{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,11,21]],"date-time":"2026-11-21T02:07:11Z","timestamp":1795226831731,"version":"4.10.3"},"reference-count":103,"publisher":"MDPI AG","issue":"2","license":[{"start":{"date-parts":[[2018,2,12]],"date-time":"2018-02-12T00:00:00Z","timestamp":1518393600000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Symmetry"],"abstract":"<jats:p>The beginning of the 21st-century resulted in a more developed multi-attribute decision-making (MADM) tool and inspired new application areas that have resulted in discoveries in sustainable construction and building life cycle analysis. Construction and civil engineering stand for the central axis of a body consisting of a multidisciplinary (multi-dimensional) world with ties to disciplines constituting the surface, and with the disciplines, as a consequence, tied to each other. When dealing with multi-attribute decision-making problems generally multiple solutions exist, especially when there is a large number of attributes, and the concept of Pareto-optimality is inefficient. The symmetry and structural regularity are essential concepts in many natural and man-made objects and play a crucial role in the design, engineering, and development of the world. The complexity and risks inherent in projects along with different effective indicators for success and failure may contribute to the difficulties in performance evaluation. In such situations, increasing the importance of uncertainty is observed. This paper proposes a novel integrated tool to find a balance between sustainable development, environmental impact and human well-being, i. e. to find symmetry axe with respect to goals, risks, and constraints (attributes) to cope with the complicated problems. The concept of \u201coptimal solution\u201d as the maximum degree of implemented goals (attributes) is very important. The model is built using the most relevant variables cited in the reviewed project literature and integrates two methods: the Step-Wise Weight Assessment Ratio Analysis (SWARA) method and a novel interval-valued fuzzy extension of the Additive Ratio Assessment (ARAS) method. This model was used to solve real case study of oil and gas well drilling projects evaluation. Despite the importance of oil and gas well drilling projects, there is lack of literature that describes and evaluates performance in this field projects. On the other hand, no structured assessment methodology has been presented for these types of projects. Given the limited research on performance evaluation in oil &amp; gas well-drilling projects, the research identifies a set of performance criteria and proposes an evaluation model using fuzzy Delphi method. An illustrative example shows that the proposed method is a useful and alternative decision-making method.<\/jats:p>","DOI":"10.3390\/sym10020045","type":"journal-article","created":{"date-parts":[[2018,2,12]],"date-time":"2018-02-12T11:16:09Z","timestamp":1518434169000},"page":"45","update-policy":"https:\/\/doi.org\/10.3390\/mdpi_crossmark_policy","source":"Crossref","is-referenced-by-count":107,"title":["A Novel Approach for Evaluation of Projects Using an Interval\u2013Valued Fuzzy Additive Ratio Assessment (ARAS) Method: A Case Study of Oil and Gas Well Drilling Projects"],"prefix":"10.3390","volume":"10","author":[{"given":"Jalil","family":"Dahooie","sequence":"first","affiliation":[{"name":"Faculty of Management, University of Tehran, Jalal-e-Al-e-Ahmad Highway, 14155-6311 Tehran, Iran"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-3201-949X","authenticated-orcid":false,"given":"Edmundas","family":"Zavadskas","sequence":"additional","affiliation":[{"name":"Faculty of Civil Engineering, Vilnius Gediminas Technical University, Sauletekio al. 11, LT-10223 Vilnius, Lithuania"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-2878-5463","authenticated-orcid":false,"given":"Mahdi","family":"Abolhasani","sequence":"additional","affiliation":[{"name":"Faculty of Management, University of Tehran, Jalal-e-Al-e-Ahmad Highway, 14155-6311 Tehran, Iran"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Amirsalar","family":"Vanaki","sequence":"additional","affiliation":[{"name":"Faculty of Management, University of Tehran, Jalal-e-Al-e-Ahmad Highway, 14155-6311 Tehran, Iran"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-5835-9388","authenticated-orcid":false,"given":"Zenonas","family":"Turskis","sequence":"additional","affiliation":[{"name":"Faculty of Civil Engineering, Vilnius Gediminas Technical University, Sauletekio al. 11, LT-10223 Vilnius, Lithuania"}],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"1968","published-online":{"date-parts":[[2018,2,12]]},"reference":[{"key":"ref_1","doi-asserted-by":"crossref","first-page":"589","DOI":"10.1016\/j.ijproman.2012.09.016","article-title":"A conceptual model for project management of exploration and production in the oil and gas industry: The case of a Brazilian company","volume":"31","year":"2013","journal-title":"Int. J. Proj. Manag."