{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,20]],"date-time":"2026-03-20T00:45:59Z","timestamp":1773967559712,"version":"3.50.1"},"reference-count":59,"publisher":"MDPI AG","issue":"9","license":[{"start":{"date-parts":[[2023,8,25]],"date-time":"2023-08-25T00:00:00Z","timestamp":1692921600000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0\/"}],"funder":[{"name":"Fundamental Research Funds for the Central Universities","award":["2022YJS050"],"award-info":[{"award-number":["2022YJS050"]}]},{"name":"Fundamental Research Funds for the Central Universities","award":["2021YJ111"],"award-info":[{"award-number":["2021YJ111"]}]},{"name":"State Key Laboratory for Track Technology of High-Speed Railway, China Academy of Railway Sciences","award":["2022YJS050"],"award-info":[{"award-number":["2022YJS050"]}]},{"name":"State Key Laboratory for Track Technology of High-Speed Railway, China Academy of Railway Sciences","award":["2021YJ111"],"award-info":[{"award-number":["2021YJ111"]}]}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Systems"],"abstract":"<jats:p>With the promotion of Engineering Procurement Construction mode in railway construction projects, collaborative management between design and construction has faced increasing challenges due to complexities of the participants and the various professional fields involved in railway EPC projects. This paper aims to analyze the issues present in the collaborative management of railway EPC project design and construction. Utilizing the social network analysis methodology combined with the Wuli\u2013Shili\u2013Renli (WSR) system methodology, a network model was established to explore relationships between design and construction management. This study investigates network-influencing factors and proposes targeted measures to enhance project management efficiency. The findings indicate that coordination and communication mechanisms, organization building, interface management systems and design management systems represent core network elements that significantly impact railway EPC collaborative management. These elements are closely related to other network factors. The research not only advances design and construction coordination theory, but it also introduces new ideas for engineering practice.<\/jats:p>","DOI":"10.3390\/systems11090443","type":"journal-article","created":{"date-parts":[[2023,8,25]],"date-time":"2023-08-25T08:42:20Z","timestamp":1692952940000},"page":"443","update-policy":"https:\/\/doi.org\/10.3390\/mdpi_crossmark_policy","source":"Crossref","is-referenced-by-count":11,"title":["Research on Collaborative Mechanisms of Railway EPC Project Design and Construction from the Perspective of Social Network Analysis"],"prefix":"10.3390","volume":"11","author":[{"ORCID":"https:\/\/orcid.org\/0009-0007-2450-6021","authenticated-orcid":false,"given":"Zilu","family":"Fan","sequence":"first","affiliation":[{"name":"School of Economics and Management, Beijing Jiaotong University, Beijing 100044, China"}]},{"given":"Yuming","family":"Liu","sequence":"additional","affiliation":[{"name":"School of Economics and Management, Beijing Jiaotong University, Beijing 100044, China"}]},{"given":"Yaxin","family":"Li","sequence":"additional","affiliation":[{"name":"School of Economics and Management, Beijing Jiaotong University, Beijing 100044, China"}]}],"member":"1968","published-online":{"date-parts":[[2023,8,25]]},"reference":[{"key":"ref_1","doi-asserted-by":"crossref","first-page":"04020008","DOI":"10.1061\/(ASCE)CO.1943-7862.0001766","article-title":"Joint Contract-Function Effects on BIM-Enabled EPC Project Performance","volume":"146","author":"Lee","year":"2020","journal-title":"J. Constr. Eng. Manag."