{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,23]],"date-time":"2026-04-23T16:18:38Z","timestamp":1776961118865,"version":"3.51.4"},"reference-count":75,"publisher":"MDPI AG","issue":"6","license":[{"start":{"date-parts":[[2019,6,20]],"date-time":"2019-06-20T00:00:00Z","timestamp":1560988800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0\/"}],"funder":[{"DOI":"10.13039\/501100003815","name":"Huaqiao University","doi-asserted-by":"publisher","award":["17BS201"],"award-info":[{"award-number":["17BS201"]}],"id":[{"id":"10.13039\/501100003815","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Future Internet"],"abstract":"<jats:p>Electronic purchasing or e-procurement saves millions of dollars yearly in transaction costs. E-procurement helps to cut down the supplier base, promotes paperless transactions, and increases transparency and accountability in the procurement process. Nonetheless, studies report that around 80% of e-procurement initiatives have met with failure and failed to achieve the desired results. Although studies to better understand the Critical Success Factors (CSFs) of e-procurement implementation involving various industries have been on the rise, little is known about architecture engineering and construction (AEC) practices, which has led to limited development of pragmatic frameworks to uncover the factors. Thus, this study aims to identify those CSFs (predicting variables) which significantly contribute to e-procurement implementation success in the construction sector and to put forward for better implementation. Results from multiple regression analysis revealed five factors to be statistically significant predictors of success. Three factors were determined to be predictors of user satisfaction. Finally, internet online procurement frameworks were developed for the success of e-procurement implementation in the construction sector.<\/jats:p>","DOI":"10.3390\/fi11060136","type":"journal-article","created":{"date-parts":[[2019,6,20]],"date-time":"2019-06-20T10:49:59Z","timestamp":1561027799000},"page":"136","update-policy":"https:\/\/doi.org\/10.3390\/mdpi_crossmark_policy","source":"Crossref","is-referenced-by-count":14,"title":["Developing Internet Online Procurement Frameworks for Construction Firms"],"prefix":"10.3390","volume":"11","author":[{"given":"Rafikullah","family":"Deraman","sequence":"first","affiliation":[{"name":"Intelligence and Automation in Construction Fujian Province Higher-Educational Engineering Research Centre, College of Civil Engineering, Huaqiao University, Xiamen 361021, China"},{"name":"Department of Construction Management, Universiti Tun Hussein Onn Malaysia, Parit Raja 86400, Batu Pahat Johor, Malaysia"}]},{"ORCID":"https:\/\/orcid.org\/0000-0001-7892-3575","authenticated-orcid":false,"given":"Chen","family":"Wang","sequence":"additional","affiliation":[{"name":"Intelligence and Automation in Construction Fujian Province Higher-Educational Engineering Research Centre, College of Civil Engineering, Huaqiao University, Xiamen 361021, China"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-4332-0031","authenticated-orcid":false,"given":"Jeffrey Boon Hui","family":"Yap","sequence":"additional","affiliation":[{"name":"Department of Surveying, Lee Kong Chian Faculty of Engineering and Science, Universiti Tunku Abdul Rahman (UTAR), Kajang 43000, Selangor, Malaysia"}]},{"given":"Heng","family":"Li","sequence":"additional","affiliation":[{"name":"Chair Professor, Department of Building and Real Estate, Faculty of Construction and Environment, the Hong Kong Polytechnic University, 999077, Hong Kong"}]},{"given":"Faizul Azli","family":"Mohd-Rahim","sequence":"additional","affiliation":[{"name":"Faculty of Built Environment, University of Malaya, Kuala Lumpur 50603, Malaysia"}]}],"member":"1968","published-online":{"date-parts":[[2019,6,20]]},"reference":[{"key":"ref_1","doi-asserted-by":"crossref","first-page":"77","DOI":"10.1016\/j.ijpe.2014.07.017","article-title":"The impact of barriers and benefits of e-procurement on its adoption decision: An empirical analysis","volume":"158","author":"Baylav","year":"2014","journal-title":"Int. J. Prod. Econ."