{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,3]],"date-time":"2026-03-03T16:33:47Z","timestamp":1772555627892,"version":"3.50.1"},"reference-count":74,"publisher":"MDPI AG","issue":"12","license":[{"start":{"date-parts":[[2024,12,18]],"date-time":"2024-12-18T00:00:00Z","timestamp":1734480000000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0\/"}],"funder":[{"DOI":"10.13039\/501100001659","name":"Deutsche Forschungsgemeinschaft (DFG, German Research Foundation)","doi-asserted-by":"publisher","award":["471703091."],"award-info":[{"award-number":["471703091."]}],"id":[{"id":"10.13039\/501100001659","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Systems"],"abstract":"<jats:p>Manufacturing companies are increasingly challenged to deliver customizable products with shorter time to market and higher quality while adhering to sustainability requirements. To meet these challenges, the frequency and importance of production ramp-ups will increase in the future. However, most ramp-ups still fail to meet targets due to unpredictable equipment failures, operator errors, and system complexity. We propose a system dynamics model that captures the unique dynamics of ramp-up phases by integrating stability and disturbance factors that influence the key performance indicators overall equipment effectiveness, process capability, and production output. A systematic literature review informed the identification of stability factors, which were validated through expert interviews in the automotive industry. Our system dynamic simulation results indicate that control factors realistically influence production system behaviour during different ramp-up phases. Despite some limitations regarding the effects of maintenance personnel and engineering changes on key performance indicators, our model effectively simulates realistic ramp-up behaviour. The findings highlight the need for tailored models that consider specific ramp-up contexts and emphasize the importance of data acquisition for enhanced performance prognosis in future research.<\/jats:p>","DOI":"10.3390\/systems12120575","type":"journal-article","created":{"date-parts":[[2024,12,18]],"date-time":"2024-12-18T11:17:22Z","timestamp":1734520642000},"page":"575","update-policy":"https:\/\/doi.org\/10.3390\/mdpi_crossmark_policy","source":"Crossref","is-referenced-by-count":1,"title":["A System Dynamics Stability Model for Discrete Production Ramp-Up"],"prefix":"10.3390","volume":"12","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-2469-3126","authenticated-orcid":false,"given":"Julian","family":"Haller","sequence":"first","affiliation":[{"name":"Laboratory for Machine Tools and Production Engineering (WZL), RWTH Aachen University, 52074 Aachen, Germany"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0009-0002-6966-2267","authenticated-orcid":false,"given":"Bharath","family":"Kumar","sequence":"additional","affiliation":[{"name":"Laboratory for Machine Tools and Production Engineering (WZL), RWTH Aachen University, 52074 Aachen, Germany"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0001-5976-5655","authenticated-orcid":false,"given":"Amon","family":"G\u00f6ppert","sequence":"additional","affiliation":[{"name":"Laboratory for Machine Tools and Production Engineering (WZL), RWTH Aachen University, 52074 Aachen, Germany"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Robert H.","family":"Schmitt","sequence":"additional","affiliation":[{"name":"Laboratory for Machine Tools and Production Engineering (WZL), RWTH Aachen University, 52074 Aachen, Germany"},{"name":"Fraunhofer Institute for Production Technology IPT, 52074 Aachen, Germany"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"1968","published-online":{"date-parts":[[2024,12,18]]},"reference":[{"key":"ref_1","doi-asserted-by":"crossref","first-page":"1015","DOI":"10.1016\/j.promfg.2018.10.085","article-title":"Industrie 4.0 in production ramp-up management","volume":"17","author":"Dombrowski","year":"2018","journal-title":"Procedia Manuf."