{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,22]],"date-time":"2026-04-22T07:08:11Z","timestamp":1776841691367,"version":"3.51.2"},"reference-count":69,"publisher":"MDPI AG","issue":"2","license":[{"start":{"date-parts":[[2025,1,31]],"date-time":"2025-01-31T00:00:00Z","timestamp":1738281600000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Systems"],"abstract":"<jats:p>Digital tools are transforming the construction industry, reshaping how projects are designed, managed, and delivered. Building Information Modeling (BIM), a cornerstone of this transformation, requires a systemic approach because its implementation spans several organization functions, involves multiple stakeholders, and encompasses all phases of the project life cycle. While extensive literature examines BIM adoption, there is no consensus on its key enablers and barriers nor a ranking of their impact on implementation success. This study investigates the system-level critical success factors (CSFs) for BIM adoption in construction management. First, it reviews earlier literature, identifying 18 CSFs across six dimensions: change management, process efficiency, regulatory compliance, strategic alignment, technology integration, and user training and support. Next, it utilizes the AHP method to rank the CSFs based on the data collected from 31 construction professionals. Results highlight the importance of aligning BIM initiatives with organizational strategies, streamlining workflows, fostering collaboration, and ensuring compliance with evolving regulations. The research concludes that effective BIM implementation requires holistic strategies that emphasize leadership, scalable technology integration, comprehensive training, and adaptability. By addressing these system-level CSFs, organizations can enhance efficiency, drive innovation, and strengthen resilience in an evolving construction landscape.<\/jats:p>","DOI":"10.3390\/systems13020094","type":"journal-article","created":{"date-parts":[[2025,2,4]],"date-time":"2025-02-04T05:13:43Z","timestamp":1738646023000},"page":"94","update-policy":"https:\/\/doi.org\/10.3390\/mdpi_crossmark_policy","source":"Crossref","is-referenced-by-count":7,"title":["System-Level Critical Success Factors for BIM Implementation in Construction Management: An AHP Approach"],"prefix":"10.3390","volume":"13","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-1150-9211","authenticated-orcid":false,"given":"Filippo Maria","family":"Ottaviani","sequence":"first","affiliation":[{"name":"Department of Management and Production Engineering, Polytechnic University of Turin, 10129 Turin, Italy"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-0996-6739","authenticated-orcid":false,"given":"Giovanni","family":"Zenezini","sequence":"additional","affiliation":[{"name":"Department of Management and Production Engineering, Polytechnic University of Turin, 10129 Turin, Italy"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0009-0001-0360-5190","authenticated-orcid":false,"given":"Francesca","family":"Saba","sequence":"additional","affiliation":[{"name":"Department of Management and Production Engineering, Polytechnic University of Turin, 10129 Turin, Italy"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-4145-2287","authenticated-orcid":false,"given":"Alberto","family":"De Marco","sequence":"additional","affiliation":[{"name":"Department of Management and Production Engineering, Polytechnic University of Turin, 10129 Turin, Italy"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Lorenzo","family":"Gavinelli","sequence":"additional","affiliation":[{"name":"ESCP Business School, Turin Campus, 10123 Turin, Italy"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"1968","published-online":{"date-parts":[[2025,1,31]]},"reference":[{"key":"ref_1","doi-asserted-by":"crossref","first-page":"3267","DOI":"10.1108\/ECAM-12-2020-1072","article-title":"Critical success factors for BIM adoption during construction phase: A Singapore case study","volume":"29","author":"Liu","year":"2022","journal-title":"Eng. Constr. Archit. Manag."