},{"key":"ref_2","unstructured":"Lewis, J.P. (1999). The Project Manager\u2019s Desk Reference: A Comprehensive Guide to Project Planning, Scheduling, Evaluation, Control and Systems, McGraw-Hill Inc."},{"key":"ref_3","unstructured":"Institute, P.M., and Staff, P.M.I. (2004). A Guide to The Project Management Body of Knowledge (PMBOK Guide), Project Management Institute. [3rd ed.]. An American National Standard, ANSI\/PMI 99-001-2004."},{"key":"ref_4","doi-asserted-by":"crossref","first-page":"99","DOI":"10.1016\/j.petrol.2014.01.010","article-title":"A hybrid approach based on locally linear neuro-fuzzy modeling and TOPSIS to determine the quality grade of gas well-drilling projects","volume":"114","author":"Ahari","year":"2014","journal-title":"J. Pet. Sci. Eng."},{"key":"ref_5","doi-asserted-by":"crossref","first-page":"1579","DOI":"10.1016\/j.ijproman.2016.08.010","article-title":"Project change stakeholder communication","volume":"34","author":"Butt","year":"2016","journal-title":"Int. J. Proj. Manag."},{"key":"ref_6","doi-asserted-by":"crossref","first-page":"218","DOI":"10.1016\/j.ijproman.2013.04.006","article-title":"A performance-based approach to project assignment and performance evaluation","volume":"32","author":"Xu","year":"2014","journal-title":"Int. J. Proj. Manag."},{"key":"ref_7","doi-asserted-by":"crossref","first-page":"155","DOI":"10.1016\/j.ijproman.2010.02.010","article-title":"A case study approach for developing a project performance evaluation system","volume":"29","author":"Cao","year":"2011","journal-title":"Int. J. Proj. Manag."},{"key":"ref_8","doi-asserted-by":"crossref","first-page":"549","DOI":"10.1016\/j.energy.2016.12.087","article-title":"Energy project performance evaluation with sustainability perspective","volume":"119","author":"Karabulut","year":"2017","journal-title":"Energy"},{"key":"ref_9","doi-asserted-by":"crossref","first-page":"961","DOI":"10.1016\/S0960-1481(02)00072-1","article-title":"Renewable energy projects: Structuring a multi-criteria group decision-making framework","volume":"28","author":"Haralambopoulos","year":"2003","journal-title":"Renew. Energy"},{"key":"ref_10","doi-asserted-by":"crossref","first-page":"810","DOI":"10.1016\/j.ejor.2011.11.038","article-title":"An MCDA approach for the selection of bike projects based on structuring and appraising activities","volume":"218","author":"Barfod","year":"2012","journal-title":"Eur. J. Oper. Res."},{"key":"ref_11","doi-asserted-by":"crossref","first-page":"789","DOI":"10.3233\/IFS-2012-0598","article-title":"Induced hesitant interval-valued fuzzy Einstein aggregation operators and their application to multiple attribute decision making","volume":"24","author":"Wei","year":"2013","journal-title":"J. Intell. Fuzzy Syst."},{"key":"ref_12","doi-asserted-by":"crossref","first-page":"199","DOI":"10.1016\/0020-0255(75)90036-5","article-title":"The concept of a linguistic variable and its application to approximate reasoning\u2014I","volume":"8","author":"Zadeh","year":"1975","journal-title":"Inf. Sci."},{"key":"ref_13","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/0165-0114(87)90148-5","article-title":"A method of inference in approximate reasoning based on interval-valued fuzzy sets","volume":"21","year":"1987","journal-title":"Fuzzy Sets Syst."},{"key":"ref_14","doi-asserted-by":"crossref","first-page":"87","DOI":"10.1016\/S0165-0114(86)80034-3","article-title":"Intuitionistic fuzzy sets","volume":"20","author":"Atanassov","year":"1986","journal-title":"Fuzzy Sets Syst."},{"key":"ref_15","doi-asserted-by":"crossref","first-page":"543","DOI":"10.1016\/j.eswa.2012.07.066","article-title":"Group multi-criteria decision making based upon interval-valued fuzzy numbers: An extension of the MULTIMOORA method","volume":"40","author":"Zeng","year":"2013","journal-title":"Expert Syst. Appl."