},{"key":"ref_2","doi-asserted-by":"crossref","first-page":"14","DOI":"10.1016\/j.ijpe.2012.03.002","article-title":"The mass customization decade: An updated review of the literature","volume":"138","author":"Fogliatto","year":"2012","journal-title":"Int. J. Prod. Econ."},{"key":"ref_3","doi-asserted-by":"crossref","first-page":"108629","DOI":"10.1016\/j.ijpe.2022.108629","article-title":"On the effect of upgradable products design on circular economy","volume":"254","author":"Zikopoulos","year":"2022","journal-title":"Int. J. Prod. Econ."},{"key":"ref_4","doi-asserted-by":"crossref","first-page":"6002","DOI":"10.1080\/00207543.2020.1798034","article-title":"Production planning for a ramp-up process in a multi-stage production system with worker learning and growth in demand","volume":"59","author":"Kim","year":"2021","journal-title":"Int. J. Prod. Res."},{"key":"ref_5","doi-asserted-by":"crossref","first-page":"178","DOI":"10.1108\/17410380910929619","article-title":"Information enabling production ramp-up","volume":"20","author":"Harlin","year":"2009","journal-title":"J. Manuf. Technol. Manag."},{"key":"ref_6","doi-asserted-by":"crossref","first-page":"70","DOI":"10.1109\/TEM.2003.822465","article-title":"The Copy-Exactly Ramp-Up Strategy: Trading-Off Learning with Process Change","volume":"51","author":"Terwiesch","year":"2004","journal-title":"IEEE Trans. Eng. Manag."},{"key":"ref_7","doi-asserted-by":"crossref","first-page":"103","DOI":"10.1007\/s11740-007-0011-2","article-title":"A controlling system based on cause\u2013effect relationships for the ramp-up of production systems","volume":"1","author":"Winkler","year":"2007","journal-title":"Prod. Eng."},{"key":"ref_8","doi-asserted-by":"crossref","first-page":"1264","DOI":"10.1080\/09537287.2013.817624","article-title":"A comparative study on production ramp-up: State-of-the-art and new challenges","volume":"25","author":"Surbier","year":"2014","journal-title":"Prod. Plan. Control"},{"key":"ref_9","doi-asserted-by":"crossref","first-page":"1063","DOI":"10.1007\/s10845-013-0839-6","article-title":"Learning and reuse of engineering ramp-up strategies for modular assembly systems","volume":"26","author":"Scrimieri","year":"2015","journal-title":"J. Intell. Manuf."},{"key":"ref_10","doi-asserted-by":"crossref","first-page":"93","DOI":"10.1016\/j.procir.2014.03.154","article-title":"Solution Principles for Managing Instabilities in Ramp-up","volume":"20","author":"Basse","year":"2014","journal-title":"Procedia CIRP"},{"key":"ref_11","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.cirpj.2015.05.007","article-title":"Complexity-oriented ramp-up of assembly systems","volume":"10","author":"Schuh","year":"2015","journal-title":"CIRP J. Manuf. Sci. Technol."},{"key":"ref_12","doi-asserted-by":"crossref","first-page":"6637","DOI":"10.1080\/00207543.2015.1064185","article-title":"Decision support models for production ramp-up: A systematic literature review","volume":"53","author":"Glock","year":"2015","journal-title":"Int. J. Prod. Res."},{"key":"ref_13","doi-asserted-by":"crossref","first-page":"635","DOI":"10.1016\/j.cirp.2021.05.008","article-title":"Evolution and future of manufacturing systems","volume":"70","author":"ElMaraghy","year":"2021","journal-title":"CIRP Ann."