},{"key":"ref_2","doi-asserted-by":"crossref","first-page":"3725254","DOI":"10.1155\/2020\/3725254","article-title":"Profit Sharing Mechanism of Large EPC Project considering the Behavior of Fairness Concern","volume":"2020","author":"Li","year":"2020","journal-title":"Adv. Civ. Eng."},{"key":"ref_3","doi-asserted-by":"crossref","first-page":"22","DOI":"10.1016\/j.autcon.2013.09.008","article-title":"Schedule control model for linear projects based on linear scheduling method and constraint programming","volume":"37","author":"Tang","year":"2014","journal-title":"Autom. Constr."},{"key":"ref_4","doi-asserted-by":"crossref","first-page":"2946158","DOI":"10.1155\/2019\/2946158","article-title":"Application of BP Neural Network Model in Risk Evaluation of Railway Construction","volume":"2019","author":"Yang","year":"2019","journal-title":"Complexity"},{"key":"ref_5","doi-asserted-by":"crossref","unstructured":"Lesniak, A., and Janowiec, F. (2019). Risk Assessment of Additional Works in Railway Construction Investments Using the Bayes Network. Sustainability, 11.","DOI":"10.3390\/su11195388"},{"key":"ref_6","doi-asserted-by":"crossref","first-page":"1244","DOI":"10.1061\/(ASCE)CO.1943-7862.0000704","article-title":"Quality Costs in Construction: Case of Qom Monorail Project in Iran","volume":"139","author":"Jafari","year":"2013","journal-title":"J. Constr. Eng. Manag."},{"key":"ref_7","doi-asserted-by":"crossref","first-page":"833","DOI":"10.1016\/j.eng.2019.06.007","article-title":"Challenges and Countermeasures for Construction Safety during the Sichuan-Tibet Railway Project","volume":"5","author":"Lu","year":"2019","journal-title":"Engineering"},{"key":"ref_8","doi-asserted-by":"crossref","first-page":"04021094","DOI":"10.1061\/JTEPBS.0000610","article-title":"System Modeling and Risk Analysis of the Sichuan-Tibet Railway Project","volume":"147","author":"Yu","year":"2021","journal-title":"J. Transp. Eng. Part A-Syst."},{"key":"ref_9","doi-asserted-by":"crossref","first-page":"1359","DOI":"10.1139\/cjce-2019-0549","article-title":"Identification of critical risks in international engineering procurement construction projects of Chinese contractors from the network perspective","volume":"47","author":"Ganbat","year":"2020","journal-title":"Can. J. Civ. Eng."},{"key":"ref_10","doi-asserted-by":"crossref","first-page":"1009","DOI":"10.1108\/ECAM-10-2017-0219","article-title":"Phase-based analysis of key cost and schedule performance causes and preventive strategies: Research trends and implications","volume":"25","author":"Habibi","year":"2018","journal-title":"Eng. Constr. Archit. Manag."},{"key":"ref_11","doi-asserted-by":"crossref","first-page":"2533","DOI":"10.1007\/s40996-023-01040-x","article-title":"Evaluating the Engineering-Procurement-Construction Approach and Whole Process Engineering Consulting Mode in Construction Projects","volume":"47","author":"Shen","year":"2023","journal-title":"Iran. J. Sci. Technol.-Trans. Civ. Eng."