{"key":"ref_32","doi-asserted-by":"crossref","first-page":"693","DOI":"10.1007\/s00170-011-3190-0","article-title":"Single-machine scheduling with a position-based learning effect and fuzzy processing times","volume":"56","author":"Ahmadizar","year":"2011","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"ref_33","doi-asserted-by":"crossref","first-page":"581","DOI":"10.1007\/s00170-012-4198-9","article-title":"Minimizing makespan in a single-machine scheduling problem with a learning effect and fuzzy processing times","volume":"65","author":"Ahmadizar","year":"2013","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"ref_34","doi-asserted-by":"crossref","first-page":"244","DOI":"10.1016\/j.jmsy.2016.12.004","article-title":"Apply Fuzzy Learning Effect with Fuzzy Processing Times for Single Machine Scheduling Problems","volume":"42","author":"Asadi","year":"2017","journal-title":"J. Manuf. Syst."},{"key":"ref_35","doi-asserted-by":"crossref","first-page":"159","DOI":"10.1016\/j.jmsy.2017.08.006","article-title":"Single machine scheduling problems under position-dependent fuzzy learning effect with fuzzy processing times","volume":"45","author":"Toksan","year":"2017","journal-title":"J. Manuf. Syst."},{"key":"ref_36","doi-asserted-by":"crossref","first-page":"195","DOI":"10.4018\/IJAMC.2021070109","article-title":"A genetic algorithm approach to parallel machine scheduling problems under effects of position-dependent learning and linear deterioration: Genetic algorithm to parallel machine scheduling problems","volume":"12","year":"2021","journal-title":"Int. J. Appl. Metaheuristic Comput."},{"key":"ref_37","doi-asserted-by":"crossref","first-page":"63","DOI":"10.1016\/j.asoc.2016.12.029","article-title":"A linguistic approach to non-identical parallel processor scheduling with fuzzy processing times","volume":"55","author":"Geyik","year":"2017","journal-title":"Appl. Soft Comput. J."},{"key":"ref_38","doi-asserted-by":"crossref","first-page":"106858","DOI":"10.1016\/j.cie.2020.106858","article-title":"Parallel machine scheduling with position-based deterioration and learning effects in an uncertain manufacturing system","volume":"149","author":"Li","year":"2020","journal-title":"Comput. Ind. Eng."},{"key":"ref_39","doi-asserted-by":"crossref","first-page":"109","DOI":"10.1016\/j.cie.2015.10.019","article-title":"A L\u00e9vy flight embedded particle swarm optimization for multi-objective parallel-machine scheduling with learning and adapting considerations","volume":"91","year":"2016","journal-title":"Comput. Ind. Eng."},{"key":"ref_40","doi-asserted-by":"crossref","first-page":"206","DOI":"10.1016\/j.cie.2015.03.022","article-title":"Multi-objective parallel machine scheduling problem with job deterioration and learning effect under fuzzy environment","volume":"85","author":"Rostami","year":"2015","journal-title":"Comput. Ind. Eng."},{"key":"ref_41","doi-asserted-by":"crossref","unstructured":"Jeong, B., Han, J.H., and Lee, J.Y. (2021). Metaheuristics for a Flow Shop Scheduling Problem with Urgent Jobs and Limited Waiting Times. Algorithms, 14.","DOI":"10.3390\/a14110323"},{"key":"ref_42","unstructured":"Botta, V. (1996). Planning & Scheduling Flow Shop Organizations with Constraints\u2014Towards a Decision Engineering System for Production Planning & Production Activity Control. [Ph.D. Thesis, Computer Engineering, Universit\u00e9 Claude Bernard\u2014LYON 1]."},{"key":"ref_43","doi-asserted-by":"crossref","first-page":"866","DOI":"10.1016\/j.jclepro.2018.09.100","article-title":"Scheduling for sustainable manufacturing: A review","volume":"205","author":"Akbar","year":"2018","journal-title":"J. Clean. Prod."},{"key":"ref_44","first-page":"67","article-title":"A review of scheduling problem and resolution methods in flexible flow shop","volume":"10","author":"Lee","year":"2019","journal-title":"Int. J. Ind. Eng. Comput."},{"key":"ref_45","doi-asserted-by":"crossref","first-page":"113348","DOI":"10.1016\/j.eswa.2020.113348","article-title":"A multi-population, multi-objective memetic algorithm for energy-efficient job-shop scheduling with deteriorating machines","volume":"157","author":"Abedi","year":"2020","journal-title":"Expert Syst. Appl."