{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,30]],"date-time":"2025-10-30T07:15:01Z","timestamp":1761808501293,"version":"build-2065373602"},"reference-count":42,"publisher":"MDPI AG","issue":"2","license":[{"start":{"date-parts":[[2022,2,7]],"date-time":"2022-02-07T00:00:00Z","timestamp":1644192000000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Computers"],"abstract":"<jats:p>Given the growing number of development projects, proper project planning and management are crucial. The purpose of this paper is to introduce a heuristic algorithm for scheduling a power plant project construction and project resource management to determine the size of project buffers and feeding buffers. This algorithm consists of three steps: 1. estimating the duration of project activities; 2. determining the size of the project buffer and feeding buffers; and 3. simulating the mentioned algorithm, which will be explained below. Innovations of this research are as follows: estimating the exact duration of project activities by using a heuristic algorithm, in addition to determining the buffer size; calculating both project buffer and feeding buffers; and applying the algorithm to implement an ACC used in combined cycle power plant projects as a numerical example. In order to evaluate the proposed algorithm, inputs from this project were run through several algorithms recently presented. The results showed that a suitable amount of buffers can be allocated for projects using this algorithm.<\/jats:p>","DOI":"10.3390\/computers11020023","type":"journal-article","created":{"date-parts":[[2022,2,7]],"date-time":"2022-02-07T08:38:48Z","timestamp":1644223128000},"page":"23","update-policy":"https:\/\/doi.org\/10.3390\/mdpi_crossmark_policy","source":"Crossref","is-referenced-by-count":8,"title":["A Project-Scheduling and Resource Management Heuristic Algorithm in the Construction of Combined Cycle Power Plant Projects"],"prefix":"10.3390","volume":"11","author":[{"ORCID":"https:\/\/orcid.org\/0000-0003-2462-999X","authenticated-orcid":false,"given":"Shakib","family":"Zohrehvandi","sequence":"first","affiliation":[{"name":"New Technologies Department, Center for European Studies, Kharazmi University, Tehran 15719-14911, Iran"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"1968","published-online":{"date-parts":[[2022,2,7]]},"reference":[{"key":"ref_1","doi-asserted-by":"crossref","first-page":"808","DOI":"10.1016\/j.ijproman.2014.09.005","article-title":"A review of analytical models, approaches and decision support tools in project monitoring and control","volume":"33","year":"2015","journal-title":"Int. J. Proj. Manag."},{"key":"ref_2","doi-asserted-by":"crossref","first-page":"502","DOI":"10.1108\/ECAM-01-2019-0065","article-title":"A reconfigurable model for implementation in the closing phase of a wind turbines project construction","volume":"27","author":"Zohrehvandi","year":"2019","journal-title":"Eng. Constr. Archit. Manag."},{"key":"ref_3","doi-asserted-by":"crossref","first-page":"274","DOI":"10.1016\/j.procs.2017.11.038","article-title":"Planning project closure phase in combined cycle power plant projects","volume":"121","author":"Zohrehvandi","year":"2017","journal-title":"Procedia Comput. Sci."},{"key":"ref_4","unstructured":"Goldratt, E.M. (1997). Critical Chain, North River Press."},{"key":"ref_5","doi-asserted-by":"crossref","first-page":"945","DOI":"10.1007\/978-3-319-05915-0_13","article-title":"Further research opportunities in project management","volume":"Volume 2","author":"Hall","year":"2015","journal-title":"Handbook on Project Management and Scheduling"},{"key":"ref_6","doi-asserted-by":"crossref","first-page":"401","DOI":"10.1016\/j.ejor.2004.10.019","article-title":"An investigation of buffer sizing techniques in critical chain scheduling","volume":"172","author":"Tukel","year":"2006","journal-title":"Eur. J. Oper. Res."