{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,8,29]],"date-time":"2026-08-29T03:48:54Z","timestamp":1787975334406,"version":"build-2784847793"},"reference-count":124,"publisher":"MDPI AG","issue":"7","license":[{"start":{"date-parts":[[2023,7,14]],"date-time":"2023-07-14T00:00:00Z","timestamp":1689292800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0\/"}],"funder":[{"name":"Research Grants Council of the Hong Kong Special Administrative Region, China","award":["PolyU15225822"],"award-info":[{"award-number":["PolyU15225822"]}]}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Systems"],"abstract":"<jats:p>With the lifting of the COVID-19 lockdown, the construction industry is gradually moving towards a new normality. This study aims to evaluate the construction project performance in the post-COVID-19 pandemic context and proposes a roadmap framework to achieve project recovery in China. This paper follows a sequential mixed methodology with three core steps. First, the critical success factors (CSFs) and key performance indicators (KPIs) are derived from literature reviews and expert interviews. Second, the study conducts a questionnaire survey with 150 experts. Third, the research implements factor analysis and analytic hierarchy process (AHP) analysis for CSFs and characteristics and comparative analysis for KPIs. Based on the results, the study employs structural equational modelling (SEM) to connect the CSFs and KPIs and develop a roadmap towards the post-COVID-19 pandemic recovery of the construction projects. The study identifies 32 CSFs and 25 KPIs and categorises them into five clusters, respectively. The SEM analysis suggests that management and technological innovation significantly contribute to achieving enterprise strategic goals and advancing industrial development. The consistency of project goals and external expectations also positively affect the satisfaction level of stakeholders and social impact. In addition, the AHP clarifies that the stability of the external environment, the internal support, and the adequacy of resources are critical drivers to the post-COVID-19 recovery of construction projects. This research proffers a roadmap towards the project recovery of the construction industry in the post-COVID-19 era by connecting the performance indicators and their critical success drivers. The findings would guide comprehensive design and construction, project life cycle management, and assist in dealing with public health emergencies in construction project management to maximise the organisation\u2019s profits and positive social impact.<\/jats:p>","DOI":"10.3390\/systems11070359","type":"journal-article","created":{"date-parts":[[2023,7,17]],"date-time":"2023-07-17T00:56:47Z","timestamp":1689555407000},"page":"359","update-policy":"https:\/\/doi.org\/10.3390\/mdpi_crossmark_policy","source":"Crossref","is-referenced-by-count":11,"title":["Post-COVID-19 Recovery: An Integrated Framework of Construction Project Performance Evaluation in China"],"prefix":"10.3390","volume":"11","author":[{"given":"Han-Sen","family":"Guo","sequence":"first","affiliation":[{"name":"Department of Civil and System Engineering, Johns Hopkins University, Baltimore, MD 21218, USA"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Ming-Xin","family":"Liu","sequence":"additional","affiliation":[{"name":"School of Civil Engineering, Chang\u2019an University, Xi\u2019an 710064, China"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0001-9653-1022","authenticated-orcid":false,"given":"Jin","family":"Xue","sequence":"additional","affiliation":[{"name":"Department of Building and Real Estate, The Hong Kong Polytechnic University, Hong Kong 999997, China"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0001-7957-3546","authenticated-orcid":false,"given":"Izzy Yi","family":"Jian","sequence":"additional","affiliation":[{"name":"School of Design, The Hong Kong Polytechnic University, Hong Kong 999997, China"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Qian","family":"Xu","sequence":"additional","affiliation":[{"name":"Department of Management, Lincoln International Business School, University of Lincoln, Lincoln LN6 7TS, UK"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-1445-5578","authenticated-orcid":false,"given":"Qian-Cheng","family":"Wang","sequence":"additional","affiliation":[{"name":"Department of Land Economy, University of Cambridge, Cambridge CB3 9EU, UK"}],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"1968","published-online":{"date-parts":[[2023,7,14]]},"reference":[{"key":"ref_1","doi-asserted-by":"crossref","first-page":"107012","DOI":"10.1016\/j.eiar.2022.107012","article-title":"Exploring the heterogeneity in drivers of energy-saving behaviours among hotel guests: Insights from the theory of planned behaviour and personality profiles","volume":"99","author":"Wang","year":"2023","journal-title":"Environ. Impact Assess. Rev."