{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,7,30]],"date-time":"2026-07-30T14:45:11Z","timestamp":1785422711053,"version":"3.56.0"},"reference-count":109,"publisher":"MDPI AG","issue":"5","license":[{"start":{"date-parts":[[2026,5,14]],"date-time":"2026-05-14T00:00:00Z","timestamp":1778716800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0\/"}],"funder":[{"DOI":"10.13039\/100000015","name":"U.S. Department of Energy","doi-asserted-by":"crossref","id":[{"id":"10.13039\/100000015","id-type":"DOI","asserted-by":"crossref"}]},{"id":[{"id":"https:\/\/ror.org\/01bj3aw27","id-type":"ROR","asserted-by":"publisher"}]}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Computers"],"abstract":"<jats:p>Sustainable manufacturing requires schedules that balance environmental responsibility with delivery reliability. This paper studies the Carbon-Aware Flexible Job Shop Scheduling Problem with Tardiness Penalty (CAFJSP-T), where total carbon emissions and total tardiness penalty are the primary objectives. We propose a Policy-based Rough Optimization with a Large Neighborhood Search (Pro-LNS) framework integrating Proximal Policy Optimization (PPO) and adaptive Large Neighborhood Search (LNS). PPO constructs a feasible schedule by selecting operation-machine assignments from job-readiness, machine-availability, earliest-completion, and critical-path features. This policy-generated schedule provides a structurally informed incumbent, enabling LNS to avoid unguided search and focus destroy-and-repair refinement on high-impact operations. Both phases use the same normalized scalarized carbon-tardiness objective, which guides PPO rewards and LNS removal, reinsertion, and acceptance while preserving precedence, eligibility, and capacity constraints. Experiments on small, medium, and large workcenter benchmarks show strong due-date performance and controlled carbon emissions. Under equal objective weighting, Pro-LNS achieves a median optimality gap of 6.12% relative to the exact formulation, with all instances within 14%, while requiring 4.08 s on average and at most 10.51 s. Comparisons with PPO-only, Advantage Actor-Critic (A2C), Soft Actor-Critic (SAC), and Genetic Algorithm (GA) schedulers show that Pro-LNS attains the best weighted scalarized objective across representative instance-weight settings. Friedman and Holm-corrected Wilcoxon tests confirm significant improvements over all competitors, with average weighted-objective gains of 4.90%, 7.25%, 8.81%, and 9.51% over PPO-only, A2C, SAC, and GA, respectively. These results demonstrate that Pro-LNS is an effective and computationally practical hybrid approach for carbon-aware, tardiness-sensitive flexible job shop scheduling.<\/jats:p>","DOI":"10.3390\/computers15050314","type":"journal-article","created":{"date-parts":[[2026,5,14]],"date-time":"2026-05-14T16:27:56Z","timestamp":1778776076000},"page":"314","update-policy":"https:\/\/doi.org\/10.3390\/mdpi_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["A Policy-Based Rough Optimization with Large Neighborhood Search for Carbon-Aware Flexible Job Shop Scheduling with Tardiness Penalty"],"prefix":"10.3390","volume":"15","author":[{"ORCID":"https:\/\/orcid.org\/0009-0006-0716-9927","authenticated-orcid":false,"given":"Saurabh Sanjay","family":"Singh","sequence":"first","affiliation":[{"name":"Department of Industrial, Systems, and Manufacturing Engineering, College of Engineering, Wichita State University, Wichita, KS 67260, USA"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Deepak","family":"Gupta","sequence":"additional","affiliation":[{"name":"Department of Industrial, Systems, and Manufacturing Engineering, College of Engineering, Wichita State University, Wichita, KS 67260, USA"}],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"1968","published-online":{"date-parts":[[2026,5,14]]},"reference":[{"key":"ref_1","doi-asserted-by":"crossref","first-page":"e24158","DOI":"10.1016\/j.heliyon.2024.e24158","article-title":"Sustaining the future: How green capabilities and digitalization drive sustainability in modern business","volume":"10","author":"Li","year":"2024","journal-title":"Heliyon"},{"key":"ref_2","first-page":"203","article-title":"Building sustainable performance through green supply chain management","volume":"74","author":"Khalaf","year":"2024","journal-title":"Int. J. Product. Perform. Manag."