},{"key":"ref_46","doi-asserted-by":"crossref","unstructured":"Liu, Y., Liao, X., and Zhang, R. (2019). An enhanced MOPSO algorithm for energy-efficient single-machine production scheduling. Sustainability, 11.","DOI":"10.3390\/su11195381"},{"key":"ref_47","doi-asserted-by":"crossref","first-page":"1939","DOI":"10.1007\/s00170-018-3043-1","article-title":"Multiobjective approach for deteriorating jobs scheduling for a sustainable manufacturing system","volume":"101","author":"Tigane","year":"2019","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"ref_48","doi-asserted-by":"crossref","first-page":"119428","DOI":"10.1016\/j.jclepro.2019.119428","article-title":"Scheduling of unrelated parallel machines considering sequence-related setup time, start time-dependent deterioration, position-dependent learning and power consumption minimization","volume":"249","author":"Soleimani","year":"2020","journal-title":"J. Clean. Prod."},{"key":"ref_49","doi-asserted-by":"crossref","first-page":"866","DOI":"10.1080\/00207543.2020.1845914","article-title":"On the trade-offs between scheduling objectives for unpaced mixed-model assembly lines","volume":"60","author":"Ostermeier","year":"2020","journal-title":"Int. J. Prod. Res."},{"key":"ref_50","doi-asserted-by":"crossref","first-page":"1725","DOI":"10.1007\/s10845-020-01713-8","article-title":"Research on flexible job-shop scheduling problem in green sustainable manufacturing based on learning effect","volume":"33","author":"Peng","year":"2021","journal-title":"J. Intell. Manuf."},{"key":"ref_51","doi-asserted-by":"crossref","unstructured":"Strusevich, V., and Rustogi, K. (2017). Scheduling with Time-Changing Effects and Rate-Modifying Activities, Springer International.","DOI":"10.1007\/978-3-319-39574-6"},{"key":"ref_52","doi-asserted-by":"crossref","first-page":"265","DOI":"10.1016\/S0263-7863(99)00079-4","article-title":"Effect of learning on line-of-balance scheduling","volume":"19","author":"Arditi","year":"2001","journal-title":"Int. J. Proj. Manag."},{"key":"ref_53","doi-asserted-by":"crossref","first-page":"273","DOI":"10.1023\/A:1019216726076","article-title":"Single Machine Scheduling with Learning Effect Considerations","volume":"98","author":"Cheng","year":"2000","journal-title":"Ann. Oper. Res."},{"key":"ref_54","doi-asserted-by":"crossref","first-page":"1573","DOI":"10.1111\/itor.12888","article-title":"Bicriterion scheduling with truncated learning effects and convex controllable processing times","volume":"28","author":"Wang","year":"2021","journal-title":"Int. Trans. Oper. Res."},{"key":"ref_55","doi-asserted-by":"crossref","first-page":"736","DOI":"10.1287\/moor.15.4.736","article-title":"Convex resource allocation problems on directed acyclic graphs: Duality, complexity, special cases, and extensions","volume":"15","author":"Monma","year":"1990","journal-title":"Math. Oper. Res."},{"key":"ref_56","doi-asserted-by":"crossref","first-page":"1643","DOI":"10.1016\/j.dam.2007.02.003","article-title":"A survey of scheduling with controllable processing times","volume":"155","author":"Shabtay","year":"2007","journal-title":"Discret. Appl. Math."},{"key":"ref_57","doi-asserted-by":"crossref","first-page":"753123","DOI":"10.1155\/2013\/753123","article-title":"Flowshop scheduling problems with a position-dependent exponential learning effect","volume":"2013","author":"Cheng","year":"2013","journal-title":"Math. Probl. Eng."},{"key":"ref_58","doi-asserted-by":"crossref","first-page":"345","DOI":"10.1007\/s10479-011-0835-1","article-title":"Single-machine scheduling problems with time and position dependent processing times","volume":"186","author":"Zhang","year":"2011","journal-title":"Ann. Oper. Res."},{"key":"ref_59","doi-asserted-by":"crossref","first-page":"64","DOI":"10.1016\/j.ipl.2005.09.007","article-title":"Minimizing the makespan in a single machine scheduling problem with a time-based learning effect","volume":"97","author":"Kuo","year":"2006","journal-title":"Inf. Process Lett."},{"key":"ref_60","doi-asserted-by":"crossref","first-page":"373","DOI":"10.1007\/s12190-019-01255-0","article-title":"Study on flow shop scheduling with sum-of-logarithm-processing-times-based learning effects","volume":"61","author":"Liang","year":"2019","journal-title":"J. Appl. Math. Comput."},{"key":"ref_61","doi-asserted-by":"crossref","first-page":"441","DOI":"10.1504\/EJIE.2012.047665","article-title":"Some polynomial solvable single-machine scheduling problems with a truncation sum-of-processing-times based learning effect","volume":"6","author":"Wu","year":"2012","journal-title":"Eur. J. Ind. Eng."