},{"key":"ref_16","doi-asserted-by":"crossref","first-page":"1013","DOI":"10.1016\/j.asoc.2014.08.031","article-title":"Extension of weighted aggregated sum product assessment with interval-valued intuitionistic fuzzy numbers (WASPAS-IVIF)","volume":"24","author":"Zavadskas","year":"2014","journal-title":"Appl. Soft Comput."},{"key":"ref_17","doi-asserted-by":"crossref","first-page":"107","DOI":"10.1016\/S0263-7863(00)00040-5","article-title":"Evaluating the risks of public private partnerships for infrastructure projects","volume":"20","author":"Grimsey","year":"2002","journal-title":"Int. J. Proj. Manag."},{"key":"ref_18","doi-asserted-by":"crossref","first-page":"48","DOI":"10.1016\/j.enconman.2012.09.029","article-title":"Decision-making in the oil and gas projects based on game theory: Conceptual process design","volume":"66","author":"Castillo","year":"2013","journal-title":"Energy Convers. Manag."},{"key":"ref_19","doi-asserted-by":"crossref","first-page":"189","DOI":"10.1016\/j.energy.2012.02.006","article-title":"Modeling the operating costs for petroleum exploration and development projects","volume":"40","author":"Luo","year":"2012","journal-title":"Energy"},{"key":"ref_20","doi-asserted-by":"crossref","first-page":"2324","DOI":"10.1016\/j.enpol.2005.04.011","article-title":"Design of drilling contracts\u2014Economic incentives and safety issues","volume":"34","author":"Osmundsen","year":"2006","journal-title":"Energy Policy"},{"key":"ref_21","doi-asserted-by":"crossref","first-page":"274","DOI":"10.1016\/j.ieri.2014.09.088","article-title":"Contractor selection in gas well-drilling projects with quality evaluation using Neuro-fuzzy networks","volume":"10","author":"Ahari","year":"2014","journal-title":"IERI Procedia"},{"key":"ref_22","doi-asserted-by":"crossref","first-page":"012012","DOI":"10.1088\/1742-6596\/495\/1\/012012","article-title":"Performance evaluation of a drilling project in oil and gas service company in Indonesia by MACBETH method","volume":"495","author":"Dachyar","year":"2014","journal-title":"J. Phys. Conf. Ser."},{"key":"ref_23","doi-asserted-by":"crossref","first-page":"732","DOI":"10.1016\/j.ijproman.2014.01.014","article-title":"Identifying, framing and managing uncertainties in project portfolios","volume":"32","author":"Martinsuo","year":"2014","journal-title":"Int. J. Proj. Manag."},{"key":"ref_24","doi-asserted-by":"crossref","first-page":"1057","DOI":"10.1016\/j.ijproman.2010.10.002","article-title":"Multi-criteria performance analysis for decision making in project management","volume":"29","author":"Marques","year":"2011","journal-title":"Int. J. Proj. Manag."},{"key":"ref_25","first-page":"3","article-title":"Level of complexity in projects and its impacts on managerial solutions","volume":"XXIX","year":"2008","journal-title":"Int. Proj. Manag. Assoc."},{"key":"ref_26","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/S0263-7863(02)00020-0","article-title":"On the nature of the project as a temporary organization","volume":"21","author":"Turner","year":"2003","journal-title":"Int. J. Proj. Manag."},{"key":"ref_27","doi-asserted-by":"crossref","first-page":"1352","DOI":"10.3390\/su9081352","article-title":"A Consistent Fuzzy Preference Relations Based ANP Model for R&D Project Selection","volume":"9","author":"Cheng","year":"2017","journal-title":"Sustainability"},{"key":"ref_28","doi-asserted-by":"crossref","unstructured":"Strojny, J., Szulc, J., and Baran, M. (2018). Applying the AHP Method into the Assessment of Project Attitudes. Eurasian Business Perspectives, Springer.","DOI":"10.1007\/978-3-319-67913-6_13"},{"key":"ref_29","doi-asserted-by":"crossref","first-page":"222","DOI":"10.1016\/j.energy.2013.12.016","article-title":"An AHP (Analytic Hierarchy Process)\/ANP (Analytic Network Process)-based multi-criteria decision approach for the selection of solar-thermal power plant investment projects","volume":"66","year":"2014","journal-title":"Energy"},{"key":"ref_30","doi-asserted-by":"crossref","first-page":"549","DOI":"10.1016\/j.ijproman.2014.07.009","article-title":"Measuring the complexity of mega construction projects in China\u2014A fuzzy analytic network process analysis","volume":"33","author":"He","year":"2015","journal-title":"Int. J. Proj. Manag."