{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,8,26]],"date-time":"2026-08-26T23:04:50Z","timestamp":1787785490089,"version":"build-2784847793"},"reference-count":26,"publisher":"MDPI AG","issue":"5","license":[{"start":{"date-parts":[[2025,5,19]],"date-time":"2025-05-19T00:00:00Z","timestamp":1747612800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0\/"}],"funder":[{"DOI":"10.13039\/501100006360","name":"German Federal Ministry of Economics and Climate Protection","doi-asserted-by":"publisher","award":["16BZF311"],"award-info":[{"award-number":["16BZF311"]}],"id":[{"id":"10.13039\/501100006360","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Systems"],"abstract":"<jats:p>The current research presents an extension of the Pit-Stop Manufacturing framework. It addresses the challenges of managing complexity and uncertainty in the production ramp-up phase of manufacturing systems, bridging the gap in existing approaches that lack comprehensive, quantitative, and system-level solutions. This research integrates state-of-the-art methodologies, utilising such metrics as Overall Equipment Effectiveness and Effective Throughput Loss to enhance ramp-up management. The developed framework is represented by a conceptual model, which is translated into a digital product combining multiple artefacts for comprehensive ramp-up research, namely a digital twin of the production system, a Custom Experiment Manager for multiple simulation runs, and a Graph Solver that uses the stochastic dynamic programming approach to address the decision-making issues during the production system ramp-up evolution. This work provides a robust decision-support tool to optimise production transitions under dynamic conditions by combining stochastic dynamic programming and discrete event simulation. The framework enables manufacturers to model, simulate, and optimise system evolution, reducing throughput losses, improving equipment efficiency, and enhancing decision-making precision. This paper demonstrates the framework\u2019s potential to streamline ramp-up processes and boost competitiveness in volatile manufacturing environments.<\/jats:p>","DOI":"10.3390\/systems13050393","type":"journal-article","created":{"date-parts":[[2025,5,19]],"date-time":"2025-05-19T11:54:26Z","timestamp":1747655666000},"page":"393","update-policy":"https:\/\/doi.org\/10.3390\/mdpi_crossmark_policy","source":"Crossref","is-referenced-by-count":2,"title":["Pit-Stop Manufacturing: Decision Support for Complexity and Uncertainty Management in Production Ramp-Up Planning"],"prefix":"10.3390","volume":"13","author":[{"ORCID":"https:\/\/orcid.org\/0000-0001-9794-2499","authenticated-orcid":false,"given":"Oleksandr","family":"Melnychuk","sequence":"first","affiliation":[{"name":"Laboratory for Machine Tools and Production Engineering (WZL), RWTH Aachen University, Campus-Boulevard 30, 52074 Aachen, Germany"},{"name":"Department of Mechanical Engineering, Politecnico di Milano, Via La Masa 1, 20133 Milano, Italy"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-1695-2308","authenticated-orcid":false,"given":"Jonas","family":"Baum","sequence":"additional","affiliation":[{"name":"Laboratory for Machine Tools and Production Engineering (WZL), RWTH Aachen University, Campus-Boulevard 30, 52074 Aachen, Germany"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Amon","family":"G\u00f6ppert","sequence":"additional","affiliation":[{"name":"Laboratory for Machine Tools and Production Engineering (WZL), RWTH Aachen University, Campus-Boulevard 30, 52074 Aachen, Germany"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Robert H.","family":"Schmitt","sequence":"additional","affiliation":[{"name":"Laboratory for Machine Tools and Production Engineering (WZL), RWTH Aachen University, Campus-Boulevard 30, 52074 Aachen, Germany"},{"name":"Fraunhofer Institute for Production Technology (IPT), Steinbachstra\u00dfe 17, 52074 Aachen, Germany"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Tullio","family":"Tolio","sequence":"additional","affiliation":[{"name":"Department