{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,29]],"date-time":"2026-03-29T07:59:25Z","timestamp":1774771165462,"version":"3.50.1"},"reference-count":70,"publisher":"MDPI AG","issue":"11","license":[{"start":{"date-parts":[[2019,11,11]],"date-time":"2019-11-11T00:00:00Z","timestamp":1573430400000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0\/"}],"funder":[{"name":"Philosophy and Social Science Research in Colleges and Universities in Jiangsu Province","award":["2017SJB1364"],"award-info":[{"award-number":["2017SJB1364"]}]},{"DOI":"10.13039\/501100012226","name":"Fundamental Research Funds for the Central Universities","doi-asserted-by":"publisher","award":["331711105"],"award-info":[{"award-number":["331711105"]}],"id":[{"id":"10.13039\/501100012226","id-type":"DOI","asserted-by":"publisher"}]},{"name":"Jiangsu Provincial Construction System Science and Technology Project of Housing and Urban and Rural Development Department","award":["2017ZD074"],"award-info":[{"award-number":["2017ZD074"]}]}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Entropy"],"abstract":"<jats:p>The project delivery mode is an extremely important link in the life cycle of water engineering. Many cases show that increases in the costs, construction period, and claims in the course of the implementation of water engineering are related to the decision of the project delivery mode in the early stages. Therefore, it is particularly important to choose a delivery mode that matches the water engineering. On the basis of identifying the key factors that affect the decision on the project delivery system and establishing a set of index systems, a comprehensive decision of engineering transaction is essentially considered to be a fuzzy multi-attribute group decision. In this study, intuitionistic fuzzy entropy was used to determine the weight of the influencing factors on the engineering transaction mode; then, intuitionistic fuzzy entropy was used to determine the weight of decision experts. Thus, a comprehensive scheme-ranking model based on an intuitionistic fuzzy hybrid average (IFHA) operator and intuitionistic fuzzy weighted average (IFWA) operator was established. Finally, a practical case analysis of a hydropower station further demonstrated the feasibility, objectivity, and scientific nature of the decision model.<\/jats:p>","DOI":"10.3390\/e21111101","type":"journal-article","created":{"date-parts":[[2019,11,12]],"date-time":"2019-11-12T04:07:07Z","timestamp":1573531627000},"page":"1101","update-policy":"https:\/\/doi.org\/10.3390\/mdpi_crossmark_policy","source":"Crossref","is-referenced-by-count":13,"title":["Intuitionistic Fuzzy Entropy for Group Decision Making of Water Engineering Project Delivery System Selection"],"prefix":"10.3390","volume":"21","author":[{"given":"Xun","family":"Liu","sequence":"first","affiliation":[{"name":"School of Civil Engineering, Suzhou University of Science and Technology, Suzhou 215000, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Fei","family":"Qian","sequence":"additional","affiliation":[{"name":"Institute of Engineering Management, Hohai University, Nanjing 211100, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Lingna","family":"Lin","sequence":"additional","affiliation":[{"name":"School of Civil Engineering, Suzhou University of Science and Technology, Suzhou 215000, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Kun","family":"Zhang","sequence":"additional","affiliation":[{"name":"Institute of Engineering Management, Hohai University, Nanjing 211100, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Lianbo","family":"Zhu","sequence":"additional","affiliation":[{"name":"School of Civil Engineering, Suzhou University of Science and Technology, Suzhou 215000, China"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"1968","published-online":{"date-parts":[[2019,11,11]]},"reference":[{"key":"ref_1","doi-asserted-by":"crossref","first-page":"03119005","DOI":"10.1061\/(ASCE)CO.1943-7862.0001688","article-title":"Effectiveness of Project Delivery Systems in Executing Green Buildings","volume":"145","author":"Raouf","year":"2019","journal-title":"J. Constr. Eng. Manag."