},{"key":"ref_3","doi-asserted-by":"crossref","unstructured":"Mahar, A.S., Zhang, Y., Sadiq, B., and Gul, R.F. (2025). Sustainability Transformation Through Green Supply Chain Management Practices and Green Innovations in Pakistan\u2019s Manufacturing and Service Industries. Sustainability, 17.","DOI":"10.3390\/su17052204"},{"key":"ref_4","doi-asserted-by":"crossref","unstructured":"Wang, M., and Zhang, G. (2023). What motivates firms to adopt a green supply chain and how much does it matter?. Front. Environ. Sci., 11.","DOI":"10.3389\/fenvs.2023.1227008"},{"key":"ref_5","doi-asserted-by":"crossref","first-page":"316","DOI":"10.3390\/appliedmath3020018","article-title":"Electricity Price Forecasting via Statistical and Deep Learning Approaches: The German Case","volume":"3","author":"Poggi","year":"2023","journal-title":"AppliedMath"},{"key":"ref_6","doi-asserted-by":"crossref","unstructured":"Narkhede, G., Chinchanikar, S., Narkhede, R., and Chaudhari, T. (2024). Role of Industry 5.0 for driving sustainability in the manufacturing sector: An emerging research agenda. J. Strategy Manag., ahead-of-print.","DOI":"10.1108\/JSMA-06-2023-0144"},{"key":"ref_7","doi-asserted-by":"crossref","first-page":"138023","DOI":"10.1016\/j.jclepro.2023.138023","article-title":"Industry 5.0 implications for inclusive sustainable manufacturing: An evidence-knowledge-based strategic roadmap","volume":"417","author":"Ghobakhloo","year":"2023","journal-title":"J. Clean. Prod."},{"key":"ref_8","doi-asserted-by":"crossref","first-page":"11781","DOI":"10.1007\/s11356-024-31859-4","article-title":"Group Technology Empowering Optimization of Mixed-Flow Precast Production in Off-Site Construction","volume":"31","author":"Zheng","year":"2024","journal-title":"Environ. Sci. Pollut. Res."},{"key":"ref_9","doi-asserted-by":"crossref","first-page":"86","DOI":"10.1080\/00207543.2024.2356628","article-title":"Scheduling Stochastic Distributed Flexible Job Shops Using a Multi-Objective Evolutionary Algorithm with Simulation Evaluation","volume":"63","author":"Fu","year":"2024","journal-title":"Int. J. Prod. Res."},{"key":"ref_10","doi-asserted-by":"crossref","unstructured":"Tang, Y., Shen, L., and Han, S. (2024). Low-Carbon Flexible Job Shop Scheduling Problem Based on Deep Reinforcement Learning. Sustainability, 16.","DOI":"10.3390\/su16114544"},{"key":"ref_11","doi-asserted-by":"crossref","first-page":"721","DOI":"10.3390\/appliedmath2040043","article-title":"A New Hybrid Multi-Objective Scheduling Model for Hierarchical Hub and Flexible Flow Shop Problems","volume":"2","author":"Aghakhani","year":"2022","journal-title":"AppliedMath"},{"key":"ref_12","doi-asserted-by":"crossref","first-page":"155","DOI":"10.1016\/j.jmsy.2023.01.004","article-title":"Flexible job shop scheduling problem under Industry 5.0: A survey on human reintegration, environmental consideration and resilience improvement","volume":"67","author":"Destouet","year":"2023","journal-title":"J. Manuf. Syst."},{"key":"ref_13","doi-asserted-by":"crossref","first-page":"12123","DOI":"10.1007\/s11227-024-05915-2","article-title":"Research on Low-Carbon Flexible Job Shop Scheduling Problem Based on Improved Grey Wolf Algorithm","volume":"80","author":"Zhou","year":"2024","journal-title":"J. Supercomput."},{"key":"ref_14","doi-asserted-by":"crossref","first-page":"107595","DOI":"10.1016\/j.engappai.2023.107595","article-title":"A hierarchical integration scheduling method for flexible job shop with green lot splitting","volume":"129","author":"Gong","year":"2024","journal-title":"Eng. Appl. Artif. Intell."},{"key":"ref_15","doi-asserted-by":"crossref","first-page":"146787","DOI":"10.1016\/j.jclepro.2025.146787","article-title":"Towards net-zero manufacturing: Carbon-aware scheduling for GHG emissions reduction","volume":"529","author":"Mencaroni","year":"2025","journal-title":"J. Clean. Prod."},{"key":"ref_16","doi-asserted-by":"crossref","unstructured":"Georgiadis, G.P., Dimitriadis, C.N., and Georgiadis, M.C. (2025). Decarbonizing the Industry Sector: Current Status and Future Opportunities of Energy-Aware Production Scheduling. Processes, 13.","DOI":"10.3390\/pr13061941"},{"key":"ref_17","doi-asserted-by":"crossref","first-page":"24","DOI":"10.33423\/jabe.v27i5.7833","article-title":"A New Algorithm for the Weighted Tardiness Problem","volume":"27","author":"Naidu","year":"2025","journal-title":"J. Appl. Bus. Econ."},{"key":"ref_18","doi-asserted-by":"crossref","first-page":"106989","DOI":"10.1016\/j.cor.2025.106989","article-title":"A systematic review of permutation flow shop scheduling with due-date-related objectives","volume":"177","year":"2025","journal-title":"Comput. Oper. Res."