},{"key":"ref_12","doi-asserted-by":"crossref","unstructured":"Nikjow, M.A., Liang, L., Qi, X.J., Sepasgozar, S.M.E., and Chileshe, N. (2021). Triggers of Delays in International Projects Using Engineering Procurement and Construction Delivery Methods in the Belt and Road Initiative: Case Study of a High-Speed Railway Projects. Sustainability, 13.","DOI":"10.3390\/su13179503"},{"key":"ref_13","doi-asserted-by":"crossref","unstructured":"Wang, Q.E., and Wang, J. (2022). Research on Key Risk Factors and Risk Transmission Path of Procurement in International Engineering Procurement Construction Project. Buildings, 12.","DOI":"10.3390\/buildings12050534"},{"key":"ref_14","doi-asserted-by":"crossref","unstructured":"Kim, M.H., Lee, E.B., and Choi, H.S. (2019). A Forecast and Mitigation Model of Construction Performance by Assessing Detailed Engineering Maturity at Key Milestones for Offshore EPC Mega-Projects. Sustainability, 11.","DOI":"10.3390\/su11051256"},{"key":"ref_15","doi-asserted-by":"crossref","first-page":"04017061","DOI":"10.1061\/(ASCE)CO.1943-7862.0001351","article-title":"Enhancing Trust-Based Interface Management in International Engineering-Procurement-Construction Projects","volume":"143","author":"Shen","year":"2017","journal-title":"J. Constr. Eng. Manag."},{"key":"ref_16","doi-asserted-by":"crossref","first-page":"04022182","DOI":"10.1061\/JCEMD4.COENG-12052","article-title":"Research on the BIM Application Mechanism of Engineering-Procurement-Construction Projects Based on a Tripartite Evolutionary Game","volume":"149","author":"Sun","year":"2023","journal-title":"J. Constr. Eng. Manag."},{"key":"ref_17","unstructured":"Wang, M. (2023, May 21). The Research of Epc Total Project Contract with the Design as the Main Body. Available online: https:\/\/www.proquest.com\/dissertations-theses\/research-epc-total-project-contract-with-design\/docview\/1874977292\/se-2?accountid=32743."},{"key":"ref_18","unstructured":"Zhao, Z.Z., Meng, Q.C., and Pang, N.S. (2020, January 7\u20139). Research on Construction Risk Evaluation of EPC Project of Transmission and Distribution Engineering Based on Design Enterprise. Proceedings of the International Conference on Energy, Environment and Bioengineering (ICEEB), Electronic Network, Xi\u2019an, China."},{"key":"ref_19","unstructured":"Zhang, J.W., Wang, F.S., Zhou, R.S., and Liu, B. (2013, January 21\u201323). Purchase Research on Supply Chain for EPC Project. Proceedings of the International Conference on Materials, Transportation and Environmental Engineering (CMTEE 2013), Taichung, Taiwan."},{"key":"ref_20","doi-asserted-by":"crossref","first-page":"05022012","DOI":"10.1061\/(ASCE)ME.1943-5479.0001088","article-title":"Postaward Construction and Contract Management o f Engineering, Procurement, and Construction Hydropower Projects: Two Case Studies from Uganda","volume":"38","author":"Mutikanga","year":"2022","journal-title":"J. Manag. Eng."},{"key":"ref_21","first-page":"24","article-title":"HS2 Old Oak Common: Collaborative delivery of the UK\u2019s largest new-build station","volume":"176","author":"Botelle","year":"2022","journal-title":"Proc. Inst. Civ. Eng. Civ. Eng."},{"key":"ref_22","doi-asserted-by":"crossref","first-page":"04022026","DOI":"10.1061\/(ASCE)CO.1943-7862.0002270","article-title":"Identifying Effective Collaborative Behaviors in Building Information Modeling-Enabled Construction Projects","volume":"148","author":"Chen","year":"2022","journal-title":"J. Constr. Eng. Manag."},{"key":"ref_23","doi-asserted-by":"crossref","unstructured":"Khouja, A., Lehoux, N., Cimon, Y., and Cloutier, C. (2021). Collaborative Interorganizational Relationships in a Project-Based Industry. Buildings, 11.","DOI":"10.3390\/buildings11110502"},{"key":"ref_24","doi-asserted-by":"crossref","first-page":"27","DOI":"10.1007\/s12205-022-0465-y","article-title":"Research on Determining Resource Utilization Rates of Regional Construction and Demolition Waste from the Perspective of Collaborative Governance","volume":"27","author":"Shen","year":"2023","journal-title":"Ksce J. Civ. Eng."