},{"key":"ref_2","doi-asserted-by":"crossref","first-page":"395","DOI":"10.1016\/j.ijproman.2019.01.012","article-title":"Comparative analysis between integrated project delivery and lean project delivery","volume":"37","author":"Mesa","year":"2019","journal-title":"Int. J. Proj. Manag."},{"key":"ref_3","doi-asserted-by":"crossref","first-page":"05019001","DOI":"10.1061\/(ASCE)CO.1943-7862.0001605","article-title":"Practices for Designing Cross-Functional Teams for Integrated Project Delivery","volume":"145","author":"Laurent","year":"2019","journal-title":"J. Constr. Eng. Manag."},{"key":"ref_4","doi-asserted-by":"crossref","first-page":"899","DOI":"10.1016\/j.jclepro.2018.12.226","article-title":"Perceptions towards risks involved in off-site construction in the integrated design & construction project delivery","volume":"213","author":"Wu","year":"2019","journal-title":"J. Clean. Prod."},{"key":"ref_5","doi-asserted-by":"crossref","first-page":"689","DOI":"10.1007\/s10726-018-9581-y","article-title":"Project Delivery System Selection with Interval-Valued Intuitionistic Fuzzy Set Group Decision-Making Method","volume":"27","author":"An","year":"2018","journal-title":"Group Decis. Negot."},{"key":"ref_6","doi-asserted-by":"crossref","first-page":"238","DOI":"10.1108\/K-01-2014-0012","article-title":"Selection of project delivery approach with unascertained model","volume":"44","author":"Li","year":"2015","journal-title":"Kybernetes"},{"key":"ref_7","doi-asserted-by":"crossref","first-page":"405","DOI":"10.1108\/02635570810858796","article-title":"A qualitative re-construction of project measurement criteria","volume":"108","author":"Ojiako","year":"2008","journal-title":"Ind. Manag. Data Syst."},{"key":"ref_8","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1061\/(ASCE)0733-9364(2006)132:1(3)","article-title":"Relative Effectiveness of Project Delivery and Contract Strategies","volume":"132","author":"Oyetunji","year":"2006","journal-title":"J. Constr. Eng. Manag."},{"key":"ref_9","doi-asserted-by":"crossref","first-page":"05018010","DOI":"10.1061\/(ASCE)ME.1943-5479.0000645","article-title":"\u201cBill\u201d Innovations in Project Delivery Method Selection Approach in the Texas Department of Transportation","volume":"34","author":"Khwaja","year":"2018","journal-title":"J. Manag. Eng."},{"key":"ref_10","doi-asserted-by":"crossref","first-page":"467","DOI":"10.1061\/(ASCE)0733-9364(1998)124:6(467)","article-title":"Model for Public Sector Design-Build Project Selection","volume":"124","author":"Molenaar","year":"1998","journal-title":"J. Constr. Eng. Manag."},{"key":"ref_11","doi-asserted-by":"crossref","first-page":"469","DOI":"10.1016\/S0263-7863(01)00032-1","article-title":"Selecting the appropriate project delivery method using AHP","volume":"20","year":"2002","journal-title":"Int. J. Proj. Manag."},{"key":"ref_12","doi-asserted-by":"crossref","first-page":"200","DOI":"10.1061\/(ASCE)0742-597X(2007)23:4(200)","article-title":"Project Delivery System Selection under Uncertainty: Multicriteria Multilevel Decision Aid Model","volume":"23","author":"Mafakheri","year":"2007","journal-title":"J. Manag. Eng."},{"key":"ref_13","doi-asserted-by":"crossref","first-page":"269","DOI":"10.1061\/(ASCE)0887-3801(2005)19:3(269)","article-title":"Formulating Procurement Selection Criteria through Case-Based Reasoning Approach","volume":"19","author":"Luu","year":"2005","journal-title":"J. Comput. Civ. Eng."},{"key":"ref_14","doi-asserted-by":"crossref","first-page":"367","DOI":"10.1108\/EUM0000000006248","article-title":"Project delivery system selection: A case-based reasoning framework","volume":"14","author":"Ribeiro","year":"2001","journal-title":"Logist. Inf. Manag."},{"key":"ref_15","doi-asserted-by":"crossref","first-page":"159","DOI":"10.1016\/j.advengsoft.2005.05.004","article-title":"A strategy for evaluating a fuzzy case-based construction procurement selection system","volume":"37","author":"Luu","year":"2006","journal-title":"Adv. Eng. Softw."