},{"key":"ref_2","unstructured":"Bertelsen, S. (2003, January 22\u201324). Construction as a Complex System. Proceedings of the 11th Annual Conference of the International Group for Lean Construction, Blacksburg, VA, USA."},{"key":"ref_3","doi-asserted-by":"crossref","unstructured":"Alsharef, A., Banerjee, S., Uddin, S.M.J., Albert, A., and Jaselskis, E. (2021). Early impacts of the COVID-19 pandemic on the United States construction industry. Int. J. Environ. Res. Public Health, 18.","DOI":"10.3390\/ijerph18041559"},{"key":"ref_4","doi-asserted-by":"crossref","unstructured":"Araya, F., and Sierra, L. (2021). Influence between COVID-19 Impacts and Project Stakeholders in Chilean Construction Projects. Sustainability, 13.","DOI":"10.3390\/su131810082"},{"key":"ref_5","doi-asserted-by":"crossref","first-page":"4021091","DOI":"10.1061\/(ASCE)ME.1943-5479.0001009","article-title":"New modes of operating for construction organizations during the COVID-19 pandemic: Challenges, actions, and future best practices","volume":"38","author":"Raoufi","year":"2022","journal-title":"J. Manag. Eng."},{"key":"ref_6","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1080\/01446193.2023.2211179","article-title":"Comparison of Construction Project Risks Before and During COVID-19 in Singapore: Criticality and Management Strategies","volume":"41","author":"Xu","year":"2023","journal-title":"Constr. Manag. Econ."},{"key":"ref_7","doi-asserted-by":"crossref","first-page":"4021082","DOI":"10.1061\/(ASCE)ME.1943-5479.0000995","article-title":"Impact of COVID-19 on the US Construction Industry as Revealed in the Purdue Index for Construction","volume":"38","author":"Jeon","year":"2022","journal-title":"J. Manag. Eng."},{"key":"ref_8","first-page":"1376","article-title":"Construction industry post-COVID-19 recovery: Stakeholders perspective on achieving sustainable development goals","volume":"23","author":"Ebekozien","year":"2021","journal-title":"Int. J. Constr. Manag."},{"key":"ref_9","doi-asserted-by":"crossref","first-page":"581","DOI":"10.1108\/SASBE-05-2020-0068","article-title":"The impact of COVID-19 outbreak on United Kingdom infrastructure sector","volume":"10","author":"Jallow","year":"2020","journal-title":"Smart Sustain. Built Environ."},{"key":"ref_10","doi-asserted-by":"crossref","first-page":"1475","DOI":"10.1108\/ECAM-03-2017-0049","article-title":"Integrating value management into sustainable construction projects in Hong Kong","volume":"25","author":"Yu","year":"2018","journal-title":"Eng. Constr. Archit. Manag."},{"key":"ref_11","doi-asserted-by":"crossref","unstructured":"Roy, S., and Ghosh, P. (2020). Factors affecting COVID-19 infected and death rates inform lockdown-related policymaking. PLoS ONE, 15.","DOI":"10.1371\/journal.pone.0241165"},{"key":"ref_12","doi-asserted-by":"crossref","first-page":"45","DOI":"10.1007\/s10272-021-0950-4","article-title":"COVID-19 and the Growth Potential","volume":"56","year":"2021","journal-title":"Intereconomics"},{"key":"ref_13","doi-asserted-by":"crossref","first-page":"104745","DOI":"10.1016\/j.scs.2023.104745","article-title":"Community resilience in city emergency: Exploring the roles of environmental perception, social justice and community attachment in subjective well-being of vulnerable residents","volume":"97","author":"Wang","year":"2023","journal-title":"Sustain. Cities Soc."},{"key":"ref_14","doi-asserted-by":"crossref","unstructured":"Islam, M.A., Barna, S.D., Raihan, H., Khan, M.N.A., and Hossain, M.T. (2020). Depression and anxiety among university students during the COVID-19 pandemic in Bangladesh: A web-based cross-sectional survey. PLoS ONE, 15.","DOI":"10.1371\/journal.pone.0238162"},{"key":"ref_15","doi-asserted-by":"crossref","first-page":"42","DOI":"10.1016\/j.ijid.2020.08.026","article-title":"Estimating the impact of physical distancing measures in containing COVID-19: An empirical analysis","volume":"100","author":"Koh","year":"2020","journal-title":"Int. J. Infectious Dis."},{"key":"ref_16","unstructured":"Frey, C.B., Chen, C., and Presidente, G. (2023, May 24). Democracy, Culture, and Contagion: Political Regimes and Countries Responsiveness to COVID-19. Covid Economics. Available online: ttps:\/\/www.oxfordmartin.ox.ac.uk\/downloads\/academic\/Democracy-Culture-and-Contagion_May13.pdf."},{"key":"ref_17","doi-asserted-by":"crossref","first-page":"2455","DOI":"10.1111\/jgs.17301","article-title":"Moving geroscience from the bench to clinical care and health policy","volume":"69","author":"Sierra","year":"2021","journal-title":"J. Am. Geriatr. Soc."},{"key":"ref_18","doi-asserted-by":"crossref","first-page":"1817","DOI":"10.1108\/ECAM-09-2020-0719","article-title":"COVID-19: Main challenges during construction stage","volume":"29","author":"Sierra","year":"2022","journal-title":"Eng. Constr. Archit. Manag."