},{"key":"ref_7","doi-asserted-by":"crossref","unstructured":"Alekseeva, N., Antoshkova, N., and Pupentsova, S. (2018). Application of the Monte-Carlo simulation method in building and energy management systems. Energy Management of Municipal Transportation Facilities and Transport, Springer.","DOI":"10.1007\/978-3-030-19868-8_26"},{"key":"ref_8","doi-asserted-by":"crossref","first-page":"2415","DOI":"10.1007\/s00170-019-04776-x","article-title":"Energy-efficient integration of process planning and scheduling in discrete parts manufacturing with a heuristic-based two-stage approach","volume":"106","author":"Liu","year":"2020","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"ref_9","unstructured":"Newbold, R.C. (1998). Project Management in the Fast Lane: Applying the Theory of Constraints, CRC Press."},{"key":"ref_10","doi-asserted-by":"crossref","unstructured":"Leach, L.P. (2005). Critical Chain Project Management, Artech House Inc.. [2nd ed.].","DOI":"10.1002\/9780470172391.ch33"},{"key":"ref_11","unstructured":"Woeppel, M.J. (2006). Projects in Less Time: A Synopsis of Critical Chain, Pinnacle Strategies Pub."},{"key":"ref_12","doi-asserted-by":"crossref","first-page":"794","DOI":"10.1016\/j.ejor.2005.09.018","article-title":"A new heuristic for resource-constrained project scheduling in stochastic networks using critical chain concept","volume":"176","author":"Rabbani","year":"2007","journal-title":"Eur. J. Oper. Res."},{"key":"ref_13","unstructured":"Goldratt, E.M., and Cox, J. (1984). The Goal: Excellence in Manufacturing, North River Press."},{"key":"ref_14","doi-asserted-by":"crossref","first-page":"04018011","DOI":"10.1061\/(ASCE)CO.1943-7862.0001178","article-title":"Developing a Novel Framework to Manage Schedule Contingency Using Theory of Constraints and Earned Schedule Method","volume":"144","author":"Hammad","year":"2018","journal-title":"J. Constr. Eng. Manag."},{"key":"ref_15","doi-asserted-by":"crossref","unstructured":"Vanhoucke, M. (2016). Buffer management. Integrated Project Management Sourcebook, Springer.","DOI":"10.1007\/978-3-319-27373-0"},{"key":"ref_16","doi-asserted-by":"crossref","first-page":"1129","DOI":"10.1108\/ECAM-04-2018-0161","article-title":"APRT-FMEA buffer sizing method in scheduling of a wind farm construction project","volume":"26","author":"Zohrehvandi","year":"2019","journal-title":"Eng. Constr. Archit. Manag."},{"key":"ref_17","doi-asserted-by":"crossref","first-page":"174","DOI":"10.1016\/j.ejor.2015.07.009","article-title":"Project buffer sizing of a critical chain based on comprehensive resource tightness","volume":"248","author":"Zhang","year":"2016","journal-title":"Eur. J. Oper. Res."},{"key":"ref_18","doi-asserted-by":"crossref","first-page":"671","DOI":"10.1080\/00207543.2016.1200151","article-title":"Critical chain project buffer sizing based on resource constraints","volume":"55","author":"Zhang","year":"2017","journal-title":"Int. J. Prod. Res."},{"key":"ref_19","doi-asserted-by":"crossref","first-page":"1950010","DOI":"10.1142\/S0217595919500106","article-title":"The Interaction between Critical Chain Sequencing, Buffer Sizing, and Reactive Actions in a CC\/BM Framework","volume":"36","author":"Hu","year":"2019","journal-title":"Asia-Pac. J. Oper. Res."},{"key":"ref_20","first-page":"194","article-title":"Critical chain project management for a highway construction project with a focus on theory of constraints","volume":"21","author":"Sarkar","year":"2021","journal-title":"Int. J. Constr. Manag."