},{"key":"ref_62","doi-asserted-by":"crossref","first-page":"790","DOI":"10.1016\/j.cie.2011.01.016","article-title":"Some single-machine scheduling problems with a truncation learning effect","volume":"60","author":"Wu","year":"2011","journal-title":"Comput. Ind. Eng."},{"key":"ref_63","doi-asserted-by":"crossref","first-page":"9","DOI":"10.1016\/j.camwa.2008.09.025","article-title":"Single machine scheduling with exponential time-dependent learning effect and past-sequence-dependent setup times","volume":"57","author":"Wang","year":"2009","journal-title":"Comput. Math. Appl."},{"key":"ref_64","doi-asserted-by":"crossref","first-page":"2813","DOI":"10.1016\/j.apm.2009.12.015","article-title":"Single machine scheduling with exponential sum-of-logarithm-processing-times based learning effect","volume":"34","author":"Wang","year":"2010","journal-title":"Appl. Math. Model."},{"key":"ref_65","doi-asserted-by":"crossref","first-page":"216","DOI":"10.1080\/05695556908974435","article-title":"On startup or learning curves: An expanded view","volume":"1","author":"Pegels","year":"1969","journal-title":"AIIE Trans."},{"key":"ref_66","doi-asserted-by":"crossref","first-page":"2476","DOI":"10.1016\/j.ins.2008.02.002","article-title":"Some scheduling problems with sum-of-processing-times-based and job-position-based learning effects","volume":"178","author":"Cheng","year":"2008","journal-title":"Inf. Sci."},{"key":"ref_67","doi-asserted-by":"crossref","first-page":"1857","DOI":"10.1142\/S0217595915500268","article-title":"Scheduling jobs with truncated exponential sum-of-logarithm-processing-times based and position-based learning effects","volume":"32","author":"Lu","year":"2015","journal-title":"Asia-Pac. J. Oper. Res."},{"key":"ref_68","doi-asserted-by":"crossref","first-page":"51","DOI":"10.1080\/00140135708964571","article-title":"The Effects Of Increasing Skill On Cycle Time And Its Consequences For Time Standards","volume":"1","author":"Jong","year":"1957","journal-title":"Ergonomics"},{"key":"ref_69","doi-asserted-by":"crossref","first-page":"195","DOI":"10.1016\/j.cie.2014.12.009","article-title":"Machine scheduling with DeJong\u2019s learning effect","volume":"80","author":"Ji","year":"2015","journal-title":"Comput. Ind. Eng."},{"key":"ref_70","doi-asserted-by":"crossref","first-page":"183","DOI":"10.1016\/j.ipl.2007.03.013","article-title":"The learning effect: Getting to the core of the problem","volume":"103","author":"Janiak","year":"2007","journal-title":"Inf. Process Lett."},{"key":"ref_71","doi-asserted-by":"crossref","first-page":"104812","DOI":"10.1016\/j.cor.2019.104812","article-title":"An improved particle swarm optimization algorithm to solve hybrid flowshop scheduling problems with the effect of human factors\u2014A case study","volume":"114","author":"Marichelvam","year":"2020","journal-title":"Comput. Oper. Res."},{"key":"ref_72","first-page":"206","article-title":"A genetic optimization algorithm and perceptron learning rules for a bi-criteria parallel machine scheduling","volume":"29","author":"Fazlollahtabar","year":"2012","journal-title":"J. Chin. Inst. Ind. Eng."},{"key":"ref_73","doi-asserted-by":"crossref","first-page":"201","DOI":"10.1007\/s10288-016-0333-z","article-title":"Single-machine time-dependent scheduling problems with fixed rate-modifying activities and resumable jobs","volume":"15","author":"Arigliano","year":"2017","journal-title":"4or"},{"key":"ref_74","doi-asserted-by":"crossref","first-page":"1743","DOI":"10.1080\/0305215X.2018.1552269","article-title":"Single machine scheduling problem with batch setups involving positional deterioration effects and multiple rate-modifying activities","volume":"51","author":"Chung","year":"2019","journal-title":"Eng. Optim."},{"key":"ref_75","doi-asserted-by":"crossref","first-page":"500","DOI":"10.1057\/jors.2014.18","article-title":"Single machine scheduling with time-dependent linear deterioration and rate-modifying maintenance","volume":"66","author":"Rustogi","year":"2015","journal-title":"J. Oper. Res. Soc."