},{"key":"ref_19","doi-asserted-by":"crossref","first-page":"126713","DOI":"10.1016\/j.eswa.2025.126713","article-title":"Scheduling distributed heterogeneous non-permutation flowshop to minimize the total weighted tardiness","volume":"272","author":"Xiong","year":"2025","journal-title":"Expert Syst. Appl."},{"key":"ref_20","doi-asserted-by":"crossref","unstructured":"Ulucak, M.I., and G\u00f6k\u00e7en, H. (2025). Dynamic Scheduling in Identical Parallel-Machine Environments: A Multi-Purpose Intelligent Utility Approach. Appl. Sci., 15.","DOI":"10.3390\/app15052483"},{"key":"ref_21","first-page":"813","article-title":"A novel hybrid algorithm of genetic algorithm, variable neighborhood search and constraint programming for distributed flexible job shop scheduling problem","volume":"15","author":"Meng","year":"2024","journal-title":"Int. J. Ind. Eng. Comput."},{"key":"ref_22","doi-asserted-by":"crossref","first-page":"100485","DOI":"10.1016\/j.dajour.2024.100485","article-title":"A hybrid simheuristic algorithm for solving bi-objective stochastic flexible job shop scheduling problems","volume":"11","author":"Nessari","year":"2024","journal-title":"Decis. Anal. J."},{"key":"ref_23","doi-asserted-by":"crossref","unstructured":"Seck-Tuoh-Mora, J.C., Escamilla-Serna, N.J., Montiel-Arrieta, L.J., Barrag\u00e1n-Vite, I., and Medina-Mar\u00edn, J. (2022). A Global Neighborhood with Hill-Climbing Algorithm for Fuzzy Flexible Job Shop Scheduling Problem. Mathematics, 10.","DOI":"10.3390\/math10224233"},{"key":"ref_24","first-page":"890","article-title":"Flexible job-shop scheduling with transportation resources","volume":"312","author":"Yugma","year":"2023","journal-title":"Eur. J. Oper. Res."},{"key":"ref_25","doi-asserted-by":"crossref","first-page":"25369","DOI":"10.1109\/ACCESS.2025.3535825","article-title":"MILP Modeling and Optimization of Multi-Objective Three-Stage Flexible Job Shop Scheduling Problem With Assembly and AGV Transportation","volume":"13","author":"Yang","year":"2025","journal-title":"IEEE Access"},{"key":"ref_26","doi-asserted-by":"crossref","unstructured":"Fernandes, J., Homayouni, S., and Fontes, D. (2022). Energy-Efficient Scheduling in Job Shop Manufacturing Systems: A Literature Review. Sustainability, 14.","DOI":"10.3390\/su14106264"},{"key":"ref_27","doi-asserted-by":"crossref","first-page":"6369","DOI":"10.1038\/s41598-023-33615-z","article-title":"Minimizing the makespan and carbon emissions in the green flexible job shop scheduling problem with learning effects","volume":"13","author":"Li","year":"2023","journal-title":"Sci. Rep."},{"key":"ref_28","doi-asserted-by":"crossref","unstructured":"Jia, S., Yang, Y., Li, S., Wang, S., Li, A., Cai, W., Liu, Y., Hao, J., and Hu, L. (2024). The Green Flexible Job-Shop Scheduling Problem Considering Cost, Carbon Emissions, and Customer Satisfaction under Time-of-Use Electricity Pricing. Sustainability, 16.","DOI":"10.3390\/su16062443"},{"key":"ref_29","doi-asserted-by":"crossref","first-page":"108507","DOI":"10.1016\/j.ijpe.2022.108507","article-title":"Energy-aware flexible job shop scheduling under time-of-use pricing","volume":"248","author":"Park","year":"2022","journal-title":"Int. J. Prod. Econ."},{"key":"ref_30","doi-asserted-by":"crossref","first-page":"106864","DOI":"10.1016\/j.engappai.2023.106864","article-title":"Multi-objective green scheduling of integrated flexible job shop and automated guided vehicles","volume":"126","author":"Xu","year":"2023","journal-title":"Eng. Appl. Artif. Intell."},{"key":"ref_31","doi-asserted-by":"crossref","first-page":"1275","DOI":"10.1080\/00207543.2024.2373426","article-title":"Integrated scheduling of multi-objective lot-streaming hybrid flowshop with AGV based on deep reinforcement learning","volume":"63","author":"Tang","year":"2024","journal-title":"Int. J. Prod. Res."},{"key":"ref_32","doi-asserted-by":"crossref","first-page":"107890","DOI":"10.1016\/j.asoc.2021.107890","article-title":"Evolutionary algorithms for multi-objective flexible job shop cell scheduling","volume":"113","author":"Ustun","year":"2021","journal-title":"Appl. Soft Comput."},{"key":"ref_33","doi-asserted-by":"crossref","first-page":"1097","DOI":"10.1109\/TCYB.2018.2796119","article-title":"A Two-Phase Meta-Heuristic for Multiobjective Flexible Job Shop Scheduling Problem With Total Energy Consumption Threshold","volume":"49","author":"Lei","year":"2019","journal-title":"IEEE Trans. Cybern."