},{"key":"ref_31","first-page":"420","article-title":"Evaluation of Research Projects of Undergraduate Students in an Engineering Department Using Topsis Method","volume":"5","author":"Ozcan","year":"2016","journal-title":"Eurasia Proc. Educ. Soc. Sci."},{"key":"ref_32","doi-asserted-by":"crossref","first-page":"1003","DOI":"10.1016\/j.eswa.2014.09.018","article-title":"A novel approach based on DEMATEL method and patent citation analysis for prioritizing a portfolio of investment projects","volume":"42","author":"Altuntas","year":"2015","journal-title":"Expert Syst. Appl."},{"key":"ref_33","doi-asserted-by":"crossref","first-page":"2063","DOI":"10.1016\/S0960-1481(03)00102-2","article-title":"Decision-making in energy planning. Application of the Electre method at regional level for the diffusion of renewable energy technology","volume":"28","author":"Beccali","year":"2003","journal-title":"Renew. Energy"},{"key":"ref_34","doi-asserted-by":"crossref","first-page":"840","DOI":"10.1016\/j.rser.2017.05.194","article-title":"Prioritization of renewable energy alternatives by using an integrated fuzzy MCDM model: A real case application for Turkey","volume":"80","author":"Kaya","year":"2017","journal-title":"Renew. Sustain. Energy Rev."},{"key":"ref_35","doi-asserted-by":"crossref","first-page":"2041","DOI":"10.1016\/j.eswa.2007.08.074","article-title":"A linguistic multicriteria analysis system combining fuzzy sets theory, ideal and anti-ideal points for location site selection","volume":"35","author":"Anagnostopoulos","year":"2008","journal-title":"Expert Syst. Appl."},{"key":"ref_36","doi-asserted-by":"crossref","first-page":"224","DOI":"10.1016\/j.knosys.2015.06.007","article-title":"Multi-criteria decision-making based on hesitant fuzzy linguistic term sets: An outranking approach","volume":"86","author":"Wang","year":"2015","journal-title":"Knowl. Based Syst."},{"key":"ref_37","doi-asserted-by":"crossref","first-page":"383","DOI":"10.1016\/j.asoc.2015.07.022","article-title":"Some interesting properties of the fuzzy linguistic model based on discrete fuzzy numbers to manage hesitant fuzzy linguistic information","volume":"36","author":"Riera","year":"2015","journal-title":"Appl. Soft Comput."},{"key":"ref_38","doi-asserted-by":"crossref","first-page":"2835","DOI":"10.1016\/j.eswa.2014.11.010","article-title":"Multi-criteria evaluation of alternative-fuel vehicles via a hierarchical hesitant fuzzy linguistic model","volume":"42","author":"Yavuz","year":"2015","journal-title":"Expert Syst. Appl."},{"key":"ref_39","doi-asserted-by":"crossref","first-page":"95","DOI":"10.1007\/s41066-016-0030-5","article-title":"Fuzzy higher type information granules from an uncertainty measurement","volume":"2","author":"Sanchez","year":"2017","journal-title":"Granul. Comput."},{"key":"ref_40","doi-asserted-by":"crossref","first-page":"41","DOI":"10.1007\/s41066-016-0024-3","article-title":"Robust decision making using intuitionistic fuzzy numbers","volume":"2","author":"Das","year":"2017","journal-title":"Granul. Comput."},{"key":"ref_41","doi-asserted-by":"crossref","unstructured":"Liu, P., Mahmood, T., and Khan, Q. (2017). Multi-Attribute Decision-Making Based on Prioritized Aggregation Operator under Hesitant Intuitionistic Fuzzy Linguistic Environment. Symmetry, 9.","DOI":"10.3390\/sym9110270"},{"key":"ref_42","unstructured":"Dubois, D.J. (1980). Fuzzy Sets and Systems: Theory and Applications, Academic Press."},{"key":"ref_43","doi-asserted-by":"crossref","first-page":"1756","DOI":"10.1016\/j.camwa.2010.07.006","article-title":"Application of level soft sets in decision making based on interval-valued fuzzy soft sets","volume":"60","author":"Feng","year":"2010","journal-title":"Comput. Math. Appl."},{"key":"ref_44","doi-asserted-by":"crossref","first-page":"13","DOI":"10.1007\/s41066-016-0023-4","article-title":"An overview of interval-valued intuitionistic fuzzy information aggregations and applications","volume":"2","author":"Xu","year":"2017","journal-title":"Granul. Comput."},{"key":"ref_45","doi-asserted-by":"crossref","first-page":"387","DOI":"10.1007\/s41066-017-0050-9","article-title":"Interval-valued intuitionistic multiplicative aggregation in group decision making","volume":"2","author":"Jiang","year":"2017","journal-title":"Granul. Comput."