},{"key":"ref_16","doi-asserted-by":"crossref","first-page":"1016","DOI":"10.1063\/1.2835911","article-title":"Efficiency assessment of road project delivery models","volume":"963","author":"Lo","year":"2007","journal-title":"AIP Conf. Proc."},{"key":"ref_17","doi-asserted-by":"crossref","first-page":"1263","DOI":"10.1016\/j.buildenv.2004.02.008","article-title":"Using neural network to predict performance of design-build projects in Singapore","volume":"39","author":"Ling","year":"2004","journal-title":"Build. Environ."},{"key":"ref_18","doi-asserted-by":"crossref","first-page":"5456","DOI":"10.1016\/j.eswa.2010.10.008","article-title":"Project delivery system selection of construction projects in China","volume":"38","author":"Chen","year":"2011","journal-title":"Expert Syst. Appl."},{"key":"ref_19","first-page":"123","article-title":"Fuzzy trust for peer-to-peer based systems","volume":"21","author":"Azzedin","year":"2007","journal-title":"Proc. World Acad. Sci. Eng. Technol."},{"key":"ref_20","doi-asserted-by":"crossref","unstructured":"Castillo, O., and Atanassov, K. (2019). Comments on fuzzy sets, interval type-2 fuzzy sets, general type-2 fuzzy sets and intuitionistic fuzzy sets. Recent Advances in Intuitionistic Fuzzy Logic Systems, Springer.","DOI":"10.1007\/978-3-030-02155-9_3"},{"key":"ref_21","doi-asserted-by":"crossref","first-page":"923","DOI":"10.1061\/(ASCE)CO.1943-7862.0000190","article-title":"Selecting Appropriate Project Delivery System: Fuzzy Approach with Risk Analysis","volume":"136","author":"Mostafavi","year":"2010","journal-title":"J. Constr. Eng. Manag."},{"key":"ref_22","doi-asserted-by":"crossref","first-page":"122","DOI":"10.1108\/IJMPB-06-2017-0055","article-title":"A fuzzy-based decision support system for ranking the delivery methods of mega projects","volume":"11","author":"Hawas","year":"2018","journal-title":"Int. J. Manag. Proj. Bus."},{"key":"ref_23","doi-asserted-by":"crossref","first-page":"04016046","DOI":"10.1061\/(ASCE)CP.1943-5487.0000614","article-title":"Cloudy with a Chance of Fuzzy: Building a Multicriteria Uncertainty Model for Construction Project Delivery Selection","volume":"31","author":"Martin","year":"2017","journal-title":"J. Comput. Civ. Eng."},{"key":"ref_24","doi-asserted-by":"crossref","first-page":"285","DOI":"10.1080\/01446190210121288","article-title":"Fuzzy membership functions of procurement selection criteria","volume":"20","author":"Ng","year":"2002","journal-title":"Constr. Manag. Econ."},{"key":"ref_25","doi-asserted-by":"crossref","first-page":"89","DOI":"10.1061\/(ASCE)ME.1943-5479.0000011","article-title":"Performance Objectives Selection Model in Public-Private Partnership Projects Based on the Perspective of Stakeholders","volume":"26","author":"Yuan","year":"2010","journal-title":"J. Manag. Eng."},{"key":"ref_26","doi-asserted-by":"crossref","first-page":"197","DOI":"10.1016\/j.patrec.2006.07.004","article-title":"Intuitionistic fuzzy information\u2014Applications to pattern recognition","volume":"28","author":"Vlachos","year":"2007","journal-title":"Pattern Recognit. Lett."},{"key":"ref_27","doi-asserted-by":"crossref","first-page":"221","DOI":"10.1080\/014461998372501","article-title":"Selecting a suitable procurement method for a building project","volume":"16","author":"Love","year":"1998","journal-title":"Constr. Manag. Econ."},{"key":"ref_28","doi-asserted-by":"crossref","first-page":"93","DOI":"10.1061\/(ASCE)0733-9364(2001)127:2(93)","article-title":"Design and Build Project Success Factors: Multivariate Analysis","volume":"127","author":"Chan","year":"2001","journal-title":"J. Constr. Eng. Manag."},{"key":"ref_29","doi-asserted-by":"crossref","first-page":"132","DOI":"10.1061\/(ASCE)0742-597X(2001)17:3(132)","article-title":"Improving Objectivity in Procurement Selection","volume":"17","author":"Cheung","year":"2001","journal-title":"J. Manag. Eng."},{"key":"ref_30","doi-asserted-by":"crossref","first-page":"429","DOI":"10.1016\/S0965-9978(03)00043-7","article-title":"A case-based procurement advisory system for construction","volume":"34","author":"Luu","year":"2003","journal-title":"Adv. Eng. Softw."