},{"key":"ref_2","doi-asserted-by":"crossref","first-page":"821","DOI":"10.1016\/j.compind.2014.03.002","article-title":"Determinants of choice of semantic web based software as a service: An integrative framework in the context of e-procurement and ERP","volume":"65","author":"Mital","year":"2014","journal-title":"Comput. Ind."},{"key":"ref_3","doi-asserted-by":"crossref","unstructured":"Wei, C.C., and Chen, L.T. (2008). Developing Supply Chain Management System Evaluation Attributes Based on the Supply Chain Strategy, I-Tech Education and Publishing.","DOI":"10.5772\/5339"},{"key":"ref_4","doi-asserted-by":"crossref","first-page":"121","DOI":"10.1016\/j.compind.2016.09.006","article-title":"Understanding the implications of digitization and automation in the context of Industry 4.0","volume":"83","author":"Oesterreich","year":"2016","journal-title":"Comput. Ind."},{"key":"ref_5","first-page":"98","article-title":"Critical success factors for e-Tendering implementation in construction collaborative environments: People and process issues","volume":"14","author":"Lou","year":"2009","journal-title":"J. Inf. Technol. Constr."},{"key":"ref_6","first-page":"49","article-title":"A systematic literature review of flexible e-procurement marketplace","volume":"8","author":"Shirzad","year":"2013","journal-title":"J. Theor. Appl. Electron. Commer. Res."},{"key":"ref_7","unstructured":"Dornberger, R. (2018). E-business in the era of digital transformation, E-Business in the Era of Digital Transformation. Business Information Systems and Technology 4.0, Studies in Systems, Decision and Control, Springer."},{"key":"ref_8","first-page":"96","article-title":"Managing critical success factors in B2B setting","volume":"4","author":"Aggestam","year":"2006","journal-title":"IADIS Int. J. WWW\/Internet"},{"key":"ref_9","doi-asserted-by":"crossref","first-page":"734","DOI":"10.1016\/j.sbspro.2015.11.528","article-title":"Theoretical framework of e-business competitiveness","volume":"213","year":"2015","journal-title":"Procedia-Soc. Behav. Sci."},{"key":"ref_10","doi-asserted-by":"crossref","first-page":"23","DOI":"10.4067\/S0718-18762009000100004","article-title":"E-procurement in hospital pharmacies: An exploratory multi-base study from Switzerland","volume":"4","author":"Mettler","year":"2009","journal-title":"J. Theor. Appl. Electron. Commer. Res."},{"key":"ref_11","doi-asserted-by":"crossref","first-page":"167","DOI":"10.1207\/S15327744JOCE133&4_02","article-title":"The impact of electronic commerce on procurement","volume":"13","author":"Benjamin","year":"2003","journal-title":"J. Organ. Comput. Electron. Commer."},{"key":"ref_12","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1108\/13555850410765140","article-title":"E-Procurement: Is the ugly duckling actually a swan down under?","volume":"16","author":"Hawking","year":"2004","journal-title":"Asia Pac. J. Mark. Logist."},{"key":"ref_13","doi-asserted-by":"crossref","unstructured":"Pani, A.K., and Agrahari, A. (2007). E-Procurement in Emerging Economies -Theory and Cases, Idea Group, Inc.","DOI":"10.4018\/978-1-59904-153-7"},{"key":"ref_14","doi-asserted-by":"crossref","first-page":"972","DOI":"10.1016\/j.omega.2008.11.001","article-title":"Adopters and non-adopters of e-procurement in Singapore: An empirical study","volume":"37","author":"Thompson","year":"2009","journal-title":"Omega\u2014Int. J. Manag. Sci."