{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,10,3]],"date-time":"2026-10-03T02:32:22Z","timestamp":1790994742106,"version":"4.1.0"},"reference-count":37,"publisher":"MDPI AG","issue":"1","license":[{"start":{"date-parts":[[2018,12,24]],"date-time":"2018-12-24T00:00:00Z","timestamp":1545609600000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0\/"}],"funder":[{"DOI":"10.13039\/501100003397","name":"Huazhong University of Science and Technology","doi-asserted-by":"publisher","award":["2015BAK33B04"],"award-info":[{"award-number":["2015BAK33B04"]}],"id":[{"id":"10.13039\/501100003397","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Symmetry"],"abstract":"<jats:p>A risk is a predominant problem in the developing countries construction projects. Although numerous studies have been concerned on risk, there is a limited study on a mechanism to identify the typical risks and effects level. This paper presents an approach for evaluating the risks in case of schedule delays at the various lifecycles of construction projects. The methodology applied is an integrated model of the technique for order preference by similarity to ideal solution (TOPSIS) and fuzzy comprehensive evaluation (FCE). In this study, common criteria, sub-criteria, and attributes are constructed to make a decision concerning the influence level of risk of delay at the construction project lifecycle. The results showed that the construction stage (44%) is highly influenced, the second highly influenced stage is post construction (37%), and the least risked stage is pre-construction (35%). The construction projects in Ethiopia have faced an average delay risk of 38% at a high and very high-risk level. This work is expected to serve as a tool to assist managers in the management and control of schedule delays to mitigate their risks.<\/jats:p>","DOI":"10.3390\/sym11010012","type":"journal-article","created":{"date-parts":[[2018,12,24]],"date-time":"2018-12-24T10:37:49Z","timestamp":1545647869000},"page":"12","update-policy":"https:\/\/doi.org\/10.3390\/mdpi_crossmark_policy","source":"Crossref","is-referenced-by-count":37,"title":["Risk Level Evaluation on Construction Project Lifecycle Using Fuzzy Comprehensive Evaluation and TOPSIS"],"prefix":"10.3390","volume":"11","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-4047-1662","authenticated-orcid":false,"given":"Tsegay","family":"Gebrehiwet","sequence":"first","affiliation":[{"name":"Institute of Construction Management, School of Civil Engineering and Mechanics, Huazhong University of Science and Technology, Wuhan 1037, China"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Hanbin","family":"Luo","sequence":"additional","affiliation":[{"name":"Institute of Construction Management, School of Civil Engineering and Mechanics, Huazhong University of Science and Technology, Wuhan 1037, China"}],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"1968","published-online":{"date-parts":[[2018,12,24]]},"reference":[{"key":"ref_1","unstructured":"Mohammadsoroush, T. (2017). Dynamic Risk Analysis of Construction Delays Using Fuzzy-Failure Mode Effects Analysis. [Master\u2019s Dissertation, University of Nevada]. Available online: https:\/\/digitalscholarship.unlv.edu\/thesesdissertations\/3043."},{"key":"ref_2","doi-asserted-by":"crossref","first-page":"601","DOI":"10.1016\/j.ijproman.2007.03.001","article-title":"Understanding the key risks in construction projects in China","volume":"25","author":"Zou","year":"2007","journal-title":"Int. J. Proj. Manag."},{"key":"ref_3","doi-asserted-by":"crossref","first-page":"300","DOI":"10.1061\/(ASCE)ME.1943-5479.0000096","article-title":"Causes of Delay in Road Construction Projects","volume":"28","author":"Mahamid","year":"2012","journal-title":"J. Manag. Eng."},{"key":"ref_4","doi-asserted-by":"crossref","unstructured":"Choudhry, R.M., Aslam, M.A., Hinze, J.W., and Arain, F.M. (2014). Cost and Schedule Risk Analysis of Bridge Construction in Pakistan: Establishing Risk Guidelines. J. Constr. Eng. Manag., 140.","DOI":"10.1061\/(ASCE)CO.1943-7862.0000857"},{"key":"ref_5","doi-asserted-by":"crossref","first-page":"174","DOI":"10.1016\/j.proeng.2017.11.036","article-title":"Risk management in construction projects","volume":"208","year":"2017","journal-title":"Procedia Eng."},{"key":"ref_6","doi-asserted-by":"crossref","unstructured":"Gonzalez, P., Gonzalez, V., Molenaar, K., and Orozco, F. (2014). Analysis of Causes of Delay and Time Performance in Construction Projects. J. Constr. Eng. Manag., 140.","DOI":"10.1061\/(ASCE)CO.1943-7862.0000721"},{"key":"ref_7","doi-asserted-by":"crossref","first-page":"2044","DOI":"10.1016\/j.mcm.2011.06.039","article-title":"A system dynamics model for assessing the impacts of design errors in construction projects","volume":"57","author":"Han","year":"2013","journal-title":"Math. Comput. Model."