},{"key":"ref_76","doi-asserted-by":"crossref","first-page":"166","DOI":"10.1016\/j.omega.2013.05.005","article-title":"Combining time and position dependent effects on a single machine subject to rate-modifying activities","volume":"42","author":"Rustogi","year":"2014","journal-title":"Omega"},{"key":"ref_77","doi-asserted-by":"crossref","first-page":"6687525","DOI":"10.1155\/2021\/6687525","article-title":"Parallel-Machine Scheduling with DeJong\u2019s Learning Effect, Delivery Times, Rate-Modifying Activity, and Resource Allocation","volume":"2021","author":"Sun","year":"2021","journal-title":"Shock. Vib."},{"key":"ref_78","doi-asserted-by":"crossref","first-page":"496","DOI":"10.1080\/0305215X.2020.1740921","article-title":"Common due-window assignment for single-machine scheduling with generalized earliness\/tardiness penalties and a rate-modifying activity","volume":"53","author":"Wang","year":"2021","journal-title":"Eng. Optim."},{"key":"ref_79","doi-asserted-by":"crossref","first-page":"511","DOI":"10.1142\/S0217595911003211","article-title":"Single machine scheduling with a learning effect and a rate-modifying activity","volume":"28","author":"Zhao","year":"2011","journal-title":"Asia-Pac. J. Oper. Res."},{"key":"ref_80","doi-asserted-by":"crossref","first-page":"151563","DOI":"10.1155\/2011\/151563","article-title":"Due-window assignment and scheduling with multiple rate-modifying activities under the effects of deterioration and learning","volume":"2011","author":"Zhu","year":"2011","journal-title":"Math. Probl. Eng."},{"key":"ref_81","doi-asserted-by":"crossref","first-page":"957","DOI":"10.1007\/s10878-019-00429-7","article-title":"Parallel-machine scheduling with job-dependent cumulative deterioration effect and rejection","volume":"38","author":"Li","year":"2019","journal-title":"J. Comb. Optim."},{"key":"ref_82","doi-asserted-by":"crossref","first-page":"495","DOI":"10.1287\/opre.38.3.495","article-title":"Scheduling deteriorating jobs on a single processor","volume":"38","author":"Browne","year":"1990","journal-title":"Oper. Res."},{"key":"ref_83","first-page":"1259","article-title":"Single-machine group scheduling problems with deteriorated and learning effect","volume":"216","author":"Xingong","year":"2010","journal-title":"Appl. Math. Comput."},{"key":"ref_84","doi-asserted-by":"crossref","first-page":"6634","DOI":"10.1080\/00207543.2019.1570378","article-title":"A two-stage three-machine assembly scheduling problem with deterioration effect","volume":"57","author":"Wu","year":"2019","journal-title":"Int. J. Prod. Res."},{"key":"ref_85","first-page":"1255","article-title":"Minimizing total weighted completion and batch delivery times with machine deterioration and learning effect: A case study from wax production","volume":"20","author":"Rostami","year":"2020","journal-title":"Oper. Res."},{"key":"ref_86","doi-asserted-by":"crossref","first-page":"547","DOI":"10.1007\/s00170-012-4348-0","article-title":"Multi-machine scheduling with deterioration effects and maintenance activities for minimizing the total earliness and tardiness costs","volume":"66","author":"Lee","year":"2013","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"ref_87","first-page":"534","article-title":"Parallel machines scheduling with deterioration effects and resource allocations","volume":"29","author":"Lee","year":"2012","journal-title":"J. Chin. Inst. Ind. Eng."},{"key":"ref_88","doi-asserted-by":"crossref","first-page":"1041","DOI":"10.1057\/jors.2009.30","article-title":"Scheduling jobs under an aging effect","volume":"61","author":"Janiak","year":"2010","journal-title":"J. Oper. Res. Soc."},{"key":"ref_89","doi-asserted-by":"crossref","first-page":"5690","DOI":"10.1080\/00207543.2014.904967","article-title":"Single-machine group scheduling problem considering learning, forgetting effects and preventive maintenance","volume":"52","author":"Pan","year":"2014","journal-title":"Int. J. Prod. Res."},{"key":"ref_90","first-page":"534","article-title":"A new mathematical model for scheduling flexible flow shop problem with learning and forgetting effects of workers","volume":"21","author":"Seidgar","year":"2015","journal-title":"Int. J. Ind. Syst. Eng."},{"key":"ref_91","doi-asserted-by":"crossref","first-page":"1033","DOI":"10.1016\/j.ejor.2006.03.065","article-title":"Learning and forgetting effects on a group scheduling problem","volume":"187","author":"Yang","year":"2008","journal-title":"Eur. J. Oper. Res."