},{"key":"ref_15","unstructured":"Giunipero, L.C., and Sawchuk, C. (2000). E-procurement Plus: Changing the Way Corporation Buy, JGC Enterprises."},{"key":"ref_16","first-page":"19","article-title":"Towards an understanding of e-procurement adoption: A case study of six hotels in Hong Kong","volume":"39","author":"Au","year":"2014","journal-title":"Tour. Recreat. Res."},{"key":"ref_17","doi-asserted-by":"crossref","first-page":"287","DOI":"10.3846\/1392-3730.2008.14.28","article-title":"E-procurement perspectives in construction sector SMEs","volume":"14","author":"Vitkauskaite","year":"2008","journal-title":"J. Civ. Eng. Manag."},{"key":"ref_18","first-page":"82","article-title":"E-procurement implementation success (e-PIS) framework in construction organizations: An empirical analysis","volume":"14","author":"Deraman","year":"2013","journal-title":"J. Build. Perform."},{"key":"ref_19","doi-asserted-by":"crossref","first-page":"836","DOI":"10.1016\/j.protcy.2013.12.093","article-title":"Exploring e-Procurement value for construction companies in Malaysia","volume":"9","author":"Hashim","year":"2013","journal-title":"Procedia Technol."},{"key":"ref_20","doi-asserted-by":"crossref","first-page":"363","DOI":"10.1016\/j.sbspro.2016.07.147","article-title":"External factors affecting the adoption of e-procurement in Saudi Arabian\u2019s SMEs","volume":"229","author":"Altayyar","year":"2016","journal-title":"Procedia-Soc. Behav. Sci."},{"key":"ref_21","first-page":"133","article-title":"Barriers to the uptake of e-procurement in the Nigerian building industry","volume":"89","author":"Aduwo","year":"2016","journal-title":"J. Theor. Appl. Inf. Technol."},{"key":"ref_22","doi-asserted-by":"crossref","unstructured":"Afolabi, A., Ibem, E., Aduwo, E., Tunji-Olayeni, P., and Oluwunmi, O. (2019). Critical success factors (CSFs) for e-procurement adoption in the Nigerian construction industry. Building, 9.","DOI":"10.3390\/buildings9020047"},{"key":"ref_23","first-page":"364","article-title":"E-procurement use in the South African construction industry","volume":"20","author":"Ibem","year":"2015","journal-title":"J. Inf. Technol. Constr."},{"key":"ref_24","first-page":"75","article-title":"E-procurement in the Atlantic Canadian AEC industry","volume":"11","author":"Rankin","year":"2006","journal-title":"J. Inf. Technol. Constr."},{"key":"ref_25","first-page":"62","article-title":"Factors influencing the usage of e-Procurement among contractor companies in Malaysia","volume":"4","author":"Daud","year":"2013","journal-title":"Bus. Manag. Q. Rev."},{"key":"ref_26","unstructured":"Torbjorn, T. (2018, October 03). Efficient Purchasing. White Paper (March), IBX Group AB. Available online: http:www.ibxeurope.com."},{"key":"ref_27","unstructured":"Ramboll, M. (2005). ICT and Electronic Business in the Construction Sector\u2014Key Issues and Case Studies, The European e-Business Market Watch. Sector Report No. 08-I (July)."},{"key":"ref_28","first-page":"217","article-title":"A cross discipline comparison of rankings for e-procurement drivers and barriers within UK construction organisations","volume":"15","author":"Eadie","year":"2010","journal-title":"J. Inf. Technol. Constr."},{"key":"ref_29","doi-asserted-by":"crossref","first-page":"205","DOI":"10.1016\/j.compind.2018.03.039","article-title":"Industry 4.0 as an enabler of proximity for construction supply chains: A systematic literature review","volume":"99","author":"Dallasega","year":"2018","journal-title":"Comput. Ind."