},{"key":"ref_2","doi-asserted-by":"crossref","first-page":"1838","DOI":"10.1108\/ECAM-05-2018-0204","article-title":"Critical success factors for building information modelling (BIM) implementation in Hong Kong","volume":"26","author":"Chan","year":"2019","journal-title":"Eng. Constr. Archit. Manag."},{"key":"ref_3","doi-asserted-by":"crossref","first-page":"103564","DOI":"10.1016\/j.autcon.2021.103564","article-title":"A BIM-data mining integrated digital twin framework for advanced project management","volume":"124","author":"Pan","year":"2021","journal-title":"Autom. Constr."},{"key":"ref_4","doi-asserted-by":"crossref","unstructured":"Diaz Schery, C.A., Caiado, R.G.G., Aguilar Vargas, S., and Rodriguez Vignon, Y. (2024). Paths to BIM-based digital transformation: A bibliometric and systematic review of critical factors. Eng. Constr. Archit. Manag.","DOI":"10.1108\/ECAM-12-2023-1230"},{"key":"ref_5","doi-asserted-by":"crossref","first-page":"5369","DOI":"10.1007\/s00170-023-12660-y","article-title":"A method for developing and validating simulation models for automated storage and retrieval system digital twins","volume":"131","author":"Ferrari","year":"2024","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"ref_6","doi-asserted-by":"crossref","unstructured":"Abdelalim, A.M., Shawky, K., Alnaser, A.A., Shibeika, A., and Sherif, A. (2024). Developing Standard BIM Execution Plans for Complex Construction Projects. Appl. Sci., 14.","DOI":"10.20944\/preprints202405.1858.v1"},{"key":"ref_7","doi-asserted-by":"crossref","first-page":"185","DOI":"10.1016\/S0263-7863(01)00067-9","article-title":"The \u201creal\u201d success factors on projects","volume":"20","year":"2002","journal-title":"Int. J. Proj. Manag."},{"key":"ref_8","unstructured":"Frick, J., and Laugen, B.T. (2011, January 26\u201328). Boundaries Matter\u2014The Pros and Cons of Vertical Integration in BIM Implementation. Proceedings of the Advances in Production Management Systems. Value Networks: Innovation, Technologies, and Management, Stavanger, Norway."},{"key":"ref_9","doi-asserted-by":"crossref","first-page":"04016054","DOI":"10.1061\/(ASCE)ME.1943-5479.0000505","article-title":"Critical Success Factors of Building Information Modeling Implementation","volume":"33","author":"Ozorhon","year":"2017","journal-title":"J. Manag. Eng."},{"key":"ref_10","doi-asserted-by":"crossref","unstructured":"Gunduz, M., and Almuajebh, M. (2020). Critical Success Factors for Sustainable Construction Project Management. Sustainability, 12.","DOI":"10.3390\/su12051990"},{"key":"ref_11","first-page":"33","article-title":"Bim Critical Success Factors in Different Life-Cycle Phases: A Review Exploring the Technology, People, and Process Bim Categories","volume":"10","author":"Melhado","year":"2022","journal-title":"J. Mod. Proj. Manag."},{"key":"ref_12","doi-asserted-by":"crossref","first-page":"100","DOI":"10.1016\/j.autcon.2018.03.010","article-title":"Critical success factors for implementing building information modelling (BIM): A longitudinal review","volume":"91","author":"Li","year":"2018","journal-title":"Autom. Constr."},{"key":"ref_13","doi-asserted-by":"crossref","first-page":"08002","DOI":"10.1051\/e3sconf\/202016408002","article-title":"The implementation of BIM in construction projects","volume":"164","author":"Sinenko","year":"2020","journal-title":"E3S Web Conf."},{"key":"ref_14","first-page":"146","article-title":"Exploring the status, benefits, barriers and opportunities of using BIM for advancing prefabrication practice","volume":"20","author":"Mostafa","year":"2020","journal-title":"Int. J. Constr. Manag."},{"key":"ref_15","first-page":"537","article-title":"Critical success factors for adopting building information modelling (BIM) and lean construction practices on construction mega-projects: A Delphi survey","volume":"19","author":"Evans","year":"2021","journal-title":"J. Eng. Des. Technol."