},{"key":"ref_31","doi-asserted-by":"crossref","first-page":"75","DOI":"10.1061\/(ASCE)0733-9364(2004)130:1(75)","article-title":"Predicting performance of design-build and design-bid-build projects","volume":"130","author":"Ling","year":"2004","journal-title":"J. Constr. Eng. Manag."},{"key":"ref_32","doi-asserted-by":"crossref","first-page":"564","DOI":"10.1016\/j.ijproman.2005.05.007","article-title":"Decision support system for selecting the proper project delivery method using analytical hierarchy process (AHP)","volume":"23","author":"Mahdi","year":"2005","journal-title":"Int. J. Proj. Manag."},{"key":"ref_33","doi-asserted-by":"crossref","first-page":"611","DOI":"10.1080\/01446190701209933","article-title":"Fuzzy procurement selection model for construction projects","volume":"25","author":"Chan","year":"2007","journal-title":"Constr. Manag. Econ."},{"key":"ref_34","first-page":"1","article-title":"Which owner characteristics are key factors affecting project delivery system decision making? Empirical analysis based on the rough set theory","volume":"31","author":"Liu","year":"2014","journal-title":"J. Manag. Eng."},{"key":"ref_35","doi-asserted-by":"crossref","first-page":"1415","DOI":"10.1016\/j.ijproman.2017.04.009","article-title":"An indicator system for evaluating megaproject social responsibility","volume":"35","author":"Lin","year":"2017","journal-title":"Int. J. Proj. Manag."},{"key":"ref_36","doi-asserted-by":"crossref","first-page":"563","DOI":"10.1016\/j.jclepro.2018.11.050","article-title":"Drivers, motivations, and barriers to the implementation of corporate social responsibility practices by construction enterprises: A review","volume":"210","author":"Zhang","year":"2019","journal-title":"J. Clean. Prod."},{"key":"ref_37","doi-asserted-by":"crossref","first-page":"398","DOI":"10.1061\/(ASCE)0733-9364(2008)134:6(398)","article-title":"Discriminant Analysis for Predicting Ranges of Cost Variance in International Construction Projects","volume":"134","author":"Kim","year":"2008","journal-title":"J. Constr. Eng. Manag."},{"key":"ref_38","doi-asserted-by":"crossref","first-page":"333","DOI":"10.1061\/(ASCE)0733-9364(2008)134:5(333)","article-title":"Determinants of successful design-build projects","volume":"134","author":"Lam","year":"2008","journal-title":"J. Constr. Eng. Manag."},{"key":"ref_39","doi-asserted-by":"crossref","first-page":"209","DOI":"10.1108\/09699980310478458","article-title":"Parameters governing the selection of procurement system\u2014An empirical survey","volume":"10","author":"Luu","year":"2003","journal-title":"Eng. Constr. Arch. Manag."},{"key":"ref_40","doi-asserted-by":"crossref","first-page":"267","DOI":"10.1061\/(ASCE)CO.1943-7862.0000621","article-title":"Cost Overruns and Failure in Project Management: Understanding the Roles of Key Stakeholders in Construction Projects","volume":"139","author":"Doloi","year":"2013","journal-title":"J. Constr. Eng. Manag."},{"key":"ref_41","doi-asserted-by":"crossref","first-page":"118","DOI":"10.1108\/ECAM-07-2015-0119","article-title":"Logistic regression analysis for factors influencing cost performance of design-bid-build and design-build projects","volume":"24","author":"Lu","year":"2017","journal-title":"Eng. Constr. Arch. Manag."},{"key":"ref_42","doi-asserted-by":"crossref","first-page":"261","DOI":"10.1016\/S0263-7863(02)00017-0","article-title":"Modelling global risk factors affecting construction cost performance","volume":"21","author":"Baloi","year":"2003","journal-title":"Int. J. Proj. Manag."},{"key":"ref_43","doi-asserted-by":"crossref","first-page":"67","DOI":"10.1061\/(ASCE)0742-597X(1998)14:1(67)","article-title":"Factors Affecting Contractors\u2019 Risk of Cost Overburden","volume":"14","author":"Akinci","year":"1998","journal-title":"J. Manag. Eng."