},{"key":"ref_19","doi-asserted-by":"crossref","first-page":"381","DOI":"10.1177\/01436244231174354","article-title":"Solving the comfort-retrofit conundrum through post-occupancy evaluation and multi-objective optimisation","volume":"44","author":"Yu","year":"2023","journal-title":"Build. Serv. Eng. Res. Technol."},{"key":"ref_20","doi-asserted-by":"crossref","first-page":"734","DOI":"10.1108\/ECAM-08-2021-0704","article-title":"Effects of the COVID-19 pandemic on the construction sector: A systemized review","volume":"30","author":"Ayat","year":"2023","journal-title":"Eng. Constr. Archit. Manag."},{"key":"ref_21","doi-asserted-by":"crossref","first-page":"100018","DOI":"10.1016\/j.plas.2021.100018","article-title":"Impact of COVID-19 on field and office workforce in construction industry","volume":"2","author":"Pamidimukkala","year":"2021","journal-title":"Proj. Leadersh. Soc."},{"key":"ref_22","first-page":"103018","article-title":"Assessing the vulnerability of energy supply chains: Influencing factors and countermeasures","volume":"56","author":"Zhao","year":"2023","journal-title":"Sustain. Energy Technol. Assess."},{"key":"ref_23","doi-asserted-by":"crossref","first-page":"384","DOI":"10.1016\/j.shaw.2021.01.010","article-title":"Occupational health problems and lifestyle changes among novice working-from-home workers amid the COVID-19 pandemic","volume":"12","author":"Ekpanyaskul","year":"2021","journal-title":"Saf. Health Work"},{"key":"ref_24","doi-asserted-by":"crossref","first-page":"425","DOI":"10.1002\/hfm.20882","article-title":"Impact of COVID-19 on health and safety in the construction sector","volume":"31","author":"Stiles","year":"2021","journal-title":"Hum. Factors Ergon. Manuf. Serv. Ind."},{"key":"ref_25","doi-asserted-by":"crossref","unstructured":"Li, X., Yuan, J., Liu, X., Wang, G., and Wang, Q.-C. (2023). The effects of joint-contract functions on PPP project value creation: A mediation model. Eng. Constr. Archit. Manag., 30.","DOI":"10.1108\/ECAM-10-2022-0949"},{"key":"ref_26","doi-asserted-by":"crossref","first-page":"142","DOI":"10.1061\/(ASCE)0733-9364(1999)125:3(142)","article-title":"Critical Success Factors for Different Project Objectives","volume":"125","author":"Chua","year":"1999","journal-title":"J. Constr. Eng. Manag."},{"key":"ref_27","doi-asserted-by":"crossref","first-page":"3061","DOI":"10.1016\/j.enpol.2009.03.057","article-title":"The market for green building in developed Asian cities\u2014The perspectives of building designers","volume":"37","author":"Chan","year":"2009","journal-title":"Energy Policy"},{"key":"ref_28","doi-asserted-by":"crossref","first-page":"520","DOI":"10.1061\/(ASCE)CO.1943-7862.0000464","article-title":"Critical Success Factors for Different Components of Construction Projects","volume":"138","author":"Kog","year":"2012","journal-title":"J. Constr. Eng. Manag."},{"key":"ref_29","doi-asserted-by":"crossref","first-page":"291","DOI":"10.1108\/ECAM-01-2013-0001","article-title":"Critical success factors for implementation of risk assessment and management practices within the Tanzanian construction industry","volume":"21","author":"Chileshe","year":"2014","journal-title":"Eng. Constr. Arch. Manag."},{"key":"ref_30","doi-asserted-by":"crossref","first-page":"551","DOI":"10.1080\/13669877.2010.547253","article-title":"Critical success factors for risk management systems","volume":"14","author":"Yaraghi","year":"2011","journal-title":"J. Risk Res."},{"key":"ref_31","doi-asserted-by":"crossref","first-page":"1199","DOI":"10.1080\/01446193.2013.867521","article-title":"Critical success factors for enterprise risk management in Chinese construction companies","volume":"31","author":"Zhao","year":"2013","journal-title":"Constr. Manag. Econ."},{"key":"ref_32","doi-asserted-by":"crossref","first-page":"18","DOI":"10.5130\/AJCEB.v16i1.4651","article-title":"Critical success factors for implementing risk management systems in developing countries","volume":"16","author":"Hosseini","year":"2016","journal-title":"Constr. Econ. Build."},{"key":"ref_33","first-page":"1","article-title":"Enterprise risk management implementation: The critical success factors for Vietnamese construction companies","volume":"3","author":"Phu","year":"2017","journal-title":"Enterp. Risk"},{"key":"ref_34","doi-asserted-by":"crossref","unstructured":"Ayat, M., Qureshi, S.M., Malikah, M., and Kang, C. (2023). The moderating role of emerging technologies on the impact of coronavirus disease 2019 and the performance of construction projects: The case of Pakistan. J. Eng. Des. Technol., ahead-of-print.","DOI":"10.1108\/JEDT-01-2023-0033"},{"key":"ref_35","doi-asserted-by":"crossref","first-page":"48","DOI":"10.1061\/(ASCE)ME.1943-5479.0000030","article-title":"Greening project management practices for sustainable construction","volume":"27","author":"Robichaud","year":"2011","journal-title":"J. Manag. Eng."