},{"key":"ref_30","doi-asserted-by":"crossref","first-page":"54","DOI":"10.5130\/AJCEB.v16i4.4984","article-title":"Factors influencing e-Procurement adoption in the Nigerian building industry","volume":"16","author":"Ibem","year":"2016","journal-title":"Constr. Econ. Build."},{"key":"ref_31","doi-asserted-by":"crossref","unstructured":"Yahya, M.A., Skitmore, M., Bridge, A., Nepal, M., and Cattell, D. (2018). e-Tendering readiness in construction: The posterior model. Constr. Innov., 18.","DOI":"10.1108\/CI-06-2017-0051"},{"key":"ref_32","doi-asserted-by":"crossref","unstructured":"Davila, A., Gupta, M., and Palmer, R.J. (2002). Moving Procurement Systems to the Internet: The Adoption and Use of e-Procurement Technology Models, Stanford University.","DOI":"10.2139\/ssrn.323923"},{"key":"ref_33","doi-asserted-by":"crossref","first-page":"34","DOI":"10.1108\/13598541311293168","article-title":"E-procurement and supply chain performance","volume":"18","author":"Chang","year":"2013","journal-title":"Supply Chain Manag. Int. J."},{"key":"ref_34","first-page":"47","article-title":"Most small business failures tied to poor management","volume":"1","author":"Clark","year":"2000","journal-title":"Bus. J."},{"key":"ref_35","first-page":"12","article-title":"Why small business fail","volume":"4","author":"Monk","year":"2000","journal-title":"CMA Manag."},{"key":"ref_36","first-page":"1","article-title":"Paradigm shift technology\u2019s diminishing role Part 1","volume":"September","author":"Hansen","year":"2006","journal-title":"Summit"},{"key":"ref_37","first-page":"62","article-title":"E-Procurement won\u2019t work on its own","volume":"36","author":"Abery","year":"2002","journal-title":"Telecommun. Int."},{"key":"ref_38","unstructured":"Allen, R.G. (2003). Best practices e-procurement. Global Purchasing & Supply Chain Strategies, A.T. Kearney."},{"key":"ref_39","unstructured":"Serour, M.K., and Sellers, B.H. (2004, January 5). Organizational aspects of transformation to e-Business: A case study. Proceedings of the IADIS International Conference e-Society, Avia, Spain."},{"key":"ref_40","unstructured":"Berez, S., Mulvin, G., and Felenbok, J.P. (Finance Today, 2002). Second coming for e-Business, Finance Today."},{"key":"ref_41","first-page":"203","article-title":"E-procurement strengthening the indirect supply chain through technology globalization","volume":"9","author":"Ghiya","year":"2005","journal-title":"Intel Technol. J."},{"key":"ref_42","doi-asserted-by":"crossref","first-page":"800","DOI":"10.1016\/j.compind.2014.04.005","article-title":"New trends on e-Procurement applying semantic technologies: Current status and future challenges","volume":"65","year":"2014","journal-title":"Comput. Ind."},{"key":"ref_43","unstructured":"Mukherjee, D. (2003). An Empirical Investigation of Critical Factors that Influence Data Warehouse Implementation Success. [Doctoral Dissertation, University of North Texas]."},{"key":"ref_44","first-page":"375","article-title":"The critical success factor and challenges in e-Procurement adoption among large scale manufacturing firms in Nairobi, Kenya","volume":"9","author":"Mose","year":"2013","journal-title":"Eur. Sci. J."},{"key":"ref_45","unstructured":"Birks, C., Bond, S., and Radford, M. (2001). Guide to e-Procurement in the Public Sector: Cutting through the Hype."},{"key":"ref_46","first-page":"153","article-title":"Success factors of successful microcredit entrepreneurs: Empirical evidence from Malaysia","volume":"4","author":"Fatimah","year":"2013","journal-title":"Int. J. Bus. Soc. Sci."