},{"key":"ref_44","doi-asserted-by":"crossref","first-page":"5016003","DOI":"10.1061\/(ASCE)EI.1943-5541.0000278","article-title":"Key Factors of Project Characteristics Affecting Project Delivery System Decision Making in the Chinese Construction Industry: Case Study Using Chinese Data Based on Rough Set Theory","volume":"142","author":"Liu","year":"2016","journal-title":"J. Prof. Issues Eng. Educ. Pr."},{"key":"ref_45","doi-asserted-by":"crossref","first-page":"382","DOI":"10.1061\/(ASCE)0733-9364(2003)129:4(382)","article-title":"Project Delivery Systems and Project Change: Quantitative Analysis","volume":"129","author":"Ibbs","year":"2003","journal-title":"J. Constr. Eng. Manag."},{"key":"ref_46","doi-asserted-by":"crossref","first-page":"527","DOI":"10.1108\/02632771111178418","article-title":"Alternative methods for choosing an appropriate project delivery system (PDS)","volume":"29","author":"Ibbs","year":"2011","journal-title":"Facilities"},{"key":"ref_47","doi-asserted-by":"crossref","first-page":"435","DOI":"10.1061\/(ASCE)0733-9364(1998)124:6(435)","article-title":"Comparison of U.S. Project Delivery Systems","volume":"124","author":"Konchar","year":"1998","journal-title":"J. Constr. Eng. Manag."},{"key":"ref_48","doi-asserted-by":"crossref","first-page":"213","DOI":"10.1016\/j.proeng.2014.07.019","article-title":"Factors Influencing Integrated Project Delivery in Publicly Owned Construction Projects: An Information Modelling Perspective","volume":"77","author":"Azhar","year":"2014","journal-title":"Procedia Eng."},{"key":"ref_49","doi-asserted-by":"crossref","first-page":"21","DOI":"10.1061\/(ASCE)ME.1943-5479.0000027","article-title":"Selection of Project Delivery Method in Transit: Drivers and Objectives","volume":"27","author":"Touran","year":"2011","journal-title":"J. Manag. Eng."},{"key":"ref_50","doi-asserted-by":"crossref","first-page":"221","DOI":"10.1061\/(ASCE)0742-597X(2009)25:4(221)","article-title":"Construction Project Cost Escalation Factors","volume":"25","author":"Shane","year":"2009","journal-title":"J. Manag. Eng."},{"key":"ref_51","doi-asserted-by":"crossref","first-page":"251","DOI":"10.1061\/(ASCE)ME.1943-5479.0000139","article-title":"Municipal Water\/Wastewater Project Delivery Performance Comparison","volume":"29","author":"Shane","year":"2013","journal-title":"J. Manag. Eng."},{"key":"ref_52","doi-asserted-by":"crossref","first-page":"699","DOI":"10.1080\/01446190110066128","article-title":"Application of Delphi method in selection of procurement systems for construction projects","volume":"19","author":"Chan","year":"2001","journal-title":"Constr. Manag. Econ."},{"key":"ref_53","doi-asserted-by":"crossref","first-page":"337","DOI":"10.1016\/S0360-1323(00)00011-1","article-title":"Developing a decision support system for building project procurement","volume":"36","author":"Kumaraswamy","year":"2001","journal-title":"Build. Environ."},{"key":"ref_54","doi-asserted-by":"crossref","first-page":"63","DOI":"10.1080\/014461901452085","article-title":"An integration of the fuzzy reasoning technique and the fuzzy optimization method in construction project management decision-making","volume":"19","author":"Lam","year":"2001","journal-title":"Constr. Manag. Econ."},{"key":"ref_55","doi-asserted-by":"crossref","first-page":"416","DOI":"10.1061\/(ASCE)0733-9364(2006)132:4(416)","article-title":"Contractor Key Competitiveness Indicators: A China Study","volume":"132","author":"Shen","year":"2006","journal-title":"J. Constr. Eng. Manag."},{"key":"ref_56","doi-asserted-by":"crossref","first-page":"560","DOI":"10.1016\/j.ijproman.2008.10.005","article-title":"Taxonomy for change causes and effects in construction projects","volume":"27","author":"Sun","year":"2009","journal-title":"Int. J. Proj. Manag."},{"key":"ref_57","doi-asserted-by":"crossref","first-page":"823","DOI":"10.1016\/j.procs.2018.10.107","article-title":"Assessing the Benefits of the Integrated Project Delivery Method: A Survey of Expert Opinions","volume":"138","author":"Karzouna","year":"2018","journal-title":"Procedia Comput. Sci."},{"key":"ref_58","doi-asserted-by":"crossref","first-page":"528","DOI":"10.1061\/(ASCE)CO.1943-7862.0000160","article-title":"Evaluation of Risk Factors Leading to Cost Overrun in Delivery of Highway Construction Projects","volume":"136","author":"Creedy","year":"2010","journal-title":"J. Constr. Eng. Manag."