},{"key":"ref_36","doi-asserted-by":"crossref","first-page":"143","DOI":"10.3992\/jgb.11.3.143.1","article-title":"Delivering sustainable building projects\u2013challenges, reality and success","volume":"11","author":"Rasekh","year":"2016","journal-title":"J. Green Build."},{"key":"ref_37","first-page":"107","article-title":"The effect of age on the job satisfaction of construction workers","volume":"8","author":"Chileshe","year":"2010","journal-title":"J. Eng. Des. Technol."},{"key":"ref_38","doi-asserted-by":"crossref","first-page":"2861","DOI":"10.1158\/1078-0432.CCR-10-0569","article-title":"Preoperative CTLA-4 Blockade: Tolerability and Immune Monitoring in the Setting of a Presurgical Clinical Trial","volume":"16","author":"Carthon","year":"2010","journal-title":"Clin. Cancer Res."},{"key":"ref_39","first-page":"379","article-title":"Critical success factor analysis for effective risk management at the execution stage of a construction project","volume":"22","author":"Shayan","year":"2019","journal-title":"Int. J. Constr. Manag."},{"key":"ref_40","first-page":"379","article-title":"Critical success factors of risk assessment and management processes (RAMP) implementation in Ghanaian construction related organisations","volume":"4","author":"Fianko","year":"2012","journal-title":"Int. J. Proj. Organ. Manag."},{"key":"ref_41","doi-asserted-by":"crossref","first-page":"62","DOI":"10.1016\/j.ijsbe.2014.08.001","article-title":"A review of Critical Project Management Success Factors (CPMSF) for sustainable social housing in Nigeria","volume":"3","author":"Ihuah","year":"2014","journal-title":"Int. J. Sustain. Built Environ."},{"key":"ref_42","doi-asserted-by":"crossref","first-page":"709","DOI":"10.1016\/j.ssci.2007.06.006","article-title":"Critical success factors influencing safety program performance in Thai construction projects","volume":"46","author":"Aksorn","year":"2008","journal-title":"Saf. Sci."},{"key":"ref_43","doi-asserted-by":"crossref","first-page":"1103","DOI":"10.1016\/j.ijproman.2017.01.014","article-title":"Critical success factors (CSFs) for integration of sustainability into construction project management practices in developing countries","volume":"35","author":"Banihashemi","year":"2017","journal-title":"Int. J. Proj. Manag."},{"key":"ref_44","doi-asserted-by":"crossref","first-page":"972","DOI":"10.1061\/(ASCE)0733-9364(2008)134:12(972)","article-title":"Critical Success Factors for Competitiveness of Contractors: China Study","volume":"134","author":"Lu","year":"2008","journal-title":"J. Constr. Eng. Manag."},{"key":"ref_45","unstructured":"Hillson, D. (2013). The A-B-C of Risk Culture: How to be Risk-Mature, Project Management Institute."},{"key":"ref_46","doi-asserted-by":"crossref","first-page":"04022015","DOI":"10.1061\/(ASCE)NH.1527-6996.0000560","article-title":"Impact of COVID-19 on the Diversity of the Construction Workforce","volume":"23","author":"Baral","year":"2022","journal-title":"Nat. Hazards Rev."},{"key":"ref_47","doi-asserted-by":"crossref","first-page":"85","DOI":"10.1007\/s12205-009-0085-9","article-title":"External risk management practices of Chinese construction firms in Singapore","volume":"13","author":"Low","year":"2009","journal-title":"KSCE J. Civ. Eng."},{"key":"ref_48","doi-asserted-by":"crossref","first-page":"148","DOI":"10.1016\/j.proeng.2011.07.017","article-title":"Critical Success Factors for Safety Program Implementation among Construction Companies in Saudi Arabia","volume":"14","author":"Panuwatwanich","year":"2011","journal-title":"Procedia Eng."},{"key":"ref_49","doi-asserted-by":"crossref","first-page":"1004","DOI":"10.1080\/13669877.2018.1437061","article-title":"Critical success factors associated with the implementation of enterprise risk management","volume":"22","author":"Oliveira","year":"2018","journal-title":"J. Risk Res."},{"key":"ref_50","doi-asserted-by":"crossref","first-page":"116","DOI":"10.1016\/j.ijproman.2013.01.007","article-title":"Risk management in small construction projects in Singapore: Status, barriers and impact","volume":"32","author":"Hwang","year":"2014","journal-title":"Int. J. Proj. Manag."},{"key":"ref_51","doi-asserted-by":"crossref","first-page":"194","DOI":"10.1061\/(ASCE)0742-597X(2002)18:4(194)","article-title":"Construction partnering process and associated critical success factors: Quantitative investigation","volume":"18","author":"Cheng","year":"2002","journal-title":"J. Manag. Eng."},{"key":"ref_52","doi-asserted-by":"crossref","first-page":"327","DOI":"10.1108\/ECAM-07-2014-0095","article-title":"Green building projects: Schedule performance, influential factors and solutions","volume":"22","author":"Hwang","year":"2015","journal-title":"Eng. Constr. Arch. Manag."