},{"key":"ref_14","unstructured":"Elstner, S., and Krause, D. (2012). Methodical approach for an e cient transition from development to production. DS 71, Proceedings of NordDesign 2012, the 9th NordDesign Conference, Aalborg, Denmark, 22\u201324 August 2012, Aarlborg University."},{"key":"ref_15","doi-asserted-by":"crossref","unstructured":"Biffl, S., Kropatschek, S., Kiesling, E., Meixner, K., and Luder, A. (2022, January 25\u201328). Risk-Driven Derivation of Operation Checklists from Mul-ti-Disciplinary Engineering Knowledge. Proceedings of the 2022 IEEE 20th International Conference on Industrial Informatics (INDIN), Perth, Australia.","DOI":"10.1109\/INDIN51773.2022.9976096"},{"key":"ref_16","doi-asserted-by":"crossref","first-page":"45","DOI":"10.1080\/10686967.2016.11918461","article-title":"Lean Application to Manufacturing Ramp-Up: A Conceptual Approach","volume":"23","author":"Christensen","year":"2016","journal-title":"Qual. Manag. J."},{"key":"ref_17","doi-asserted-by":"crossref","first-page":"387","DOI":"10.3139\/104.111733","article-title":"Lean Ramp-up: Ein Organisationsmodell f\u00fcr das Anlaufmanagement","volume":"112","author":"Dombrowski","year":"2017","journal-title":"Z. Wirtsch. Fabr."},{"key":"ref_18","doi-asserted-by":"crossref","unstructured":"Slattery, O., Trubetskaya, A., Moore, S., and McDermott, O. (2022). A Review of Lean Methodology Application and Its Integration in Medical Device New Product Introduction Processes. Processes, 10.","DOI":"10.3390\/pr10102005"},{"key":"ref_19","doi-asserted-by":"crossref","first-page":"85","DOI":"10.1016\/j.procir.2016.05.045","article-title":"On the Application of Agility Principles in Ramp-up Management: Approaching the Challenges in the High-end Powder Metallurgy Industry","volume":"51","author":"Kremsmayr","year":"2016","journal-title":"Procedia CIRP"},{"key":"ref_20","doi-asserted-by":"crossref","first-page":"620","DOI":"10.1016\/j.procir.2016.01.014","article-title":"Enabling Radical Innovation through Highly Iterative Product Expedition in Ramp up and Demonstration Factories","volume":"41","author":"Schuh","year":"2016","journal-title":"Procedia CIRP"},{"key":"ref_21","doi-asserted-by":"crossref","unstructured":"Rapp, S., Heimicke, J., Weber, J., and Albers, A. (2020, January 12\u201314). Development of strategic guidelines for agile Parts Ma- turity Management of engine subsystems in the automotive industry during series ramp-up. Proceedings of the DS 101: Proceedings of NordDesign 2020, Lyngby, Denmark. Available online: https:\/\/www.designsociety.org\/publication\/42552\/development+of+strategic+guidelines+for+agile+parts+ma-+turity+management+of+engine+subsystems+in+the+automotive+industry+during+series+ramp-up.","DOI":"10.35199\/NORDDESIGN2020.52"},{"key":"ref_22","doi-asserted-by":"crossref","first-page":"4","DOI":"10.1016\/j.mfglet.2020.09.010","article-title":"Agile ramp-up production as an advantage of highly iterative product development","volume":"27","author":"Bergs","year":"2021","journal-title":"Manuf. Lett."},{"key":"ref_23","doi-asserted-by":"crossref","first-page":"125","DOI":"10.1016\/j.cirpj.2023.06.002","article-title":"Managing agile ramp-up projects in manufacturing\u2014Status quo and recommendations","volume":"45","author":"Heraud","year":"2023","journal-title":"CIRP J. Manuf. Sci. Technol."