},{"key":"ref_21","doi-asserted-by":"crossref","first-page":"04016046","DOI":"10.1061\/(ASCE)CO.1943-7862.0001158","article-title":"A probabilistic-based method to determine optimum size of project buffer in construction schedules","volume":"142","author":"Poshdar","year":"2016","journal-title":"J. Constr. Eng. Manag."},{"key":"ref_22","doi-asserted-by":"crossref","first-page":"22","DOI":"10.1016\/j.ejor.2014.06.025","article-title":"Multi-mode resource constrained multi-project scheduling and resource portfolio problem","volume":"240","author":"Bilge","year":"2015","journal-title":"Eur. J. Oper. Res."},{"key":"ref_23","doi-asserted-by":"crossref","unstructured":"Rueda-Velasco, F.J., Cubaque, C.E., and Latorre, J.M.I. (2017). Project Scheduling with Dynamic Resource Allocation in a Multi-project Environment. Case: Bogot\u00e1 Electricity Distributor. Workshop on Engineering Applications, Springer.","DOI":"10.1007\/978-3-319-66963-2_52"},{"key":"ref_24","doi-asserted-by":"crossref","first-page":"103052","DOI":"10.1016\/j.autcon.2019.103052","article-title":"Memetic algorithm for solving resource constrained project scheduling problems","volume":"111","author":"Rahman","year":"2020","journal-title":"Autom. Constr."},{"key":"ref_25","doi-asserted-by":"crossref","first-page":"6231","DOI":"10.1080\/00207543.2015.1043157","article-title":"Optimisation of critical chain sequencing based on activities\u2019 information flow interactions","volume":"53","author":"Zhang","year":"2015","journal-title":"Int. J. Prod. Res."},{"key":"ref_26","doi-asserted-by":"crossref","first-page":"782","DOI":"10.1108\/ECAM-05-2014-0069","article-title":"Optimized scheduling and buffering of repetitive construction projects under uncertainty","volume":"23","author":"Bakry","year":"2016","journal-title":"Eng. Constr. Archit. Manag."},{"key":"ref_27","doi-asserted-by":"crossref","first-page":"6130","DOI":"10.1080\/00207543.2019.1667041","article-title":"Incorporation of resource reliability into critical chain project management buffer sizing","volume":"58","author":"Zarghami","year":"2019","journal-title":"Int. J. Prod. Res."},{"key":"ref_28","doi-asserted-by":"crossref","first-page":"67","DOI":"10.1007\/s10479-019-03347-3","article-title":"A two-stage approach for the critical chain project rescheduling","volume":"285","author":"Zhao","year":"2020","journal-title":"Ann. Oper. Res."},{"key":"ref_29","doi-asserted-by":"crossref","first-page":"1123","DOI":"10.1108\/IJESM-10-2019-0025","article-title":"A project buffer and resource management model in energy sector; a case study in construction of a wind farm project","volume":"14","author":"Zohrehvandi","year":"2020","journal-title":"Int. J. Energy Sect. Manag."},{"key":"ref_30","doi-asserted-by":"crossref","first-page":"103267","DOI":"10.1016\/j.autcon.2020.103267","article-title":"A heuristic buffer sizing algorithm for implementing a renewable energy project","volume":"117","author":"Zohrehvandi","year":"2020","journal-title":"Autom. Constr."},{"key":"ref_31","first-page":"121","article-title":"Project scheduling and buffer management: A comprehensive review and future directions","volume":"7","author":"Zohrehvandi","year":"2022","journal-title":"J. Proj. Manag."},{"key":"ref_32","doi-asserted-by":"crossref","first-page":"675","DOI":"10.1108\/IJESM-07-2016-0001","article-title":"Generation scheduling with large-scale integration of renewable energy sources using grey wolf optimization","volume":"12","author":"Saravanan","year":"2018","journal-title":"Int. J. Energy Sect. Manag."