},{"key":"ref_46","doi-asserted-by":"crossref","first-page":"187","DOI":"10.1007\/s41066-017-0038-5","article-title":"GIFIHIA operator and its application to the selection of cold chain logistics enterprises","volume":"2","author":"Meng","year":"2017","journal-title":"Granul. Comput."},{"key":"ref_47","doi-asserted-by":"crossref","first-page":"321","DOI":"10.1007\/s41066-017-0046-5","article-title":"Multi-attribute decision-making based on the SPIFGIA operators","volume":"2","author":"Wang","year":"2017","journal-title":"Granul. Comput."},{"key":"ref_48","doi-asserted-by":"crossref","first-page":"167","DOI":"10.1016\/j.asoc.2017.06.034","article-title":"The new extension of TOPSIS method for multiple criteria decision making with hesitant Pythagorean fuzzy sets","volume":"60","author":"Liang","year":"2017","journal-title":"Appl. Soft Comput."},{"key":"ref_49","doi-asserted-by":"crossref","first-page":"327","DOI":"10.1016\/S0165-0114(00)00079-8","article-title":"Operations on type-2 fuzzy sets","volume":"122","author":"Karnik","year":"2001","journal-title":"Fuzzy Sets Syst."},{"key":"ref_50","doi-asserted-by":"crossref","first-page":"1053","DOI":"10.1016\/j.eswa.2010.07.144","article-title":"A weighted aggregation operators multi-attribute group decision-making method based on interval-valued trapezoidal fuzzy numbers","volume":"38","author":"Liu","year":"2011","journal-title":"Expert Syst. Appl."},{"key":"ref_51","doi-asserted-by":"crossref","first-page":"21","DOI":"10.1007\/s41066-015-0006-x","article-title":"Managing multi-granularity linguistic information in qualitative group decision making: An overview","volume":"1","author":"Xu","year":"2016","journal-title":"Granul. Comput."},{"key":"ref_52","doi-asserted-by":"crossref","first-page":"4269","DOI":"10.1016\/j.apm.2012.09.033","article-title":"Some interval-valued 2-tuple linguistic aggregation operators and application in multiattribute group decision making","volume":"37","author":"Zhang","year":"2013","journal-title":"Appl. Math. Model."},{"key":"ref_53","doi-asserted-by":"crossref","first-page":"59","DOI":"10.1007\/s41066-015-0009-7","article-title":"A comparison of three approaches for estimating (synthesizing) an interval type-2 fuzzy set model of a linguistic term for computing with words","volume":"1","author":"Mendel","year":"2016","journal-title":"Granul. Comput."},{"key":"ref_54","doi-asserted-by":"crossref","first-page":"97","DOI":"10.1016\/j.knosys.2014.01.017","article-title":"A social network analysis trust\u2013consensus based approach to group decision-making problems with interval-valued fuzzy reciprocal preference relations","volume":"59","author":"Wu","year":"2014","journal-title":"Knowl. Based Syst."},{"key":"ref_55","doi-asserted-by":"crossref","first-page":"410","DOI":"10.1016\/j.jcss.2013.05.007","article-title":"Interval-valued fuzzy coimplications and related dual interval-valued conjugate functions","volume":"80","author":"Reiser","year":"2014","journal-title":"J. Comput. Syst. Sci."},{"key":"ref_56","doi-asserted-by":"crossref","first-page":"249","DOI":"10.1007\/s41066-017-0041-x","article-title":"Interval type-2 fuzzy Hamy mean operators and their application in multiple criteria decision making","volume":"2","author":"Qin","year":"2017","journal-title":"Granul. Comput."},{"key":"ref_57","doi-asserted-by":"crossref","first-page":"1231","DOI":"10.1007\/s00170-009-2241-2","article-title":"Extension of VIKOR method based on interval-valued fuzzy sets","volume":"47","author":"Vahdani","year":"2010","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"ref_58","doi-asserted-by":"crossref","first-page":"199","DOI":"10.1007\/s41066-017-0039-4","article-title":"Unified Granular-number-based AHP-VIKOR multi-criteria decision framework","volume":"2","author":"Chatterjee","year":"2017","journal-title":"Granul. Comput."},{"key":"ref_59","doi-asserted-by":"crossref","first-page":"457","DOI":"10.1016\/j.asoc.2008.05.005","article-title":"Extension of fuzzy TOPSIS method based on interval-valued fuzzy sets","volume":"9","author":"Ashtiani","year":"2009","journal-title":"Appl. Soft Comput."},{"key":"ref_60","doi-asserted-by":"crossref","first-page":"333","DOI":"10.1007\/s41066-017-0047-4","article-title":"Probabilistic linguistic TODIM approach for multiple attribute decision-making","volume":"2","author":"Liu","year":"2017","journal-title":"Granul. Comput."