},{"key":"ref_53","doi-asserted-by":"crossref","first-page":"91","DOI":"10.1108\/ECAM-04-2014-0057","article-title":"Risk management implementation in small and medium enterprises in the UK construction industry","volume":"22","author":"Rostami","year":"2015","journal-title":"Eng. Constr. Arch. Manag."},{"key":"ref_54","doi-asserted-by":"crossref","first-page":"618","DOI":"10.1016\/j.jom.2005.01.002","article-title":"Development and validation of a measurement instrument for studying supply chain management practices","volume":"23","author":"Li","year":"2005","journal-title":"J. Oper. Manag."},{"key":"ref_55","doi-asserted-by":"crossref","first-page":"748","DOI":"10.1061\/(ASCE)0733-9364(2005)131:6(748.2)","article-title":"Closure to \u201cFactors Affecting the Success of a Construction Project\u201d by Albert P. C. Chan, David Scott, and Ada P. L. Chan","volume":"131","author":"Chan","year":"2005","journal-title":"J. Constr. Eng. Manag."},{"key":"ref_56","doi-asserted-by":"crossref","first-page":"94","DOI":"10.1061\/(ASCE)0733-9364(1992)118:1(94)","article-title":"Critical Success Factors for Construction Projects","volume":"118","author":"Sanvido","year":"1992","journal-title":"J. Constr. Eng. Manag."},{"key":"ref_57","unstructured":"Petrovic, D. (2023, May 24). Risk Management in Construction Projects: A Knowledge Management Perspective from Swedish Contractors. Available online: https:\/\/www.diva-portal.org\/smash\/get\/diva2:1150372\/FULLTEXT01.pdf."},{"key":"ref_58","doi-asserted-by":"crossref","first-page":"71","DOI":"10.1061\/(ASCE)ME.1943-5479.0000114","article-title":"Delivering sustainable, high-performance buildings: Influence of project delivery methods on integration and project outcomes","volume":"29","author":"Swarup","year":"2013","journal-title":"J. Manag. Eng."},{"key":"ref_59","first-page":"266","article-title":"Assessing Project Delivery for Sustainable, High-Performance Buildings Through Mixed Methods","volume":"7","author":"Korkmaz","year":"2011","journal-title":"Arch. Eng. Des. Manag."},{"key":"ref_60","first-page":"43","article-title":"Critical factors to company success in the construction industry","volume":"45","author":"Arslan","year":"2008","journal-title":"World Acad. Sci. Eng. Technol."},{"key":"ref_61","doi-asserted-by":"crossref","first-page":"301","DOI":"10.1108\/09699980410558494","article-title":"Managing knowledge and intellectual capital for improved organizational innovations in the construction industry: An examination of critical success factors","volume":"11","author":"Egbu","year":"2004","journal-title":"Eng. Constr. Arch. Manag."},{"key":"ref_62","doi-asserted-by":"crossref","first-page":"259","DOI":"10.1080\/014461997372999","article-title":"Leaders and champions for construction innovation","volume":"15","author":"Nam","year":"1997","journal-title":"Constr. Manag. Econ."},{"key":"ref_63","doi-asserted-by":"crossref","first-page":"202","DOI":"10.15302\/J-FEM-2014027","article-title":"Identification of critical success factors for construction innovation: From the perspective of strategic cooperation","volume":"1","author":"Liu","year":"2014","journal-title":"Front. Eng. Manag."},{"key":"ref_64","doi-asserted-by":"crossref","first-page":"111","DOI":"10.1260\/1757-2223.6.2.111","article-title":"Innovation in Construction: A Critical Review and Future Research","volume":"6","author":"Xue","year":"2014","journal-title":"Int. J. Innov. Sci."},{"key":"ref_65","doi-asserted-by":"crossref","first-page":"121","DOI":"10.3992\/jgb.4.1.121","article-title":"Analysis of the design process of green children\u2019s hospitals: Focus on process modeling and lessons learned","volume":"4","author":"Bilec","year":"2009","journal-title":"J. Green Build."},{"key":"ref_66","doi-asserted-by":"crossref","first-page":"1080","DOI":"10.1016\/j.protcy.2014.10.122","article-title":"Project Management success in health\u2014The need of additional research in public health projects","volume":"16","author":"Santos","year":"2014","journal-title":"Proced. Technol."},{"key":"ref_67","doi-asserted-by":"crossref","first-page":"958","DOI":"10.1016\/j.ijproman.2013.10.015","article-title":"Competencies required of project managers at the design phase of mass house building projects","volume":"32","author":"Ahadzie","year":"2014","journal-title":"Int. J. Proj. Manag."},{"key":"ref_68","doi-asserted-by":"crossref","first-page":"311","DOI":"10.1109\/SURV.2011.032211.00087","article-title":"A Survey of Large Scale Data Management Approaches in Cloud Environments","volume":"13","author":"Sakr","year":"2011","journal-title":"IEEE Commun. Surv. Tutor."},{"key":"ref_69","doi-asserted-by":"crossref","first-page":"61","DOI":"10.1080\/01446193.2016.1178392","article-title":"The relationship between motivations of architectural designers and environmentally sustainable construction design","volume":"34","author":"Murtagh","year":"2016","journal-title":"Constr. Manag. Econ."