{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,10,18]],"date-time":"2026-10-18T03:12:29Z","timestamp":1792293149942,"version":"4.4.0"},"reference-count":59,"publisher":"MDPI AG","issue":"2","license":[{"start":{"date-parts":[[2019,2,8]],"date-time":"2019-02-08T00:00:00Z","timestamp":1549584000000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Symmetry"],"abstract":"<jats:p>\u201cEstimation at completion\u201d (EAC) is a manager\u2019s projection of a project\u2019s total cost at its completion. It is an important tool for monitoring a project\u2019s performance and risk. Executives usually make high-level decisions on a project, but they may have gaps in the technical knowledge which may cause errors in their decisions. In this current study, the authors implemented new coupled intelligence models, namely global harmony search (GHS) and brute force (BF) integrated with extreme learning machine (ELM) for modeling the project construction estimation at completion. GHS and BF were used to abstract the substantial influential attributes toward the EAC dependent variable, whereas the effectiveness of ELM as a novel predictive model for the investigated application was demonstrated. As a benchmark model, a classical artificial neural network (ANN) was developed to validate the new ELM model in terms of the prediction accuracy. The predictive models were applied using historical information related to construction projects gathered from the United Arab Emirates (UAE). The study investigated the application of the proposed coupled model in determining the EAC and calculated the tendency of a change in the forecast model monitor. The main goal of the investigated model was to produce a reliable trend of EAC estimates which can aid project managers in improving the effectiveness of project costs control. The results demonstrated a noticeable implementation of the GHS-ELM and BF-ELM over the classical and hybridized ANN models.<\/jats:p>","DOI":"10.3390\/sym11020190","type":"journal-article","created":{"date-parts":[[2019,2,11]],"date-time":"2019-02-11T03:26:01Z","timestamp":1549855561000},"page":"190","update-policy":"https:\/\/doi.org\/10.3390\/mdpi_crossmark_policy","source":"Crossref","is-referenced-by-count":14,"title":["Estimation at Completion Simulation Using the Potential of Soft Computing Models: Case Study of Construction Engineering Projects"],"prefix":"10.3390","volume":"11","author":[{"ORCID":"https:\/\/orcid.org\/0000-0003-1262-3208","authenticated-orcid":false,"given":"Enas Fathi Taher","family":"AlHares","sequence":"first","affiliation":[{"name":"Electricity Distribution Branch in Najaf, General Company of Middle Electricity Distribution, Ministry of Electricity, Najaf 54001, Iraq"},{"name":"Department of Civil Engineering, Yildiz Technical University, 34220 Esenler, Istanbul, Turkey"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Cenk","family":"Budayan","sequence":"additional","affiliation":[{"name":"Department of Civil Engineering, Yildiz Technical University, 34220 Esenler, Istanbul, Turkey"}],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"1968","published-online":{"date-parts":[[2019,2,8]]},"reference":[{"key":"ref_1","doi-asserted-by":"crossref","first-page":"589","DOI":"10.1016\/j.ijproman.2007.02.006","article-title":"Application of a fuzzy based decision making methodology to construction project risk assessment","volume":"25","author":"Zeng","year":"2007","journal-title":"Int. J. Proj. Manag."},{"key":"ref_2","doi-asserted-by":"crossref","first-page":"257","DOI":"10.1016\/j.ijproman.2004.12.003","article-title":"Transferring projects to their final users: The effect of planning and preparations for commissioning on project success","volume":"23","author":"Dvir","year":"2005","journal-title":"Int. J. Proj. Manag."},{"key":"ref_3","doi-asserted-by":"crossref","first-page":"619","DOI":"10.1016\/j.autcon.2010.02.008","article-title":"Estimate at completion for construction projects using evolutionary support vector machine inference model","volume":"19","author":"Cheng","year":"2010","journal-title":"Autom. Constr."