},{"key":"ref_61","doi-asserted-by":"crossref","first-page":"468","DOI":"10.1016\/j.sbspro.2016.05.294","article-title":"Infrastructural projects and territorial development in Veneto Dolomites: Evaluation of performances through AHP","volume":"223","author":"Campeol","year":"2016","journal-title":"Procedia Soc. Behav. Sci."},{"key":"ref_62","doi-asserted-by":"crossref","first-page":"220","DOI":"10.1016\/j.petrol.2010.03.021","article-title":"Offshore oil service contracts new incentive schemes to promote drilling efficiency","volume":"72","author":"Osmundsen","year":"2010","journal-title":"J. Pet. Sci. Eng."},{"key":"ref_63","doi-asserted-by":"crossref","first-page":"449","DOI":"10.1016\/j.ijproman.2012.09.015","article-title":"Risk analysis in ultra deep scientific drilling project\u2014A fuzzy synthetic evaluation approach","volume":"31","author":"Liu","year":"2013","journal-title":"Int. J. Proj. Manag."},{"key":"ref_64","doi-asserted-by":"crossref","first-page":"492","DOI":"10.1016\/j.ijproman.2013.07.005","article-title":"A performance evaluation framework of development projects: An empirical study of constituency development fund (CDF) construction projects in Kenya","volume":"32","author":"Ngacho","year":"2014","journal-title":"Int. J. Proj. Manag."},{"key":"ref_65","doi-asserted-by":"crossref","first-page":"42","DOI":"10.1061\/(ASCE)0742-597X(2004)20:2(42)","article-title":"Performance measurement in construction","volume":"20","author":"Bassioni","year":"2004","journal-title":"J. Manag. Eng."},{"key":"ref_66","doi-asserted-by":"crossref","first-page":"438","DOI":"10.1108\/09699980610690729","article-title":"Exploring the integration of health and safety with pre-construction planning","volume":"13","author":"Hare","year":"2006","journal-title":"Eng. Constr. Archit. Manag."},{"key":"ref_67","doi-asserted-by":"crossref","first-page":"401","DOI":"10.1016\/j.apergo.2004.12.002","article-title":"Contributing factors in construction accidents","volume":"36","author":"Haslam","year":"2005","journal-title":"Appl. Ergon."},{"key":"ref_68","doi-asserted-by":"crossref","first-page":"15","DOI":"10.1080\/13599370050028567","article-title":"Systematic prevention of construction failures: An overview","volume":"5","author":"Ortega","year":"2000","journal-title":"Technol. Law Insur."},{"key":"ref_69","doi-asserted-by":"crossref","first-page":"261","DOI":"10.1080\/01446193.2010.549138","article-title":"Analyses and evaluation of irregularities in public procurement in India","volume":"29","author":"Tabish","year":"2011","journal-title":"Constr. Manag. Econ."},{"key":"ref_70","doi-asserted-by":"crossref","first-page":"197","DOI":"10.1016\/j.ijproman.2010.01.003","article-title":"Effects of cooperative procurement procedures on construction project performance: A conceptual framework","volume":"29","author":"Eriksson","year":"2011","journal-title":"Int. J. Proj. Manag."},{"key":"ref_71","doi-asserted-by":"crossref","first-page":"25","DOI":"10.1057\/rlp.2009.20","article-title":"The performance measurement of construction projects managed by ISO-certified contractors in Malaysia","volume":"9","author":"Ali","year":"2010","journal-title":"J. Retail Leis. Prop."},{"key":"ref_72","doi-asserted-by":"crossref","first-page":"203","DOI":"10.1108\/14635770410532624","article-title":"Key performance indicators for measuring construction success","volume":"11","author":"Chan","year":"2004","journal-title":"Benchmarking"},{"key":"ref_73","doi-asserted-by":"crossref","first-page":"89","DOI":"10.1016\/j.eswa.2015.11.022","article-title":"A three-stage DEA model to evaluate learning-teaching technical efficiency: Key performance indicators and contextual variables","volume":"48","author":"Fuentes","year":"2016","journal-title":"Expert Syst. Appl."},{"key":"ref_74","doi-asserted-by":"crossref","first-page":"243","DOI":"10.1016\/j.ejor.2008.05.027","article-title":"Network DEA: A slacks-based measure approach","volume":"197","author":"Tone","year":"2009","journal-title":"Eur. J. Oper. Res."},{"key":"ref_75","doi-asserted-by":"crossref","first-page":"351","DOI":"10.1016\/j.apenergy.2016.01.104","article-title":"Impact of energy conservation policies on the green productivity in China\u2019s manufacturing sector: Evidence from a three-stage DEA model","volume":"168","author":"Li","year":"2016","journal-title":"Appl. Energy"},{"key":"ref_76","doi-asserted-by":"crossref","first-page":"20","DOI":"10.1016\/j.seps.2013.08.003","article-title":"The appreciative democratic voice of DEA: A case of faculty academic performance evaluation","volume":"48","author":"Oral","year":"2014","journal-title":"Socio Econ. Plan. Sci."