},{"key":"ref_34","first-page":"100901","article-title":"Enhanced NSGA-II for multi-objective energy-saving flexible job shop scheduling","volume":"39","author":"Luan","year":"2023","journal-title":"Sustain. Comput. Inform. Syst."},{"key":"ref_35","first-page":"481","article-title":"Due date optimization in multi-objective scheduling of flexible job shop production","volume":"15","author":"Tang","year":"2020","journal-title":"Adv. Prod. Eng. Manag."},{"key":"ref_36","doi-asserted-by":"crossref","unstructured":"Wu, Z., Fan, H., Sun, Y., and Peng, M. (2023). Efficient Multi-Objective Optimization on Dynamic Flexible Job Shop Scheduling Using Deep Reinforcement Learning Approach. Processes, 11.","DOI":"10.3390\/pr11072018"},{"key":"ref_37","doi-asserted-by":"crossref","first-page":"2912","DOI":"10.1109\/TASE.2023.3271666","article-title":"A DRL-Based Reactive Scheduling Policy for Flexible Job Shops With Random Job Arrivals","volume":"21","author":"Zhao","year":"2024","journal-title":"IEEE Trans. Autom. Sci. Eng."},{"key":"ref_38","doi-asserted-by":"crossref","unstructured":"Chen, Y., Liao, X., Chen, G., and Hou, Y. (2024). Dynamic Intelligent Scheduling in Low-Carbon Heterogeneous Distributed Flexible Job Shops with Job Insertions and Transfers. Sensors, 24.","DOI":"10.3390\/s24072251"},{"key":"ref_39","doi-asserted-by":"crossref","first-page":"109926","DOI":"10.1016\/j.cie.2024.109926","article-title":"An improved MOEA\/D for low-carbon many-objective flexible job shop scheduling problem","volume":"188","author":"Wang","year":"2024","journal-title":"Comput. Ind. Eng."},{"key":"ref_40","doi-asserted-by":"crossref","first-page":"267","DOI":"10.1016\/j.resconrec.2016.12.001","article-title":"Minimizing total carbon footprint and total late work criterion in flexible job shop scheduling by using an improved multi-objective genetic algorithm","volume":"128","author":"Piroozfard","year":"2016","journal-title":"Resour. Conserv. Recycl."},{"key":"ref_41","doi-asserted-by":"crossref","first-page":"116785","DOI":"10.1016\/j.eswa.2022.116785","article-title":"Hybrid energy-efficient scheduling measures for flexible job-shop problem with variable machining speeds","volume":"197","author":"Wei","year":"2022","journal-title":"Expert Syst. Appl."},{"key":"ref_42","doi-asserted-by":"crossref","first-page":"109917","DOI":"10.1016\/j.cie.2024.109917","article-title":"Deep reinforcement learning-based memetic algorithm for energy-aware flexible job shop scheduling with multi-AGV","volume":"189","author":"Zhang","year":"2024","journal-title":"Comput. Ind. Eng."},{"key":"ref_43","doi-asserted-by":"crossref","first-page":"106347","DOI":"10.1016\/j.cie.2020.106347","article-title":"Mixed-integer linear programming and constraint programming formulations for solving distributed flexible job shop scheduling problem","volume":"142","author":"Meng","year":"2020","journal-title":"Comput. Ind. Eng."},{"key":"ref_44","doi-asserted-by":"crossref","unstructured":"Ji, B., Zhang, S., Yu, S., and Zhang, B. (2023). Mathematical Modeling and a Novel Heuristic Method for Flexible Job-Shop Batch Scheduling Problem with Incompatible Jobs. Sustainability, 15.","DOI":"10.3390\/su15031954"},{"key":"ref_45","doi-asserted-by":"crossref","first-page":"6565","DOI":"10.1080\/00207543.2022.2135629","article-title":"A matheuristic for flexible job shop scheduling problem with lot-streaming and machine reconfigurations","volume":"61","author":"Fan","year":"2022","journal-title":"Int. J. Prod. Res."},{"key":"ref_46","doi-asserted-by":"crossref","unstructured":"Mei, Z., Lu, Y., and Lv, L. (2024). Research on Multi-Objective Low-Carbon Flexible Job Shop Scheduling Based on Improved NSGA-II. Machines, 12.","DOI":"10.3390\/machines12090590"},{"key":"ref_47","doi-asserted-by":"crossref","unstructured":"Sang, Y., and Tan, J. (2022). Many-Objective Flexible Job Shop Scheduling Problem with Green Consideration. Energies, 15.","DOI":"10.3390\/en15051884"},{"key":"ref_48","doi-asserted-by":"crossref","first-page":"101139","DOI":"10.1016\/j.swevo.2022.101139","article-title":"Two-stage knowledge-driven evolutionary algorithm for distributed green flexible job shop scheduling with type-2 fuzzy processing time","volume":"74","author":"Li","year":"2022","journal-title":"Swarm Evol. Comput."},{"key":"ref_49","doi-asserted-by":"crossref","first-page":"3126","DOI":"10.1080\/00207543.2016.1262082","article-title":"A shuffled frog-leaping algorithm for flexible job shop scheduling with the consideration of energy consumption","volume":"55","author":"Lei","year":"2016","journal-title":"Int. J. Prod. Res."