},{"key":"ref_4","doi-asserted-by":"crossref","first-page":"12","DOI":"10.1177\/875697280303400403","article-title":"Earned Value Project Management Method and Extensions","volume":"34","author":"Anbari","year":"2003","journal-title":"Proj. Manag. J."},{"key":"ref_5","doi-asserted-by":"crossref","first-page":"04013038","DOI":"10.1061\/(ASCE)CO.1943-7862.0000783","article-title":"Combination of Growth Model and Earned Schedule to Forecast Project Cost at Completion","volume":"140","author":"Narbaev","year":"2014","journal-title":"J. Constr. Eng. Manag."},{"key":"ref_6","doi-asserted-by":"crossref","first-page":"289","DOI":"10.1016\/j.ijproman.2005.10.004","article-title":"A comparison of different project duration forecasting methods using earned value metrics","volume":"24","author":"Vandevoorde","year":"2006","journal-title":"Int. J. Proj. Manag."},{"key":"ref_7","doi-asserted-by":"crossref","unstructured":"Larson, E.W., and Gray, C.F. (2004). A Guide to the Project Management Body of Knowledge\u2014PMBOK Guide, Project Management Institute.","DOI":"10.1002\/9780470172391.ch3"},{"key":"ref_8","first-page":"17","article-title":"Determining an accurate estimate at completion","volume":"25","author":"Christensen","year":"1993","journal-title":"Natl. Contract Manag. J."},{"key":"ref_9","doi-asserted-by":"crossref","first-page":"41","DOI":"10.1080\/08823871.1995.10462292","article-title":"A Review of Estimate at Completion Research","volume":"12","author":"Christensen","year":"1995","journal-title":"J. Cost Anal."},{"key":"ref_10","doi-asserted-by":"crossref","unstructured":"Abu Hammad, A.A., Ali, S.M., Sweis, G.J., and Sweis, R.J. (2010). Statistical Analysis on the Cost and Duration of Public Building Projects. J. Manag. Eng.","DOI":"10.1061\/(ASCE)0742-597X(2010)26:2(105)"},{"key":"ref_11","doi-asserted-by":"crossref","unstructured":"Khosrowshahi, F., and Kaka, A.P. (1996). Estimation of project total cost and duration for housing projects in the U.K.. Build. Environ.","DOI":"10.1016\/0360-1323(96)00003-0"},{"key":"ref_12","doi-asserted-by":"crossref","first-page":"1007","DOI":"10.1016\/j.ijproman.2013.12.005","article-title":"An Earned Schedule-based regression model to improve cost estimate at completion","volume":"32","author":"Narbaev","year":"2014","journal-title":"Int. J. Proj. Manag."},{"key":"ref_13","doi-asserted-by":"crossref","first-page":"386","DOI":"10.1016\/j.autcon.2008.10.005","article-title":"Artificial intelligence approaches to achieve strategic control over project cash flows","volume":"18","author":"Cheng","year":"2009","journal-title":"Autom. Constr."},{"key":"ref_14","first-page":"58","article-title":"Earned value management\u2014Reconciling government and commercial practices","volume":"26","author":"Abba","year":"1997","journal-title":"Program Manag."},{"key":"ref_15","doi-asserted-by":"crossref","first-page":"323","DOI":"10.1016\/j.ijproman.2005.09.004","article-title":"Using data envelope analysis to compare project efficiency in a multi-project environment","volume":"24","author":"Vitner","year":"2006","journal-title":"Int. J. Proj. Manag."},{"key":"ref_16","doi-asserted-by":"crossref","first-page":"813","DOI":"10.1061\/(ASCE)0733-9364(2008)134:10(813)","article-title":"Project Performance Evaluation Based on Statistical Process Control Techniques","volume":"134","author":"Leu","year":"2008","journal-title":"J. Constr. Eng. Manag."},{"key":"ref_17","doi-asserted-by":"crossref","first-page":"400","DOI":"10.1016\/j.ijproman.2008.02.009","article-title":"Prediction of project outcome. The application of statistical methods to earned value management and earned schedule performance indexes","volume":"27","author":"Lipke","year":"2009","journal-title":"Int. J. Proj. Manag."},{"key":"ref_18","doi-asserted-by":"crossref","first-page":"488","DOI":"10.1016\/j.dss.2009.04.010","article-title":"A model-based DSS for integrating the impact of learning in project control","volume":"47","author":"Plaza","year":"2009","journal-title":"Decis. Support Syst."