},{"key":"ref_70","doi-asserted-by":"crossref","first-page":"736","DOI":"10.1108\/ECAM-07-2016-0159","article-title":"Managing the expectations of external stakeholders in construction projects","volume":"24","author":"Chan","year":"2017","journal-title":"Eng. Constr. Arch. Manag."},{"key":"ref_71","doi-asserted-by":"crossref","first-page":"348","DOI":"10.1016\/j.scs.2017.03.027","article-title":"Effect of lean tools to control external environment risks of construction projects","volume":"32","author":"Ansah","year":"2017","journal-title":"Sustain. Cities Soc."},{"key":"ref_72","first-page":"384","article-title":"PESTLE technique\u2014A tool to identify external risks in construction projects","volume":"3","author":"Rastogi","year":"2016","journal-title":"Int. Res. J. Eng. Technol."},{"key":"ref_73","doi-asserted-by":"crossref","first-page":"564","DOI":"10.1016\/j.ijproman.2014.08.004","article-title":"An exploratory study of understanding project risk management from the perspective of national culture","volume":"33","author":"Liu","year":"2015","journal-title":"Int. J. Project Manag."},{"key":"ref_74","doi-asserted-by":"crossref","first-page":"24","DOI":"10.1016\/j.ijproman.2005.06.001","article-title":"Environmental factors and work performance of project managers in the construction industry","volume":"24","author":"Pheng","year":"2006","journal-title":"Int. J. Proj. Manag."},{"key":"ref_75","doi-asserted-by":"crossref","first-page":"404","DOI":"10.1108\/09699980410570166","article-title":"A study on project success factors in large construction projects in Vietnam","volume":"11","author":"Nguyen","year":"2004","journal-title":"Eng. Constr. Archit. Manag."},{"key":"ref_76","doi-asserted-by":"crossref","first-page":"395","DOI":"10.1080\/01446190801905406","article-title":"Problems causing delays in major construction projects in Thailand","volume":"26","author":"Toor","year":"2008","journal-title":"Constr. Manag. Econ."},{"key":"ref_77","doi-asserted-by":"crossref","first-page":"228","DOI":"10.1016\/j.ijproman.2009.05.005","article-title":"Beyond the \u2018iron triangle\u2019: Stakeholder perception of key performance indicators (KPIs) for large-scale public sector development projects","volume":"28","author":"Ogunlana","year":"2010","journal-title":"Int. J. Proj. Manag."},{"key":"ref_78","doi-asserted-by":"crossref","first-page":"337","DOI":"10.1016\/S0263-7863(98)00069-6","article-title":"Project management: Cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria","volume":"17","author":"Atkinson","year":"1999","journal-title":"Int. J. Proj. Manag."},{"key":"ref_79","doi-asserted-by":"crossref","first-page":"57","DOI":"10.1177\/875697280403500407","article-title":"The influence of a project performance measurement system on the success of a contract for maintaining motorways and trunk roads","volume":"35","author":"Bryde","year":"2004","journal-title":"Proj. Manag. J."},{"key":"ref_80","doi-asserted-by":"crossref","first-page":"22","DOI":"10.1109\/TEM.1987.6498856","article-title":"Critical factors in successful project implementation","volume":"34","author":"Pinto","year":"1987","journal-title":"IEEE Trans. Eng. Manag."},{"key":"ref_81","unstructured":"Freeman, M., and Beale, P. (1992). Measuring Project Success, Project Management Institute."},{"key":"ref_82","doi-asserted-by":"crossref","first-page":"189","DOI":"10.1016\/j.ijproman.2013.02.006","article-title":"Different stakeholder groups and their perceptions of project success","volume":"32","author":"Davis","year":"2014","journal-title":"Int. J. Proj. Manag."},{"key":"ref_83","doi-asserted-by":"crossref","first-page":"231","DOI":"10.1016\/j.ijproman.2017.08.002","article-title":"The management of the project-based organization: A personal reflection","volume":"36","author":"Turner","year":"2018","journal-title":"Int. J. Proj. Manag."},{"key":"ref_84","doi-asserted-by":"crossref","first-page":"411","DOI":"10.1016\/S0263-7863(02)00112-6","article-title":"The Project Excellence Model\u00ae: Linking success criteria and critical success factors","volume":"21","author":"Westerveld","year":"2003","journal-title":"Int. J. Proj. Manag."},{"key":"ref_85","doi-asserted-by":"crossref","first-page":"21","DOI":"10.3846\/1648715X.2013.787128","article-title":"Evaluation of critical success factors for construction projects\u2014An empirical study in Lithuania","volume":"17","author":"Banaitis","year":"2013","journal-title":"Int. J. Strateg. Prop. Manag."},{"key":"ref_86","doi-asserted-by":"crossref","first-page":"67","DOI":"10.3846\/20294913.2015.1074129","article-title":"Analysis of project success factors in construction industry","volume":"24","author":"Gunduz","year":"2018","journal-title":"Technol. Econ. Dev. Econ."},{"key":"ref_87","unstructured":"Saaty, T.L. (1988). Mathematical Models for Decision Support, Springer."},{"key":"ref_88","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.ejor.2004.04.028","article-title":"Analytic hierarchy process: An overview of applications","volume":"169","author":"Vaidya","year":"2006","journal-title":"Eur. J. Oper. Res."