},{"key":"ref_50","first-page":"4573","article-title":"Improved African buffalo optimization algorithm for the green flexible job shop scheduling problem considering energy consumption","volume":"38","author":"Jiang","year":"2020","journal-title":"J. Intell. Fuzzy Syst."},{"key":"ref_51","doi-asserted-by":"crossref","first-page":"1725","DOI":"10.1007\/s10845-020-01713-8","article-title":"Research on flexible job-shop scheduling problem in green sustainable manufacturing based on learning effect","volume":"33","author":"Peng","year":"2021","journal-title":"J. Intell. Manuf."},{"key":"ref_52","doi-asserted-by":"crossref","first-page":"7216","DOI":"10.1080\/00207543.2020.1836421","article-title":"Multi-objective optimisation for energy-aware flexible job-shop scheduling problem with assembly operations","volume":"59","author":"Ren","year":"2020","journal-title":"Int. J. Prod. Res."},{"key":"ref_53","doi-asserted-by":"crossref","first-page":"107695","DOI":"10.1016\/j.asoc.2021.107695","article-title":"Low-carbon joint scheduling in flexible open-shop environment with constrained automatic guided vehicle by multi-objective particle swarm optimization","volume":"111","author":"Tan","year":"2021","journal-title":"Appl. Soft Comput."},{"key":"ref_54","doi-asserted-by":"crossref","first-page":"012155","DOI":"10.1088\/1742-6596\/1574\/1\/012155","article-title":"Low Carbon Multi-Objective Shop Scheduling Based On Genetic and Variable Neighborhood Algorithm","volume":"1574","author":"Yang","year":"2020","journal-title":"J. Phys. Conf. Ser."},{"key":"ref_55","doi-asserted-by":"crossref","unstructured":"Hayat, I., Tariq, A., Shahzad, W., Masud, M., Ahmed, S., Ali, M., and Zafar, A. (2023). Hybridization of Particle Swarm Optimization with Variable Neighborhood Search and Simulated Annealing for Improved Handling of the Permutation Flow-Shop Scheduling Problem. Systems, 11.","DOI":"10.3390\/systems11050221"},{"key":"ref_56","doi-asserted-by":"crossref","first-page":"257","DOI":"10.23919\/CSMS.2021.0027","article-title":"A Review of Reinforcement Learning Based Intelligent Optimization for Manufacturing Scheduling","volume":"1","author":"Wang","year":"2021","journal-title":"Complex Syst. Model. Simul."},{"key":"ref_57","doi-asserted-by":"crossref","unstructured":"Khadivi, M., Charter, T., Yaghoubi, M., Jalayer, M., Ahang, M., Shojaeinasab, A., and Najjaran, H. (2023). Deep reinforcement learning for machine scheduling: Methodology, the state-of-the-art, and future directions. arXiv.","DOI":"10.2139\/ssrn.4319327"},{"key":"ref_58","doi-asserted-by":"crossref","first-page":"4049","DOI":"10.1080\/00207543.2022.2058432","article-title":"Deep reinforcement learning for dynamic scheduling of a flexible job shop","volume":"60","author":"Liu","year":"2022","journal-title":"Int. J. Prod. Res."},{"key":"ref_59","doi-asserted-by":"crossref","first-page":"9112","DOI":"10.1080\/00207543.2025.2533528","article-title":"An improved deep Q-network for dynamic flexible job shop scheduling with limited maintenance resources","volume":"63","author":"Yi","year":"2025","journal-title":"Int. J. Prod. Res."},{"key":"ref_60","doi-asserted-by":"crossref","first-page":"1600","DOI":"10.1109\/TII.2022.3189725","article-title":"Flexible Job-Shop Scheduling via Graph Neural Network and Deep Reinforcement Learning","volume":"19","author":"Song","year":"2023","journal-title":"IEEE Trans. Ind. Inform."},{"key":"ref_61","doi-asserted-by":"crossref","first-page":"121756","DOI":"10.1016\/j.eswa.2023.121756","article-title":"An end-to-end deep reinforcement learning method based on graph neural network for distributed job-shop scheduling problem","volume":"238","author":"Huang","year":"2023","journal-title":"Expert Syst. Appl."},{"key":"ref_62","doi-asserted-by":"crossref","unstructured":"Wang, S., Li, J., Tang, H., and Wang, J. (2022). CEA-FJSP: Carbon emission-aware flexible job-shop scheduling based on deep reinforcement learning. Front. Environ. Sci., 10.","DOI":"10.3389\/fenvs.2022.1059451"},{"key":"ref_63","first-page":"1955","article-title":"Using the proximal policy optimisation algorithm for solving the stochastic capacitated lot sizing problem","volume":"61","author":"Dellaert","year":"2022","journal-title":"Int. J. Prod. Res."},{"key":"ref_64","unstructured":"Schulman, J., Wolski, F., Dhariwal, P., Radford, A., and Klimov, O. (2017). Proximal Policy Optimization Algorithms. arXiv."