},{"key":"ref_92","doi-asserted-by":"crossref","first-page":"415","DOI":"10.1016\/j.apm.2014.05.036","article-title":"A note on single-machine scheduling with sum-of-processing-time-based learning and forgetting effects","volume":"39","author":"Wu","year":"2015","journal-title":"Appl. Math. Model."},{"key":"ref_93","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.disopt.2015.11.002","article-title":"Some single-machine scheduling problems with elapsed-time-based and position-based learning and forgetting effects","volume":"19","author":"Wu","year":"2016","journal-title":"Discret. Optim."},{"key":"ref_94","doi-asserted-by":"crossref","first-page":"687","DOI":"10.1016\/S0377-2217(00)00175-2","article-title":"Scheduling problems with a learning effect","volume":"132","author":"Mosheiov","year":"2001","journal-title":"Eur. J. Oper. Res."},{"key":"ref_95","doi-asserted-by":"crossref","first-page":"107309","DOI":"10.1016\/j.cie.2021.107309","article-title":"Minimization of maximum lateness in a flowshop learning effect scheduling with release dates","volume":"158","author":"Bai","year":"2021","journal-title":"Comput. Ind. Eng."},{"key":"ref_96","doi-asserted-by":"crossref","first-page":"294","DOI":"10.1002\/hfm.20160","article-title":"Human and machine effects in a just-in-time scheduling problem","volume":"19","author":"Eren","year":"2009","journal-title":"Hum. Factors Ergon. Manuf."},{"key":"ref_97","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.jmsy.2010.06.004","article-title":"Solving a single-machine scheduling problem with maintenance, job deterioration and learning effect by simulated annealing","volume":"29","author":"Ghodratnama","year":"2010","journal-title":"J. Manuf. Syst."},{"key":"ref_98","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1111\/itor.12001","article-title":"Metaheuristics-the metaphor exposed","volume":"22","year":"2015","journal-title":"Int. Trans. Oper. Res."},{"key":"ref_99","doi-asserted-by":"crossref","first-page":"487","DOI":"10.15302\/J-FEM-2018042","article-title":"Minimization of total energy consumption in an m-machine flow shop with an exponential time-dependent learning effect","volume":"5","author":"Liu","year":"2018","journal-title":"Front. Eng. Manag."},{"key":"ref_100","doi-asserted-by":"crossref","first-page":"73","DOI":"10.1016\/j.cie.2016.04.010","article-title":"Minimization of maximum lateness in an m-machine permutation flow shop with a general exponential learning effect","volume":"97","author":"He","year":"2016","journal-title":"Comput. Ind. Eng."},{"key":"ref_101","doi-asserted-by":"crossref","first-page":"2071","DOI":"10.1016\/j.cor.2013.02.024","article-title":"Makespan minimization flowshop with position dependent job processing times\u2014Computational complexity and solution algorithms","volume":"40","author":"Rudek","year":"2013","journal-title":"Comput. Oper. Res."},{"key":"ref_102","doi-asserted-by":"crossref","first-page":"1475","DOI":"10.1080\/0305215X.2019.1664498","article-title":"Scheduling with a position-weighted learning effect and job release dates","volume":"52","author":"Wang","year":"2020","journal-title":"Eng. Optim."},{"key":"ref_103","doi-asserted-by":"crossref","unstructured":"Sauvey, C., and Sauer, N. (2020). Two NEH heuristic improvements for flowshop scheduling problem with makespan criterion. Algorithms, 13.","DOI":"10.3390\/a13050112"},{"key":"ref_104","doi-asserted-by":"crossref","first-page":"1501","DOI":"10.1007\/s00500-020-05234-7","article-title":"Population-based Tabu search with evolutionary strategies for permutation flow shop scheduling problems under effects of position-dependent learning and linear deterioration","volume":"25","year":"2021","journal-title":"Soft Comput."},{"key":"ref_105","doi-asserted-by":"crossref","first-page":"292","DOI":"10.1080\/0951192X.2016.1145808","article-title":"A single-machine scheduling problem with learning effect, deterioration and non-monotonic time-dependent processing times","volume":"30","author":"Azadeh","year":"2017","journal-title":"Int. J. Comput. Integr. Manuf."},{"key":"ref_106","doi-asserted-by":"crossref","first-page":"108023","DOI":"10.1016\/j.asoc.2021.108023","article-title":"A fast neighborhood search scheme for identical parallel machine scheduling problems under general learning curves","volume":"113","author":"Rudek","year":"2021","journal-title":"Appl. Soft Comput."