of Mechanical Engineering, Politecnico di Milano, Via La Masa 1, 20133 Milano, Italy"}],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"1968","published-online":{"date-parts":[[2025,5,19]]},"reference":[{"key":"ref_1","doi-asserted-by":"crossref","first-page":"617","DOI":"10.1108\/JAOC-05-2020-0060","article-title":"An empirical study of sustainability reporting assurance: Current trends and new insights","volume":"18","author":"Alsahali","year":"2022","journal-title":"J. Account. Organ. Change"},{"key":"ref_2","doi-asserted-by":"crossref","unstructured":"Mura, P.O., and Donath, L.E. (2023). Digitalisation and Economic Growth in the European Union. Electronics, 12.","DOI":"10.3390\/electronics12071718"},{"key":"ref_3","doi-asserted-by":"crossref","first-page":"93","DOI":"10.1016\/j.procir.2014.03.154","article-title":"Solution Principles for Managing Instabilities in Ramp-up","volume":"20","author":"Basse","year":"2014","journal-title":"Procedia CIRP"},{"key":"ref_4","doi-asserted-by":"crossref","first-page":"197","DOI":"10.1016\/j.cirpj.2018.07.001","article-title":"Production quality improvement during manufacturing systems ramp-up","volume":"23","author":"Colledani","year":"2018","journal-title":"CIRP J. Manuf. Sci. Technol."},{"key":"ref_5","doi-asserted-by":"crossref","unstructured":"Monostori, L., Majstorovic, V.D., Hu, S.J., and Djurdjanovic, D. (2019, January 3\u20136). The Paradigm of Pit\u2014Stop Manufacturing. Proceedings of the 4th International Conference on the Industry 4.0 Model for Advanced Manufacturing, Belgrade, Serbia.","DOI":"10.1007\/978-3-030-18180-2"},{"key":"ref_6","doi-asserted-by":"crossref","first-page":"966","DOI":"10.1016\/j.procir.2022.05.093","article-title":"Evaluation of Material Shortage Effect on Assembly Systems Considering Flexibility Levels","volume":"107","author":"Melnychuk","year":"2022","journal-title":"Procedia CIRP"},{"key":"ref_7","doi-asserted-by":"crossref","first-page":"85","DOI":"10.1016\/j.ejor.2013.02.051","article-title":"A framework for performance measurement during production ramp-up of assembly stations","volume":"229","author":"Doltsinis","year":"2013","journal-title":"Eur. J. Oper. Res."},{"key":"ref_8","doi-asserted-by":"crossref","first-page":"187","DOI":"10.1016\/j.cirpj.2017.09.008","article-title":"Stabilizing production ramp-up by modeling uncertainty for product design verification using Dempster\u2013Shafer theory","volume":"23","author":"Kukulies","year":"2018","journal-title":"CIRP J. Manuf. Sci. Technol."},{"key":"ref_9","unstructured":"Kr\u00fcger, J. (2005, January 9\u201311). OEE Simulation in Production Ramp-up. Proceedings of the 3rd International Industrial Simulation Conference 2005: ISC 2005, Berlin, Germany."},{"key":"ref_10","doi-asserted-by":"crossref","first-page":"3517","DOI":"10.1080\/00207540601142645","article-title":"Performance measurement using overall equipment effectiveness (OEE): Literature review and practical application discussion","volume":"46","author":"Muchiri","year":"2008","journal-title":"Int. J. Prod. Res."},{"key":"ref_11","doi-asserted-by":"crossref","unstructured":"Nee, A.Y.C., Song, B., and Ong, S.-K. (2013). Lifecycle Oriented Ramp-Up\u2014Conception of a Quality-Oriented Process Model. Re-Engineering Manufacturing for Sustainability, Springer.","DOI":"10.1007\/978-981-4451-48-2"},{"key":"ref_12","doi-asserted-by":"crossref","first-page":"217","DOI":"10.1016\/j.cirpj.2018.03.001","article-title":"On the future of ramp-up management","volume":"23","author":"Schmitt","year":"2018","journal-title":"CIRP J. Manuf. Sci. Technol."},{"key":"ref_13","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/S0925-5273(00)00045-1","article-title":"Learning and process improvement during production ramp-up","volume":"70","author":"Terwiesch","year":"2001","journal-title":"Int. J. Prod. Econ."