},{"key":"ref_65","doi-asserted-by":"crossref","first-page":"3360","DOI":"10.1080\/00207543.2020.1870013","article-title":"Learning to schedule job-shop problems: Representation and policy learning using graph neural network and reinforcement learning","volume":"59","author":"Park","year":"2021","journal-title":"Int. J. Prod. Res."},{"key":"ref_66","doi-asserted-by":"crossref","first-page":"117796","DOI":"10.1016\/j.eswa.2022.117796","article-title":"A multi-action deep reinforcement learning framework for flexible Job-shop scheduling problem","volume":"205","author":"Lei","year":"2022","journal-title":"Expert Syst. Appl."},{"key":"ref_67","doi-asserted-by":"crossref","unstructured":"Tang, H., and Dong, J. (2024). Solving Flexible Job-Shop Scheduling Problem with Heterogeneous Graph Neural Network Based on Relation and Deep Reinforcement Learning. Machines, 12.","DOI":"10.3390\/machines12080584"},{"key":"ref_68","doi-asserted-by":"crossref","first-page":"101550","DOI":"10.1016\/j.swevo.2024.101550","article-title":"Multi-policy deep reinforcement learning for multi-objective multiplicity flexible job shop scheduling","volume":"87","author":"Ding","year":"2024","journal-title":"Swarm Evol. Comput."},{"key":"ref_69","doi-asserted-by":"crossref","first-page":"3020","DOI":"10.1109\/TASE.2021.3104716","article-title":"Real-Time Scheduling for Dynamic Partial-No-Wait Multiobjective Flexible Job Shop by Deep Reinforcement Learning","volume":"19","author":"Luo","year":"2022","journal-title":"IEEE Trans. Autom. Sci. Eng."},{"key":"ref_70","doi-asserted-by":"crossref","first-page":"144","DOI":"10.1007\/s40747-024-01772-x","article-title":"Preference learning based deep reinforcement learning for flexible job shop scheduling problem","volume":"11","author":"Liu","year":"2025","journal-title":"Complex Intell. Syst."},{"key":"ref_71","doi-asserted-by":"crossref","first-page":"983","DOI":"10.1109\/TETCI.2021.3098354","article-title":"Deep Reinforcement Learning Based Optimization Algorithm for Permutation Flow-Shop Scheduling","volume":"7","author":"Pan","year":"2023","journal-title":"IEEE Trans. Emerg. Top. Comput. Intell."},{"key":"ref_72","doi-asserted-by":"crossref","first-page":"1853","DOI":"10.1109\/TII.2023.3282313","article-title":"A Knowledge-Guided End-to-End Optimization Framework Based on Reinforcement Learning for Flow Shop Scheduling","volume":"20","author":"Pan","year":"2024","journal-title":"IEEE Trans. Ind. Inform."},{"key":"ref_73","doi-asserted-by":"crossref","first-page":"106791","DOI":"10.1016\/j.cor.2024.106791","article-title":"A Graph Reinforcement Learning Framework for Neural Adaptive Large Neighbourhood Search","volume":"172","author":"Johnn","year":"2024","journal-title":"Comput. Oper. Res."},{"key":"ref_74","first-page":"97","article-title":"SOLO: Search Online, Learn Offline for Combinatorial Optimization Problems","volume":"12","author":"Oren","year":"2021","journal-title":"Proc. Int. Symp. Comb. Search"},{"key":"ref_75","doi-asserted-by":"crossref","unstructured":"Shi, J., Liu, W., and Yang, J. (2024). An Enhanced Multi-Objective Evolutionary Algorithm with Reinforcement Learning for Energy-Efficient Scheduling in the Flexible Job Shop. Processes, 12.","DOI":"10.3390\/pr12091976"},{"key":"ref_76","doi-asserted-by":"crossref","first-page":"101544","DOI":"10.1016\/j.swevo.2024.101544","article-title":"A DQN-based memetic algorithm for energy-efficient job shop scheduling problem with integrated limited AGVs","volume":"87","author":"Yao","year":"2024","journal-title":"Swarm Evol. Comput."},{"key":"ref_77","doi-asserted-by":"crossref","first-page":"117380","DOI":"10.1016\/j.eswa.2022.117380","article-title":"A reinforcement learning based RMOEA\/D for bi-objective fuzzy flexible job shop scheduling","volume":"203","author":"Li","year":"2022","journal-title":"Expert Syst. Appl."},{"key":"ref_78","first-page":"e574","article-title":"A global-local neighborhood search algorithm and tabu search for flexible job shop scheduling problem","volume":"7","author":"Mora","year":"2020","journal-title":"PeerJ Comput. Sci."},{"key":"ref_79","doi-asserted-by":"crossref","first-page":"82","DOI":"10.1016\/j.jmsy.2023.09.002","article-title":"A hybrid genetic tabu search algorithm for distributed flexible job shop scheduling problems","volume":"71","author":"Xie","year":"2023","journal-title":"J. Manuf. Syst."},{"key":"ref_80","doi-asserted-by":"crossref","first-page":"7921","DOI":"10.1080\/00207543.2025.2508336","article-title":"An efficient and stable intelligent scheduling algorithm based on hybrid neighbourhood structure for flexible job shop scheduling problem benchmarks","volume":"63","author":"Xie","year":"2025","journal-title":"Int. J. Prod. Res."