},{"key":"ref_19","doi-asserted-by":"crossref","unstructured":"Pajares, J., and L\u00f3pez-Paredes, A. (2011). An extension of the EVM analysis for project monitoring: The Cost Control Index and the Schedule Control Index. Int. J. Proj. Manag.","DOI":"10.1016\/j.ijproman.2010.04.005"},{"key":"ref_20","doi-asserted-by":"crossref","unstructured":"Willems, L.L., and Vanhoucke, M. (2015). Classification of articles and journals on project control and earned value management. Int. J. Proj. Manag.","DOI":"10.1016\/j.ijproman.2015.06.003"},{"key":"ref_21","doi-asserted-by":"crossref","unstructured":"Abellan-Nebot, J.V., and Subri\u00f3n, F.R. (2009). A review of machining monitoring systems based on artificial intelligence process models. Int. J. Adv. Manuf. Technol.","DOI":"10.1007\/s00170-009-2191-8"},{"key":"ref_22","unstructured":"Iranmanesh, S.H., and Zarezadeh, M. (2008, January 25\u201326). Application of artificial neural network to forecast actual cost of a project to improve earned value management system. Proceedings of the World Congress on Science, Engineering and Technology, Kuala Lumpur, Malaysia."},{"key":"ref_23","doi-asserted-by":"crossref","first-page":"6061","DOI":"10.1016\/j.eswa.2010.02.120","article-title":"Evolutionary fuzzy decision model for construction management using support vector machine","volume":"37","author":"Cheng","year":"2010","journal-title":"Expert Syst. Appl."},{"key":"ref_24","doi-asserted-by":"crossref","first-page":"4224","DOI":"10.1016\/j.eswa.2009.11.080","article-title":"Conceptual cost estimates using evolutionary fuzzy hybrid neural network for projects in construction industry","volume":"37","author":"Cheng","year":"2010","journal-title":"Expert Syst. Appl."},{"key":"ref_25","doi-asserted-by":"crossref","first-page":"744","DOI":"10.1016\/j.engappai.2011.09.022","article-title":"A novel time-depended evolutionary fuzzy SVM inference model for estimating construction project at completion","volume":"25","author":"Cheng","year":"2012","journal-title":"Eng. Appl. Artif. Intell."},{"key":"ref_26","first-page":"477","article-title":"A fuzzy neural network to estimate at completion costs of construction projects","volume":"3","author":"Feylizadeh","year":"2012","journal-title":"Int. J. Ind. Eng. Comput."},{"key":"ref_27","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1002\/pmj.21303","article-title":"A bayesian approach to improve estimate at completion in earned value management","volume":"44","author":"Caron","year":"2013","journal-title":"Proj. Manag. J."},{"key":"ref_28","doi-asserted-by":"crossref","first-page":"92","DOI":"10.1016\/j.autcon.2014.07.014","article-title":"Support Vector Machine Regression for project control forecasting","volume":"47","author":"Wauters","year":"2014","journal-title":"Autom. Constr."},{"key":"ref_29","first-page":"197","article-title":"Automated estimation of completion time for dam projects","volume":"17","author":"Golizadeh","year":"2017","journal-title":"Int. J. Constr. Manag."},{"key":"ref_30","doi-asserted-by":"crossref","first-page":"489","DOI":"10.1016\/j.neucom.2005.12.126","article-title":"Extreme learning machine: Theory and applications","volume":"70","author":"Huang","year":"2006","journal-title":"Neurocomputing"},{"key":"ref_31","doi-asserted-by":"crossref","first-page":"32","DOI":"10.1016\/j.neunet.2014.10.001","article-title":"Trends in extreme learning machines: A review","volume":"61","author":"Huang","year":"2015","journal-title":"Neural Netw."},{"key":"ref_32","doi-asserted-by":"crossref","first-page":"387","DOI":"10.1016\/j.jhydrol.2018.11.069","article-title":"An enhanced extreme learning machine model for river flow forecasting: State-of-the-art, practical applications in water resource engineering area and future research direction","volume":"569","author":"Yaseen","year":"2018","journal-title":"J. Hydrol."