},{"key":"ref_89","first-page":"2403","article-title":"Analytic hierarchy process decision making algorithm","volume":"11","author":"Ansah","year":"2015","journal-title":"Glob. J. Pure Appl. Math."},{"key":"ref_90","first-page":"10","article-title":"Optimal decision making approach for selecting effort estimation model","volume":"39","author":"Zamani","year":"2013","journal-title":"Int. J. Mach. Learn. Comput."},{"key":"ref_91","first-page":"7","article-title":"Analytical Hierarchy Process (AHP) Approach on consumers preferences for selecting telecom operators in Bangladesh","volume":"2","author":"Alam","year":"2012","journal-title":"Inform. Knowl. Manag."},{"key":"ref_92","doi-asserted-by":"crossref","first-page":"1164","DOI":"10.1061\/(ASCE)CO.1943-7862.0000382","article-title":"Identification of risk paths in international construction projects using structural equation modeling","volume":"137","author":"Eybpoosh","year":"2011","journal-title":"J. Constr. Eng. Manag."},{"key":"ref_93","doi-asserted-by":"crossref","first-page":"160","DOI":"10.1016\/j.ssci.2015.03.010","article-title":"Analyzing safety behaviors of temporary construction workers using structural equation modeling","volume":"77","author":"Seo","year":"2015","journal-title":"Saf. Sci."},{"key":"ref_94","doi-asserted-by":"crossref","first-page":"358","DOI":"10.1037\/h0036316","article-title":"When is a correlation matrix appropriate for factor analysis? Some decision rules","volume":"81","author":"Dziuban","year":"1974","journal-title":"Psychol. Bull."},{"key":"ref_95","unstructured":"Mallery, P., and George, D. (2000). SPSS for Windows Step by Step, Allyn & Bacon, Inc."},{"key":"ref_96","unstructured":"Foster, J.J. (1998). Data Analysis Using SPSS for Windows-Version 6: A Beginner\u2019s Guide, Sage."},{"key":"ref_97","doi-asserted-by":"crossref","first-page":"89","DOI":"10.1111\/j.1745-3984.1979.tb00090.x","article-title":"An empirical comparison of coefficient alpha, Guttman\u2019s lambda-2, and MSPLIT maximized split-half reliability estimates","volume":"16","author":"Callender","year":"1979","journal-title":"J. Educ. Meas."},{"key":"ref_98","unstructured":"Guilford, J.P. (1954). Psychometric Methods, McGraw-Hill."},{"key":"ref_99","doi-asserted-by":"crossref","unstructured":"Golden, B.L., Wasil, E.A., and Harker, P.T. (1989). The Analytic Hierarchy Process. Applications and Studies, Springer.","DOI":"10.1007\/978-3-642-50244-6"},{"key":"ref_100","unstructured":"Schieg, M.W. (2010). Multiple Criteria Analysis of Construction Project Management, Vilnius Gediminas Technical University."},{"key":"ref_101","unstructured":"Cleland, D.I. (2007). Project Management: Strategic Design and Implementation, McGraw-Hill Education."},{"key":"ref_102","doi-asserted-by":"crossref","first-page":"277","DOI":"10.1080\/01446190600879125","article-title":"Stakeholder impact analysis in construction project management","volume":"25","author":"Olander","year":"2007","journal-title":"Constr. Manag. Econ."},{"key":"ref_103","doi-asserted-by":"crossref","first-page":"415","DOI":"10.1016\/j.respol.2010.10.011","article-title":"Project risk management and design flexibility: Analysing a case and conditions of complementarity","volume":"40","author":"Gil","year":"2011","journal-title":"Res. Policy"},{"key":"ref_104","doi-asserted-by":"crossref","first-page":"85","DOI":"10.1080\/01446190010003425","article-title":"Performance management in construction: A conceptual framework","volume":"19","author":"Kagioglou","year":"2001","journal-title":"Constr. Manag. Econ."},{"key":"ref_105","doi-asserted-by":"crossref","first-page":"102803","DOI":"10.1016\/j.scs.2021.102803","article-title":"COVID-19 recovery for the Nigerian construction sites: The role of the fourth industrial revolution technologies","volume":"69","author":"Ebekozien","year":"2021","journal-title":"Sustain. Cities Soc."},{"key":"ref_106","doi-asserted-by":"crossref","first-page":"455","DOI":"10.1061\/(ASCE)ME.1943-5479.0000157","article-title":"Analysis of Construction Innovation Process at Project Level","volume":"29","author":"Ozorhon","year":"2013","journal-title":"J. Manag. Eng."},{"key":"ref_107","doi-asserted-by":"crossref","first-page":"43","DOI":"10.1080\/01446199500000006","article-title":"Innovation in the construction industry: The dominant role of the environment","volume":"13","author":"Pries","year":"1995","journal-title":"Constr. Manag. Econ."