},{"key":"ref_14","doi-asserted-by":"crossref","first-page":"61","DOI":"10.1016\/j.cie.2014.04.017","article-title":"The effect of system configuration and ramp-up time on manufacturing system acquisition under uncertain demand","volume":"73","author":"Niroomand","year":"2014","journal-title":"Comput. Ind. Eng."},{"key":"ref_15","doi-asserted-by":"crossref","first-page":"6637","DOI":"10.1080\/00207543.2015.1064185","article-title":"Decision support models for production ramp-up: A systematic literature review","volume":"53","author":"Glock","year":"2015","journal-title":"Int. J. Prod. Res."},{"key":"ref_16","doi-asserted-by":"crossref","first-page":"178","DOI":"10.1108\/17410380910929619","article-title":"Information enabling production ramp-up","volume":"20","author":"Harlin","year":"2009","journal-title":"J. Manuf. Technol. Manag."},{"key":"ref_17","doi-asserted-by":"crossref","first-page":"521","DOI":"10.1016\/j.procir.2020.05.090","article-title":"Artificial intelligence based decision model for a quality oriented production ramp-up","volume":"88","author":"Ngo","year":"2020","journal-title":"Procedia CIRP"},{"key":"ref_18","doi-asserted-by":"crossref","first-page":"2133","DOI":"10.1007\/s10845-021-01860-6","article-title":"Pipeline for ontology-based modeling and automated deployment of digital twins for planning and control of manufacturing systems","volume":"34","author":"Grahn","year":"2023","journal-title":"J. Intell. Manuf."},{"key":"ref_19","doi-asserted-by":"crossref","first-page":"216","DOI":"10.1016\/j.ejor.2016.09.040","article-title":"A rollout algorithm framework for heuristic solutions to finite-horizon stochastic dynamic programs","volume":"258","author":"Goodson","year":"2017","journal-title":"Eur. J. Oper. Res."},{"key":"ref_20","doi-asserted-by":"crossref","first-page":"3657","DOI":"10.1080\/00207540701837029","article-title":"A stochastic dynamic programming based model for uncertain production planning of re-manufacturing system","volume":"47","author":"Li","year":"2009","journal-title":"Int. J. Prod. Res."},{"key":"ref_21","doi-asserted-by":"crossref","first-page":"2418","DOI":"10.1016\/j.cor.2008.09.009","article-title":"On stochastic dynamic programming for solving large-scale planning problems under uncertainty","volume":"36","author":"Cristobal","year":"2009","journal-title":"Comput. Oper. Res."},{"key":"ref_22","doi-asserted-by":"crossref","first-page":"9","DOI":"10.12688\/digitaltwin.17489.1","article-title":"Digital twin-driven complexity management in intelligent manufacturing","volume":"1","author":"Wang","year":"2021","journal-title":"Digit. Twin"},{"key":"ref_23","doi-asserted-by":"crossref","unstructured":"Kahlen, F.-J., Flumerfelt, S., and Alves, A. (2017). Digital Twin: Mitigating Unpredictable, Undesirable Emergent Behavior in Complex Systems. Transdisciplinary Perspectives on Complex Systems, Springer International Publishing.","DOI":"10.1007\/978-3-319-38756-7"},{"key":"ref_24","unstructured":"Hansen, R.C. (2001). Overall Equipment Effectiveness: A Powerful Production\/Maintenance Tool for Increased Profits, Industrial Press Inc."},{"key":"ref_25","unstructured":"Conway, R.W., Maxwell, W.L., and Miller, L.W. (2003). Theory of Scheduling, Dover."},{"key":"ref_26","unstructured":"Rabe, M., Spiekermann, S., and Wenzel, S. (2008). Verifikation und Validierung f\u00fcr die Simulation in Produktion und Logistik, Springer."}],"container-title":["Systems"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.mdpi.com\/2079-8954\/13\/5\/393\/pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,10,9]],"date-time":"2025-10-09T17:35:23Z","timestamp":1760031323000},"score":1,"resource":{"primary":{"URL":"https:\/\/www.mdpi.com\/2079-8954\/13\/5\/393"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2025,5,19]]},"references-count":26,"journal-issue":{"issue":"5","published-online":{"date-parts":[[2025,5]]}},"alternative-id":["systems13050393"],"URL":"https:\/\/doi.org\/10.3390\/systems13050393","relation":{},"ISSN":["2079-8954"],"issn-type":[{"value":"2079-8954","type":"electronic"}],"subject":[],"published":{"date-parts":[[2025,5,19]]}}}