},{"key":"ref_33","doi-asserted-by":"crossref","first-page":"3056","DOI":"10.1016\/j.neucom.2007.02.009","article-title":"Convex incremental extreme learning machine","volume":"70","author":"Huang","year":"2007","journal-title":"Neurocomputing"},{"key":"ref_34","doi-asserted-by":"crossref","first-page":"3984","DOI":"10.1016\/j.eswa.2013.01.011","article-title":"A new method for expert target recognition system: Genetic wavelet extreme learning machine (GAWELM)","volume":"40","author":"Avci","year":"2013","journal-title":"Expert Syst. Appl."},{"key":"ref_35","doi-asserted-by":"crossref","first-page":"205","DOI":"10.1002\/er.3030","article-title":"Application of extreme learning machine for estimating solar radiation from satellite data","volume":"38","author":"Sahin","year":"2014","journal-title":"Int. J. Energy Res."},{"key":"ref_36","doi-asserted-by":"crossref","first-page":"1893","DOI":"10.1007\/s00382-015-2682-2","article-title":"Application of extreme learning machine for estimation of wind speed distribution","volume":"46","author":"Shamshirband","year":"2016","journal-title":"Clim. Dyn."},{"key":"ref_37","doi-asserted-by":"crossref","first-page":"1060","DOI":"10.1109\/JSTARS.2014.2301775","article-title":"Ensemble Extreme Learning Machines for Hyperspectral Image Classification","volume":"7","author":"Samat","year":"2014","journal-title":"IEEE Sel. Top. Appl. Earth Obs. Remote Sens. J."},{"key":"ref_38","doi-asserted-by":"crossref","first-page":"505","DOI":"10.1109\/TNN.2010.2103956","article-title":"BELM: Bayesian extreme learning machine","volume":"22","author":"Magdalena","year":"2011","journal-title":"IEEE Trans. Neural Netw."},{"key":"ref_39","doi-asserted-by":"crossref","first-page":"920","DOI":"10.1021\/ie0704647","article-title":"Prediction of Melting Points of Organic Compounds Using Extreme Learning Machines","volume":"47","author":"Bhat","year":"2008","journal-title":"Ind. Eng. Chem. Res."},{"key":"ref_40","first-page":"240","article-title":"Displacement prediction model of landslide based on ensemble of extreme learning machine","volume":"Volume 7666","author":"Lian","year":"2012","journal-title":"Lecture Notes in Computer Science, Proceedings of the International Conference on Neural Information Processing, Doha, Qatar, 12\u201315 November 2012"},{"key":"ref_41","doi-asserted-by":"crossref","first-page":"112","DOI":"10.1016\/j.advengsoft.2017.09.004","article-title":"Predicting compressive strength of lightweight foamed concrete using extreme learning machine model","volume":"115","author":"Yaseen","year":"2018","journal-title":"Adv. Eng. Softw."},{"key":"ref_42","doi-asserted-by":"crossref","first-page":"52","DOI":"10.1016\/j.geoderma.2018.05.030","article-title":"Non-tuned data intelligent model for soil temperature estimation: A new approach","volume":"330","author":"Sanikhani","year":"2018","journal-title":"Geoderma"},{"key":"ref_43","first-page":"1","article-title":"Non-tuned machine learning approach for hydrological time series forecasting","volume":"30","author":"Yaseen","year":"2016","journal-title":"Neural Comput. Appl."},{"key":"ref_44","doi-asserted-by":"crossref","unstructured":"Li, J., Salim, R.D., Aldlemy, M.S., Abdullah, J.M., and Yaseen, Z.M. (2018). Fiberglass-Reinforced Polyester Composites Fatigue Prediction Using Novel Data-Intelligence Model. Arab. J. Sci. Eng.","DOI":"10.1007\/s13369-018-3508-4"},{"key":"ref_45","doi-asserted-by":"crossref","unstructured":"Hou, M., Zhang, T., Weng, F., Ali, M., Al-Ansari, N., and Yaseen, Z. (2018). Global Solar Radiation Prediction Using Hybrid Online Sequential Extreme Learning Machine Model. Energies, 11.","DOI":"10.3390\/en11123415"},{"key":"ref_46","doi-asserted-by":"crossref","first-page":"242","DOI":"10.1016\/j.compag.2018.07.008","article-title":"Survey of different data-intelligent modeling strategies for forecasting air temperature using geographic information as model predictors","volume":"152","author":"Sanikhani","year":"2018","journal-title":"Comput. Electron. Agric."},{"key":"ref_47","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1007\/978-3-319-28495-8_1","article-title":"Artificial Neural Network Modelling","volume":"628","author":"Shanmuganathan","year":"2016","journal-title":"Stud. Comput. Intell."