},{"key":"ref_77","doi-asserted-by":"crossref","first-page":"107","DOI":"10.1016\/S0965-8564(99)00049-X","article-title":"Efficiency measurement of selected Australian and other international ports using data envelopment analysis","volume":"35","author":"Tongzon","year":"2001","journal-title":"Transp. Res. Part A Policy Pract."},{"key":"ref_78","doi-asserted-by":"crossref","first-page":"1753","DOI":"10.1016\/j.euroecorev.2005.08.001","article-title":"The impact of experience on risk taking, overconfidence, and herding of fund managers: Complementary survey evidence","volume":"50","author":"Menkhoff","year":"2006","journal-title":"Eur. Econ. Rev."},{"key":"ref_79","doi-asserted-by":"crossref","first-page":"432","DOI":"10.1037\/0021-9010.71.3.432","article-title":"Impact of job experience and ability on job knowledge, work sample performance, and supervisory ratings of job performance","volume":"71","author":"Schmidt","year":"1986","journal-title":"J. Appl. Psychol."},{"key":"ref_80","doi-asserted-by":"crossref","first-page":"1460","DOI":"10.1016\/j.ijproman.2016.07.009","article-title":"The downside risk of project portfolios: The impact of capital investment projects and the value of project efficiency and project risk management programmes","volume":"34","author":"Paquin","year":"2016","journal-title":"Int. J. Proj. Manag."},{"key":"ref_81","doi-asserted-by":"crossref","first-page":"195","DOI":"10.1016\/0048-7333(93)90025-D","article-title":"Do we need a price index for industrial R&D?","volume":"22","author":"Jankowski","year":"1993","journal-title":"Res. Policy"},{"key":"ref_82","doi-asserted-by":"crossref","first-page":"213","DOI":"10.1111\/1540-5885.1130213","article-title":"The R&D effectiveness index: A metric for product development performance","volume":"11","author":"McGrath","year":"1994","journal-title":"J. Prod. Innov. Manag."},{"key":"ref_83","doi-asserted-by":"crossref","first-page":"297","DOI":"10.1016\/0272-6963(89)90033-8","article-title":"Alternative research paradigms in operations","volume":"8","author":"Meredith","year":"1989","journal-title":"J. Oper. Manag."},{"key":"ref_84","doi-asserted-by":"crossref","first-page":"2331","DOI":"10.1016\/j.eswa.2012.10.031","article-title":"Content presentation personalisation and media adaptation in tourism web sites using fuzzy Delphi method and fuzzy cognitive maps","volume":"40","author":"Kardaras","year":"2013","journal-title":"Expert Syst. Appl."},{"key":"ref_85","doi-asserted-by":"crossref","first-page":"15","DOI":"10.1016\/j.im.2003.11.002","article-title":"The Delphi method as a research tool: An example, design considerations and applications","volume":"42","author":"Okoli","year":"2004","journal-title":"Inf. Manag."},{"key":"ref_86","doi-asserted-by":"crossref","first-page":"1930","DOI":"10.1016\/j.eswa.2007.08.068","article-title":"Constructing performance appraisal indicators for mobility of the service industries using fuzzy Delphi method","volume":"35","author":"Kuo","year":"2008","journal-title":"Expert Syst. Appl."},{"key":"ref_87","doi-asserted-by":"crossref","first-page":"76","DOI":"10.3233\/HSM-1985-5111","article-title":"A pilot study of fuzzy set modification of Delphi","volume":"5","author":"Murray","year":"1985","journal-title":"Hum. Syst. Manag."},{"key":"ref_88","first-page":"19","article-title":"Application of fuzzy analytic hierarchy process in the selection of advertising media","volume":"7","author":"Hsu","year":"2000","journal-title":"J. Manag. Syst."},{"key":"ref_89","doi-asserted-by":"crossref","first-page":"91","DOI":"10.1080\/03081069308717504","article-title":"Transportation investment project selection with fuzzy multiobjectives","volume":"17","author":"Tzeng","year":"1993","journal-title":"Transp. Plan. Technol."},{"key":"ref_90","doi-asserted-by":"crossref","first-page":"7111","DOI":"10.1016\/j.eswa.2013.06.040","article-title":"Decision making on business issues with foresight perspective; an application of new hybrid MCDM model in shopping mall locating","volume":"40","author":"Aghdaie","year":"2013","journal-title":"Expert Syst. Appl."