},{"key":"ref_25","doi-asserted-by":"crossref","first-page":"04021057","DOI":"10.1061\/(ASCE)ME.1943-5479.0000953","article-title":"Collaborative Planning Index: A Novel Comprehensive Benchmark for Collaboration in Construction Projects","volume":"37","author":"Elsayegh","year":"2021","journal-title":"J. Manag. Eng."},{"key":"ref_26","doi-asserted-by":"crossref","first-page":"04021023","DOI":"10.1061\/(ASCE)CO.1943-7862.0002031","article-title":"Holistic Study and Analysis of Factors Affecting Collaborative Planning in Construction","volume":"147","author":"Elsayegh","year":"2021","journal-title":"J. Constr. Eng. Manag."},{"key":"ref_27","doi-asserted-by":"crossref","first-page":"4299756","DOI":"10.1155\/2022\/4299756","article-title":"Application of Cloud Computing Combined with GIS Virtual Reality in Construction Process of Building Steel Structure","volume":"2022","author":"Dong","year":"2022","journal-title":"Math. Probl. Eng."},{"key":"ref_28","doi-asserted-by":"crossref","first-page":"104149","DOI":"10.1016\/j.autcon.2022.104149","article-title":"Dynamic networks for resilience-driven management of infrastructure projects","volume":"136","author":"Gondia","year":"2022","journal-title":"Autom. Constr."},{"key":"ref_29","doi-asserted-by":"crossref","first-page":"950","DOI":"10.1080\/15732479.2022.2038642","article-title":"Flexibility and adaptability within the context of decision-making in infrastructure management","volume":"18","year":"2022","journal-title":"Struct. Infrastruct. Eng."},{"key":"ref_30","doi-asserted-by":"crossref","first-page":"721","DOI":"10.1108\/IJMPB-02-2022-0035","article-title":"Improved reliability in planning large-scale infrastructure project delivery through Alliancing","volume":"15","author":"Walker","year":"2022","journal-title":"Int. J. Manag. Proj. Bus."},{"key":"ref_31","doi-asserted-by":"crossref","unstructured":"Rosok, O.P., de Bruijne, M.L.C., and Veeneman, W.W. (2023). Dealing with Cross-Sectoral Uncertainty: A Case Study on Governing Uncertainty for Infrastructures in Transition. Sustainability, 15.","DOI":"10.3390\/su15043750"},{"key":"ref_32","doi-asserted-by":"crossref","first-page":"595","DOI":"10.1108\/IJMPB-03-2021-0072","article-title":"Praxis of knowledge-management and trust-based collaborative relationships in project delivery: Mediating role of a project facilitator","volume":"15","author":"Tokede","year":"2022","journal-title":"Int. J. Manag. Proj. Bus."},{"key":"ref_33","doi-asserted-by":"crossref","first-page":"1022","DOI":"10.1016\/j.ijproman.2015.02.001","article-title":"Managing collaborative research projects: A synthesis of project management literature and directives for future research","volume":"33","author":"Lippe","year":"2015","journal-title":"Int. J. Proj. Manag."},{"key":"ref_34","doi-asserted-by":"crossref","first-page":"433","DOI":"10.1111\/mice.12839","article-title":"Mountain railway alignment optimization integrating layouts of large-scale auxiliary construction projects","volume":"38","author":"Song","year":"2023","journal-title":"Comput. Aided Civ. Infrastruct. Eng."},{"key":"ref_35","first-page":"5336591","article-title":"Study on Design Optimization in Major Railway Projects with Fair Preference Based on Stackelberg Game","volume":"2022","author":"Liu","year":"2022","journal-title":"Math. Probl. Eng."},{"key":"ref_36","doi-asserted-by":"crossref","first-page":"05022009","DOI":"10.1061\/(ASCE)ME.1943-5479.0001062","article-title":"Assessing Safety Risk Management Performance in Chinese Subway Construction Projects: A Multistakeholder Perspective","volume":"38","author":"Zhang","year":"2022","journal-title":"J. Manag. Eng."