},{"key":"ref_16","doi-asserted-by":"crossref","unstructured":"Ali, K.N., Alhajlah, H.H., and Kassem, M.A. (2022). Collaboration and Risk in Building Information Modelling (BIM): A Systematic Literature Review. Buildings, 12.","DOI":"10.3390\/buildings12050571"},{"key":"ref_17","unstructured":"Macloughlin, S., and Hayes, E. (2019, January 26). Overcoming Resistance To BIM: Aligning A Change Management Method with A BIM Implementation Strategy. Proceedings of the CITA BIM Gathering 2019, Galway, Ireland."},{"key":"ref_18","doi-asserted-by":"crossref","first-page":"210","DOI":"10.1016\/j.proeng.2014.12.048","article-title":"Traditional Design versus BIM Based Design","volume":"91","author":"Czmoch","year":"2014","journal-title":"Procedia Eng."},{"key":"ref_19","doi-asserted-by":"crossref","first-page":"587","DOI":"10.1002\/sd.1925","article-title":"Critical success factors for implementing building information modeling and sustainability practices in construction projects: A Delphi survey","volume":"27","author":"Olawumi","year":"2019","journal-title":"Sustain. Dev."},{"key":"ref_20","doi-asserted-by":"crossref","first-page":"61","DOI":"10.1016\/j.sbspro.2014.10.041","article-title":"Determining Critical Success Factors of Project Management Practice: A Conceptual Framework","volume":"153","author":"Alias","year":"2014","journal-title":"Procedia Soc. Behav. Sci."},{"key":"ref_21","first-page":"80","article-title":"Critical success competencies for the BIM implementation process: UK construction clients","volume":"24","author":"Dakhil","year":"2019","journal-title":"J. Inf. Technol. Constr."},{"key":"ref_22","doi-asserted-by":"crossref","first-page":"2737","DOI":"10.1108\/ECAM-09-2019-0475","article-title":"Critical success factors for BIM implementation: A Malaysian case study","volume":"27","author":"Sinoh","year":"2020","journal-title":"Eng. Constr. Archit. Manag."},{"key":"ref_23","first-page":"188","article-title":"Critical Analysis of Linear and Nonlinear Project Duration Forecasting Methods","volume":"11","author":"Warburton","year":"2023","journal-title":"J. Mod. Proj. Manag."},{"key":"ref_24","doi-asserted-by":"crossref","unstructured":"AbuMoeilak, L., AlQuraidi, A., AlZarooni, A., and Beheiry, S. (2023). Critical Success Factors for Building Information Modeling Implementation as a Sustainable Construction Practice in the UAE. Buildings, 13.","DOI":"10.3390\/buildings13061406"},{"key":"ref_25","doi-asserted-by":"crossref","first-page":"108556","DOI":"10.1016\/j.buildenv.2021.108556","article-title":"Modelling the relationship between Building Information Modelling (BIM) implementation barriers, usage and awareness on building project lifecycle","volume":"207","author":"Olanrewaju","year":"2022","journal-title":"Build. Environ."},{"key":"ref_26","doi-asserted-by":"crossref","first-page":"04022104","DOI":"10.1061\/(ASCE)CO.1943-7862.0002343","article-title":"BIM Critical-Success Factors in the Design Phase and Risk Management: Exploring Knowledge and Maturity Mediating Effect","volume":"148","author":"Vieira","year":"2022","journal-title":"J. Constr. Eng. Manag."},{"key":"ref_27","doi-asserted-by":"crossref","first-page":"512","DOI":"10.1108\/SASBE-06-2022-0124","article-title":"Embracing BIM in its totality: A Total BIM case study","volume":"13","author":"Disney","year":"2024","journal-title":"Smart Sustain. Built Environ."},{"key":"ref_28","doi-asserted-by":"crossref","unstructured":"Khosrowshahi, F. (2017). Building Information Modelling (BIM) a Paradigm Shift in Construction. Building Information Modelling, Building Performance, Design and Smart Construction, Springer International Publishing.","DOI":"10.1007\/978-3-319-50346-2_4"},{"key":"ref_29","doi-asserted-by":"crossref","first-page":"1878","DOI":"10.1108\/ECAM-11-2017-0246","article-title":"Adoption of building information modeling in Chinese construction industry","volume":"26","author":"Chen","year":"2019","journal-title":"Eng. Constr. Archit. Manag."},{"key":"ref_30","doi-asserted-by":"crossref","first-page":"84","DOI":"10.1016\/j.autcon.2014.03.009","article-title":"Beyond the BIM utopia: Approaches to the development and implementation of building information modeling","volume":"43","author":"Miettinen","year":"2014","journal-title":"Autom. Constr."