},{"key":"ref_108","doi-asserted-by":"crossref","unstructured":"Maina, A.N., Kimani, J., and Anzala, O. (2016). Prevalence and risk factors of three curable sexually transmitted infections among women in Nairobi, Kenya. BMC Res. Notes, 9.","DOI":"10.1186\/s13104-016-1990-x"},{"key":"ref_109","doi-asserted-by":"crossref","first-page":"012067","DOI":"10.1088\/1757-899X\/667\/1\/012067","article-title":"Innovation incentive mechanism in the construction industry","volume":"Volume 667","author":"Nikityuk","year":"2019","journal-title":"IOP Conference Series: Materials Science and Engineering, 25 April 2019, Irkutsk, Russian Federation"},{"key":"ref_110","doi-asserted-by":"crossref","first-page":"147","DOI":"10.1108\/02632770710729737","article-title":"Clients\u2019 goals and the construction project management process","volume":"25","author":"Lindahl","year":"2007","journal-title":"Facilities"},{"key":"ref_111","doi-asserted-by":"crossref","first-page":"1433","DOI":"10.1016\/j.ijproman.2016.07.008","article-title":"How the public reacts to social impacts in construction projects? A structural equation modeling study","volume":"34","author":"Wang","year":"2016","journal-title":"Int. J. Project Manag."},{"key":"ref_112","doi-asserted-by":"crossref","first-page":"25","DOI":"10.1108\/EJIM-01-2013-0010","article-title":"Integrating risk management in the innovation project","volume":"17","author":"Bowers","year":"2014","journal-title":"Eur. J. Innov. Manag."},{"key":"ref_113","unstructured":"Van Staveren, M.T. (2009). Risk, Innovation & Change: Design Propositions for Implementing Risk Management in Organizations, LAP Lambert Academic Publishing."},{"key":"ref_114","doi-asserted-by":"crossref","unstructured":"Murray, M., and Dainty, A. (2013). Corporate Social Responsibility in the Construction Industry, Routledge.","DOI":"10.4324\/9780203012338"},{"key":"ref_115","doi-asserted-by":"crossref","first-page":"323","DOI":"10.3200\/JOER.99.6.323-338","article-title":"Reporting structural equation modeling and confirmatory factor analysis results: A review","volume":"99","author":"Schreiber","year":"2006","journal-title":"J. Educ. Res."},{"key":"ref_116","unstructured":"Molwus, J.J., Erdogan, B., and Ogunlana, S.O. (2013). ICCREM 2013: Construction and Operation in the Context of Sustainability, American Society of Civil Engineers."},{"key":"ref_117","doi-asserted-by":"crossref","first-page":"2","DOI":"10.1108\/EBR-11-2018-0203","article-title":"When to use and how to report the results of PLS-SEM","volume":"31","author":"Hair","year":"2019","journal-title":"Eur. Bus. Rev."},{"key":"ref_118","first-page":"1","article-title":"One-tailed or two-tailed P values in PLS-SEM?","volume":"11","author":"Kock","year":"2015","journal-title":"Int. J. E-Collab."},{"key":"ref_119","doi-asserted-by":"crossref","first-page":"2","DOI":"10.1108\/IMDS-09-2015-0382","article-title":"Using PLS path modeling in new technology research: Updated guidelines","volume":"116","author":"Henseler","year":"2016","journal-title":"Ind. Manag. Data Syst."},{"key":"ref_120","doi-asserted-by":"crossref","first-page":"119347","DOI":"10.1016\/j.jclepro.2019.119347","article-title":"Barriers to the adoption of modular integrated construction: Systematic review and meta-analysis, integrated conceptual framework, and strategies","volume":"249","author":"Wuni","year":"2020","journal-title":"J. Clean. Prod."},{"key":"ref_121","doi-asserted-by":"crossref","first-page":"103264","DOI":"10.1016\/j.compind.2020.103264","article-title":"Peeking into the void: Digital twins for construction site logistics","volume":"121","author":"Greif","year":"2020","journal-title":"Comput. Ind."},{"key":"ref_122","doi-asserted-by":"crossref","first-page":"553","DOI":"10.1080\/01446190701821810","article-title":"A comparative study of factors affecting the external stakeholder management process","volume":"26","author":"Olander","year":"2008","journal-title":"Constr. Manag. Econ."},{"key":"ref_123","doi-asserted-by":"crossref","first-page":"123","DOI":"10.1016\/j.autcon.2012.09.007","article-title":"Evaluating stakeholder satisfaction during public participation in major infrastructure and construction projects: A fuzzy approach","volume":"29","author":"Li","year":"2013","journal-title":"Autom. Constr."},{"key":"ref_124","doi-asserted-by":"crossref","first-page":"319","DOI":"10.1080\/01446190320000000000","article-title":"Measuring construction project participant satisfaction","volume":"22","author":"Leung","year":"2004","journal-title":"Constr. Manag. Econ."}],"container-title":["Systems"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.mdpi.com\/2079-8954\/11\/7\/359\/pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,10,10]],"date-time":"2025-10-10T20:12:25Z","timestamp":1760127145000},"score":1,"resource":{"primary":{"URL":"https:\/\/www.mdpi.com\/2079-8954\/11\/7\/359"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2023,7,14]]},"references-count":124,"journal-issue":{"issue":"7","published-online":{"date-parts":[[2023,7]]}},"alternative-id":["systems11070359"],"URL":"https:\/\/doi.org\/10.3390\/systems11070359","relation":{},"ISSN":["2079-8954"],"issn-type":[{"value":"2079-8954","type":"electronic"}],"subject":[],"published":{"date-parts":[[2023,7,14]]}}}