},{"key":"ref_24","doi-asserted-by":"crossref","first-page":"461","DOI":"10.1016\/j.procir.2013.06.016","article-title":"Viable System Model for Manufacturing Execution Systems","volume":"7","author":"Brecher","year":"2013","journal-title":"Procedia CIRP"},{"key":"ref_25","doi-asserted-by":"crossref","first-page":"420","DOI":"10.1016\/j.procir.2014.10.058","article-title":"Concept of a Failures Management Assistance System for the Reaction on Unforeseeable Events during the Ramp-up","volume":"25","author":"Bauer","year":"2014","journal-title":"Procedia CIRP"},{"key":"ref_26","doi-asserted-by":"crossref","first-page":"267","DOI":"10.1016\/j.procs.2015.12.247","article-title":"Serious Games and Virtual Simulator for Automotive Manufacturing Education & Training","volume":"75","author":"Ordaz","year":"2015","journal-title":"Procedia Comput. Sci."},{"key":"ref_27","doi-asserted-by":"crossref","first-page":"44","DOI":"10.1016\/j.procir.2016.05.042","article-title":"Classification of Company-specific Influence Factors as Part of a Knowledge Management System for Ramp-up Projects","volume":"51","author":"Burgahn","year":"2016","journal-title":"Procedia CIRP"},{"key":"ref_28","unstructured":"Biffl, S., L\u00fcder, A., and Gerhard, D. (2017). A Deterministic Product Ramp-up Process: How to Integrate a Multi-Disciplinary Knowledge Base. Multi-Disciplinary Engineering for Cyber-Physical Production Systems: Data Models and Software Solutions for Handling Complex Engineering Projects, Springer."},{"key":"ref_29","unstructured":"Newnes, L. (2021). Integration Across Knowledge Boundaries During New Product Introduction. Advances in Transdisciplinary Engineering Ser, v.16, Transdisciplinary Engineering for Resilience, Proceedings of the 28th ISTE International Conference on Transdisciplinary Engineering, Virtual, 5\u20139 July 2021, IOS Press Incorporated. [1st ed.]."},{"key":"ref_30","doi-asserted-by":"crossref","first-page":"1628","DOI":"10.3182\/20120523-3-RO-2023.00288","article-title":"A Model-Free Reinforcement Learning Approach Using Monte Carlo Method for Production Ramp-Up Policy Improvement\u2014A Copy Exactly Test Case","volume":"45","author":"Doltsinis","year":"2012","journal-title":"IFAC Proc. Vol."},{"key":"ref_31","doi-asserted-by":"crossref","first-page":"1125","DOI":"10.1109\/TSMC.2013.2294155","article-title":"An MDP Model-Based Reinforcement Learning Approach for Production Station Ramp-Up Optimization: Q-Learning Analysis","volume":"44","author":"Doltsinis","year":"2014","journal-title":"IEEE Trans. Syst. Man Cybern. Syst."},{"key":"ref_32","doi-asserted-by":"crossref","first-page":"28","DOI":"10.5604\/01.3001.0012.4605","article-title":"Development of an automated assembly process supported with an artificial neural network","volume":"18","author":"Bobka","year":"2018","journal-title":"J. Mach. Eng."},{"key":"ref_33","doi-asserted-by":"crossref","unstructured":"Meiners, M., and Franke, J. (2020, January 20\u201322). Concept of a Machine Learning supported Cross-Machine Control Loop in the Ramp-Up of Large Series Manufacturing. Proceedings of the 2020 IEEE 11th International Conference on Mechanical and Intelligent Manufacturing Technologies (ICMIMT 2020), Cape Town, South Africa.","DOI":"10.1109\/ICMIMT49010.2020.9041239"},{"key":"ref_34","doi-asserted-by":"crossref","first-page":"395","DOI":"10.1007\/s11740-012-0394-6","article-title":"Simulation of personnel requirements during production ramp-up","volume":"6","author":"Lanza","year":"2012","journal-title":"Prod. Eng."},{"key":"ref_35","doi-asserted-by":"crossref","unstructured":"Schmid, F., Schneidewind, J., Wild, T., Galka, S., Schuhegger, L., and Vogl, T. (2022, January 11\u201314). Simulation Based Approach for Reconfiguration and Ramp Up Scenario Analysis in Factory Planning. Proceedings of the 2022 Winter Simulation Conference (WSC), Singapore.","DOI":"10.1109\/WSC57314.2022.10015310"},{"key":"ref_36","first-page":"343","article-title":"Intelligenter St\u00f6rungsassistent im Serienanlauf als Industrie 4.0-Anwendungsfall","volume":"4","author":"Spath","year":"2014","journal-title":"Industrie"},{"key":"ref_37","unstructured":"Haller, J., Kaven, L., G\u00f6ppert, A., and Schmitt, R.H. (2024). Industry 4.0 advancements in discrete production ramp-ups: A systematic literature review. J. Intell. Manuf., under revision."