},{"key":"ref_8","doi-asserted-by":"crossref","first-page":"1167","DOI":"10.1080\/01446190600827033","article-title":"Significant factors causing schedule delay in the UAE construction industry","volume":"24","author":"Faridi","year":"2006","journal-title":"Constr. Manag. Econ."},{"key":"ref_9","doi-asserted-by":"crossref","first-page":"517","DOI":"10.1016\/j.ijproman.2006.11.007","article-title":"Causes and effects of delays in Malaysian construction industry","volume":"25","author":"Sambasivan","year":"2007","journal-title":"Int. J. Proj. Manag."},{"key":"ref_10","doi-asserted-by":"crossref","first-page":"349","DOI":"10.1016\/j.ijproman.2005.11.010","article-title":"Causes of schedule delay in large construction projects","volume":"24","author":"Assaf","year":"2006","journal-title":"Int. J. Proj. Manag."},{"key":"ref_11","first-page":"1","article-title":"Assessment on Performance and Challenges of Ethiopian Construction Industry","volume":"2","author":"Ayalew","year":"2016","journal-title":"J. Arch. Civ. Eng."},{"key":"ref_12","doi-asserted-by":"crossref","first-page":"831","DOI":"10.1061\/(ASCE)0733-9364(2008)134:11(831)","article-title":"Causes of Schedule delay in Building Construction Projects in Egypt","volume":"134","author":"Bassioni","year":"2008","journal-title":"J. Constr. Eng. Manag."},{"key":"ref_13","doi-asserted-by":"crossref","first-page":"321","DOI":"10.1016\/S0263-7863(02)00055-8","article-title":"Causes of schedule delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study","volume":"21","author":"Frimpong","year":"2003","journal-title":"Int. J. Proj. Manag."},{"key":"ref_14","doi-asserted-by":"crossref","first-page":"133","DOI":"10.1061\/(ASCE)ME.1943-5479.0000129","article-title":"Quantification of Delay Factors Using the Relative Importance Index Method for Construction Projects in Turkey","volume":"29","author":"Gunduz","year":"2013","journal-title":"J. Manag. Eng."},{"key":"ref_15","doi-asserted-by":"crossref","unstructured":"Larsen, J.K., Shen, G.Q., Lindhard, S.M., and Brunoe, T.D. (2016). Factors Affecting Schedule Schedule delay, Cost Overrun, and Quality Level in Public Construction Projects. J. Manag. Eng., 32.","DOI":"10.1061\/(ASCE)ME.1943-5479.0000391"},{"key":"ref_16","doi-asserted-by":"crossref","first-page":"20","DOI":"10.1016\/j.autcon.2018.07.026","article-title":"Schedule risk analysis of infrastructure projects: A hybrid dynamic approach","volume":"95","author":"Xu","year":"2018","journal-title":"Autom. Constr."},{"key":"ref_17","first-page":"202","article-title":"Identification and assessment of risk factors affecting construction projects","volume":"13","year":"2015","journal-title":"HBRC J."},{"key":"ref_18","doi-asserted-by":"crossref","unstructured":"Tavakolan, M., and Etemadinia, H. (2017). Fuzzy Weighted Interpretive Structural Modeling: Improved Method for Identification of Risk Interactions in Construction Projects. J. Constr. Eng. Manag., 143.","DOI":"10.1061\/(ASCE)CO.1943-7862.0001395"},{"key":"ref_19","doi-asserted-by":"crossref","first-page":"362","DOI":"10.1016\/j.net.2014.12.019","article-title":"Construction schedule delay risk assessment by using combined AHP-RII methodology for an international NPP project","volume":"47","author":"Hossen","year":"2015","journal-title":"Nucl. Eng. Technol."},{"key":"ref_20","doi-asserted-by":"crossref","first-page":"313","DOI":"10.1007\/s13198-012-0088-7","article-title":"Analysis of barriers total productive maintenance (TPM)","volume":"4","author":"Attri","year":"2013","journal-title":"Int. J. Syst. Assur. Eng. Manag."},{"key":"ref_21","doi-asserted-by":"crossref","first-page":"1961","DOI":"10.1016\/j.eswa.2007.12.048","article-title":"Structuring the prediction model of project performance for international construction projects: A comparative analysis","volume":"36","author":"Kim","year":"2009","journal-title":"Expert Syst. Appl."},{"key":"ref_22","doi-asserted-by":"crossref","first-page":"39","DOI":"10.1016\/j.ijproman.2008.03.003","article-title":"Quantifying schedule risk in construction projects using Bayesian belief networks","volume":"27","author":"Luu","year":"2009","journal-title":"Int. J. Proj. Manag."