},{"key":"ref_37","doi-asserted-by":"crossref","first-page":"819","DOI":"10.3233\/JIFS-169375","article-title":"Analysis of collaborative design and construction collaborative mechanism of cloud bim platform construction project based on green computing technology","volume":"34","author":"Zheng","year":"2018","journal-title":"J. Intell. Fuzzy Syst."},{"key":"ref_38","first-page":"41","article-title":"Benefit-Cost Analysis of BIM Application\u2014Case Study on Osong Test Line Railway","volume":"8","author":"Kim","year":"2018","journal-title":"KIBIM Mag."},{"key":"ref_39","doi-asserted-by":"crossref","unstructured":"Andric, J.M., Wang, J.Y., and Zhong, R.Y. (2019). Identifying the Critical Risks in Railway Projects Based on Fuzzy and Sensitivity Analysis: A Case Study of Belt and Road Projects. Sustainability, 11.","DOI":"10.3390\/su11051302"},{"key":"ref_40","doi-asserted-by":"crossref","unstructured":"Cheng, J.J., Huang, L., Jiang, L.X., Chen, J.H., Chen, W.W., and He, Y.P. (2023). Fostering Knowledge Collaboration in Construction Projects: The Role of BIM Application. Buildings, 13.","DOI":"10.3390\/buildings13030812"},{"key":"ref_41","doi-asserted-by":"crossref","first-page":"83","DOI":"10.1016\/j.autcon.2014.10.002","article-title":"4D CAD models to support the coordination of construction activities between contractors","volume":"49","author":"Trebbe","year":"2015","journal-title":"Autom. Constr."},{"key":"ref_42","doi-asserted-by":"crossref","first-page":"417","DOI":"10.1007\/s12205-017-1342-y","article-title":"Collaborative innovation in construction project: A social network perspective","volume":"22","author":"Xue","year":"2018","journal-title":"Ksce J. Civ. Eng."},{"key":"ref_43","doi-asserted-by":"crossref","first-page":"205","DOI":"10.1108\/SCM-10-2014-0331","article-title":"Coordinating collaboration in contractually different complex construction projects","volume":"20","author":"Lavikka","year":"2015","journal-title":"Supply Chain. Manag. Int. J."},{"key":"ref_44","doi-asserted-by":"crossref","unstructured":"Gao, S.C., Song, X.Y., and Ding, R.G. (2019, January 17\u201319). Dynamic Agent-Based Simulation of Information Transfer in Collaborative Project Network. Proceedings of the ASCE International Conference on Computing in Civil Engineering (i3CE), Georgia Inst Technol, Atlanta, GA, USA.","DOI":"10.1061\/9780784482421.076"},{"key":"ref_45","unstructured":"Gu, J., and Zhu, Z.C. (1995). The Wu-Li Shi-Li Ren-Li Approach (WSR): An Oriental Systems Methodology, The University of Hull Press."},{"key":"ref_46","doi-asserted-by":"crossref","first-page":"11","DOI":"10.1023\/A:1009567421256","article-title":"Knowing Wuli, sensing Shili, caring for Renli: Methodology of the WSR approach","volume":"13","author":"Gu","year":"2000","journal-title":"Syst. Pract. Action Res."},{"key":"ref_47","doi-asserted-by":"crossref","first-page":"233","DOI":"10.1108\/JKM-02-2016-0071","article-title":"Knowledge strategy planning: An integrated approach to manage uncertainty, turbulence, and dynamics","volume":"21","author":"Bolisani","year":"2017","journal-title":"J. Knowl. Manag."},{"key":"ref_48","doi-asserted-by":"crossref","first-page":"18","DOI":"10.1108\/IJES-11-2015-0024","article-title":"The nexus of transformational leadership of emergency services systems: Beyond the Wu-Shi-Ren (WSR)-Li paradigm","volume":"5","author":"Caro","year":"2016","journal-title":"Int. J. Emerg. Serv."