},{"key":"ref_38","unstructured":"Padr\u00f3n, M., Haller, J., and Schmitt, R.H. (2024). Production ramp-up in discrete manufacturing systems: A systematic literature review of modelling methods. Procedia CIRP, in print."},{"key":"ref_39","doi-asserted-by":"crossref","first-page":"1037","DOI":"10.1057\/palgrave.jors.2600946","article-title":"Industrial Dynamics","volume":"48","author":"Forrester","year":"1997","journal-title":"J. Oper. Res. Soc."},{"key":"ref_40","doi-asserted-by":"crossref","first-page":"71","DOI":"10.1136\/bmj.n71","article-title":"The PRISMA 2020 statement: An updated guideline for reporting systematic reviews","volume":"372","author":"Page","year":"2021","journal-title":"BMJ"},{"key":"ref_41","unstructured":"Pufall, A., Fransoo, J.C., and de Kok, A.G. (2007). What Determines Product Ramp-Up Performance?: A Review of Characteristics Based on a Case Study at Nokia Mobile Phones, Technische Universiteit Eindhoven. Beta, Research School for Operations Management and Logistics."},{"key":"ref_42","doi-asserted-by":"crossref","first-page":"94","DOI":"10.1111\/jpim.12194","article-title":"Breakeven Time on New Product Launches: An Investigation of the Drivers and Impact on Firm Performance","volume":"31","author":"Calantone","year":"2014","journal-title":"J. Prod. Innov. Manag."},{"key":"ref_43","doi-asserted-by":"crossref","unstructured":"Kampker, A., Kreiskother, K., Lutz, N., Gauckler, V., and Hehl, M. (2019, January 2\u20134). Re-Ramp-Up Management of Scalable Production Systems in the Automotive Industry. Proceedings of the 2019 8th International Conference on Industrial Technology and Management: ICITM 2019, Cambridge, UK.","DOI":"10.1109\/ICITM.2019.8710702"},{"key":"ref_44","doi-asserted-by":"crossref","first-page":"126","DOI":"10.1016\/j.procir.2014.05.043","article-title":"A New Framework to Evaluate the Process Capability of Production Technologies during Production Ramp-Up","volume":"20","author":"Stauder","year":"2014","journal-title":"Procedia CIRP"},{"key":"ref_45","doi-asserted-by":"crossref","first-page":"75","DOI":"10.1016\/j.procir.2019.03.014","article-title":"A Multivariate KPI-Based Method for Quality Assurance in Lithium-Ion-Battery Production","volume":"81","author":"Kornas","year":"2019","journal-title":"Procedia CIRP"},{"key":"ref_46","doi-asserted-by":"crossref","unstructured":"Lalic, B., Majstorovic, V., Marjanovic, U., von Cieminski, G., and Romero, D. (2020). Key Factors on Utilizing the Production System Design Phase for Increasing Operational Performance. Springer eBook Collection, Volume 592, Advances in Production Management Systems. Towards Smart and Digital Manufacturing, Proceedings of the IFIP WG 5.7 International Conference, APMS 2020, Novi Sad, Serbia, 30 August\u20133 September 2020, Springer International Publishing. [1st ed.]. Proceedings, Part II.","DOI":"10.1007\/978-3-030-57997-5"},{"key":"ref_47","doi-asserted-by":"crossref","first-page":"145","DOI":"10.1007\/s11740-022-01154-7","article-title":"Practice-oriented methodology for increasing production ramp-up efficiency in global production networks of SME","volume":"17","author":"Verhaelen","year":"2022","journal-title":"Prod. Eng."},{"key":"ref_48","doi-asserted-by":"crossref","first-page":"536","DOI":"10.1016\/j.ejor.2004.08.040","article-title":"Investing in product development and production capabilities: The crucial linkage between time-to-market and ramp-up time","volume":"171","author":"Carrillo","year":"2006","journal-title":"Eur. J. Oper. Res."