},{"key":"ref_31","doi-asserted-by":"crossref","first-page":"988","DOI":"10.1016\/j.autcon.2010.09.002","article-title":"Understanding and facilitating BIM adoption in the AEC industry","volume":"19","author":"Gu","year":"2010","journal-title":"Autom. Constr."},{"key":"ref_32","doi-asserted-by":"crossref","first-page":"140","DOI":"10.1016\/j.autcon.2019.01.019","article-title":"Building Information Maturity Model specific to the renovation sector","volume":"101","author":"Joblot","year":"2019","journal-title":"Autom. Constr."},{"key":"ref_33","doi-asserted-by":"crossref","first-page":"241","DOI":"10.1061\/(ASCE)LM.1943-5630.0000127","article-title":"Building Information Modeling (BIM): Trends, Benefits, Risks, and Challenges for the AEC Industry","volume":"11","author":"Azhar","year":"2011","journal-title":"Leadersh. Manag. Eng."},{"key":"ref_34","doi-asserted-by":"crossref","first-page":"04018140","DOI":"10.1061\/(ASCE)CO.1943-7862.0001607","article-title":"Empirical Approach to Identify Operational Critical Success Factors for BIM Projects","volume":"145","author":"Hsieh","year":"2019","journal-title":"J. Constr. Eng. Manag."},{"key":"ref_35","doi-asserted-by":"crossref","first-page":"357","DOI":"10.1016\/j.autcon.2008.10.003","article-title":"Building information modelling framework: A research and delivery foundation for industry stakeholders","volume":"18","author":"Succar","year":"2009","journal-title":"Autom. Constr."},{"key":"ref_36","doi-asserted-by":"crossref","unstructured":"Sacks, R., Eastman, C., Lee, G., and Teicholz, P. (2018). BIM Handbook, Wiley.","DOI":"10.1002\/9781119287568"},{"key":"ref_37","doi-asserted-by":"crossref","first-page":"85","DOI":"10.1007\/s40999-020-00542-3","article-title":"Critical Success Factors and a Contractual Framework for Construction Projects Adopting Building Information Modeling in Vietnam","volume":"19","author":"Dao","year":"2021","journal-title":"Int. J. Civ. Eng."},{"key":"ref_38","doi-asserted-by":"crossref","unstructured":"Aladayleh, K.J., and Aladaileh, M.J. (2024). Applying Analytical Hierarchy Process (AHP) to BIM-Based Risk Management for Optimal Performance in Construction Projects. Buildings, 14.","DOI":"10.20944\/preprints202410.1783.v1"},{"key":"ref_39","doi-asserted-by":"crossref","first-page":"05021004","DOI":"10.1061\/(ASCE)CO.1943-7862.0002086","article-title":"Framework for Building Information Modeling Adoption Based on Critical Success Factors from Brazilian Public Organizations","volume":"147","author":"Ferreira","year":"2021","journal-title":"J. Constr. Eng. Manag."},{"key":"ref_40","first-page":"5","article-title":"KEY SUCCESS FACTORS OF IMPLEMENTATION OF BUILDING INFORMATION MODELING IN SLOVENIAN ORGANIZATIONS","volume":"13","author":"Gorenc","year":"2024","journal-title":"Dyn. Relatsh. Manag. J."},{"key":"ref_41","doi-asserted-by":"crossref","unstructured":"Tan, S., Gumusburun Ayalp, G., Tel, M.Z., Serter, M., and Metinal, Y.B. (2022). Modeling the Critical Success Factors for BIM Implementation in Developing Countries: Sampling the Turkish AEC Industry. Sustainability, 14.","DOI":"10.3390\/su14159537"},{"key":"ref_42","doi-asserted-by":"crossref","first-page":"1837","DOI":"10.14488\/BJOPM.1837.2023","article-title":"BIM critical factors and benefits for public sector","volume":"20","author":"Schery","year":"2023","journal-title":"Braz. J. Oper. Prod. Manag."},{"key":"ref_43","doi-asserted-by":"crossref","first-page":"04020014","DOI":"10.1061\/(ASCE)CO.1943-7862.0001773","article-title":"New Model for Identifying Critical Success Factors Influencing BIM Adoption from Precast Concrete Manufacturers\u2019 View","volume":"146","author":"Phang","year":"2020","journal-title":"J. Constr. Eng. Manag."},{"key":"ref_44","doi-asserted-by":"crossref","first-page":"201","DOI":"10.1108\/JFM-06-2021-0066","article-title":"Integrating building information modelling for improving facility management operations: A fuzzy synthetic evaluation of the critical success factors","volume":"21","author":"Oluleye","year":"2023","journal-title":"J. Facil. Manag."