},{"key":"ref_49","unstructured":"Pillet, M., Mignon, E., Boillon, R., and Horlogerie, C. (2008, January 9). L\u2019am\u00e9lioration Continue \u00e0 L\u2019europ\u00e9enne, ce N\u2019est Pas du Luxe. Proceedings of the CPIM de France 2008, Paris, France."},{"key":"ref_50","doi-asserted-by":"crossref","first-page":"734","DOI":"10.1016\/j.ejor.2014.07.042","article-title":"Foundation of nomology","volume":"240","author":"Brugha","year":"2015","journal-title":"Eur. J. Oper. Res."},{"key":"ref_51","doi-asserted-by":"crossref","first-page":"339","DOI":"10.1023\/A:1011311432199","article-title":"Systemic thinking in China: A meta-decision-making bridge to Western concepts","volume":"14","author":"Brugha","year":"2001","journal-title":"Syst. Pract. Action Res."},{"key":"ref_52","doi-asserted-by":"crossref","first-page":"253","DOI":"10.1080\/02604027.1999.9972742","article-title":"Systems approaches: Where the East meets the West?","volume":"53","author":"Zhu","year":"1999","journal-title":"World Futures J. Gen. Evol."},{"key":"ref_53","doi-asserted-by":"crossref","first-page":"197","DOI":"10.1007\/BF01059565","article-title":"Total systems intervention: A practical face to critical systems thinking","volume":"4","author":"Flood","year":"1991","journal-title":"Syst. Pract."},{"key":"ref_54","doi-asserted-by":"crossref","unstructured":"Shin, M.H., Lee, H.K., and Kim, H.Y. (2018). Benefit-Cost Analysis of Building Information Modeling (BIM) in a Railway Site. Sustainability, 10.","DOI":"10.20944\/preprints201810.0019.v1"},{"key":"ref_55","unstructured":"Rowlands, A.S. (2016). Effective Collaboration in Construction: The Importance of Managing Power. [Ph.D. Thesis, University of Birmingham]."},{"key":"ref_56","doi-asserted-by":"crossref","first-page":"1187","DOI":"10.3233\/JIFS-169413","article-title":"Network evolution simulation of cooperation relationship in two phase project of zhengzhou airport based on BIM","volume":"34","author":"Dong","year":"2018","journal-title":"J. Intell. Fuzzy Syst."},{"key":"ref_57","doi-asserted-by":"crossref","first-page":"04022178","DOI":"10.1061\/JCEMD4.COENG-12729","article-title":"Understanding the Relationship between Asset Specificity and Governance Choices in Construction Projects: Moderating Role of Uncertainty","volume":"149","author":"Luo","year":"2023","journal-title":"J. Constr. Eng. Manag."},{"key":"ref_58","doi-asserted-by":"crossref","first-page":"1537","DOI":"10.1016\/j.jclepro.2019.04.156","article-title":"Digital twin aided sustainability-based lifecycle management for railway turnout systems","volume":"228","author":"Kaewunruen","year":"2019","journal-title":"J. Clean. Prod."},{"key":"ref_59","doi-asserted-by":"crossref","first-page":"04016055","DOI":"10.1061\/(ASCE)ME.1943-5479.0000503","article-title":"Dynamics of Project-Based Collaborative Networks for BIM Implementation: Analysis Based on Stochastic Actor-Oriented Models","volume":"33","author":"Cao","year":"2017","journal-title":"J. Manag. Eng."}],"container-title":["Systems"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.mdpi.com\/2079-8954\/11\/9\/443\/pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,10,10]],"date-time":"2025-10-10T20:39:06Z","timestamp":1760128746000},"score":1,"resource":{"primary":{"URL":"https:\/\/www.mdpi.com\/2079-8954\/11\/9\/443"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2023,8,25]]},"references-count":59,"journal-issue":{"issue":"9","published-online":{"date-parts":[[2023,9]]}},"alternative-id":["systems11090443"],"URL":"https:\/\/doi.org\/10.3390\/systems11090443","relation":{},"ISSN":["2079-8954"],"issn-type":[{"value":"2079-8954","type":"electronic"}],"subject":[],"published":{"date-parts":[[2023,8,25]]}}}