},{"key":"ref_107","doi-asserted-by":"crossref","first-page":"5445","DOI":"10.1007\/s00500-019-04301-y","article-title":"Two-stage three-machine assembly scheduling problem with sum-of-processing-times-based learning effect","volume":"24","author":"Zou","year":"2020","journal-title":"Soft Comput."},{"key":"ref_108","doi-asserted-by":"crossref","first-page":"733","DOI":"10.1080\/0951192X.2013.834465","article-title":"Incorporating learning effect and deterioration for solving a SDST flexible job-shop scheduling problem with a hybrid meta-heuristic approach","volume":"27","author":"Araghi","year":"2014","journal-title":"Int. J. Comput. Integr. Manuf."},{"key":"ref_109","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1177\/1687814018804096","article-title":"Solving the dual-resource constrained flexible job shop scheduling problem with learning effect by a hybrid genetic algorithm","volume":"10","author":"Wu","year":"2018","journal-title":"Adv. Mech. Eng."},{"key":"ref_110","first-page":"156","article-title":"Maximum completion time under a learning effect in the permutation flowshop scheduling problem","volume":"25","author":"Eren","year":"2018","journal-title":"Int. J. Ind. Eng. Theory Appl. Pract."},{"key":"ref_111","doi-asserted-by":"crossref","first-page":"237","DOI":"10.1007\/s10472-018-9602-1","article-title":"A BRKGA-DE algorithm for parallel-batching scheduling with deterioration and learning effects on parallel machines under preventive maintenance consideration","volume":"88","author":"Kong","year":"2020","journal-title":"Ann. Math. Artif. Intell."},{"key":"ref_112","doi-asserted-by":"crossref","first-page":"407","DOI":"10.1007\/s10479-020-03555-2","article-title":"Parallel-machine serial-batching scheduling with release times under the effects of position-dependent learning and time-dependent deterioration","volume":"298","author":"Pei","year":"2021","journal-title":"Ann. Oper. Res."},{"key":"ref_113","doi-asserted-by":"crossref","first-page":"147","DOI":"10.1007\/s10898-017-0536-7","article-title":"Serial-batching group scheduling with release times and the combined effects of deterioration and truncated job-dependent learning","volume":"71","author":"Fan","year":"2018","journal-title":"J. Glob. Optim."},{"key":"ref_114","doi-asserted-by":"crossref","first-page":"748","DOI":"10.1007\/s10696-021-09434-7","article-title":"Self-Adaptive Memetic Algorithms for Multi-Objective Single Machine Learning-Effect Scheduling Problems with Release Times","volume":"34","year":"2022","journal-title":"Flex. Serv. Manuf. J."},{"key":"ref_115","doi-asserted-by":"crossref","first-page":"9149510","DOI":"10.1155\/2018\/9149510","article-title":"Bicriterion optimization for flow shop with a learning effect subject to release dates","volume":"2018","author":"Wang","year":"2018","journal-title":"Complexity"},{"key":"ref_116","doi-asserted-by":"crossref","first-page":"1004","DOI":"10.1016\/j.cie.2019.06.048","article-title":"The flexible job-shop scheduling problem considering deterioration effect and energy consumption simultaneously","volume":"135","author":"Wu","year":"2019","journal-title":"Comput. Ind. Eng."},{"key":"ref_117","doi-asserted-by":"crossref","first-page":"265","DOI":"10.1007\/s11518-018-5361-0","article-title":"The Effect of Worker Learning on Scheduling Jobs in a Hybrid Flow Shop: A Bi-Objective Approach","volume":"27","author":"Pargar","year":"2018","journal-title":"J. Syst. Sci. Syst. Eng."},{"key":"ref_118","doi-asserted-by":"crossref","first-page":"1593","DOI":"10.1186\/s40064-016-3265-3","article-title":"Hybrid Pareto artificial bee colony algorithm for multi-objective single machine group scheduling problem with sequence-dependent setup times and learning effects","volume":"5","author":"Yue","year":"2016","journal-title":"Springerplus"},{"key":"ref_119","doi-asserted-by":"crossref","first-page":"3773","DOI":"10.1007\/s13369-021-06114-4","article-title":"An NSGA-II-Based Memetic Algorithm for an Energy-Efficient Unrelated Parallel Machine Scheduling Problem with Machine-Sequence Dependent Setup Times and Learning Effect","volume":"47","author":"Bektur","year":"2022","journal-title":"Arab. J. Sci. Eng."},{"key":"ref_120","doi-asserted-by":"crossref","first-page":"339","DOI":"10.1504\/IJOR.2019.098311","article-title":"Preemptive just-in-time scheduling problem on uniform parallel machines with time-dependent learning effect and release dates","volume":"34","author":"Shokoufi","year":"2019","journal-title":"Int. J. Oper. Res."