},{"key":"ref_45","doi-asserted-by":"crossref","first-page":"718","DOI":"10.1016\/j.ijproman.2010.07.005","article-title":"Measuring project complexity using the Analytic Hierarchy Process","volume":"29","author":"Vidal","year":"2011","journal-title":"Int. J. Proj. Manag."},{"key":"ref_46","first-page":"14336","article-title":"Review of the main developments in the analytic hierarchy process","volume":"38","author":"Ishizaka","year":"2011","journal-title":"Expert Syst. Appl."},{"key":"ref_47","doi-asserted-by":"crossref","first-page":"e40824","DOI":"10.1016\/j.heliyon.2024.e40824","article-title":"Enhancing strategic decision-making in built asset management through BIM-Enabled asset information modelling (AIM) for public buildings in Ethiopia: A fuzzy-AHP analysis","volume":"10","author":"Desbalo","year":"2024","journal-title":"Heliyon"},{"key":"ref_48","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1007\/s11518-006-0151-5","article-title":"Decision making\u2014The Analytic Hierarchy and Network Processes (AHP\/ANP)","volume":"13","author":"Saaty","year":"2004","journal-title":"J. Syst. Sci. Syst. Eng."},{"key":"ref_49","doi-asserted-by":"crossref","first-page":"1011","DOI":"10.1016\/j.autcon.2009.07.002","article-title":"Automatic rule-based checking of building designs","volume":"18","author":"Eastman","year":"2009","journal-title":"Autom. Constr."},{"key":"ref_50","doi-asserted-by":"crossref","first-page":"522","DOI":"10.1016\/j.autcon.2009.11.003","article-title":"Value proposition on interoperability of BIM and collaborative working environments","volume":"19","author":"Grilo","year":"2010","journal-title":"Autom. Constr."},{"key":"ref_51","doi-asserted-by":"crossref","first-page":"1265","DOI":"10.3390\/buildings5041265","article-title":"Evaluating the Alignment of Organizational and Project Contexts for BIM Adoption: A Case Study of a Large Owner Organization","volume":"5","author":"Cavka","year":"2015","journal-title":"Buildings"},{"key":"ref_52","doi-asserted-by":"crossref","first-page":"51","DOI":"10.1016\/j.autcon.2014.10.004","article-title":"Development of an object model for automated compliance checking","volume":"49","author":"Malsane","year":"2015","journal-title":"Autom. Constr."},{"key":"ref_53","doi-asserted-by":"crossref","unstructured":"Sacks, R., Bloch, T., Katz, M., and Yosef, R. (2019, January 17\u201319). Automating Design Review with Artificial Intelligence and BIM: State of the Art and Research Framework. Proceedings of the ASCE International Conference on Computing in Civil Engineering 2019: Visualization, Information Modeling, and Simulation, Atlanta, GA, USA.","DOI":"10.1061\/9780784482421.045"},{"key":"ref_54","doi-asserted-by":"crossref","unstructured":"Sepasgozar, S.M.E., Hui, F.K.P., Shirowzhan, S., Foroozanfar, M., Yang, L., and Aye, L. (2020). Lean Practices Using Building Information Modeling (BIM) and Digital Twinning for Sustainable Construction. Sustainability, 13.","DOI":"10.3390\/su13010161"},{"key":"ref_55","doi-asserted-by":"crossref","unstructured":"Wu, K., and Tang, S. (2022). BIM-Assisted Workflow Enhancement for Architecture Preliminary Design. Buildings, 12.","DOI":"10.3390\/buildings12050601"},{"key":"ref_56","doi-asserted-by":"crossref","first-page":"606","DOI":"10.1108\/CI-12-2021-0245","article-title":"Examining the effect of interoperability factors on building information modelling (BIM) adoption in Malaysia","volume":"24","author":"Ahmed","year":"2024","journal-title":"Constr. Innov."},{"key":"ref_57","doi-asserted-by":"crossref","first-page":"968","DOI":"10.1061\/(ASCE)CO.1943-7862.0000203","article-title":"Interaction of Lean and Building Information Modeling in Construction","volume":"136","author":"Sacks","year":"2010","journal-title":"J. Constr. Eng. Manag."