},{"key":"ref_47","doi-asserted-by":"crossref","first-page":"70","DOI":"10.1108\/JOPP-06-01-02-2006-B004","article-title":"Critical factors that influence e-Procurement implementation success in the public sector","volume":"6","author":"Vaidya","year":"2006","journal-title":"J. Public Procure."},{"key":"ref_48","doi-asserted-by":"crossref","first-page":"180","DOI":"10.1016\/j.autcon.2014.03.019","article-title":"Social e-business as support for construction e-procurement: E-procurement network dynamics","volume":"43","author":"Costa","year":"2014","journal-title":"Autom. Constr."},{"key":"ref_49","doi-asserted-by":"crossref","first-page":"236","DOI":"10.1057\/ejis.2008.15","article-title":"Measuring information systems success: Models, dimensions, measures, and interrelationships","volume":"17","author":"Petter","year":"2008","journal-title":"Eur. J. Inf. Syst."},{"key":"ref_50","unstructured":"Rasmy, M.H., Assem, T., and Sondoss, A. (2005, January 2). Enterprise resource planning (ERP) implementation in the Egyptian organizational. Proceedings of the European and Mediterranean Conference on Information Systems (EMCIS 2005), Cairo, Egypt."},{"key":"ref_51","doi-asserted-by":"crossref","first-page":"9","DOI":"10.1080\/07421222.2003.11045748","article-title":"The DeLone and McLean model of information system success: A ten-year update","volume":"19","author":"DeLone","year":"2003","journal-title":"J. Manag. Inf. Syst."},{"key":"ref_52","first-page":"16","article-title":"Measuring e-Procurement benefit","volume":"February","author":"Eakin","year":"2003","journal-title":"Can. Mag. Public Sect. Purch."},{"key":"ref_53","doi-asserted-by":"crossref","first-page":"345","DOI":"10.1108\/09593840610718036","article-title":"Global boundaries, task processes and IS project success: A field study","volume":"19","author":"Espinosa","year":"2006","journal-title":"Inf. Technol. People"},{"key":"ref_54","doi-asserted-by":"crossref","first-page":"323","DOI":"10.1207\/s15327590ijhc1903_3","article-title":"Empirically testing user characteristics and fitness factors in enterprise resource planning success","volume":"19","author":"Holsapple","year":"2005","journal-title":"Int. J. Hum.-Comput. Interact."},{"key":"ref_55","doi-asserted-by":"crossref","first-page":"412","DOI":"10.1016\/j.sbspro.2012.09.1205","article-title":"Information system acceptance and user satisfaction: The mediating role of trust","volume":"57","author":"Kassim","year":"2012","journal-title":"Procedia-Soc. Behav. Sci."},{"key":"ref_56","unstructured":"Markus, M.L., and Tanis, C. (2010). The Enterprise Systems Experience- from Adoption to Success, Pinnaflex Educational Resources."},{"key":"ref_57","doi-asserted-by":"crossref","first-page":"543","DOI":"10.1016\/S0378-7206(03)00089-2","article-title":"The conceptualization and empirical validation of web site user satisfaction","volume":"41","author":"Muylle","year":"2004","journal-title":"Inf. Manag."},{"key":"ref_58","doi-asserted-by":"crossref","first-page":"147","DOI":"10.2307\/41164448","article-title":"MIS project management: Myths, opinions and realities","volume":"15","author":"Powers","year":"1973","journal-title":"Calif. Manag. Rev."},{"key":"ref_59","first-page":"81","article-title":"Measuring IS user satisfaction: Review and implications","volume":"12","author":"Zviran","year":"2003","journal-title":"Commun. Assoc. Inf. Syst."},{"key":"ref_60","unstructured":"Creswell, J. (2014). Research Design: Qualitative, Quantitative, and Mixed Method Approaches, Sage Publications. [4th ed.]."},{"key":"ref_61","doi-asserted-by":"crossref","first-page":"155","DOI":"10.1037\/0033-2909.112.1.155","article-title":"A power primer","volume":"112","author":"Cohen","year":"1992","journal-title":"Psychol. Bull."