},{"key":"ref_121","doi-asserted-by":"crossref","first-page":"4386","DOI":"10.1080\/00207543.2019.1652780","article-title":"The impact of human consideration, schedule types and product mix on scheduling objectives for unpaced mixed-model assembly lines","volume":"58","author":"Ostermeier","year":"2020","journal-title":"Int. J. Prod. Res."},{"key":"ref_122","doi-asserted-by":"crossref","first-page":"62","DOI":"10.1016\/j.eswa.2018.09.041","article-title":"A metaheuristic algorithm and simulation to study the effect of learning or tiredness on sequence-dependent setup times in a parallel machine scheduling problem","volume":"117","author":"Alvarez","year":"2019","journal-title":"Expert Syst. Appl."},{"key":"ref_123","doi-asserted-by":"crossref","unstructured":"Agnetis, A. (2012). Multiagent Scheduling Problems. New Directions in Informatics, Optimization, Logistics, and Production 2012 TutORials in Operations Research, INFORMS.","DOI":"10.1287\/educ.1120.0096"},{"key":"ref_124","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.ejor.2013.09.017","article-title":"A common framework and taxonomy for multicriteria scheduling problems with interfering and competing jobs: Multi-agent scheduling problems","volume":"235","author":"Framinan","year":"2014","journal-title":"Eur. J. Oper. Res."},{"key":"ref_125","doi-asserted-by":"crossref","first-page":"1250013","DOI":"10.1142\/S0217595912500133","article-title":"A single-machine two-agent scheduling problem by GA approach","volume":"29","author":"Cheng","year":"2012","journal-title":"Asia-Pac. J. Oper. Res."},{"key":"ref_126","doi-asserted-by":"crossref","first-page":"534","DOI":"10.1016\/j.cie.2010.12.008","article-title":"A two-agent single-machine scheduling problem with truncated sum-of-processing-times-based learning considerations","volume":"60","author":"Cheng","year":"2011","journal-title":"Comput. Ind. Eng."},{"key":"ref_127","first-page":"8804","article-title":"Two-agent scheduling with position-based deteriorating jobs and learning effects","volume":"217","author":"Cheng","year":"2011","journal-title":"Appl. Math. Comput."},{"key":"ref_128","doi-asserted-by":"crossref","first-page":"13","DOI":"10.1177\/1063293X14559750","article-title":"Algorithms for single-machine scheduling to minimize the total tardiness with learning effects and two competing agents","volume":"23","author":"Lee","year":"2015","journal-title":"Concurr. Eng. Res. Appl."},{"key":"ref_129","doi-asserted-by":"crossref","first-page":"1644","DOI":"10.1016\/j.cor.2011.09.018","article-title":"Solving a two-agent single-machine scheduling problem considering learning effect","volume":"39","author":"Li","year":"2012","journal-title":"Comput. Oper. Res."},{"key":"ref_130","first-page":"471016","article-title":"Some single-machine scheduling problems with learning effects and two competing agents","volume":"2014","author":"Li","year":"2014","journal-title":"Sci. World J."},{"key":"ref_131","doi-asserted-by":"crossref","first-page":"325","DOI":"10.1007\/s00170-009-2259-5","article-title":"Two-agent single-machine scheduling with position-dependent processing times","volume":"48","author":"Liu","year":"2010","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"ref_132","doi-asserted-by":"crossref","first-page":"1850037","DOI":"10.1142\/S0217595918500379","article-title":"A Branch-and-Bound Algorithm for Two-Agent Scheduling with Learning Effect and Late Work Criterion","volume":"35","author":"Liu","year":"2018","journal-title":"Asia-Pac. J. Oper. Res."},{"key":"ref_133","doi-asserted-by":"crossref","first-page":"580","DOI":"10.1016\/j.cie.2015.05.032","article-title":"Two-agent two-machine flowshop scheduling with learning effects to minimize the total completion time","volume":"87","author":"Shiau","year":"2015","journal-title":"Comput. Ind. Eng."},{"key":"ref_134","first-page":"648082","article-title":"A two-agent single-machine scheduling problem with learning and deteriorating considerations","volume":"2013","author":"Wu","year":"2013","journal-title":"Math. Probl. Eng."},{"key":"ref_135","doi-asserted-by":"crossref","first-page":"1450046","DOI":"10.1142\/S0217595914500468","article-title":"Genetic algorithm for a two-agent scheduling problem with truncated learning consideration","volume":"31","author":"Wu","year":"2014","journal-title":"Asia-Pac. J. Oper. Res."