},{"key":"ref_59","doi-asserted-by":"crossref","first-page":"161","DOI":"10.1061\/(ASCE)0733-9364(1999)125:3(161)","article-title":"Quantitative Analysis of Partnered Project Performance","volume":"125","author":"Gransberg","year":"1999","journal-title":"J. Constr. Eng. Manag."},{"key":"ref_60","doi-asserted-by":"crossref","first-page":"338","DOI":"10.1016\/S0019-9958(65)90241-X","article-title":"Fuzzy sets","volume":"8","author":"Zadeh","year":"1965","journal-title":"Inf. Control"},{"key":"ref_61","doi-asserted-by":"crossref","first-page":"87","DOI":"10.1016\/S0165-0114(86)80034-3","article-title":"Intuitionistic fuzzy sets","volume":"20","author":"Atanassov","year":"1986","journal-title":"Fuzzy Sets Syst."},{"key":"ref_62","doi-asserted-by":"crossref","first-page":"425","DOI":"10.1016\/S0167-8655(97)00028-7","article-title":"A note on fuzzy information measures","volume":"18","author":"Shang","year":"1997","journal-title":"Pattern Recognit. Lett."},{"key":"ref_63","first-page":"48","article-title":"Combination weighting approach in multiple attribute decision making based on relative entropy","volume":"15","author":"Zhou","year":"2006","journal-title":"Oper. Res. Manag. Sci."},{"key":"ref_64","doi-asserted-by":"crossref","first-page":"477","DOI":"10.1016\/S0165-0114(98)00191-2","article-title":"Some operations on intuitionistic fuzzy sets","volume":"114","author":"De","year":"2000","journal-title":"Fuzzy Sets Syst."},{"key":"ref_65","doi-asserted-by":"crossref","first-page":"417","DOI":"10.1080\/03081070600574353","article-title":"Some geometric aggregation operators based on intuitionistic fuzzy sets","volume":"35","author":"Xu","year":"2006","journal-title":"Int. J. Gen. Syst."},{"key":"ref_66","doi-asserted-by":"crossref","first-page":"1179","DOI":"10.1109\/TFUZZ.2006.890678","article-title":"Intuitionistic Fuzzy Aggregation Operators","volume":"15","author":"Xu","year":"2007","journal-title":"IEEE Trans. Fuzzy Syst."},{"key":"ref_67","doi-asserted-by":"crossref","first-page":"505","DOI":"10.1016\/S0165-0114(98)00244-9","article-title":"Distances between intuitionistic fuzzy sets","volume":"114","author":"Szmidt","year":"2000","journal-title":"Fuzzy Sets Syst."},{"key":"ref_68","doi-asserted-by":"crossref","first-page":"78","DOI":"10.1016\/j.spc.2016.06.006","article-title":"Intuitionistic fuzzy multi-criteria decision-making framework based on life cycle environmental, economic and social impacts: The case of U.S. wind energy","volume":"8","author":"Gumus","year":"2016","journal-title":"Sustain. Prod. Consum."},{"key":"ref_69","doi-asserted-by":"crossref","first-page":"202","DOI":"10.1016\/j.ejor.2010.01.019","article-title":"Fuzzy decision-making method based on the weighted correlation coefficient under intuitionistic fuzzy environment","volume":"205","author":"Ye","year":"2010","journal-title":"Eur. J. Oper. Res."},{"key":"ref_70","doi-asserted-by":"crossref","first-page":"3421","DOI":"10.1007\/s00500-015-1813-3","article-title":"Weight computation of criteria in a decision-making problem by knowledge measure with intuitionistic fuzzy set and interval-valued intuitionistic fuzzy set","volume":"20","author":"Das","year":"2016","journal-title":"Soft Comput."}],"container-title":["Entropy"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.mdpi.com\/1099-4300\/21\/11\/1101\/pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,10,11]],"date-time":"2025-10-11T13:33:33Z","timestamp":1760189613000},"score":1,"resource":{"primary":{"URL":"https:\/\/www.mdpi.com\/1099-4300\/21\/11\/1101"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019,11,11]]},"references-count":70,"journal-issue":{"issue":"11","published-online":{"date-parts":[[2019,11]]}},"alternative-id":["e21111101"],"URL":"https:\/\/doi.org\/10.3390\/e21111101","relation":{},"ISSN":["1099-4300"],"issn-type":[{"value":"1099-4300","type":"electronic"}],"subject":[],"published":{"date-parts":[[2019,11,11]]}}}