},{"key":"ref_81","doi-asserted-by":"crossref","first-page":"860","DOI":"10.1111\/itor.70057","article-title":"Energy-aware flexible job shop scheduling problem with nonlinear routes and position-based learning effect","volume":"33","author":"Birgin","year":"2025","journal-title":"Int. Trans. Oper. Res."},{"key":"ref_82","doi-asserted-by":"crossref","first-page":"455","DOI":"10.1287\/trsc.1050.0135","article-title":"An Adaptive Large Neighborhood Search Heuristic for the Pickup and Delivery Problem with Time Windows","volume":"40","author":"Pisinger","year":"2006","journal-title":"Transp. Sci."},{"key":"ref_83","doi-asserted-by":"crossref","first-page":"42","DOI":"10.1016\/j.asoc.2015.11.034","article-title":"Multi-objective adaptive large neighborhood search for distributed reentrant permutation flow shop scheduling","volume":"40","author":"Rifai","year":"2016","journal-title":"Appl. Soft Comput."},{"key":"ref_84","doi-asserted-by":"crossref","first-page":"100601","DOI":"10.1016\/j.swevo.2019.100601","article-title":"An adaptive multi-objective algorithm based on decomposition and large neighborhood search for a green machine scheduling problem","volume":"51","author":"Cota","year":"2019","journal-title":"Swarm Evol. Comput."},{"key":"ref_85","doi-asserted-by":"crossref","first-page":"107917","DOI":"10.1016\/j.engappai.2024.107917","article-title":"Multi-objective adaptive large neighbourhood search algorithm for dynamic flexible job shop schedule problem with transportation resource","volume":"132","author":"Liu","year":"2024","journal-title":"Eng. Appl. Artif. Intell."},{"key":"ref_86","doi-asserted-by":"crossref","first-page":"101419","DOI":"10.1016\/j.swevo.2023.101419","article-title":"Inverse model and adaptive neighborhood search based cooperative optimizer for energy-efficient distributed flexible job shop scheduling","volume":"83","author":"Cao","year":"2023","journal-title":"Swarm Evol. Comput."},{"key":"ref_87","doi-asserted-by":"crossref","unstructured":"Hariri, F., and Santosa, B. (2025). A Hybrid Genetic Algorithm and Adaptive Large Neighborhood Search for Flexible Job Shop Scheduling with Fuzzy Processing Time. 2025 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), IEEE.","DOI":"10.1109\/IEEM63636.2025.11357635"},{"key":"ref_88","doi-asserted-by":"crossref","first-page":"130","DOI":"10.1007\/s10462-024-11045-1","article-title":"Neural combinatorial optimization with reinforcement learning in industrial engineering: A survey","volume":"58","author":"Chung","year":"2025","journal-title":"Artif. Intell. Rev."},{"key":"ref_89","first-page":"1","article-title":"Stable-Baselines3: Reliable Reinforcement Learning Implementations","volume":"22","author":"Raffin","year":"2021","journal-title":"J. Mach. Learn. Res."},{"key":"ref_90","doi-asserted-by":"crossref","first-page":"7745","DOI":"10.2118\/230322-PA","article-title":"Worst-Case Soft Actor-Critic-Based Safe Reinforcement Learning Method for Nonlinear Constrained Waterflood Reservoir Production Optimization","volume":"30","author":"Chen","year":"2025","journal-title":"SPE J."},{"key":"ref_91","unstructured":"Liang, Y., Sun, Y., Zheng, R., and Huang, F. (2022). Efficient adversarial training without attacking: Worst-case-aware robust reinforcement learning. arXiv."},{"key":"ref_92","doi-asserted-by":"crossref","first-page":"71752","DOI":"10.1109\/ACCESS.2020.2987820","article-title":"Actor-Critic Deep Reinforcement Learning for Solving Job Shop Scheduling Problems","volume":"8","author":"Liu","year":"2020","journal-title":"IEEE Access"},{"key":"ref_93","doi-asserted-by":"crossref","first-page":"6836","DOI":"10.1109\/TSMC.2023.3287655","article-title":"Dynamic Job-Shop Scheduling Problems Using Graph Neural Network and Deep Reinforcement Learning","volume":"53","author":"Liu","year":"2023","journal-title":"IEEE Trans. Syst. Man. Cybern. Syst."},{"key":"ref_94","first-page":"100582","article-title":"Job shop smart manufacturing scheduling by deep reinforcement learning","volume":"38","author":"Ruiz","year":"2024","journal-title":"J. Ind. Inf. Integr."},{"key":"ref_95","doi-asserted-by":"crossref","first-page":"4420","DOI":"10.1109\/JIOT.2024.3485748","article-title":"End-to-End Multitarget Flexible Job Shop Scheduling With Deep Reinforcement Learning","volume":"12","author":"Wang","year":"2025","journal-title":"IEEE Internet Things J."