},{"key":"ref_136","doi-asserted-by":"crossref","first-page":"111","DOI":"10.1057\/s41274-016-0008-3","article-title":"A combined approach for two-agent scheduling with sum-of-processing-times-based learning effect","volume":"68","author":"Wu","year":"2017","journal-title":"J. Oper. Res. Soc."},{"key":"ref_137","doi-asserted-by":"crossref","first-page":"136","DOI":"10.1016\/j.ins.2013.06.054","article-title":"Single-machine scheduling with two competing agents and learning consideration","volume":"251","author":"Wu","year":"2013","journal-title":"Inf. Sci."},{"key":"ref_138","doi-asserted-by":"crossref","first-page":"1324","DOI":"10.1016\/j.cie.2011.08.007","article-title":"Two-agent scheduling with learning consideration","volume":"61","author":"Wu","year":"2011","journal-title":"Comput. Ind. Eng."},{"key":"ref_139","doi-asserted-by":"crossref","first-page":"20","DOI":"10.1016\/j.cie.2011.02.005","article-title":"Computational complexity and solution algorithms for flowshop scheduling problems with the learning effect","volume":"61","author":"Rudek","year":"2011","journal-title":"Comput. Ind. Eng."},{"key":"ref_140","doi-asserted-by":"crossref","first-page":"1170","DOI":"10.1057\/jors.2013.19","article-title":"Computational complexity of the single processor makespan minimization problem with release dates and job-dependent learning","volume":"65","author":"Rudek","year":"2014","journal-title":"J. Oper. Res. Soc."},{"key":"ref_141","first-page":"819","article-title":"The computational complexity analysis of the two-processor flowshop problems with position dependent job processing times","volume":"221","author":"Rudek","year":"2013","journal-title":"Appl. Math. Comput."},{"key":"ref_142","doi-asserted-by":"crossref","first-page":"176","DOI":"10.1016\/j.cie.2017.07.016","article-title":"Complexity of late work minimization in flow shop systems and a particle swarm optimization algorithm for learning effect","volume":"111","author":"Chen","year":"2017","journal-title":"Comput. Ind. Eng."},{"key":"ref_143","doi-asserted-by":"crossref","first-page":"1325","DOI":"10.1057\/palgrave.jors.2601856","article-title":"Flow-shop scheduling with a learning effect","volume":"56","author":"Wang","year":"2005","journal-title":"J. Oper. Res. Soc."},{"key":"ref_144","first-page":"1135","article-title":"A comparison of local search algorithms with population-based algorithms in hybrid flow shop scheduling problems with realistic characteristics. The international journal of advanced manufacturing","volume":"83","author":"Bozorgirad","year":"2016","journal-title":"Technology"},{"key":"ref_145","doi-asserted-by":"crossref","unstructured":"Yin, P.Y., Chen, H.M., Cheng, Y.L., Wei, Y.C., Huang, Y.L., and Day, R.F. (2021). Minimizing the Makespan in Flowshop Scheduling for Sustainable Rubber Circular Manufacturing. Sustainability, 13.","DOI":"10.3390\/su13052576"},{"key":"ref_146","doi-asserted-by":"crossref","unstructured":"Schumacher, C., and Buchholz, P. (2020). Scheduling Algorithms for a Hybrid Flow Shop under Uncertainty. Algorithms, 13.","DOI":"10.3390\/a13110277"},{"key":"ref_147","doi-asserted-by":"crossref","first-page":"1045","DOI":"10.1016\/j.cor.2010.10.009","article-title":"Minimizing total completion time in two-stage hybrid flow shop with dedicated machines","volume":"38","author":"Yang","year":"2011","journal-title":"Comput. Oper. Res."},{"key":"ref_148","doi-asserted-by":"crossref","first-page":"541","DOI":"10.1023\/A:1016540724870","article-title":"A Taxonomy of Hybrid Metaheuristics","volume":"97","author":"Talbi","year":"2002","journal-title":"J. Heuristics"}],"container-title":["Algorithms"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.mdpi.com\/1999-4893\/15\/11\/439\/pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,10,11]],"date-time":"2025-10-11T01:22:47Z","timestamp":1760145767000},"score":1,"resource":{"primary":{"URL":"https:\/\/www.mdpi.com\/1999-4893\/15\/11\/439"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2022,11,21]]},"references-count":148,"journal-issue":{"issue":"11","published-online":{"date-parts":[[2022,11]]}},"alternative-id":["a15110439"],"URL":"https:\/\/doi.org\/10.3390\/a15110439","relation":{},"ISSN":["1999-4893"],"issn-type":[{"type":"electronic","value":"1999-4893"}],"subject":[],"published":{"date-parts":[[2022,11,21]]}}}