},{"key":"ref_49","doi-asserted-by":"crossref","first-page":"5399","DOI":"10.1080\/00207543.2014.998788","article-title":"Modelling ramp-up curves to reflect learning: Improving capacity planning in secondary pharmaceutical production","volume":"53","author":"Hansen","year":"2015","journal-title":"Int. J. Prod. Res."},{"key":"ref_50","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/S0925-5273(00)00045-1","article-title":"Learning and process improvement during production ramp-up","volume":"70","author":"Terwiesch","year":"2001","journal-title":"Int. J. Prod. Econ."},{"key":"ref_51","doi-asserted-by":"crossref","first-page":"85","DOI":"10.1016\/j.ejor.2013.02.051","article-title":"A framework for performance measurement during production ramp-up of assembly stations","volume":"229","author":"Doltsinis","year":"2013","journal-title":"Eur. J. Oper. Res."},{"key":"ref_52","unstructured":"Safri, S.B., and Bazin, N.E.N.B. (2012, January 2\u20134). Conceptualization of factors influencing new product introduction within shorter product life cycle. Proceedings of the 2012 4th Conference on Data Mining and Optimization (DMO), Langkawi, Malaysia."},{"key":"ref_53","doi-asserted-by":"crossref","first-page":"2977","DOI":"10.4028\/www.scientific.net\/AMR.945-949.2977","article-title":"Research on Enterprises Knowledge Transfer under NPI Model Based on the System Dynamics","volume":"945\u2013949","author":"Xu","year":"2014","journal-title":"Adv. Mater. Res."},{"key":"ref_54","first-page":"364","article-title":"Two-stage decision support for production ramp-up","volume":"4","author":"Chen","year":"2011","journal-title":"Int. J. Agil. Syst. Manag."},{"key":"ref_55","doi-asserted-by":"crossref","first-page":"164","DOI":"10.1016\/j.procir.2014.03.005","article-title":"Procurement of Reconfigurable Assembly System a Justification for Effective Production Ramp-up Planning","volume":"16","author":"ElMaraghy","year":"2014","journal-title":"Procedia CIRP"},{"key":"ref_56","unstructured":"Stiller, S. (2015). Qualit\u00e4tsorientierte Produktionstheorie zur Beherrschung Dynamischer Produktrealisierender Prozesse. [Ph.D. Thesis, Apprimus]."},{"key":"ref_57","unstructured":"Ngo, Q.H. (2020). Gestaltungsmodell f\u00fcr Qualit\u00e4tsorientierte Produktionsanl\u00e4ufe, Apprimus."},{"key":"ref_58","doi-asserted-by":"crossref","unstructured":"Haller, J., Beckschulte, S., Padr\u00f3n, M., Ngo, Q.H., and Schmitt, R.H. (2023, January 17\u201320). Framework for Target Classification and Strategy Derivation during Production Ramp-up. Proceedings of the 2023 IEEE International Systems Conference (SysCon), Vancouver, BC, Canada.","DOI":"10.1109\/SysCon53073.2023.10131053"},{"key":"ref_59","doi-asserted-by":"crossref","first-page":"74","DOI":"10.1016\/j.procir.2014.05.034","article-title":"Increasing Ramp-up Performance By Implementing the Gamification Approach","volume":"20","author":"Kampker","year":"2014","journal-title":"Procedia CIRP"},{"key":"ref_60","doi-asserted-by":"crossref","first-page":"4577","DOI":"10.1080\/00207540050205316","article-title":"Pilot production and manufacturing start-up: The case of Volvo S80","volume":"38","author":"Almgren","year":"2000","journal-title":"Int. J. Prod. Res."},{"key":"ref_61","unstructured":"J\u00fcrging, J., and Milling, P.M. (2024, October 07). Manufacturing Start-Ups in the Automobile Industry. Available online: https:\/\/proceedings.systemdynamics.org\/2006\/proceed\/papers\/JUERG310.pdf."