},{"key":"ref_33","doi-asserted-by":"crossref","first-page":"2771","DOI":"10.1080\/00207543.2014.980463","article-title":"A new scheduling technique for the resource\u2013constrained project scheduling problem with discounted cash flows","volume":"53","author":"Leyman","year":"2015","journal-title":"Int. J. Prod. Res."},{"key":"ref_34","doi-asserted-by":"crossref","first-page":"91","DOI":"10.1016\/j.eswa.2016.03.017","article-title":"Priority-based heuristics for the multi-skill resource constrained project scheduling problem","volume":"57","author":"Almeida","year":"2016","journal-title":"Expert Syst. Appl."},{"key":"ref_35","doi-asserted-by":"crossref","first-page":"66","DOI":"10.1016\/j.omega.2016.09.009","article-title":"An adjustable robust optimization model for the resource-constrained project scheduling problem with uncertain activity durations","volume":"71","author":"Bruni","year":"2017","journal-title":"Omega"},{"key":"ref_36","doi-asserted-by":"crossref","first-page":"454","DOI":"10.1016\/j.ejor.2017.07.027","article-title":"An efficient genetic algorithm to solve the resource-constrained project scheduling problem with transfer times: The single mode case","volume":"265","author":"Kadri","year":"2018","journal-title":"Eur. J. Oper. Res."},{"key":"ref_37","doi-asserted-by":"crossref","first-page":"1291","DOI":"10.1007\/978-3-319-05915-0_28","article-title":"Robust multi-criteria project scheduling in plant engineering and construction","volume":"Volume 2","author":"Bevilacqua","year":"2015","journal-title":"Handbook on Project Management and Scheduling"},{"key":"ref_38","doi-asserted-by":"crossref","unstructured":"Cheraghi, E., Zohrehvandi, S., Vanhoucke, M., and Tosarkani, B.M. (Eng. Constr. Archit. Manag., 2022). A multiproject scheduling and resource management model in projects construction, Eng. Constr. Archit. Manag., ahead-of-print.","DOI":"10.1108\/ECAM-02-2021-0177"},{"key":"ref_39","doi-asserted-by":"crossref","first-page":"04018094","DOI":"10.1061\/(ASCE)CO.1943-7862.0001552","article-title":"New Approach to the Distribution of Project Completion Time in PERT Networks","volume":"144","year":"2018","journal-title":"J. Constr. Eng. Manag."},{"key":"ref_40","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.autcon.2016.01.003","article-title":"Sensitivity analysis in PERT networks: Does activity duration distribution matter?","volume":"65","author":"Hajdu","year":"2016","journal-title":"Autom. Constr."},{"key":"ref_41","doi-asserted-by":"crossref","first-page":"3278","DOI":"10.1016\/j.arthro.2018.10.004","article-title":"Research pearls: Expert consensus based evidence using the Delphi method","volume":"34","author":"Hohmann","year":"2018","journal-title":"Arthrosc. J. Arthrosc. Relat. Surg."},{"key":"ref_42","doi-asserted-by":"crossref","first-page":"65","DOI":"10.1108\/17595901011026481","article-title":"Resourcing for a resilient post-disaster reconstruction environment","volume":"1","author":"Chang","year":"2010","journal-title":"Int. J. Disaster Resil. Built Environ."}],"container-title":["Computers"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.mdpi.com\/2073-431X\/11\/2\/23\/pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,10,10]],"date-time":"2025-10-10T22:15:22Z","timestamp":1760134522000},"score":1,"resource":{"primary":{"URL":"https:\/\/www.mdpi.com\/2073-431X\/11\/2\/23"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2022,2,7]]},"references-count":42,"journal-issue":{"issue":"2","published-online":{"date-parts":[[2022,2]]}},"alternative-id":["computers11020023"],"URL":"https:\/\/doi.org\/10.3390\/computers11020023","relation":{},"ISSN":["2073-431X"],"issn-type":[{"type":"electronic","value":"2073-431X"}],"subject":[],"published":{"date-parts":[[2022,2,7]]}}}