},{"key":"ref_23","doi-asserted-by":"crossref","unstructured":"Wang, J., and Yuan, H. (2017). System Dynamics Approach for Investigating the Risk Effects on Schedule Delay in Infrastructure Projects. J. Manag. Eng., 33.","DOI":"10.1061\/(ASCE)ME.1943-5479.0000472"},{"key":"ref_24","doi-asserted-by":"crossref","first-page":"138","DOI":"10.1016\/j.ijproman.2007.05.007","article-title":"Risk perception and Bayesian analysis of international construction contract risks: The case of payment delays in a developing economy","volume":"26","author":"Adams","year":"2008","journal-title":"Int. J. Proj. Manag."},{"key":"ref_25","doi-asserted-by":"crossref","first-page":"1164","DOI":"10.1061\/(ASCE)CO.1943-7862.0000382","article-title":"Identification of Risk Paths in International Construction Projects Using Structural Equation Modeling","volume":"137","author":"Eybpoosh","year":"2011","journal-title":"J. Constr. Eng. Manag."},{"key":"ref_26","doi-asserted-by":"crossref","first-page":"497","DOI":"10.3846\/13923730.2013.801922","article-title":"Application of importance-satisfaction analysis and influence-relations map to evaluate design delay factors","volume":"20","author":"Wang","year":"2014","journal-title":"J. Civ. Eng. Manag."},{"key":"ref_27","first-page":"1","article-title":"A dynamic framework for managing the complexities of risks in megaprojects","volume":"5","author":"Boateng","year":"2016","journal-title":"Int. J. Technol. Manag. Res."},{"key":"ref_28","first-page":"7","article-title":"Machine Selection by AHP and TOPSIS Methods","volume":"4","author":"Karim","year":"2016","journal-title":"Am. J. Ind. Eng."},{"key":"ref_29","doi-asserted-by":"crossref","unstructured":"Jang, W., Hong, H., and Baek, S. (2017). Optimal Supply Vendor Selection Model for LNG Plant Projects Using Fuzzy-TOPSIS Theory. J. Constr. Eng. Manag., 33.","DOI":"10.1061\/(ASCE)ME.1943-5479.0000474"},{"key":"ref_30","doi-asserted-by":"crossref","first-page":"431","DOI":"10.1016\/j.ijproman.2007.07.004","article-title":"Risk assessment and allocation in the UAE construction industry","volume":"26","year":"2008","journal-title":"Int. J. Proj. Manag."},{"key":"ref_31","doi-asserted-by":"crossref","unstructured":"Yoon, Y., Tamer, Z., and Hastak, M. (2015). Protocol to Enhance Profitability by Managing Risks in Construction Projects. J. Manag. Eng., 31.","DOI":"10.1061\/(ASCE)ME.1943-5479.0000339"},{"key":"ref_32","doi-asserted-by":"crossref","first-page":"602","DOI":"10.1016\/j.ijproman.2012.10.003","article-title":"Using fuzzy multiple criteria decision making approach to enhance risk assessment for metropolitan construction projects","volume":"31","author":"Kuo","year":"2013","journal-title":"Int. J. Proj. Manag."},{"key":"ref_33","doi-asserted-by":"crossref","first-page":"42","DOI":"10.1016\/j.autcon.2008.04.008","article-title":"Learning from risks: A tool for post-project risk assessment","volume":"18","author":"Dikmen","year":"2008","journal-title":"Autom. Constr."},{"key":"ref_34","doi-asserted-by":"crossref","unstructured":"Rao, R., Zhang, X., Shi, Z., Luo, K., Tan, Z., and Feng, Y. (2014). A Systematical Framework of Schedule Risk Management for Power Grid Engineering Projects\u2019 Sustainable Development. Sustainability, 6.","DOI":"10.3390\/su6106872"},{"key":"ref_35","doi-asserted-by":"crossref","unstructured":"Chatterjee, K., Zavadskas, K.E., Tamo\u0161aitien\u0117, J., Adhikary, K., and Kar, S. (2018). A Hybrid MCDM Technique for Risk Management in Construction Projects. Symmetry, 10.","DOI":"10.3390\/sym10020046"},{"key":"ref_36","doi-asserted-by":"crossref","first-page":"1364","DOI":"10.1016\/j.ijproman.2015.02.007","article-title":"Quantifying the complexity of transportation projects using the fuzzy analytic hierarchy process","volume":"33","author":"Nguyen","year":"2015","journal-title":"Int. J. Proj. Manag."},{"key":"ref_37","first-page":"29","article-title":"Information security risk analysis method and research trends: AHP and fuzzy comprehensive method","volume":"6","author":"Lee","year":"2014","journal-title":"Int. J. Comput. Sci. Inf. Technol."}],"container-title":["Symmetry"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.mdpi.com\/2073-8994\/11\/1\/12\/pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,10,11]],"date-time":"2025-10-11T15:35:55Z","timestamp":1760196955000},"score":1,"resource":{"primary":{"URL":"https:\/\/www.mdpi.com\/2073-8994\/11\/1\/12"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018,12,24]]},"references-count":37,"journal-issue":{"issue":"1","published-online":{"date-parts":[[2019,1]]}},"alternative-id":["sym11010012"],"URL":"https:\/\/doi.org\/10.3390\/sym11010012","relation":{},"ISSN":["2073-8994"],"issn-type":[{"value":"2073-8994","type":"electronic"}],"subject":[],"published":{"date-parts":[[2018,12,24]]}}}