},{"key":"ref_62","doi-asserted-by":"crossref","first-page":"755","DOI":"10.1177\/0954405416654416","article-title":"Overview of ramp-up curves: A literature review and new challenges","volume":"232","author":"Viles","year":"2018","journal-title":"Proc. Inst. Mech. Eng. Part B J. Eng. Manuf."},{"key":"ref_63","doi-asserted-by":"crossref","first-page":"122","DOI":"10.1016\/j.procir.2016.05.098","article-title":"Modeling of Manufacturing Technologies During Ramp-up","volume":"51","author":"Klocke","year":"2016","journal-title":"Procedia CIRP"},{"key":"ref_64","doi-asserted-by":"crossref","first-page":"187","DOI":"10.1016\/j.cirpj.2017.09.008","article-title":"Stabilizing production ramp-up by modeling uncertainty for product design verification using Dempster\u2013Shafer theory","volume":"23","author":"Kukulies","year":"2018","journal-title":"CIRP J. Manuf. Sci. Technol."},{"key":"ref_65","unstructured":"Gartzen, T. (2012). Diskrete Migration als Anlaufstrategie f\u00fcr Montagesysteme, Apprimus."},{"key":"ref_66","doi-asserted-by":"crossref","first-page":"535","DOI":"10.1108\/JMTM-03-2015-0017","article-title":"Characteristics of product introduction process in low-volume manufacturing industries","volume":"27","author":"Javadi","year":"2016","journal-title":"J. Manuf. Technol. Manag."},{"key":"ref_67","doi-asserted-by":"crossref","first-page":"134","DOI":"10.1016\/j.procir.2016.06.088","article-title":"Potentials of Factory Standards in Production Ramp-Ups","volume":"51","author":"Dannapfel","year":"2016","journal-title":"Procedia CIRP"},{"key":"ref_68","doi-asserted-by":"crossref","first-page":"34","DOI":"10.1080\/09537287.2020.1711980","article-title":"Production ramp-up in European automotive production systems: A performance analysis","volume":"32","author":"Viles","year":"2021","journal-title":"Prod. Plan. Control"},{"key":"ref_69","doi-asserted-by":"crossref","first-page":"183","DOI":"10.1016\/S0736-5845(02)00078-9","article-title":"Cycle time management during production ramp-up","volume":"19","author":"Haller","year":"2003","journal-title":"Robot. Comput. Manuf."},{"key":"ref_70","doi-asserted-by":"crossref","first-page":"41","DOI":"10.1016\/S0272-6963(99)00014-5","article-title":"The economics of yield-driven processes","volume":"18","author":"Bohn","year":"1999","journal-title":"J. Oper. Manag."},{"key":"ref_71","unstructured":"Jackson, M.C. (2003). Systems Thinking: Creative Holism for Managers, Wiley."},{"key":"ref_72","unstructured":"Zeugtr\u00e4ger, K. (1998). Anlaufmanagement f\u00fcr Gro\u00dfanlagen, VDI."},{"key":"ref_73","unstructured":"Nakajima, S. (1988). Introduction to TPM: Total Productive Maintenance, Productivity Press."},{"key":"ref_74","doi-asserted-by":"crossref","unstructured":"Chatzimichali, A.P., and Tourassis, V.D. (2011, January 9\u201312). Hierarchies of adaptable learning during product development. Proceedings of the 2011 IEEE International Conference on Systems, Man and Cybernetics\u2014SMC, Anchorage, AK, USA.","DOI":"10.1109\/ICSMC.2011.6083708"}],"container-title":["Systems"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.mdpi.com\/2079-8954\/12\/12\/575\/pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,10,10]],"date-time":"2025-10-10T16:54:58Z","timestamp":1760115298000},"score":1,"resource":{"primary":{"URL":"https:\/\/www.mdpi.com\/2079-8954\/12\/12\/575"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2024,12,18]]},"references-count":74,"journal-issue":{"issue":"12","published-online":{"date-parts":[[2024,12]]}},"alternative-id":["systems12120575"],"URL":"https:\/\/doi.org\/10.3390\/systems12120575","relation":{},"ISSN":["2079-8954"],"issn-type":[{"value":"2079-8954","type":"electronic"}],"subject":[],"published":{"date-parts":[[2024,12,18]]}}}