},{"key":"ref_96","doi-asserted-by":"crossref","first-page":"257","DOI":"10.1016\/j.jmsy.2023.09.009","article-title":"Deep reinforcement learning for dynamic flexible job shop scheduling problem considering variable processing times","volume":"71","author":"Zhang","year":"2023","journal-title":"J. Manuf. Syst."},{"key":"ref_97","doi-asserted-by":"crossref","unstructured":"Zhou, Y., Jiang, J., Shi, Q., Fu, M., Zhang, Y., Chen, Y., and Zhou, L. (2025). GA-HPO PPO: A Hybrid Algorithm for Dynamic Flexible Job Shop Scheduling. Sensors, 25.","DOI":"10.3390\/s25216736"},{"key":"ref_98","doi-asserted-by":"crossref","unstructured":"Chen, Y., Zhang, F., and Liu, Z. (2021). Adaptive Advantage Estimation for Actor-Critic Algorithms. 2021 International Joint Conference on Neural Networks (IJCNN), IEEE.","DOI":"10.1109\/IJCNN52387.2021.9534005"},{"key":"ref_99","doi-asserted-by":"crossref","first-page":"764","DOI":"10.1016\/j.neunet.2023.10.023","article-title":"Adaptive bias-variance trade-off in advantage estimator for actor-critic algorithms","volume":"169","author":"Chen","year":"2023","journal-title":"Neural Netw."},{"key":"ref_100","doi-asserted-by":"crossref","unstructured":"Li, Y., and Yu, C. (2025). Flexible Job Shop Scheduling with Job Precedence Constraints: A Deep Reinforcement Learning Approach. J. Manuf. Mater. Process., 9.","DOI":"10.3390\/jmmp9070216"},{"key":"ref_101","doi-asserted-by":"crossref","first-page":"2593","DOI":"10.1007\/s10845-023-02161-w","article-title":"Smart scheduling of dynamic job shop based on discrete event simulation and deep reinforcement learning","volume":"35","author":"Wang","year":"2023","journal-title":"J. Intell. Manuf."},{"key":"ref_102","doi-asserted-by":"crossref","first-page":"102412","DOI":"10.1016\/j.rcim.2022.102412","article-title":"Dynamic job shop scheduling based on deep reinforcement learning for multi-agent manufacturing systems","volume":"78","author":"Zhang","year":"2022","journal-title":"Robot. Comput.-Integr. Manuf."},{"key":"ref_103","first-page":"24611","article-title":"The Surprising Effectiveness of PPO in Cooperative Multi-Agent Games","volume":"35","author":"Yu","year":"2021","journal-title":"Adv. Neural Inf. Process. Syst."},{"key":"ref_104","unstructured":"Behnke, D., and Geiger, M.J. (2012). Test Instances for the Flexible Job Shop Scheduling Problem with Work Centers, Logistik-Management. Helmut-Schmidt-Universit\u00e4t, Lehrstuhl f\u00fcr Betriebswirtschaftslehre, insbes."},{"key":"ref_105","doi-asserted-by":"crossref","unstructured":"Lu, Y., Zhu, Q., Tian, C., He, E., and Zhang, T. (2026). Low-Carbon and Energy-Efficient Dynamic Flexible Job Shop Scheduling Method Towards Renewable Energy Driven Manufacturing. Machines, 14.","DOI":"10.3390\/machines14010088"},{"key":"ref_106","doi-asserted-by":"crossref","first-page":"1391","DOI":"10.3934\/jimo.2016.12.1391","article-title":"A priority-based genetic algorithm for a flexible job shop scheduling problem","volume":"12","author":"Cinar","year":"2016","journal-title":"J. Ind. Manag. Optim."},{"key":"ref_107","first-page":"115","article-title":"Simulated binary crossover for continuous search space","volume":"9","author":"Deb","year":"1995","journal-title":"Complex Syst."},{"key":"ref_108","doi-asserted-by":"crossref","first-page":"177","DOI":"10.32604\/jai.2025.065078","article-title":"An Advantage Actor-Critic Approach for Energy-Conscious Scheduling in Flexible Job Shops","volume":"7","author":"Singh","year":"2025","journal-title":"J. Artif. Intell."},{"key":"ref_109","doi-asserted-by":"crossref","first-page":"116","DOI":"10.62704\/10057\/31199","article-title":"A Soft Actor-Critic Approach for Energy-Conscious Flexible Job Shop Scheduling Incorporating Machine Usage Constraints and Job Release Times","volume":"18","author":"Singh","year":"2025","journal-title":"J. Manag. Eng. Integr."}],"container-title":["Computers"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.mdpi.com\/2073-431X\/15\/5\/314\/pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2026,5,16]],"date-time":"2026-05-16T04:21:03Z","timestamp":1778905263000},"score":1,"resource":{"primary":{"URL":"https:\/\/www.mdpi.com\/2073-431X\/15\/5\/314"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2026,5,14]]},"references-count":109,"journal-issue":{"issue":"5","published-online":{"date-parts":[[2026,5]]}},"alternative-id":["computers15050314"],"URL":"https:\/\/doi.org\/10.3390\/computers15050314","relation":{},"ISSN":["2073-431X"],"issn-type":[{"value":"2073-431X","type":"electronic"}],"subject":[],"published":{"date-parts":[[2026,5,14]]}}}