},{"key":"ref_91","doi-asserted-by":"crossref","first-page":"243","DOI":"10.3846\/jbem.2010.12","article-title":"Selection of rational dispute resolution method by applying new step-wise weight assessment ratio analysis (Swara)","volume":"11","author":"Zavadskas","year":"2010","journal-title":"J. Bus. Econ. Manag."},{"key":"ref_92","doi-asserted-by":"crossref","first-page":"122","DOI":"10.1016\/j.catena.2015.07.020","article-title":"A new hybrid model using Step-Wise Weight Assessment Ratio Analysis (SWARA) technique and Adaptive Neuro-Fuzzy Inference System (ANFIS) for regional landslide hazard assessment in Iran","volume":"135","author":"Dehnavi","year":"2015","journal-title":"CATENA"},{"key":"ref_93","doi-asserted-by":"crossref","first-page":"534","DOI":"10.3846\/20294913.2014.881435","article-title":"Investment prioritizing in high tech industries based on SWARA-COPRAS approach","volume":"20","author":"Bahrami","year":"2014","journal-title":"Technol. Econ. Dev. Econ."},{"key":"ref_94","doi-asserted-by":"crossref","first-page":"45","DOI":"10.1109\/TFUZZ.2002.806316","article-title":"Fuzzy risk analysis based on similarity measures of generalized fuzzy numbers","volume":"11","author":"Chen","year":"2003","journal-title":"IEEE Trans. Fuzzy Syst."},{"key":"ref_95","doi-asserted-by":"crossref","first-page":"215","DOI":"10.1016\/S0888-613X(01)00064-0","article-title":"Constructing a fuzzy flow-shop sequencing model based on statistical data","volume":"29","author":"Yao","year":"2002","journal-title":"Int. J. Approx. Reason."},{"key":"ref_96","doi-asserted-by":"crossref","first-page":"1670","DOI":"10.1016\/j.camwa.2007.06.022","article-title":"Fuzzy risk analysis based on measures of similarity between interval-valued fuzzy numbers","volume":"55","author":"Chen","year":"2008","journal-title":"Comput. Math. Appl."},{"key":"ref_97","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/S0165-0114(97)00377-1","article-title":"Extensions of the TOPSIS for group decision-making under fuzzy environment","volume":"114","author":"Chen","year":"2000","journal-title":"Fuzzy Sets Syst."},{"key":"ref_98","doi-asserted-by":"crossref","first-page":"607","DOI":"10.1016\/j.amc.2008.05.047","article-title":"Designing a model of fuzzy TOPSIS in multiple criteria decision making","volume":"206","author":"Mahdavi","year":"2008","journal-title":"Appl. Math. Comput."},{"key":"ref_99","doi-asserted-by":"crossref","first-page":"309","DOI":"10.1016\/j.eswa.2005.09.040","article-title":"Fuzzy TOPSIS method based on alpha level sets with an application to bridge risk assessment","volume":"31","author":"Wang","year":"2006","journal-title":"Expert Syst. Appl."},{"key":"ref_100","doi-asserted-by":"crossref","first-page":"2285","DOI":"10.1016\/j.eswa.2007.12.037","article-title":"Fuzzy risk analysis based on interval-valued fuzzy numbers","volume":"36","author":"Wei","year":"2009","journal-title":"Expert Syst. Appl."},{"key":"ref_101","doi-asserted-by":"crossref","first-page":"257","DOI":"10.3846\/jcem.2010.30","article-title":"Multiple criteria assessment of alternatives for built and human environment renovation","volume":"16","author":"Tupenaite","year":"2010","journal-title":"J. Civ. Eng. Manag."},{"key":"ref_102","doi-asserted-by":"crossref","first-page":"159","DOI":"10.3846\/tede.2010.10","article-title":"A new additive ratio assessment (ARAS) method in multicriteria decision-making","volume":"16","author":"Zavadskas","year":"2010","journal-title":"Technol. Econ. Dev. Econ."},{"key":"ref_103","doi-asserted-by":"crossref","first-page":"123","DOI":"10.1016\/S1644-9665(12)60141-1","article-title":"Multiple criteria analysis of foundation instalment alternatives by applying Additive Ratio Assessment (ARAS) method","volume":"10","author":"Zavadskas","year":"2010","journal-title":"Arch. Civ. Mech. Eng."}],"container-title":["Symmetry"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.mdpi.com\/2073-8994\/10\/2\/45\/pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,10,11]],"date-time":"2025-10-11T14:54:48Z","timestamp":1760194488000},"score":1,"resource":{"primary":{"URL":"https:\/\/www.mdpi.com\/2073-8994\/10\/2\/45"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018,2,12]]},"references-count":103,"journal-issue":{"issue":"2","published-online":{"date-parts":[[2018,2]]}},"alternative-id":["sym10020045"],"URL":"https:\/\/doi.org\/10.3390\/sym10020045","relation":{},"ISSN":["2073-8994"],"issn-type":[{"value":"2073-8994","type":"electronic"}],"subject":[],"published":{"date-parts":[[2018,2,12]]}}}