},{"key":"ref_58","doi-asserted-by":"crossref","first-page":"431","DOI":"10.1061\/(ASCE)CO.1943-7862.0000433","article-title":"Application Areas and Data Requirements for BIM-Enabled Facilities Management","volume":"138","author":"Jazizadeh","year":"2012","journal-title":"J. Constr. Eng. Manag."},{"key":"ref_59","doi-asserted-by":"crossref","first-page":"173","DOI":"10.1016\/j.autcon.2012.09.008","article-title":"A knowledge-based BIM system for building maintenance","volume":"29","author":"Motawa","year":"2013","journal-title":"Autom. Constr."},{"key":"ref_60","doi-asserted-by":"crossref","first-page":"103086","DOI":"10.1016\/j.autcon.2020.103086","article-title":"BIM compatibility and its differentiation with interoperability challenges as an innovation factor","volume":"112","author":"Shirowzhan","year":"2020","journal-title":"Autom. Constr."},{"key":"ref_61","first-page":"466","article-title":"Improving the Design Process Quality Using BIM: A Case Study","volume":"Volume 98","author":"Domingues","year":"2021","journal-title":"Proceedings of the 18th International Conference on Computing in Civil and Building Engineering. ICCCBE 2020"},{"key":"ref_62","doi-asserted-by":"crossref","first-page":"59","DOI":"10.1016\/j.autcon.2015.02.014","article-title":"Using social network theory and simulation to compare traditional versus BIM\u2013lean practice for design error management","volume":"52","author":"Hamzeh","year":"2015","journal-title":"Autom. Constr."},{"key":"ref_63","doi-asserted-by":"crossref","first-page":"248","DOI":"10.1016\/j.autcon.2018.11.031","article-title":"Site logistics planning and control for engineer-to-order prefabricated building systems using BIM 4D modeling","volume":"98","author":"Bortolini","year":"2019","journal-title":"Autom. Constr."},{"key":"ref_64","unstructured":"Sackey, E., Tuuli, M.M., and Dainty, A. (2013, January 3\u20135). Bim Implementation: From Capability Maturity Models To Implementation Strategy. Proceedings of the Sustainable Building and Construction Conference 2013, Coventry, UK."},{"key":"ref_65","doi-asserted-by":"crossref","unstructured":"Semaan, J., Underwood, J., and Hyde, J. (2021). An Investigation of Work-Based Education and Training Needs for Effective BIM Adoption and Implementation: An Organisational Upskilling Model. Appl. Sci., 11.","DOI":"10.3390\/app11188646"},{"key":"ref_66","doi-asserted-by":"crossref","unstructured":"Rajabi, M.S., Radzi, A.R., Rezaeiashtiani, M., Famili, A., Rashidi, M.E., and Rahman, R.A. (2022). Key Assessment Criteria for Organizational BIM Capabilities: A Cross-Regional Study. Buildings, 12.","DOI":"10.3390\/buildings12071013"},{"key":"ref_67","first-page":"596","article-title":"Unveiling Bim Core: Enhancing Long-Term Usability of Digital Building Documentation With an Advanced Representation Information Repository","volume":"29","author":"Borghoff","year":"2024","journal-title":"J. Inf. Technol. Constr."},{"key":"ref_68","doi-asserted-by":"crossref","first-page":"64","DOI":"10.1016\/j.autcon.2015.04.018","article-title":"Macro-BIM adoption: Conceptual structures","volume":"57","author":"Succar","year":"2015","journal-title":"Autom. Constr."},{"key":"ref_69","doi-asserted-by":"crossref","unstructured":"Patel, T., Bapat, H., Patel, D., and van der Walt, J.D. (2021). Identification of Critical Success Factors (CSFs) of BIM Software Selection: A Combined Approach of FCM and Fuzzy DEMATEL. Buildings, 11.","DOI":"10.3390\/buildings11070311"}],"container-title":["Systems"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.mdpi.com\/2079-8954\/13\/2\/94\/pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,10,9]],"date-time":"2025-10-09T16:25:13Z","timestamp":1760027113000},"score":1,"resource":{"primary":{"URL":"https:\/\/www.mdpi.com\/2079-8954\/13\/2\/94"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2025,1,31]]},"references-count":69,"journal-issue":{"issue":"2","published-online":{"date-parts":[[2025,2]]}},"alternative-id":["systems13020094"],"URL":"https:\/\/doi.org\/10.3390\/systems13020094","relation":{},"ISSN":["2079-8954"],"issn-type":[{"value":"2079-8954","type":"electronic"}],"subject":[],"published":{"date-parts":[[2025,1,31]]}}}