},{"key":"ref_62","unstructured":"Pallant, J. (2007). SPSS Survival Manual\u2014A Step by Step Guide to Data Analysis using SPSS for Windows, Open University Press. [1st ed.]."},{"key":"ref_63","doi-asserted-by":"crossref","unstructured":"Salkind, N.J. (USA; London, UK, 2007). Encyclopaedia of Measurement and Statistics, SAGE Publications.","DOI":"10.4135\/9781412952644"},{"key":"ref_64","first-page":"180","article-title":"Factor effecting business success of Small & Medium Enterprise (SMEs) in Thailand","volume":"7","author":"Chittihaworn","year":"2011","journal-title":"Asian Soc. Sci."},{"key":"ref_65","first-page":"1470","article-title":"Investigating of value management effects on project briefing process in National Iranian Gas Transmission company \u201cNIGTC\u201d","volume":"3","author":"Ahmadpour","year":"2011","journal-title":"J. Basic Appl. Sci. Res."},{"key":"ref_66","doi-asserted-by":"crossref","first-page":"222","DOI":"10.1108\/20463161211270455","article-title":"Measuring student perception and expectations in business schools of Pakistan","volume":"1","author":"Malik","year":"2012","journal-title":"Asian Educ. Dev. Stud."},{"key":"ref_67","unstructured":"Liu, A.M.M. (2004, January 21\u201322). The mythical CSFs in project procurement. Proceedings of the 7th Surveyors\u2019 Congress, Kuala Lumpur, Malaysia."},{"key":"ref_68","unstructured":"Hair, J.F., Anderson, R.E., Tatham, R.L., and Black, W.C. (1998). Multivariate Data Analysis, Prentice-Hall. [5th ed.]."},{"key":"ref_69","unstructured":"Norusis, M.J. (1994). SPSS Professional Statistics 6.1, SPSS Inc."},{"key":"ref_70","unstructured":"Tabachnick, B.G., and Fidell, L.S. (2007). Using Multivariate Statistics, Pearson Education. [5th ed.]."},{"key":"ref_71","unstructured":"Lind, M.R., and Culler, E. (2009, January 16). The relationship between information technology critical success factors and project performance. Proceedings of the Conference on Information Systems Applied Research (CONISAR), Washington, DC, USA."},{"key":"ref_72","doi-asserted-by":"crossref","first-page":"595","DOI":"10.1111\/j.1540-5414.2003.02428.x","article-title":"Confirmatory factor analysis of the end-user computing satisfaction instrument: Replication within an ERP domain","volume":"34","author":"Somers","year":"2003","journal-title":"Decis. Sci."},{"key":"ref_73","unstructured":"Kinnear, P.R., and Gray, C.D. (2010). PASW 17 Statistics Made Simple: Replaces SPSS Statistics 17, Psychology Press. [1st ed.]."},{"key":"ref_74","first-page":"1","article-title":"Antecedents to successful adoption of e-procurement in textile and apparel firms in Kenya","volume":"3","author":"Arasa","year":"2012","journal-title":"Int. J. Sci. Eng. Res."},{"key":"ref_75","doi-asserted-by":"crossref","first-page":"499","DOI":"10.1016\/j.ijproman.2003.12.003","article-title":"Development of the SMART project planning framework","volume":"22","author":"Hartman","year":"2004","journal-title":"Int. J. Proj. Manag."}],"container-title":["Future Internet"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.mdpi.com\/1999-5903\/11\/6\/136\/pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,10,11]],"date-time":"2025-10-11T12:59:55Z","timestamp":1760187595000},"score":1,"resource":{"primary":{"URL":"https:\/\/www.mdpi.com\/1999-5903\/11\/6\/136"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019,6,20]]},"references-count":75,"journal-issue":{"issue":"6","published-online":{"date-parts":[[2019,6]]}},"alternative-id":["fi11060136"],"URL":"https:\/\/doi.org\/10.3390\/fi11060136","relation":{},"ISSN":["1999-5903"],"issn-type":[{"value":"1999-5903","type":"electronic"}],"subject":[],"published":{"date-parts":[[2019,6,20]]}}}