},{"key":"ref_48","doi-asserted-by":"crossref","unstructured":"Wang, S.-C. (2003). Artificial Neural Network, McGraw-Hill.","DOI":"10.1007\/978-1-4615-0377-4_5"},{"key":"ref_49","doi-asserted-by":"crossref","unstructured":"Tino, P., Benuskova, L., and Sperduti, A. (2015). Artificial Neural Network Models, Springer. Springer Handbook of Computational Intelligence.","DOI":"10.1007\/978-3-662-43505-2_27"},{"key":"ref_50","doi-asserted-by":"crossref","unstructured":"Yaseen, Z.M., El-Shafie, A., Afan, H.A., Hameed, M., Mohtar, W.H.M.W., and Hussain, A. (2015). RBFNN versus FFNN for daily river flow forecasting at Johor River, Malaysia. Neural Comput. Appl.","DOI":"10.1007\/s00521-015-1952-6"},{"key":"ref_51","doi-asserted-by":"crossref","first-page":"2244","DOI":"10.1016\/j.apenergy.2008.12.020","article-title":"Prediction of thermal conductivity of ethylene glycol-water solutions by using artificial neural networks","volume":"86","author":"Kurt","year":"2009","journal-title":"Appl. Energy"},{"key":"ref_52","doi-asserted-by":"crossref","first-page":"246","DOI":"10.1016\/j.icheatmasstransfer.2015.06.002","article-title":"Applicability of artificial neural network and nonlinear regression to predict thermal conductivity modeling of Al2O3\u2013water nanofluids using experimental data","volume":"66","author":"Afrand","year":"2015","journal-title":"Int. Commun. Heat Mass Transf."},{"key":"ref_53","doi-asserted-by":"crossref","first-page":"643","DOI":"10.1016\/j.amc.2007.09.004","article-title":"Global-best harmony search","volume":"198","author":"Omran","year":"2008","journal-title":"Appl. Math. Comput."},{"key":"ref_54","doi-asserted-by":"crossref","first-page":"318","DOI":"10.1016\/j.ins.2016.02.007","article-title":"Hybrid harmony search particle swarm optimization with global dimension selection","volume":"346\u2013347","author":"Ouyang","year":"2016","journal-title":"Inf. Sci."},{"key":"ref_55","doi-asserted-by":"crossref","first-page":"489","DOI":"10.1016\/S0074-6142(10)97020-4","article-title":"Simple, Brute-force computation of theta functions and beyond","volume":"97","author":"Osborne","year":"2010","journal-title":"Int. Geophys."},{"key":"ref_56","doi-asserted-by":"crossref","first-page":"70","DOI":"10.1145\/3107239","article-title":"The Science of Brute Force","volume":"60","author":"Heule","year":"2017","journal-title":"Commun. ACM"},{"key":"ref_57","doi-asserted-by":"crossref","first-page":"1247","DOI":"10.5194\/gmd-7-1247-2014","article-title":"Root mean square error (RMSE) or mean absolute error (MAE)?\u2014Arguments against avoiding RMSE in the literature","volume":"7","author":"Chai","year":"2014","journal-title":"Geosci. Model Dev."},{"key":"ref_58","doi-asserted-by":"crossref","first-page":"282","DOI":"10.1016\/0022-1694(70)90255-6","article-title":"River flow forecasting through conceptual models part I\u2014A discussion of principles","volume":"10","author":"Nash","year":"1970","journal-title":"J. Hydrol."},{"key":"ref_59","doi-asserted-by":"crossref","first-page":"140","DOI":"10.1016\/j.agwat.2018.06.018","article-title":"Reference evapotranspiration prediction using hybridized fuzzy model with firefly algorithm: Regional case study in Burkina Faso","volume":"208","author":"Tao","year":"2018","journal-title":"Agric. Water Manag."}],"container-title":["Symmetry"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.mdpi.com\/2073-8994\/11\/2\/190\/pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,10,11]],"date-time":"2025-10-11T12:30:47Z","timestamp":1760185847000},"score":1,"resource":{"primary":{"URL":"https:\/\/www.mdpi.com\/2073-8994\/11\/2\/190"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019,2,8]]},"references-count":59,"journal-issue":{"issue":"2","published-online":{"date-parts":[[2019,2]]}},"alternative-id":["sym11020190"],"URL":"https:\/\/doi.org\/10.3390\/sym11020190","relation":{},"ISSN":["2073-8994"],"issn-type":[{"value":"2073-8994","type":"electronic"}],"subject":[],"published":{"date-parts":[[2019,2,8]]}}}